A02._SOW_-_Appendix_A_-_Drawing_Set_Reduced.pdf
PDF 23 MB Posted
- Solicitation number
- W912P919T0045
About this file
Appendix A - Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A12._Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
N O
A N
S I
D
E-101
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
E L E
C T
R
IC
A L
NOT TO SCALEA1
GENERAL SHEET NOTES
D
R G
SHEET KEYNOTES
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
E -1
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
D M
C
B R
A N
D O
N B L E
W
IS
P .E
M C
P L
A N V
IE
W
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
OVERALL SITE PLAN IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
O V
E R
A L L S
IT
E P
L A
N
A1
E-102
KEY LOCKED GATE TO SPILLWAY4.
KEY LOCKED GATE TO ACCESS ROAD3.
KEY LOCKED GATE TO GALLERY2.
KEY LOCKED GATE TO CONTRACTOR STAGING AREA1.
N
SEE DRAWING E-102 AND E-103 FOR DETAILED SITE PLAN.2.
GOVERNMENT.
DISCONNECTED FROM THE POWER SOURCE BY THE
SPECIFICATIONS. ALL CABLING WILL BE PREVIOUSLY
THIS DRAWING SET AND AS DETAILED IN THE
SYSTEM, JUNCTION BOXES, AND CABLING AS SHOWN IN
REMOVE AND DISPOSE OF THE EXISTING CONDUIT
AND ACCESS CONTROL POINTS. CONTRACTOR SHALL
OVERALL SITE PLAN SHOWS CONTRACTOR STAGING AREA 1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
IO
A N
S I
D
E-102
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
E L E
C T
R
IC
A L
G
SHEET KEYNOTES
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
E -1
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
D M
C
B R
A N
D O
N B L E
W
IS
P
C
P L
A N V
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
DETAILED SITE PLAN IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
D E
T A
IL
E D S
IT
E P
L A
N
N
ON THE SPILLWAY WALL.
CONDUITS THAT SPAN ACROSS CONSTRUCTION JOINTS
6. NEW EXPANSION FITTINGS SHALL BE INSTALLED ON ANY
PROVIDE EARTH GROUND TO EACH LAB-3 MODULE.
AS SHOWN ON THIS DRAWING. #4 AWG GROUND SHALL
SHALL BE LOCATED AT THE PAD MOUNTED ENCLOSURE
MULTIPLEXER JUNCTION BOX. ANOTHER GROUND ROD
TO A 3/4”X 10’ COPPER GROUND ROD LOCATED AT THE
A #4 AWG BARE COPPER GROUND SHALL BE CONNECTED 5.
MULTIPLEXER JUNCTION BOX.
MODULE BUT LEAVE UNTERMINATED AT THE
CONTRACTOR SHALL TERMINATE CABLES AT EACH LAB-3
MULTIPLEXER JUNCTION BOX TO EACH LAB-3 MODULE.
EQUAL. CABLES SHALL BE CONTINUOUS FROM THE
4-CONDUCTOR, 2 TWISTED PAIR, #22 AWG, OR APPROVED
TO EACH PIEZOMETER SHALL BE GEOKON 02-250V6
NEW CABLING FROM THE MULTIPLEXER JUNCTION BOX 4.
ON THIS DRAWING.
MOUNTED INSIDE A NEMA 4X JUNCTION BOX AS SHOWN
ENCLOSURE AND GROUND LUG. LAB-3 MODULE SHALL BE
AND INSTALL A GEOKON LAB-3 LIGHTING ARRESTOR WITH
FOR EACH PIEZOMETER, CONTRACTOR SHALL SUPPLY 3.
WATERTIGHT.
ALL CONDUIT FITTINGS AND CONNECTIONS SHALL BE
SCHEDULE 40 AND BURIED A MINIMUM OF 18 INCHES DEEP.
CONDUIT TO BE TRENCHED UNDERGROUND SHALL BE PVC
THE PIEZOMETER. CAP SHALL BE PROVIDED ON T-FITTING.
TO PERMIT UNOBSTRUCTED STRAIGHT DOWN ACCESS TO
FOR CONNECTION TO THE EXISTING PIEZOMETER CONDUIT
THE PIEZOMETER RISER PIPE. A T-FITTING SHALL BE USED
CONDUIT SHALL BE USED FROM THE JUNCTION BOX TO
MINIMUM PERMITTED. LIQUID TIGHT FLEXIBLE METAL
SIZED AS SHOWN ON THIS DRAWING. SIZE SHOWN IS THE
NEW CONDUIT SHALL BE RIGID GALVANIZED STEEL (RGS), 2.
ON THIS DRAWING FOR DETAILS AT EACH LOCATION.
POWER SOURCE BY THE GOVERNMENT. SEE KEYNOTES
WILL BE PREVIOUSLY DISCONNECTED FROM THE
DESCRIBED IN THE SPECIFICATIONS. ALL CABLING
CABLING AS SHOWN ON THESE DRAWINGS AND
EXISTING CONDUIT SYSTEM, JUNCTION BOXES, AND
CONTRACTOR SHALL REMOVE AND DISPOSE OF THE 1.
SHALL BE INSTALLED IN THIS JUNCTION BOX.
DWG E-501 FOR CONFIGURATION. TWO LAB-3 MODULES
WITH CONTINUOUS HINGES. REFER TO DETAILS ON
APPROVED EQUAL 12”L X 10”W X 6”D NEMA 4X ENCLOSURE
AND REPLACE WITH A HOFFMAN A12106CHNFSS OR
EXISTING JUNCTION BOXES AND ASSOCIATED CONDUIT
TWO PIEZOMETERS AT THIS LOCATION. DEMO TWO 7.
BOX.
LAB-3 MODULES SHALL BE INSTALLED IN THIS JUNCTION
DETAILS ON DWG E-501 FOR CONFIGURATION. TWO
ENCLOSURE WITH CONTINUOUS HINGES. REFER TO
APPROVED EQUAL 12”L X10” W X 6”D NEMA 4X
AND REPLACE WITH A HOFFMAN A12106CHNFSS OR
EXISTING JUNCTION BOX AND ASSOCIATED CONDUIT
TWO PIEZOMETERS AT THIS LOCATION. DEMO ONE 6.
INSTALLED IN THIS JUNCTION BOX.
CONFIGURATION. ONE LAB-3 MODULE SHALL BE
REFER TO DETAILS ON DWG E-501 FOR
NEMA 4X ENCLOSURE WITH CONTINUOUS HINGES.
A1008CHNFSS OR APPROVED EQUAL 10”L X 8”W X 4”D
PIEZOMETER. PROVIDE AND INSTALL A HOFFMAN
BE LEFT AS-IS AND REMAIN A MANUAL-READ ONLY
TWO PIEZOMETERS AT THIS LOCATION, BUT PS7 SHALL 5.
INSTALLED IN THIS JUNCTION BOX.
CONFIGURATION. ONE LAB-3 MODULE SHALL BE
HINGES. REFER TO DETAILS ON DWG E-501 FOR
10”L X 8”W X 4”D NEMA 4X ENCLOSURE WITH CONTINUOUS
INSTALL A HOFFMAN A1008CHNFSS OR APPROVED EQUAL
ONE PIEZOMETER AT THIS LOCATION. PROVIDE AND 4.
“ELECTRIC” NAMEPLATE.
LEAST A TIER 15 RATING. COVER SHALL HAVE AN
PRECAST POLYMER CONCRETE HANDHOLE WITH AT
HANDHOLE. PROVIDE AND INSTALL A 17”W X 30”L X 24”D 3.
INSTALLED INSIDE THE ENCLOSURE.
ENCLOSURE. FOUR (4) LAB-3 MODULES SHALL BE
AND THE NEW PVC CONDUIT SHALL STUB UP 12" INTO THE
ENCLOSURE. FOUR (4) EXISTING PIEZOMETER CONDUITS
EQUAL 30"H X 30"W X 18"D MUNSELL GREEN MILD STEEL
ENCLOSURE SHALL BE A TRINETICS CW63388006 OR
ENCLOSURE SHALL BE INSTALLED. PAD MOUNTED
BE DEMOLISHED AND NEW CONCRETE PAD AND
PAD MOUNTED ENCLOSURE. EXISTING PEDESTAL SHALL 2.
FEET ABOVE GROUND LINE.
CONTINUOUS HINGES. TOP OF ENCLOSURE SHALL BE 5
16”H X 14” W X 6”D NEMA 4X ENCLOSURE WITH
HOFFMAN A1614CHNFSS OR APPROVED EQUAL
MULTIPLEXER JUNCTION BOX. JUNCTION BOX SHALL BE A 1.
1-1/C #4
2-4/C #22
1" RGS
1-1/C #4
4-4/C #22
1" RGS
1-1/C #4
19-4/C #22
2" PVC
1-1/C #4
4-4/C #22
1" PVC
1-1/C #4
6-4/C #22
1.5" RGS
1-1/C #4
8-4/C #22
1.5" RGS
6 6 7 7 764 4 5
1-1/C #4
15-4/C #22
2" PVC/RGS
1-1/C #4
14-4/C #22
2" RGS
1-1/C #4
13-4/C #22
2" RGS
1-1/C #4
10-4/C #22
1.5" RGS
1-1/C #4
12-4/C #22
1.5" RGS
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
A N
S I
D
E-103
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
E L E
C T
R
IC
A L
G
SHEET KEYNOTES
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
E -1
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
D M
C
B R
A N
D O
N B L E
W
IS
P
C
P L
A N V
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
U P
P E
R W
E S
T G
A L L E
R Y
N
UPPER WEST GALLERY
DOOR TO UPPER WEST GALLERY.3.
MULTIPLEXER ENCLOSURE.
NEW 1” RGS CONDUIT FROM GALLERY DOOR TO 2.
EXISTING DATALOGGER ENCLOSURE.1.
REPLACED WITH 1” RGS CONDUIT.
THE MULTIPLEXER ENCLOSURE SHALL BE REMOVED AND
CONDUIT FROM THE UPPER WEST GALLERY DOOR TO 2.
APPROVED EQUAL.
SHALL BE CAMPBELL SCIENTIFIC CABLE5CBL-L, OR
SOURCE BY THE GOVERNMENT. TWO (2) NEW CABLES
PREVIOUSLY DISCONNECTED FROM THE POWER
DRAWINGS E-102 AND E-301. ALL CABLING WILL BE
ENCLOSURE AT GROUND LEVEL AS SHOWN ON
FROM THIS ENCLOSURE TO THE MULTIPLEXER
CONTRACTOR SHALL REMOVE AND REPLACE CABLES
IN AN ENCLOSURE AS SHOWN BY KEYNOTE 1.
FOR THE INSTRUMENTATION IS EXISTING AND MOUNTED
UPPER WEST GALLERY OF THE DAM. THE DATA LOGGER
LOCATION SHOWN ON THIS DRAWING IS THE 1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
A N
S I
D
E-301
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
E L E
C T
R
IC
A L
G
SHEET KEYNOTES
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
E -3
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
D M
C
B R
A N
D O
N B L E
W
IS
P
C
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
E L E
V A
T
IO
N V
IE
W
R
IG
H T A
B U
T M
E N
T
RIGHT ABUTMENT
ELEVATION VIEW OF THE SPILLWAY WALL.
SEE DRAWINGS E-302 AND E-303 FOR CONTINUATION OF3.
INSTALLATION DETAILS.
SEE DRAWING E-102 FOR PLAN VIEW AND MORE2.
DRAWING FOR DETAILS AT EACH LOCATION.
POWER SOURCE BY THE GOVERNMENT. SEE KEYNOTES ON THIS
ALL CABLING WILL BE PREVIOUSLY DISCONNECTED FROM THE
THESE DRAWINGS AND DESCRIBED IN THE SPECIFICATIONS.
SYSTEM, JUNCTION BOXES, AND CABLING AS SHOWN ON
SHALL REMOVE AND DISPOSE OF THE EXISTING CONDUIT
ELEVATION OF RIGHT ABUTMENT PIER SHOWN. CONTRACTOR1.
CONCRETE HANDHOLE WITH AT LEAST A TIER 15 RATING.
NEW 17"W X 30"L X 24"D PRECAST POLYMER4.
NEW 2" PVC SCHEDULE 40 CONDUIT.3.
NEW 16"H X 14"W X 6"D MULTIPLEXER JUNCTION BOX.2.
NEW 1" RGS CONDUIT.1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
A N
S I
D
E-302
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
E L E
C T
R
IC
A L
G
SHEET KEYNOTES
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
E -3
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
D M
C
B R
A N
D O
N B L E
W
IS
P
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
E L E
V A
T
IO
N V
IE
W
S P
IL
L W
A Y W
A L L
U P
P E
R H
A L F
SPILLWAY WALL (UPPER HALF)
FOR INSTALLATION INSTRUCTIONS AT EACH LOCATION.
LOCATIONS OF EACH PIEZOMETER. REFER TO DRAWING E-102
THIS DRAWING IS FOR REFERENCE ONLY WITH APPROXIMATE1.
LOCATION OF TWO PIEZOMETERS.3.
INSTRUMENTATION AUTOMATION. PS-7 SHALL BE LEFT AS-IS.
ONLY PIEZOMETER PD-7 IS INCLUDED IN THE2.
THIS DRAWING.
APPROXIMATE LOCATION OF PIEZOMETER NOT SHOWN ON1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
A N
S I
D
E-303
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
E L E
C T
R
IC
A L
G
SHEET KEYNOTES
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
E -3
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
D M
C
B R
A N
D O
N B L E
W
IS
P
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
E L E
V A
T
IO
N V
IE
W
S P
IL
L W
A Y W
A L L
L O
W E
R H
A L F
SPILLWAY WALL (LOWER HALF)
FOR INSTALLATION INSTRUCTIONS AT EACH LOCATION.
LOCATIONS OF EACH PIEZOMETER. REFER TO DRAWING E-102
THIS DRAWING IS FOR REFERENCE ONLY WITH APPROXIMATE1.
LOCATION OF TWO PIEZOMETERS.1.
1 1 1
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
A N
S I
D
E-501
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
E L E
C T
R
IC
A L
A1
G
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
E -5
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
D M
C
B R
A N
D O
N B L E
W
IS
P
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
ONE PIEZOMETER CONFIGURATION - FRONT VIEW
SCALE 3" = 1' - 0"
B1 SCALE 3" = 1' - 0"
ONE PIEZOMETER CONFIGURATION - 3D VIEW
B3 SCALE 3" = 1' - 0"
TWO PIEZOMETER CONFIGURATION - 3D VIEW
A3
TWO PIEZOMETER CONFIGURATION - FRONT VIEW
SCALE 3" = 1' - 0"
E
T A
IL
S
OF THE ENCLOSURE.
CONDUIT FITTINGS SHALL MAINTAIN THE NEMA 4X RATING
CONFIGURATIONS SHOWN ARE APPROXIMATE. ALL1.
SCALE: 3"=1'
3" 6" 9" 12"
SCALE: 3"=1'
3" 6" 9" 12" 0
SCALE: 3"=1'
3" 6" 9" 12"
SCALE: 3"=1'
3" 6" 9" 12"
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
A N
S I
D
B-501
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
A1
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
B -5
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
T J
L
K
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
IO
N
C1 C3
A3
6"
3'-0"
EXISTING PIEZOMETERS
NEW 1" PVC PIPE
3"
2.5
6"
6"
3'-0"
2.5
EXISTING GROUND EXISTING GROUND
PAD MOUNTED ENCLOSURE
TO EXTEND 1' ABOVE CONCRETE FLOOR
EXISTING PIEZOMETERS WITH STEEL PIPE ADDED
ANCHOR TO FLOOR WITH SEAL
A1 A3
PLAN- HEADWALL PLAN- HEADWALL WITH INSTRUMENTATION LAYOUT
SECTION- HEADWALL SECTION- HEADWALL WITH INSTRUMENTATION LAYOUT
SCALE: 1 1/2" = 1'
SCALE: 1 1/2" = 1'
SCALE: 1 1/2" = 1'
SCALE: 1 1/2" = 1' 1' 2'0 6" 1' 2'0 6"
1' 2'0 6"1' 2'0 6"
G E
O T
E C
H N
IC
A L
P
IE
Z O
M E
T E
R H
E A
D W
A L L D
E T
IL
U
C A
S A
K R
U M
W
IE
D E P .E
ACCORDING TO SPECIFICATIONS.
REBAR LAYOUT TO BE APPROVED BY GOVERNMENT1.
1 1/4" PVC PIPE SPACER
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
A N
S I
D
R-501
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T L
O U
IS
D
IS
T R
IC
T
S T L
O U
IS
M
IS
S O
U R I
:1
S H
E L
B Y C
O U
N T
Y
IL
L
IN
O
IS
R -5
.d g n
L A
K E S
H E
L B
Y V
IL
L E
L A
K E S
H E
L B
Y V
IL
L E
T J
K
/1
/2
D M
C M
O D
IF
IE
D P
E R A
M E
N D
M E
N T
IN
S
T R
U M
E N
T A
T
IO
N A
U T
O M
A T
G
O T
E C
H N
IC
A L
P A
D E
N C
L O
S U
R E R
E F
E R
E N
U
C A
S A
K R
U M
W
IE
D E P .E
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
M V
S D
O C
U M
E N
T S P
R O J E
C T S E
N V
IR
O N
M E
N T
A L M
A N
A G
E M
E N
T P
R O
G R
A M C
L A
R E
N C
E C
A N
N O
N N
W R I
M P
L E
M E
N T
A T
IO
N P
U M
P S
T A
T
| E-101 |
| E-102 |
| E-103 |
| E-301 |
| E-302 |
| E-303 |
| E-501 |
File details come from the government source that posted it.