This document provides details for a federal contract solicitation for floating plant services. The U.S. Army Corps of Engineers, St. Louis District is seeking firms to perform repair, installation, demolition, removal, rehabilitation, and restoration of U.S. government lands and facilities utilizing floating plant, labor, equipment, operators, supervision, supplies, and materials. Services required include floating plant with cranes ranging from 150 to 600 tons, excavators, barges, equipment, pumps, divers, and construction materials. The contract value is over $10 million. Interested vendors must register on FedBizOpps to receive notification of solicitation W912P9-19-R-0017 which will be issued on or after December 28, 2018. Offers are due by February 21, 2019. The NAICS code is 238910 and the size standard is $15 million.

Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W912P919R0017

2. TYPE OF SOLICITATION 3. DATE ISSUED

15-Jan-2019

PAGE OF PAGES

1 OF 156 SEALED BID (IFB)

NEGOTIATED (RFP) X

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE W912P9 8. ADDRESS OFFER TO (If Other Than Item 7) CODE

CONTRACTING DIVISION

USARMY ENGR DIST ST LOUIS

1222 SPRUCE ST RM 4.207

ST LOUIS MO 63103-2833

TEL: 314-331-8500 FAX: 314-331-8746

See Item 7

TEL: FAX:

9. FOR INFORMATION

CALL:

A. NAME

BARRIETTA KILLIEBREW

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

314 331-8514

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

FLOATING PLANT:

Work consist of consists of furnishing all floating plant, labor, equipment, operators, supervision/site superintendent, supplies and materials necessary to satisfactorily perform the repair, installation, demolition, removal/disposal, rehabilitation and/or restoration of U.S.

The Magnitude of this project is More than $10,000,000.

This Acquisition is Unrestricted.

11. The Contractor shall begin performance w ithin 10 calendar days and complete it w ithin 365 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See 52.211-10 .)

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 4 copies to perform the w ork required are due at the place specified in Item 8 by 10:00 AM (hour) local time 21 Feb 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

OFFER (M ust be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

See Item 14

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY: CODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this 29. AWARD (Contractor is not required to sign this document.)

document and return copies to issuing office.) Contractor agrees to f urnish and deliv er all items or perf orm all work, requisitions identif ied on this f orm and any continuation sheets f or the consideration stated in this contract. The rights and obligations of the parties to this contract shall be gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Gov ernment solicitation and y our of f er, and (b) this contract award. No f urther contractual document is necessary .

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

30B. SIGNATURE 30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

NSN 7540-01-155-3212 STANDARD FORM 1442 BACK (REV. 4-85)

W912P919R0017

Section 00 10 00 - Solicitation

BID SCHEDULE

Period of Performance: Ordering Period 1

ITEM DESCRIPTION Est.

Quantities U/M Unit Price Total

0001 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0002 FLOATING PLANT W/150 TN CRANE 8 HOUR

DURATION

10 EA

0003 FLOATING PLANT W/150 TN CRANE 12 HOUR

DURATION

8 EA

0004 FLOATING PLANT W/150 TN CRANE 24 HOUR

DURATION

2 EA

0005 FLOATING PLANT W/150 TN CRANE STANDBY 4 DY $ -

0006 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0007 FLOATING PLANT W/200 TN CRANE 8 HOUR

DURATION

10 EA

0008 FLOATING PLANT W/200 TN CRANE 12 HOUR

DURATION

8 EA

0009 FLOATING PLANT W/200 TN CRANE 24 HOUR

DURATION

2 EA

0010 FLOATING PLANT W/200 TN CRANE STANDBY 4 DY $ -

0011 FLOATING PLANT W/300 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0012 FLOATING PLANT W/300 TN CRANE 8 HOUR

DURATION

10 EA $ -

0013 FLOATING PLANT W/300 TN CRANE 12 HOUR

DURATION

8 EA

0014 FLOATING PLANT W/300 TN CRANE 24 HOUR

DURATION

2 EA

0015 FLOATING PLANT W/300 TN CRANE STANDBY 4 DY $ -

0016 FLOATING PLANT W/400 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0017 FLOATING PLANT W/400 TN CRANE 8 HOUR

DURATION

10 EA

0018 FLOATING PLANT W/400 TN CRANE 12 HOUR

DURATION

8 EA $ -

0019 FLOATING PLANT W/400 TN CRANE 24 HOUR

DURATION

2 EA

0020 FLOATING PLANT W/400 TN CRANE STANDBY 4 DY $ -

0021 FLOATING PLANT W/600 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0022 FLOATING PLANT W/600 TN CRANE 8 HOUR

DURATION

10 EA

Each Ordering Period last 1 Year

0023 FLOATING PLANT W/600 TN CRANE 12 HOUR

DURATION

8 EA

0024 FLOATING PLANT W/600 TN CRANE 24 HOUR

DURATION

2 EA

0025 FLOATING PLANT W/600 TN CRANE STANDBY 4 DY $ -

0026 FLOATING PLANT W/ LARGE EXCAVATOR

MOBILIZATION & DEMOBILIZATION (TBD) TBD

0027 FLOATING PLANT W/LARGE EXCAVATOR 8 HOUR

DURATION

10 EA

0028 FLOATING PLANT W/LARGE EXCAVATOR 12 HOUR

DURATION

8 EA

0029 FLOATING PLANT W/LARGE EXCAVATOR 24 HOUR

DURATION

2 EA $ -

0030 FLOATING PLANT W/LARGE EXCAVATOR STANDBY 4 DY $ -

0031 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS MOBILIZATION & DEMOBILIZATION (TBD) TBD

0032 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 8 HOUR DURATION 10 EA

0033 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 12 HOUR DURATION 10 EA

0034 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 24 HOUR DURATION 2 EA

0035 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS STANDBY 4 DY

0036 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS MOBILIZATION & DEMOBILIZATION (TBD) TBD

0037 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 8 HOUR DURATION 10 EA

0038 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 12 HOUR DURATION 10 EA

0039 FLOATING PLANT WITH MATERIAL BARGE W/RAMPS

24 HOUR DURATION 1 EA

0040 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS STANDBY 4 DY

0041 GROUP 1 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD

0042 LGP TRACK-TYPE BULLDOZER (Min 180 hp) 1000 HR $ -

0043 LGP TRACK- TYPE BULLDOZER (Min 90 hp) 600 HR $ -

0044 TRACK-TYPE LOADER (Min 160 hp) 800 HR $ -

0045 TRACK-TYPE HYDRAULIC BACKHOE (Min 155 hp)

EXCAVATOR

1200 HR $ -

0046 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR

1300 HR

0047 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR WITH VIBRATORY PILE

DRIVER/EXTRACTOR

250 HR

0048 TRACK-TYPE HYDRAULIC BACKHOE EXCAVATOR (MIN

60 FOOT REACH) 1000 HR

0049 RUBBER-TIRED FRONT END LOADER (Min 275 hp) 500 HR $ -

0050 OPERATOR - GROUP 1 – STRAIGHT TIME 9590 HR $ -

0051 OPERATOR - GROUP 1 - OVERTIME 100 HR $ -

0052 GROUP 2 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD

0053 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/GRADING/GRAPPLE BUCKET &

PALLET FORKS

160 HR

0054 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/ GRADING/GRAPPLE BUCKET &

PALLET FORKS (WEEKLY)

2 WK

0055 COMPACT TRACK LOADER (Min 73 hp) WITH BROOM 100 HR $ -

0056 COMPACT TRACK LOADER (Min 73 hp) WITH

CONCRETE BREAKER

100 HR

0057 8.5 TN CARRY DECK CRANE (Min 30Ft Reach) 160 HR $ -

0058 STRAIGHT BOOM LIFT (Min 60Ft Reach) 120 HR $ -

0059 STRAIGHT BOOM LIFT (Min 110Ft Reach) 120 HR $ -

0060 ARTICULATING BOOM LIFT (Min 86Ft Reach) 120 HR $ -

0061 TELEHANDLER LIFT (Min 55Ft Lift) 120 HR $ -

0062 FORKLIFT (Min 5,000lb Capacity) 120 HR

0063 16’ JON BOAT WITH 50 HP MOTOR 200 HR $ -

0064 OPERATOR - GROUP 2 – STRAIGHT TIME 5360 HR $ -

0065 OPERATOR - GROUP 2 - OVERTIME 100 HR $ -

0066 GROUP 4 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD

0067 WATER AND TRASH PUMP, (13,500GPM) (DAILY) 14 DY $ -

0068 WATER AND TRASH PUMP, (13,500GPM) 80 HR $ -

0069 WATER AND TRASH PUMP, (13,500GPM), SUCTION

& DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF

0070 WATER AND TRASH PUMP, (4,600GPM) (DAILY) 14 DY $ -

0071 WATER AND TRASH PUMP, (4,600GPM) 80 HR $ -

0072 WATER AND TRASH PUMP, (4,600GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF

0073 WATER AND TRASH PUMP, (2,750GPM) (DAILY) 10 DY $ -

0074 WATER AND TRASH PUMP, (2,750GPM) 80 HR $ -

0075 WATER AND TRASH PUMP, (2,750GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF

0076 WATER AND TRASH PUMP, (1,450GPM) (DAILY) 10 DY $ -

0077 WATER AND TRASH PUMP, (1,450GPM) 80 HR $ -

0078 WATER AND TRASH PUMP, (1,450GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF

0079 WATER AND TRASH PUMP, (200GPM) (DAILY) 14 DY $ -

0080 WATER AND TRASH PUMP, (200GPM) 80 HR $ -

0081 WATER AND TRASH PUMP, (200GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF

0082 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM) (DAILY) 10 DY

0083 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM)

80 HR

0084 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0085 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) (DAILY)

10 DY

0086 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) 80 HR

0087 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0088 SUBMERSIBLE SUMP PUMP,TWO-INCH (DAILY) 10 DY $ -

0089 SUBMERSIBLE SUMP PUMP,TWO-INCH 80 HR $ -

0090 SUBMERSIBLE SUMP PUMP,TWO-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF

0091 SUBMERSIBLE SUMP PUMP,THREE-INCH (DAILY) 10 DY $ -

0092 SUBMERSIBLE SUMP PUMP,THREE-INCH 80 HR $ -

0093 SUBMERSIBLE SUMP PUMP,THREE-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF

0094 SUBMERSIBLE SUMP PUMP,SIX-INCH (DAILY) 5 DY $ -

0095 SUBMERSIBLE SUMP PUMP,SIX-INCH 40 HR $ -

0096 SUBMERSIBLE SUMP PUMP,SIX-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 600 LF

0097 OPERATOR - GROUP 4 - STRAIGHT TIME 300 HR $ -

0098 OPERATOR - GROUP 4 - OVERTIME 50 HR $ -

0099 GROUP 5 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD

0100 PORTABLE DIESEL AIR COMPRESSOR (200CFM) 200 HR $ -

0101 PORTABLE DIESEL AIR COMPRESSOR (600CFM) 200 HR $ -

0102 PORTABLE DIESEL AIR COMPRESSOR (1000CFM) 200 HR $ -

0103 PORTABLE GENERATOR 160 HR $ -

0104 TOWABLE GENERATOR (250kW) 160 HR $ -

0105 TOWABLE GENERATOR (500kW) 80 HR $ -

0106 HIGH PRESSURE HYDRO JET/BLASTING MACHINE 80 HR $ -

0107 TRAILER MOUNTED CONCRETE PUMP (Min 100hp) 200 HR $ -

0108 LIGHT TOWER 200 HR $ -

0109 RENTAL OF MISC. EQUIPMENT (TBD) TBD $ -

0110 CHAINSAW 160 HR $ -

0111 POWER WASHER 200 HR $ -

0112 HAND OPERATED ELECTRIC POWERED JACK

HAMMER

40 HR

0113 HAND OPERATED AIR POWERED JACK HAMMER 80 HR $ -

0114 HAND OPERATED AIR POWERED CHIPPING HAMMER 80 HR $ -

0115 VIBRATORY PLATE TAMPER 200 HR $ -

0116 HAND OPERATED POWER CUTOFF SAW 160 HR $ -

0117 HAND OPERATED POWER HAMMER DRILL W/BITS 40 HR $ -

0118 HAND OPERATED AIR POWERED CORE DRILL W/BITS 40 HR $ -

0119 CONCRETE SAW 80 HR $ -

0120 DOWEL MACHINE W/BITS 60 HR $ -

0121 GROUP 5 LABORER - STAIGHT TIME 2500 HR $ -

0122 GROUP 5 LABORER - OVERTIME 150 HR $ -

0123 IRON WORKER 240 HR $ -

0124 CARPENTER 240 HR $ -

0125 CEMENT MASON 160 HR $ -

0126 WELDER TYPE I 240 HR $ -

0127 WELDER TYPE 2 240 HR $ -

0128 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

8 HOUR OPERATION 10 DY

0129 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

12 HOUR OPERATION 10 DY

0130 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

24 HOUR OPERATION 5 DY

0131 ADDITIONAL DIVER/TENDER 80 HR $ -

0132 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

STANDBY

24 HR

0133 HYDRAULIC STEEL STRUCTURES PAINTING TBD

0134 L&D BULLNOSE PAINTING TBD

0135 DELIVERY OF MISCELLANEOUS MATERIAL (TBD) TBD $ -

0136 OFF SITE BORROW 200 CY $ -

0137 ROCK BLANKET (MISSOURI TYPE 2) 2000 TN $ -

0138 RIPRAP, 2200 LB. TOPSIZE 500 TN $ -

0139 RIPRAP, 1000 LB. TOPSIZE 8000 TN $ -

0140 RIPRAP, 650 LB. TOPSIZE 5000 TN $ -

0141 RIPRAP, 400 LB. TOPSIZE 10000 TN $ -

0142 RIPRAP, 140 LB. TOPSIZE 2000 TN $ -

0143 RIPRAP, 90 LB. TOPSIZE 200 TN $ -

0144 RIPRAP, BEDDING MATERIAL 1000 TN $ -

0145 GABIAN (FOUR-SIX INCH) STONE 500 TN $ -

0146 AGGREGATE FOR BASE 3/4-INCH MINUS STONE

COMMERICAL CA-6

2000 TN

0147 AGGREGATE FOR SURFACING AND PIPE BEDDING 2000 TN $ -

0148 SAND (FA-6) 1000 TN $ -

0149 CONCRETE TYPE I 50 CY $ -

0150 CONCRETE TYPE 2 70 CY $ -

0151 RIP RAP GROUT 100 CY $ -

0152 TACK FREE CONCRETE SEALER 5000 SY $ -

0153 REINFORCEMENT BARS STRAIGHT 800 LB $ -

0154 REINFORCEMENT BARS PRE-FORMED 800 LB $ -

0155 REINFORCEMENT BARS STRAIGHT EPOXY COATED 500 LB $ -

0156 REINFORCEMENT BARS PRE-FORMED EPOXY

COATED

500 LB

0157 WELDED WIRE FABRIC 1000 SF $ -

0158 DEMOLITION/CONSTRUCTION WASTE 30 CY

DUMPSTER

100 EA

0159 DEMOLITION/CONSTRUCTION WASTE 40 CY

DUMPSTER

100 EA

0160 DUMPSTER OVERWEIGHT FEE 50 TN $ -

0161 LANDFILL DISPOSAL FEE 10 TN $ -

0162 BONDS (ACTUAL COST OF BONDS) 1 LS $ -

TOTAL COST $ -

Period of Performance: Ordering Period 2

ITEM DESCRIPTION Est.

Quantities

U/M Unit Price Total

0001 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0002 FLOATING PLANT W/150 TN CRANE 8 HOUR

DURATION

10 EA

0003 FLOATING PLANT W/150 TN CRANE 12 HOUR

DURATION

8 EA

0004 FLOATING PLANT W/150 TN CRANE 24 HOUR

DURATION

2 EA

0005 FLOATING PLANT W/150 TN CRANE STANDBY 4 DY $ -

0006 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0007 FLOATING PLANT W/200 TN CRANE 8 HOUR

DURATION 10 EA

0008 FLOATING PLANT W/200 TN CRANE 12 HOUR

DURATION

8 EA

0009 FLOATING PLANT W/200 TN CRANE 24 HOUR

DURATION

2 EA

0010 FLOATING PLANT W/200 TN CRANE STANDBY 4 DY $ -

0011 FLOATING PLANT W/300 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0012 FLOATING PLANT W/300 TN CRANE 8 HOUR

DURATION

10 EA

0013 FLOATING PLANT W/300 TN CRANE 12 HOUR

DURATION 8 EA

0014 FLOATING PLANT W/300 TN CRANE 24 HOUR

DURATION

2 EA

0015 FLOATING PLANT W/300 TN CRANE STANDBY 4 DY $ -

0016 FLOATING PLANT W/400 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0017 FLOATING PLANT W/400 TN CRANE 8 HOUR

DURATION

10 EA $ -

0018 FLOATING PLANT W/400 TN CRANE 12 HOUR

DURATION

8 EA

0019 FLOATING PLANT W/400 TN CRANE 24 HOUR

DURATION 2 EA

0020 FLOATING PLANT W/400 TN CRANE STANDBY 4 DY $ -

0021 FLOATING PLANT W/600 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0022 FLOATING PLANT W/600 TN CRANE 8 HOUR

DURATION

10 EA

0023 FLOATING PLANT W/600 TN CRANE 12 HOUR

DURATION

8 EA $ -

0024 FLOATING PLANT W/600 TN CRANE 24 HOUR

DURATION

2 EA

0025 FLOATING PLANT W/600 TN CRANE STANDBY 4 DY $ -

0026 FLOATING PLANT W/ LARGE EXCAVATOR

MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0027 FLOATING PLANT W/LARGE EXCAVATOR 8 HOUR

DURATION

10 EA $ -

0028 FLOATING PLANT W/LARGE EXCAVATOR 12 HOUR

DURATION 8 EA $ -

0029 FLOATING PLANT W/LARGE EXCAVATOR 24 HOUR

DURATION

2 EA $ -

0030 FLOATING PLANT W/LARGE EXCAVATOR STANDBY 4 DY $ -

0031 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0032 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 8 HOUR DURATION 10 EA $ -

0033 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 12 HOUR DURATION 10 EA $ -

0034 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 24 HOUR DURATION 2 EA $ -

0035 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS STANDBY 4 DY $ -

0036 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0037 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 8 HOUR DURATION 10 EA $ -

0038 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 12 HOUR DURATION 10 EA $ -

0039 FLOATING PLANT WITH MATERIAL BARGE W/RAMPS

24 HOUR DURATION 1 EA $ -

0040 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS STANDBY 4 DY $ -

0041 GROUP 1 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD

0042 LGP TRACK-TYPE BULLDOZER (Min 180 hp) 1000 HR $ -

0043 LGP TRACK- TYPE BULLDOZER (Min 90 hp) 600 HR $ -

0044 TRACK-TYPE LOADER (Min 160 hp) 800 HR $ -

0045 TRACK-TYPE HYDRAULIC BACKHOE (Min 155 hp)

EXCAVATOR

1200 HR $ -

0046 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR

1300 HR $ -

0047 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR WITH VIBRATORY PILE

DRIVER/EXTRACTOR

250 HR

0048 TRACK-TYPE HYDRAULIC BACKHOE EXCAVATOR (MIN

60 FOOT REACH) 1000 HR $ -

0049 RUBBER-TIRED FRONT END LOADER (Min 275 hp) 500 HR $ -

0050 OPERATOR - GROUP 1 – STRAIGHT TIME 9590 HR $ -

0051 OPERATOR - GROUP 1 - OVERTIME 100 HR $ -

0052 GROUP 2 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0053 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/GRADING/GRAPPLE BUCKET &

PALLET FORKS

160 HR

0054 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/ GRADING/GRAPPLE BUCKET &

PALLET FORKS (WEEKLY)

2 WK

0055 COMPACT TRACK LOADER (Min 73 hp) WITH BROOM 100 HR $ -

0056 COMPACT TRACK LOADER (Min 73 hp) WITH

CONCRETE BREAKER 100 HR $ -

0057 8.5 TN CARRY DECK CRANE (Min 30Ft Reach) 160 HR $ -

0058 STRAIGHT BOOM LIFT (Min 60Ft Reach) 120 HR $ -

0059 STRAIGHT BOOM LIFT (Min 110Ft Reach) 120 HR $ -

0060 ARTICULATING BOOM LIFT (Min 86Ft Reach) 120 HR $ -

0061 TELEHANDLER LIFT (Min 55Ft Lift) 120 HR $ -

0062 FORKLIFT (Min 5,000lb Capacity) 120 HR

0063 16’ JON BOAT WITH 50 HP MOTOR 200 HR $ -

0064 OPERATOR - GROUP 2 – STRAIGHT TIME 5360 HR $ -

0065 OPERATOR - GROUP 2 - OVERTIME 100 HR $ -

0066 GROUP 4 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0067 WATER AND TRASH PUMP, (13,500GPM) (DAILY) 14 DY $ -

0068 WATER AND TRASH PUMP, (13,500GPM) 80 HR $ -

0069 WATER AND TRASH PUMP, (13,500GPM), SUCTION

& DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0070 WATER AND TRASH PUMP, (4,600GPM) (DAILY) 14 DY $ -

0071 WATER AND TRASH PUMP, (4,600GPM) 80 HR $ -

0072 WATER AND TRASH PUMP, (4,600GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0073 WATER AND TRASH PUMP, (2,750GPM) (DAILY) 10 DY $ -

0074 WATER AND TRASH PUMP, (2,750GPM) 80 HR $ -

0075 WATER AND TRASH PUMP, (2,750GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0076 WATER AND TRASH PUMP, (1,450GPM) (DAILY) 10 DY $ -

0077 WATER AND TRASH PUMP, (1,450GPM) 80 HR $ -

0078 WATER AND TRASH PUMP, (1,450GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0079 WATER AND TRASH PUMP, (200GPM) (DAILY) 14 DY $ -

0080 WATER AND TRASH PUMP, (200GPM) 80 HR $ -

0081 WATER AND TRASH PUMP, (200GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0082 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM) (DAILY) 10 DY $ -

0083 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM)

80 HR $ -

0084 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0085 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) (DAILY) 10 DY $ -

0086 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) 80 HR $ -

0087 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0088 SUBMERSIBLE SUMP PUMP,TWO-INCH (DAILY) 10 DY $ -

0089 SUBMERSIBLE SUMP PUMP,TWO-INCH 80 HR $ -

0090 SUBMERSIBLE SUMP PUMP,TWO-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0091 SUBMERSIBLE SUMP PUMP,THREE-INCH (DAILY) 10 DY $ -

0092 SUBMERSIBLE SUMP PUMP,THREE-INCH 80 HR $ -

0093 SUBMERSIBLE SUMP PUMP,THREE-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0094 SUBMERSIBLE SUMP PUMP,SIX-INCH (DAILY) 5 DY $ -

0095 SUBMERSIBLE SUMP PUMP,SIX-INCH 40 HR $ -

0096 SUBMERSIBLE SUMP PUMP,SIX-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 600 LF $ -

0097 OPERATOR - GROUP 4 - STRAIGHT TIME 300 HR $ -

0098 OPERATOR - GROUP 4 - OVERTIME 50 HR $ -

0099 GROUP 5 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0100 PORTABLE DIESEL AIR COMPRESSOR (200CFM) 200 HR $ -

0101 PORTABLE DIESEL AIR COMPRESSOR (600CFM) 200 HR $ -

0102 PORTABLE DIESEL AIR COMPRESSOR (1000CFM) 200 HR $ -

0103 PORTABLE GENERATOR 160 HR $ -

0104 TOWABLE GENERATOR (250kW) 160 HR $ -

0105 TOWABLE GENERATOR (500kW) 80 HR $ -

0106 HIGH PRESSURE HYDRO JET/BLASTING MACHINE 80 HR $ -

0107 TRAILER MOUNTED CONCRETE PUMP (Min 100hp) 200 HR $ -

0108 LIGHT TOWER 200 HR $ -

0109 RENTAL OF MISC. EQUIPMENT (TBD) TBD $ -

0110 CHAINSAW 160 HR $ -

0111 POWER WASHER 200 HR $ -

0112 HAND OPERATED ELECTRIC POWERED JACK

HAMMER

40 HR $ -

0113 HAND OPERATED AIR POWERED JACK HAMMER 80 HR $ -

0114 HAND OPERATED AIR POWERED CHIPPING HAMMER 80 HR $ -

0115 VIBRATORY PLATE TAMPER 200 HR $ -

0116 HAND OPERATED POWER CUTOFF SAW 160 HR $ -

0117 HAND OPERATED POWER HAMMER DRILL W/BITS 40 HR $ -

0118 HAND OPERATED AIR POWERED CORE DRILL W/BITS 40 HR $ -

0119 CONCRETE SAW 80 HR $ -

0120 DOWEL MACHINE W/BITS 60 HR $ -

0121 GROUP 5 LABORER - STAIGHT TIME 2500 HR $ -

0122 GROUP 5 LABORER - OVERTIME 150 HR $ -

0123 IRON WORKER 240 HR $ -

0124 CARPENTER 240 HR $ -

0125 CEMENT MASON 160 HR $ -

0126 WELDER TYPE I 240 HR $ -

0127 WELDER TYPE 2 240 HR $ -

0128 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

8 HOUR OPERATION 10 DY $ -

0129 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

12 HOUR OPERATION 10 DY $ -

0130 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

24 HOUR OPERATION 5 DY $ -

0131 ADDITIONAL DIVER/TENDER 80 HR $ -

0132 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

STANDBY

24 HR $ -

0133 HYDRAULIC STEEL STRUCTURES PAINTING TBD

0134 L&D BULLNOSE PAINTING TBD

0135 DELIVERY OF MISCELLANEOUS MATERIAL (TBD) TBD $ -

0136 OFF SITE BORROW 200 CY $ -

0137 ROCK BLANKET (MISSOURI TYPE 2) 2000 TN $ -

0138 RIPRAP, 2200 LB. TOPSIZE 500 TN $ -

0139 RIPRAP, 1000 LB. TOPSIZE 8000 TN $ -

0140 RIPRAP, 650 LB. TOPSIZE 5000 TN $ -

0141 RIPRAP, 400 LB. TOPSIZE 10000 TN $ -

0142 RIPRAP, 140 LB. TOPSIZE 2000 TN $ -

0143 RIPRAP, 90 LB. TOPSIZE 200 TN $ -

0144 RIPRAP, BEDDING MATERIAL 1000 TN $ -

0145 GABIAN (FOUR-SIX INCH) STONE 500 TN $ -

0146 AGGREGATE FOR BASE 3/4-INCH MINUS STONE

COMMERICAL CA-6 2000 TN $ -

0147 AGGREGATE FOR SURFACING AND PIPE BEDDING 2000 TN $ -

0148 SAND (FA-6) 1000 TN $ -

0149 CONCRETE TYPE I 50 CY $ -

0150 CONCRETE TYPE 2 70 CY $ -

0151 RIP RAP GROUT 100 CY $ -

0152 TACK FREE CONCRETE SEALER 5000 SY $ -

0153 REINFORCEMENT BARS STRAIGHT 800 LB $ -

0154 REINFORCEMENT BARS PRE-FORMED 800 LB $ -

0155 REINFORCEMENT BARS STRAIGHT EPOXY COATED 500 LB $ -

0156 REINFORCEMENT BARS PRE-FORMED EPOXY

COATED

500 LB $ -

0157 WELDED WIRE FABRIC 1000 SF $ -

0158 DEMOLITION/CONSTRUCTION WASTE 30 CY

DUMPSTER

100 EA $ -

0159 DEMOLITION/CONSTRUCTION WASTE 40 CY

DUMPSTER

100 EA $ -

0160 DUMPSTER OVERWEIGHT FEE 50 TN $ -

0161 LANDFILL DISPOSAL FEE 10 TN $ -

Period of Performance: Ordering Period 3

ITEM DESCRIPTION Est.

Quantities

U/M Unit Price Total

0001 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0002 FLOATING PLANT W/150 TN CRANE 8 HOUR

DURATION

10 EA

0003 FLOATING PLANT W/150 TN CRANE 12 HOUR

DURATION

8 EA $ -

0004 FLOATING PLANT W/150 TN CRANE 24 HOUR

DURATION

2 EA

0005 FLOATING PLANT W/150 TN CRANE STANDBY 4 DY $ -

0006 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0007 FLOATING PLANT W/200 TN CRANE 8 HOUR

DURATION

10 EA

0008 FLOATING PLANT W/200 TN CRANE 12 HOUR

DURATION

8 EA

0009 FLOATING PLANT W/200 TN CRANE 24 HOUR

DURATION

2 EA $ -

0010 FLOATING PLANT W/200 TN CRANE STANDBY 4 DY $ -

0011 FLOATING PLANT W/300 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0012 FLOATING PLANT W/300 TN CRANE 8 HOUR

DURATION

10 EA

0013 FLOATING PLANT W/300 TN CRANE 12 HOUR

DURATION

8 EA

0014 FLOATING PLANT W/300 TN CRANE 24 HOUR

DURATION

2 EA

0015 FLOATING PLANT W/300 TN CRANE STANDBY 4 DY $ -

0016 FLOATING PLANT W/400 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0017 FLOATING PLANT W/400 TN CRANE 8 HOUR

DURATION

10 EA

0018 FLOATING PLANT W/400 TN CRANE 12 HOUR

DURATION

8 EA

0019 FLOATING PLANT W/400 TN CRANE 24 HOUR

DURATION

2 EA $ -

0020 FLOATING PLANT W/400 TN CRANE STANDBY 4 DY $ -

0021 FLOATING PLANT W/600 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0022 FLOATING PLANT W/600 TN CRANE 8 HOUR

DURATION 10 EA

0023 FLOATING PLANT W/600 TN CRANE 12 HOUR

DURATION

8 EA

0024 FLOATING PLANT W/600 TN CRANE 24 HOUR

DURATION

2 EA

MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0027 FLOATING PLANT W/LARGE EXCAVATOR 8 HOUR

DURATION

10 EA $ -

0028 FLOATING PLANT W/LARGE EXCAVATOR 12 HOUR

DURATION 8 EA $ -

0029 FLOATING PLANT W/LARGE EXCAVATOR 24 HOUR

DURATION

2 EA $ -

0030 FLOATING PLANT W/LARGE EXCAVATOR STANDBY 4 DY $ -

0031 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0032 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 8 HOUR DURATION 10 EA $ -

0033 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 12 HOUR DURATION 10 EA $ -

0034 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 24 HOUR DURATION 2 EA $ -

0035 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS STANDBY 4 DY $ -

0036 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0037 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 8 HOUR DURATION 10 EA $ -

0038 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 12 HOUR DURATION 10 EA $ -

0039 FLOATING PLANT WITH MATERIAL BARGE W/RAMPS

24 HOUR DURATION 1 EA $ -

0040 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS STANDBY 4 DY $ -

0041 GROUP 1 EQUIPMENT MOBILIZATION &

0044 TRACK-TYPE LOADER (Min 160 hp) 800 HR $ -

0045 TRACK-TYPE HYDRAULIC BACKHOE (Min 155 hp)

EXCAVATOR

1200 HR $ -

0046 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR

1300 HR $ -

0047 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR WITH VIBRATORY PILE

DRIVER/EXTRACTOR

250 HR

0048 TRACK-TYPE HYDRAULIC BACKHOE EXCAVATOR (MIN

60 FOOT REACH) 1000 HR $ -

DEMOBILIZATION (TBD)

TBD $ -

0053 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/GRADING/GRAPPLE BUCKET &

PALLET FORKS

160 HR

0054 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/ GRADING/GRAPPLE BUCKET &

PALLET FORKS (WEEKLY)

2 WK

0055 COMPACT TRACK LOADER (Min 73 hp) WITH BROOM 100 HR $ -

0056 COMPACT TRACK LOADER (Min 73 hp) WITH

CONCRETE BREAKER 100 HR $ -

0057 8.5 TN CARRY DECK CRANE (Min 30Ft Reach) 160 HR $ -

0058 STRAIGHT BOOM LIFT (Min 60Ft Reach) 120 HR $ -

0059 STRAIGHT BOOM LIFT (Min 110Ft Reach) 120 HR $ -

0060 ARTICULATING BOOM LIFT (Min 86Ft Reach) 120 HR $ -

0065 OPERATOR - GROUP 2 - OVERTIME 100 HR $ -

0066 GROUP 4 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0067 WATER AND TRASH PUMP, (13,500GPM) (DAILY) 14 DY $ -

0068 WATER AND TRASH PUMP, (13,500GPM) 80 HR $ -

0069 WATER AND TRASH PUMP, (13,500GPM), SUCTION

& DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0070 WATER AND TRASH PUMP, (4,600GPM) (DAILY) 14 DY $ -

0071 WATER AND TRASH PUMP, (4,600GPM) 80 HR $ -

0072 WATER AND TRASH PUMP, (4,600GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0073 WATER AND TRASH PUMP, (2,750GPM) (DAILY) 10 DY $ -

0074 WATER AND TRASH PUMP, (2,750GPM) 80 HR $ -

0075 WATER AND TRASH PUMP, (2,750GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0076 WATER AND TRASH PUMP, (1,450GPM) (DAILY) 10 DY $ -

0077 WATER AND TRASH PUMP, (1,450GPM) 80 HR $ -

0078 WATER AND TRASH PUMP, (1,450GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0079 WATER AND TRASH PUMP, (200GPM) (DAILY) 14 DY $ -

0080 WATER AND TRASH PUMP, (200GPM) 80 HR $ -

0083 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM)

80 HR $ -

0084 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0085 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) (DAILY) 10 DY $ -

0086 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) 80 HR $ -

0087 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0088 SUBMERSIBLE SUMP PUMP,TWO-INCH (DAILY) 10 DY $ -

0089 SUBMERSIBLE SUMP PUMP,TWO-INCH 80 HR $ -

0090 SUBMERSIBLE SUMP PUMP,TWO-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0091 SUBMERSIBLE SUMP PUMP,THREE-INCH (DAILY) 10 DY $ -

0092 SUBMERSIBLE SUMP PUMP,THREE-INCH 80 HR $ -

0093 SUBMERSIBLE SUMP PUMP,THREE-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0094 SUBMERSIBLE SUMP PUMP,SIX-INCH (DAILY) 5 DY $ -

0095 SUBMERSIBLE SUMP PUMP,SIX-INCH 40 HR $ -

0096 SUBMERSIBLE SUMP PUMP,SIX-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 600 LF $ -

0097 OPERATOR - GROUP 4 - STRAIGHT TIME 300 HR $ -

0098 OPERATOR - GROUP 4 - OVERTIME 50 HR $ -

0099 GROUP 5 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0100 PORTABLE DIESEL AIR COMPRESSOR (200CFM) 200 HR $ -

0101 PORTABLE DIESEL AIR COMPRESSOR (600CFM) 200 HR $ -

0102 PORTABLE DIESEL AIR COMPRESSOR (1000CFM) 200 HR $ -

0103 PORTABLE GENERATOR 160 HR $ -

0104 TOWABLE GENERATOR (250kW) 160 HR $ -

0105 TOWABLE GENERATOR (500kW) 80 HR $ -

0106 HIGH PRESSURE HYDRO JET/BLASTING MACHINE 80 HR $ -

0107 TRAILER MOUNTED CONCRETE PUMP (Min 100hp) 200 HR $ -

0108 LIGHT TOWER 200 HR $ -

0109 RENTAL OF MISC. EQUIPMENT (TBD) TBD $ -

0110 CHAINSAW 160 HR $ -

0111 POWER WASHER 200 HR $ -

0112 HAND OPERATED ELECTRIC POWERED JACK

0115 VIBRATORY PLATE TAMPER 200 HR $ -

0116 HAND OPERATED POWER CUTOFF SAW 160 HR $ -

0117 HAND OPERATED POWER HAMMER DRILL W/BITS 40 HR $ -

0118 HAND OPERATED AIR POWERED CORE DRILL W/BITS 40 HR $ -

0119 CONCRETE SAW 80 HR $ -

0120 DOWEL MACHINE W/BITS 60 HR $ -

0121 GROUP 5 LABORER - STAIGHT TIME 2500 HR $ -

0122 GROUP 5 LABORER - OVERTIME 150 HR $ -

0123 IRON WORKER 240 HR $ -

0124 CARPENTER 240 HR $ -

0125 CEMENT MASON 160 HR $ -

0126 WELDER TYPE I 240 HR $ -

0127 WELDER TYPE 2 240 HR $ -

0128 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

8 HOUR OPERATION 10 DY $ -

0129 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

12 HOUR OPERATION 10 DY $ -

0130 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

24 HOUR OPERATION 5 DY $ -

0131 ADDITIONAL DIVER/TENDER 80 HR $ -

0132 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

STANDBY

0137 ROCK BLANKET (MISSOURI TYPE 2) 2000 TN $ -

0138 RIPRAP, 2200 LB. TOPSIZE 500 TN $ -

0139 RIPRAP, 1000 LB. TOPSIZE 8000 TN $ -

0140 RIPRAP, 650 LB. TOPSIZE 5000 TN $ -

0141 RIPRAP, 400 LB. TOPSIZE 10000 TN $ -

0142 RIPRAP, 140 LB. TOPSIZE 2000 TN $ -

0143 RIPRAP, 90 LB. TOPSIZE 200 TN $ -

0144 RIPRAP, BEDDING MATERIAL 1000 TN $ -

0145 GABIAN (FOUR-SIX INCH) STONE 500 TN $ -

0146 AGGREGATE FOR BASE 3/4-INCH MINUS STONE

0150 CONCRETE TYPE 2 70 CY $ -

0151 RIP RAP GROUT 100 CY $ -

0152 TACK FREE CONCRETE SEALER 5000 SY $ -

0153 REINFORCEMENT BARS STRAIGHT 800 LB $ -

0154 REINFORCEMENT BARS PRE-FORMED 800 LB $ -

0155 REINFORCEMENT BARS STRAIGHT EPOXY COATED 500 LB $ -

0156 REINFORCEMENT BARS PRE-FORMED EPOXY

COATED

500 LB $ -

0157 WELDED WIRE FABRIC 1000 SF $ -

0158 DEMOLITION/CONSTRUCTION WASTE 30 CY

DUMPSTER

100 EA $ -

0159 DEMOLITION/CONSTRUCTION WASTE 40 CY

DUMPSTER

100 EA $ -

0160 DUMPSTER OVERWEIGHT FEE 50 TN $ -

Period of Performance: Ordering Period 4

ITEM DESCRIPTION Est.

Quantities

U/M Unit Price Total

0001 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0002 FLOATING PLANT W/150 TN CRANE 8 HOUR

DURATION

10 EA

0003 FLOATING PLANT W/150 TN CRANE 12 HOUR

DURATION

8 EA $ -

0004 FLOATING PLANT W/150 TN CRANE 24 HOUR

DURATION

2 EA

0005 FLOATING PLANT W/150 TN CRANE STANDBY 4 DY $ -

0006 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0007 FLOATING PLANT W/200 TN CRANE 8 HOUR

DURATION

10 EA

0008 FLOATING PLANT W/200 TN CRANE 12 HOUR

DURATION

8 EA

0009 FLOATING PLANT W/200 TN CRANE 24 HOUR

DURATION

2 EA $ -

0010 FLOATING PLANT W/200 TN CRANE STANDBY 4 DY $ -

0011 FLOATING PLANT W/300 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0012 FLOATING PLANT W/300 TN CRANE 8 HOUR

DURATION

10 EA

0013 FLOATING PLANT W/300 TN CRANE 12 HOUR

DURATION

8 EA

0014 FLOATING PLANT W/300 TN CRANE 24 HOUR

DURATION

2 EA

0015 FLOATING PLANT W/300 TN CRANE STANDBY 4 DY $ -

0016 FLOATING PLANT W/400 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0017 FLOATING PLANT W/400 TN CRANE 8 HOUR

DURATION

10 EA

0018 FLOATING PLANT W/400 TN CRANE 12 HOUR

DURATION

8 EA

0019 FLOATING PLANT W/400 TN CRANE 24 HOUR

DURATION

2 EA $ -

0020 FLOATING PLANT W/400 TN CRANE STANDBY 4 DY $ -

0021 FLOATING PLANT W/600 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0022 FLOATING PLANT W/600 TN CRANE 8 HOUR

DURATION 10 EA

0023 FLOATING PLANT W/600 TN CRANE 12 HOUR

DURATION

8 EA

0024 FLOATING PLANT W/600 TN CRANE 24 HOUR

DURATION

2 EA

MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0027 FLOATING PLANT W/LARGE EXCAVATOR 8 HOUR

DURATION

10 EA $ -

0028 FLOATING PLANT W/LARGE EXCAVATOR 12 HOUR

DURATION 8 EA $ -

0029 FLOATING PLANT W/LARGE EXCAVATOR 24 HOUR

DURATION

2 EA $ -

0030 FLOATING PLANT W/LARGE EXCAVATOR STANDBY 4 DY $ -

0031 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0032 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 8 HOUR DURATION 10 EA $ -

0033 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 12 HOUR DURATION 10 EA $ -

0034 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 24 HOUR DURATION 2 EA $ -

0035 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS STANDBY 4 DY $ -

0036 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0037 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 8 HOUR DURATION 10 EA $ -

0038 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 12 HOUR DURATION 10 EA $ -

0039 FLOATING PLANT WITH MATERIAL BARGE W/RAMPS

24 HOUR DURATION 1 EA $ -

0040 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS STANDBY 4 DY $ -

0041 GROUP 1 EQUIPMENT MOBILIZATION &

0044 TRACK-TYPE LOADER (Min 160 hp) 800 HR $ -

0045 TRACK-TYPE HYDRAULIC BACKHOE (Min 155 hp)

EXCAVATOR

1200 HR $ -

0046 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR

1300 HR $ -

0047 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR WITH VIBRATORY PILE

DRIVER/EXTRACTOR

250 HR

0048 TRACK-TYPE HYDRAULIC BACKHOE EXCAVATOR (MIN

60 FOOT REACH) 1000 HR $ -

DEMOBILIZATION (TBD)

TBD $ -

0053 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/GRADING/GRAPPLE BUCKET &

PALLET FORKS

160 HR

0054 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/ GRADING/GRAPPLE BUCKET &

PALLET FORKS (WEEKLY)

2 WK

0055 COMPACT TRACK LOADER (Min 73 hp) WITH BROOM 100 HR $ -

0056 COMPACT TRACK LOADER (Min 73 hp) WITH

CONCRETE BREAKER 100 HR $ -

0057 8.5 TN CARRY DECK CRANE (Min 30Ft Reach) 160 HR $ -

0058 STRAIGHT BOOM LIFT (Min 60Ft Reach) 120 HR $ -

0059 STRAIGHT BOOM LIFT (Min 110Ft Reach) 120 HR $ -

0060 ARTICULATING BOOM LIFT (Min 86Ft Reach) 120 HR $ -

0065 OPERATOR - GROUP 2 - OVERTIME 100 HR $ -

0066 GROUP 4 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0067 WATER AND TRASH PUMP, (13,500GPM) (DAILY) 14 DY $ -

0068 WATER AND TRASH PUMP, (13,500GPM) 80 HR $ -

0069 WATER AND TRASH PUMP, (13,500GPM), SUCTION

& DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0070 WATER AND TRASH PUMP, (4,600GPM) (DAILY) 14 DY $ -

0071 WATER AND TRASH PUMP, (4,600GPM) 80 HR $ -

0072 WATER AND TRASH PUMP, (4,600GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0073 WATER AND TRASH PUMP, (2,750GPM) (DAILY) 10 DY $ -

0074 WATER AND TRASH PUMP, (2,750GPM) 80 HR $ -

0075 WATER AND TRASH PUMP, (2,750GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0076 WATER AND TRASH PUMP, (1,450GPM) (DAILY) 10 DY $ -

0077 WATER AND TRASH PUMP, (1,450GPM) 80 HR $ -

0078 WATER AND TRASH PUMP, (1,450GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0079 WATER AND TRASH PUMP, (200GPM) (DAILY) 14 DY $ -

0080 WATER AND TRASH PUMP, (200GPM) 80 HR $ -

0083 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM)

80 HR $ -

0084 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0085 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) (DAILY) 10 DY $ -

0086 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) 80 HR $ -

0087 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0088 SUBMERSIBLE SUMP PUMP,TWO-INCH (DAILY) 10 DY $ -

0089 SUBMERSIBLE SUMP PUMP,TWO-INCH 80 HR $ -

0090 SUBMERSIBLE SUMP PUMP,TWO-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0091 SUBMERSIBLE SUMP PUMP,THREE-INCH (DAILY) 10 DY $ -

0092 SUBMERSIBLE SUMP PUMP,THREE-INCH 80 HR $ -

0093 SUBMERSIBLE SUMP PUMP,THREE-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0094 SUBMERSIBLE SUMP PUMP,SIX-INCH (DAILY) 5 DY $ -

0095 SUBMERSIBLE SUMP PUMP,SIX-INCH 40 HR $ -

0096 SUBMERSIBLE SUMP PUMP,SIX-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 600 LF $ -

0097 OPERATOR - GROUP 4 - STRAIGHT TIME 300 HR $ -

0098 OPERATOR - GROUP 4 - OVERTIME 50 HR $ -

0099 GROUP 5 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0100 PORTABLE DIESEL AIR COMPRESSOR (200CFM) 200 HR $ -

0101 PORTABLE DIESEL AIR COMPRESSOR (600CFM) 200 HR $ -

0102 PORTABLE DIESEL AIR COMPRESSOR (1000CFM) 200 HR $ -

0103 PORTABLE GENERATOR 160 HR $ -

0104 TOWABLE GENERATOR (250kW) 160 HR $ -

0105 TOWABLE GENERATOR (500kW) 80 HR $ -

0106 HIGH PRESSURE HYDRO JET/BLASTING MACHINE 80 HR $ -

0107 TRAILER MOUNTED CONCRETE PUMP (Min 100hp) 200 HR $ -

0108 LIGHT TOWER 200 HR $ -

0109 RENTAL OF MISC. EQUIPMENT (TBD) TBD $ -

0110 CHAINSAW 160 HR $ -

0111 POWER WASHER 200 HR $ -

0112 HAND OPERATED ELECTRIC POWERED JACK

0115 VIBRATORY PLATE TAMPER 200 HR $ -

0116 HAND OPERATED POWER CUTOFF SAW 160 HR $ -

0117 HAND OPERATED POWER HAMMER DRILL W/BITS 40 HR $ -

0118 HAND OPERATED AIR POWERED CORE DRILL W/BITS 40 HR $ -

0119 CONCRETE SAW 80 HR $ -

0120 DOWEL MACHINE W/BITS 60 HR $ -

0121 GROUP 5 LABORER - STAIGHT TIME 2500 HR $ -

0122 GROUP 5 LABORER - OVERTIME 150 HR $ -

0123 IRON WORKER 240 HR $ -

0124 CARPENTER 240 HR $ -

0125 CEMENT MASON 160 HR $ -

0126 WELDER TYPE I 240 HR $ -

0127 WELDER TYPE 2 240 HR $ -

0128 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

8 HOUR OPERATION 10 DY $ -

0129 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

12 HOUR OPERATION 10 DY $ -

0130 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

24 HOUR OPERATION 5 DY $ -

0131 ADDITIONAL DIVER/TENDER 80 HR $ -

0132 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

STANDBY

0137 ROCK BLANKET (MISSOURI TYPE 2) 2000 TN $ -

0138 RIPRAP, 2200 LB. TOPSIZE 500 TN $ -

0139 RIPRAP, 1000 LB. TOPSIZE 8000 TN $ -

0140 RIPRAP, 650 LB. TOPSIZE 5000 TN $ -

0141 RIPRAP, 400 LB. TOPSIZE 10000 TN $ -

0142 RIPRAP, 140 LB. TOPSIZE 2000 TN $ -

0143 RIPRAP, 90 LB. TOPSIZE 200 TN $ -

0144 RIPRAP, BEDDING MATERIAL 1000 TN $ -

0145 GABIAN (FOUR-SIX INCH) STONE 500 TN $ -

0146 AGGREGATE FOR BASE 3/4-INCH MINUS STONE

0150 CONCRETE TYPE 2 70 CY $ -

0151 RIP RAP GROUT 100 CY $ -

0152 TACK FREE CONCRETE SEALER 5000 SY $ -

0153 REINFORCEMENT BARS STRAIGHT 800 LB $ -

0154 REINFORCEMENT BARS PRE-FORMED 800 LB $ -

0155 REINFORCEMENT BARS STRAIGHT EPOXY COATED 500 LB $ -

0156 REINFORCEMENT BARS PRE-FORMED EPOXY

COATED

500 LB $ -

0157 WELDED WIRE FABRIC 1000 SF $ -

0158 DEMOLITION/CONSTRUCTION WASTE 30 CY

DUMPSTER

100 EA $ -

0159 DEMOLITION/CONSTRUCTION WASTE 40 CY

DUMPSTER

100 EA $ -

0160 DUMPSTER OVERWEIGHT FEE 50 TN $ -

Period of Performance: Ordering Period 5

ITEM DESCRIPTION Est.

Quantities

U/M Unit Price Total

0001 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0002 FLOATING PLANT W/150 TN CRANE 8 HOUR

DURATION

10 EA

0003 FLOATING PLANT W/150 TN CRANE 12 HOUR

DURATION

8 EA $ -

0004 FLOATING PLANT W/150 TN CRANE 24 HOUR

DURATION

2 EA

0005 FLOATING PLANT W/150 TN CRANE STANDBY 4 DY $ -

0006 FLOATING PLANT W/150 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0007 FLOATING PLANT W/200 TN CRANE 8 HOUR

DURATION

10 EA

0008 FLOATING PLANT W/200 TN CRANE 12 HOUR

DURATION

8 EA

0009 FLOATING PLANT W/200 TN CRANE 24 HOUR

DURATION

2 EA $ -

0010 FLOATING PLANT W/200 TN CRANE STANDBY 4 DY $ -

0011 FLOATING PLANT W/300 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0012 FLOATING PLANT W/300 TN CRANE 8 HOUR

DURATION

10 EA

0013 FLOATING PLANT W/300 TN CRANE 12 HOUR

DURATION

8 EA

0014 FLOATING PLANT W/300 TN CRANE 24 HOUR

DURATION

2 EA

0015 FLOATING PLANT W/300 TN CRANE STANDBY 4 DY $ -

0016 FLOATING PLANT W/400 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0017 FLOATING PLANT W/400 TN CRANE 8 HOUR

DURATION

10 EA

0018 FLOATING PLANT W/400 TN CRANE 12 HOUR

DURATION

8 EA

0019 FLOATING PLANT W/400 TN CRANE 24 HOUR

DURATION

2 EA $ -

0020 FLOATING PLANT W/400 TN CRANE STANDBY 4 DY $ -

0021 FLOATING PLANT W/600 TN CRANE MOBILIZATION

& DEMOBILIZATION (TBD) TBD

0022 FLOATING PLANT W/600 TN CRANE 8 HOUR

DURATION 10 EA

0023 FLOATING PLANT W/600 TN CRANE 12 HOUR

DURATION

8 EA

0024 FLOATING PLANT W/600 TN CRANE 24 HOUR

DURATION

2 EA

MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0027 FLOATING PLANT W/LARGE EXCAVATOR 8 HOUR

DURATION

10 EA $ -

0028 FLOATING PLANT W/LARGE EXCAVATOR 12 HOUR

DURATION 8 EA $ -

0029 FLOATING PLANT W/LARGE EXCAVATOR 24 HOUR

DURATION

2 EA $ -

0030 FLOATING PLANT W/LARGE EXCAVATOR STANDBY 4 DY $ -

0031 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0032 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 8 HOUR DURATION 10 EA $ -

0033 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 12 HOUR DURATION 10 EA $ -

0034 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS 24 HOUR DURATION 2 EA $ -

0035 FLOATING PLANT WITH MATERIAL BARGE W/SPUDS

& RAMPS STANDBY 4 DY $ -

0036 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS MOBILIZATION & DEMOBILIZATION (TBD)

TBD $ -

0037 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 8 HOUR DURATION 10 EA $ -

0038 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS 12 HOUR DURATION 10 EA $ -

0039 FLOATING PLANT WITH MATERIAL BARGE W/RAMPS

24 HOUR DURATION 1 EA $ -

0040 FLOATING PLANT WITH MATERIAL BARGE W/

RAMPS STANDBY 4 DY $ -

0041 GROUP 1 EQUIPMENT MOBILIZATION &

0044 TRACK-TYPE LOADER (Min 160 hp) 800 HR $ -

0045 TRACK-TYPE HYDRAULIC BACKHOE (Min 155 hp)

EXCAVATOR

1200 HR $ -

0046 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR

1300 HR $ -

0047 TRACK-TYPE HYDRAULIC BACKHOE (Min 242 hp)

EXCAVATOR WITH VIBRATORY PILE

DRIVER/EXTRACTOR

250 HR

0048 TRACK-TYPE HYDRAULIC BACKHOE EXCAVATOR (MIN

60 FOOT REACH) 1000 HR $ -

DEMOBILIZATION (TBD)

TBD $ -

0053 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/GRADING/GRAPPLE BUCKET &

PALLET FORKS

160 HR

0054 COMPACT TRACK LOADER (Min 73 hp) WITH

CONSTRUCTION/ GRADING/GRAPPLE BUCKET &

PALLET FORKS (WEEKLY)

2 WK

0055 COMPACT TRACK LOADER (Min 73 hp) WITH BROOM 100 HR $ -

0056 COMPACT TRACK LOADER (Min 73 hp) WITH

CONCRETE BREAKER 100 HR $ -

0057 8.5 TN CARRY DECK CRANE (Min 30Ft Reach) 160 HR $ -

0058 STRAIGHT BOOM LIFT (Min 60Ft Reach) 120 HR $ -

0059 STRAIGHT BOOM LIFT (Min 110Ft Reach) 120 HR $ -

0060 ARTICULATING BOOM LIFT (Min 86Ft Reach) 120 HR $ -

0065 OPERATOR - GROUP 2 - OVERTIME 100 HR $ -

0066 GROUP 4 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0067 WATER AND TRASH PUMP, (13,500GPM) (DAILY) 14 DY $ -

0068 WATER AND TRASH PUMP, (13,500GPM) 80 HR $ -

0069 WATER AND TRASH PUMP, (13,500GPM), SUCTION

& DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0070 WATER AND TRASH PUMP, (4,600GPM) (DAILY) 14 DY $ -

0071 WATER AND TRASH PUMP, (4,600GPM) 80 HR $ -

0072 WATER AND TRASH PUMP, (4,600GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0073 WATER AND TRASH PUMP, (2,750GPM) (DAILY) 10 DY $ -

0074 WATER AND TRASH PUMP, (2,750GPM) 80 HR $ -

0075 WATER AND TRASH PUMP, (2,750GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0076 WATER AND TRASH PUMP, (1,450GPM) (DAILY) 10 DY $ -

0077 WATER AND TRASH PUMP, (1,450GPM) 80 HR $ -

0078 WATER AND TRASH PUMP, (1,450GPM), SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0079 WATER AND TRASH PUMP, (200GPM) (DAILY) 14 DY $ -

0080 WATER AND TRASH PUMP, (200GPM) 80 HR $ -

0083 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM)

80 HR $ -

0084 HYDRAULIC SUBMERSIBLE DEWATERING PUMP,

(4,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0085 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) (DAILY) 10 DY $ -

0086 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM) 80 HR $ -

0087 ELECTRIC SUBMERSIBLE DEWATERING PUMP,

(3,500GPM), DISCHARGE PIPE, SETUP AND

TEARDOWN

100 LF

0088 SUBMERSIBLE SUMP PUMP,TWO-INCH (DAILY) 10 DY $ -

0089 SUBMERSIBLE SUMP PUMP,TWO-INCH 80 HR $ -

0090 SUBMERSIBLE SUMP PUMP,TWO-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0091 SUBMERSIBLE SUMP PUMP,THREE-INCH (DAILY) 10 DY $ -

0092 SUBMERSIBLE SUMP PUMP,THREE-INCH 80 HR $ -

0093 SUBMERSIBLE SUMP PUMP,THREE-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 800 LF $ -

0094 SUBMERSIBLE SUMP PUMP,SIX-INCH (DAILY) 5 DY $ -

0095 SUBMERSIBLE SUMP PUMP,SIX-INCH 40 HR $ -

0096 SUBMERSIBLE SUMP PUMP,SIX-INCH, SUCTION &

DISCHARGE PIPE, SETUP AND TEARDOWN 600 LF $ -

0097 OPERATOR - GROUP 4 - STRAIGHT TIME 300 HR $ -

0098 OPERATOR - GROUP 4 - OVERTIME 50 HR $ -

0099 GROUP 5 EQUIPMENT MOBILIZATION &

DEMOBILIZATION (TBD)

TBD $ -

0100 PORTABLE DIESEL AIR COMPRESSOR (200CFM) 200 HR $ -

0101 PORTABLE DIESEL AIR COMPRESSOR (600CFM) 200 HR $ -

0102 PORTABLE DIESEL AIR COMPRESSOR (1000CFM) 200 HR $ -

0103 PORTABLE GENERATOR 160 HR $ -

0104 TOWABLE GENERATOR (250kW) 160 HR $ -

0105 TOWABLE GENERATOR (500kW) 80 HR $ -

0106 HIGH PRESSURE HYDRO JET/BLASTING MACHINE 80 HR $ -

0107 TRAILER MOUNTED CONCRETE PUMP (Min 100hp) 200 HR $ -

0108 LIGHT TOWER 200 HR $ -

0109 RENTAL OF MISC. EQUIPMENT (TBD) TBD $ -

0110 CHAINSAW 160 HR $ -

0111 POWER WASHER 200 HR $ -

0112 HAND OPERATED ELECTRIC POWERED JACK

0115 VIBRATORY PLATE TAMPER 200 HR $ -

0116 HAND OPERATED POWER CUTOFF SAW 160 HR $ -

0117 HAND OPERATED POWER HAMMER DRILL W/BITS 40 HR $ -

0118 HAND OPERATED AIR POWERED CORE DRILL W/BITS 40 HR $ -

0119 CONCRETE SAW 80 HR $ -

0120 DOWEL MACHINE W/BITS 60 HR $ -

0121 GROUP 5 LABORER - STAIGHT TIME 2500 HR $ -

0122 GROUP 5 LABORER - OVERTIME 150 HR $ -

0123 IRON WORKER 240 HR $ -

0124 CARPENTER 240 HR $ -

0125 CEMENT MASON 160 HR $ -

0126 WELDER TYPE I 240 HR $ -

0127 WELDER TYPE 2 240 HR $ -

0128 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

8 HOUR OPERATION 10 DY $ -

0129 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

12 HOUR OPERATION 10 DY $ -

0130 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

24 HOUR OPERATION 5 DY $ -

0131 ADDITIONAL DIVER/TENDER 80 HR $ -

0132 FOUR (4) MAN DIVE TEAM WITH FLOATING PLANT -

STANDBY

0137 ROCK BLANKET (MISSOURI TYPE 2) 2000 TN $ -

0138 RIPRAP, 2200 LB. TOPSIZE 500 TN $ -

0139 RIPRAP, 1000 LB. TOPSIZE 8000 TN $ -

0140 RIPRAP, 650 LB. TOPSIZE 5000 TN $ -

0141 RIPRAP, 400 LB. TOPSIZE 10000 TN $ -

0142 RIPRAP, 140 LB. TOPSIZE 2000 TN $ -

0143 RIPRAP, 90 LB. TOPSIZE 200 TN $ -

0144 RIPRAP, BEDDING MATERIAL 1000 TN $ -

0145 GABIAN (FOUR-SIX INCH) STONE 500 TN $ -

0146 AGGREGATE FOR BASE 3/4-INCH MINUS STONE

0150 CONCRETE TYPE 2 70 CY $ -

0151 RIP RAP GROUT 100 CY $ -

0152 TACK FREE CONCRETE SEALER 5000 SY $ -

0153 REINFORCEMENT BARS STRAIGHT 800 LB $ -

0154 REINFORCEMENT BARS PRE-FORMED 800 LB $ -

0155 REINFORCEMENT BARS STRAIGHT EPOXY COATED 500 LB $ -

0156 REINFORCEMENT BARS PRE-FORMED EPOXY

COATED

500 LB $ -

0157 WELDED WIRE FABRIC 1000 SF $ -

0158 DEMOLITION/CONSTRUCTION WASTE 30 CY

DUMPSTER

100 EA $ -

0159 DEMOLITION/CONSTRUCTION WASTE 40 CY

DUMPSTER

100 EA $ -

0160 DUMPSTER OVERWEIGHT FEE 50 TN $ -

ORDERING PERIODS 1,2,3,4, & 5

GRAND TOTAL COST $

ABBREVIATIONS

JB Job EA Each LF Linear Foot CY Cubic Yard TN Ton HR Hour SY Square Yard GL Gallon UT Unit DY Day SF Square Foot MI Mile WK Week LB Pounds TBD To Be Determine

(See BIDDING SCHEDULE NOTES)

LEFT

BLANK

BID NOTES

BIDDING SCHEDULE NOTES

1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".

2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.

4. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.

6. Equipment Ownership and Operating Expense Schedule (MAR 1995)

(a) This clause does not apply to terminations. See 52.249-9000, Basis for Settlement of Proposals, and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region V. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer.