A22___Questions_and_Answers.docx
DOCX document 13 KB Posted
- Attached to
- Lift Station Rehab Power Plant
- Solicitation number
- W912P918T0016
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A12__W912P918T0016_0001_ammendment.pdf | ||
| A20___SCA_Wages.pdf | ||
| A02__Combined_appendix.pdf | ||
| A12__Combined_Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
SOLICITATION NUMBER: W912P918T0016
SOLICITATION: LIFT STATION REHAB POWER PLANT
Q&A Results for Pre-Bid Site Visit held 22MAY2018
Q1: Line Item 0002, “Lift Station 7th Floor” is shown as an Optional Bid Item, is this accurate?
Ans: Line Item 0002, “Lift Station 7th Floor” is a base bide item. Bid Schedule shall be corrected to show this indication.
Q2: Submittals are currently shown to be required within 5 calendar days from date of award, can this be extended?
Ans: Paragraph 3.5 of the Specifications has been revised to permit up to 21 Calendar Days for submission.
Q3: Is there a main line shut off valve to prevent return flows from the main line?
Ans: Main line does contain shut off valve however condition is unknown. See Paragraph 2.4 of the Specifications for revisions and requirements associated with this question.
Q4: Performance Period of 30SEPT2018 may not be realistic if the contractor is not permitted to start work until after August, can this be revised?
Ans: Paragraph 1.8 of the Specifications has been revised to permit final completion by 30OCT2018.
Q5: Are there any Security Requirements associated with working in the facility?
Ans: Paragraph 1.15 and associated sub-paragraphs have been added to the specifications addressing security requirements.
Q6: How are lift station components to be removed from the facility and current locations?
Ans: Paragraph 2.1.2 and 2.2.2 of the specifications have been revised to provide access points and address requirements associated with this question.
Q7: Should Spare Pump match the new approved pumps installed in the 2nd and 7th floor lift stations?
Ans: Yes, Paragraph 2.7 of the specifications has been revised.
Q8: Is the contractor required to furnish portable toilet facilities while the onsite restrooms are closed for completion of work.
Ans: Paragraph 2.4 of the specifications has been revised to show the government shall furnish portable toilet facilities?