A12__W912P918T0016_0001_ammendment.pdf
PDF 781 KB Posted
- Attached to
- Lift Station Rehab Power Plant
- Solicitation number
- W912P918T0016
About this file
Amendment- W912P918T0016 - for Lift Station Rehab Power Plant
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22___Questions_and_Answers.docx | DOCX document | |
| A20___SCA_Wages.pdf | ||
| A02__Combined_appendix.pdf | ||
| A12__Combined_Synopsis.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81C8X80513965
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is revise the scope of w ork, Updated the question and answ er document and change the closing date from 29 May 2018 at 10:00 AM to 4 Jul 2018 at 10:00 AM. Changes are highlighted in Red and Italic Fonts.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P918T0016
X 9B. DATED (SEE ITEM 11)
14-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-May-2018
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P918T0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REVISED SCOPE OF WORK
STATEMENT OF WORK/SPECIFICATIONS
1. GENERAL.
1.1 SCOPE OF WORK. Replace two existing lift stations at Clarence Cannon Power Plant to include lift station on powerhouse 2nd floor and powerhouse 7th floor in accordance with specifications. Replacement and installation of equipment and components shall be furnished and installed new.
1.2 CONTRACTOR. The "Contractor" is the individual whose contract bid was accepted by the U.S. Army Corps of Engineers and who has gained the responsibility of performing the duties governed by the specifications of this contract.
1.3 CONTRACTING OFFICER. The term "Contracting Officer" shall mean the person executing this contract on behalf of the Government, and any other officer or civilian employee who is acting on his/her behalf.
1.3.1 CONTRACTING OFFICER’S REPRESENTATIVE (COR). An individual designated in writing by the Contracting Officer to be responsible for administration of the contract and Quality Assurance Representative.
1.4 REQUIRED INSURANCE.
1.4.1 As required by the Contract Clause entitled “Insurance – Work on a Government Installation”, the Contractor shall furnish to the Contracting Officer, prior to the commencement of work, a certificate or written statement as evidence of the minimum insurance listed below. The Contractor shall procure and maintain such types and amounts of insurance during the entire period of performance under this contract. The Contractor shall assure that the certificate or written statement is in accordance with required wording indicated in paragraph b of the aforementioned Contract Clause.
Workmen’s Compensation - Amounts required by applicable jurisdictional statutes.
Employer’s Liability Insurance - $100,000.00
Comprehensive General Liability Insurance
Bodily Injury - $500,000.00 per occurrence
Comprehensive Automobile Insurance
Bodily Injury - $200,000.00 each person $500,000.00 each person
1.4.2 Statements of insurance shall be submitted to the following address:
U.S. Army Corps of Engineers Clarence Cannon Dam & Mark Twain Lake
20642 Hwy J Monroe City, MO 63456
1.5 CONFINED SPACE ENTRY. The Contractor shall complete a confined space entry permit for approval to enter any confined space as defined in US Army Corps of Engineers Manual, EM 385-1-1. The Contractor shall submit a copy of their confined space program in accordance with 29 CFR 1910.146 to the Government. All work in confined spaces shall be accomplished in accordance with OSHA requirements and safety requirements set forth in EM 385-1-1, entitled “Safety and Health Requirements Manual”.
1.6 SAFETY. This paragraph applies to contracts and purchase orders that require the Contractor to comply with EM 385-1-1 (e.g., contracts that include the Accident Prevention clause at FAR 52.235-13 and/or other safety provisions). EM 385-1-1 and its changes are available at http://www.hq.usace.army.mil (at the HQ homepage, select Safety and Occupational Health). The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation. The Government may inspect all equipment and materials. Any equipment or material found not in conformity with the requirements of this contract shall be removed from Government property immediately. The Contractor shall develop and submit an Accident Prevention Program using the forms located in Appendices A-1, A-2, and A-3 together with a copy of the Company Policy on Safety.
1.6.1 References. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the test by the basis designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2002) Portable Fire Extinguishers NFPA 70 (2017) National Electrical Code
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2003) Safety - Safety and Health Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
1.6.2 Site Safety and Health Officer (SSHO). Site Safety and Health Officer (SSHO) shall be provided at the work site at all times to perform safety and occupational health management, surveillance, inspections and safety enforcement for the Contractor. The Contractor Quality Control (QC) person can be the SSHO on this project. The SSHO shall meet the following requirements.
1.6.2.1 Work on similar projects.
1.6.2.2 10-hour OSHA safety class or equivalent within the last three (3) years.
1.6.2.3 Competent person training as needed.
1.6.3 Accident Prevention Plan (APP).
1.6.3.1 The Contractor shall use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, ‘Minimum Basic Outline for Accident Prevention Plan”. Specific requirements for some of the APP elements are described below. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor’s overall safety and health program. Any portions of the Contractor’s overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the “controlling authority” for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm (senior person) preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer and any designated CSP and/or CIH.
1.6.3.2 Submit the APP to the Contracting Officer’s Representative (COR) for acceptance following award and prior to the post award conference for acceptance. Work cannot proceed without an accepted APP.
1.6.3.3 Once accepted by the COR, the APP and attachments will be enforced as part of the contract.
Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the COR, until the matter has been rectified.
1.6.3.4 Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the COR, project superintendent, SSHO and quality control manager. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard. Notify the COR within 24 hours of discovery. Eliminate/remove the hazard. In the interim, all necessary action shall be taken to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public and the environment.
1.6.3.5 Copies of the accepted plan will be maintained at the Mark Twain Lake Project Office. The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.
1.6.4 Activity Hazard Analysis (AHA).
1.6.4.1 The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1.
Submit the AHA to the COR for review following award and prior to the post award conference. Format subsequent AHAs as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activities safety and health controls.
1.6.4.2 The AHA list will be reviewed periodically and updated as necessary when procedures, scheduling or hazards change.
1.6.4.3 The activity hazard analyses shall be developed for activities being performed. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime contractor for submittal to the
COR.
1.6.5 Emergency Medical Treatment. Contractors will arrange for their own emergency medical treatment.
Government has no responsibility to provide emergency medical treatment.
1.6.6 Reports
1.6.6.1 Accident Reports. For recordable injuries and illnesses, and property damage accidents resulting in at least $2,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete USACE Accident Report Form 3394 and provide the report to the COR within Two (2) calendar days of the accident. The COR will provide copies of any required special forms.
1.6.6.2 Accident Notification. Notify the COR as soon as practical, but not later than four (4) hours, after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, or property damage equal to or greater than $2,000. Information shall include contractor name; contract title; type of contract;
name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of equipment used, PPE used, etc. Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.
1.6.6.3 Monthly Exposure Reports. Monthly exposure reporting to the COR is required to be attached to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor. The COR will provide copies of any special forms.
1.6.7 Meetings
1.6.7.1 Post Award Conference
1.6.7.1.1 Contractor representatives who have a responsibility or significant role in accident prevention on the contract shall attend the post award conference. This includes the project superintendent, site safety and health officer, quality control supervisor, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHAs) and special plans, program and procedures associated with it).
1.6.7.1.2 The Contractor shall discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHAs that will be developed and implemented during the performance of the contract. This list of proposed AHAs will be reviewed at the conference and an agreement will be reached between the Contractor and the COR as to which phases will require an analysis. In addition, a schedule for the preparation, submittal, review and acceptance of AHAs shall be established to preclude delays.
1.6.7.1.3 Deficiencies in the submitted APP will be brought to the attention of the Contractor at the post award conference and the Contractor shall revise the plan to correct deficiencies and resubmit it for acceptance.
Work shall not begin until there is an accepted APP.
1.6.7.2 Safety Meetings. Shall be conducted and documented as required by EM 385-1-1.
1.7 LOCATION AND CONTRACT LIMITS. The location of the work to be performed is at the Clarence Cannon Powerplant Powerhouse, Mark Twain Lake Project, Missouri.
1.8 SCHEDULE OF WORK. The Contractor shall perform all work between 0700 and 1530 hrs Monday through Friday. No work shall be performed on weekends or Federal holidays. All work and associated training shall be completed no later than October 30, 2018. The Contractor may begin work lift station once all submittals have been approved with the exception of the O&M manuals. The COR shall be informed of intent to start work 14 calendar days prior. Work shall be conducted on both lift stations in parallel and shall be completed in not more than 14 calendar days. The COR will direct the Contractor to suspend work during high water events (lake level 630 and above) and prevent contractor access. The Contractor shall have no access to the site on 25 May or 31 August.
1.9 ACCESS. The Contractor shall be responsible for access to, into and through all locations. Access into and through Government property shall be by routes approved by the Contracting Officer in advance prior to entry.
Access through Government locked barricades or gates will be provided by the Government to the Contractor provided that notification is given a minimum of twenty-four (24) hours in advance. Contractor personnel will be required to sign into and out of the facility.
1.10 UNUSUAL CONDITIONS. The Contractor shall inform the Contracting Officer of any unusual conditions observed such damage to existing work. NOTICE: The Contractor shall be required to cooperate with, and coordinate with the Government any operations in and around any other Contractors, work crews, Government employees or the public which may be working or entering the area within the contract limits.
1.11 QUALITY CONTROL. The Contractor shall establish and maintain quality control for all operations to assure compliance with contract requirements and maintain records of his quality control for all construction operations.
1.12 WARRANTY. All items furnished under this section shall be warranted to be free from defect in workmanship and materials for a minimum period of one (1) year after date of start-up assistance.
1.13 WORK PLAN. Contractor shall submit for review his work plan for review. Work plan shall include details on proposed dates of work
1.14 REFERENCE PUBLICATIONS. These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers listed below:
American National Standards Institute (ANSI) 11 West 42ND Street New York, NY 10036 www.ansi.org
American Society of Testing and Materials (ASTM) 100 Barr Harbor Drive West Conshohocken, PA 19428 www.astm.org
American Water Works Association (AWWA) 666 West Quincy Denver, CO 80235 www.awwa.org
Underwriters Laboratories Inc.
333 Pfingsten Road Northbrook, IL 60062-2096 www.ul.com
American Society of Mechanical Engineers ASME International Three Park Avenue New York, NY 10016-5990 www.asme.org
American Iron and Steel Institute 1140 Connecticut Ave. NW Suite 705 Washington D.C. 20036 www.steel.org
1.15 SECURITY
1.15.1 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html.
1.15.2 For Access and General Protection Policy and Procedures: All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of
Defense, Department of the Army, St. Louis District and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
1.15.3 In support of St. Louis District evaluation of personnel authorized for access to federal facilities, the
Contractor shall submit background checks, on all employees, that have been conducted by either a bonded third party agency or state police department within the last 6 months prior to the Notice to Proceed date.
Background check results will be provided to the St. Louis District Security Office for access 15 calendar days after accessing the project site. The background check will cover, at a minimum, the last five years covering all States the employee has lived in, criminal history and arrest report, and a national sex offender registry check. Uncleared employee must be escorted while on site. This is defined as being in the line of sight of an identified prime contractor employee who has a background check on file with the St. Louis District (as noted on the ACL).
Disqualifying factors include, but are not limited to:
(1) Criminal conduct, in particular violent crime and sex offenders;
(2) Habitual use of intoxicating beverages to excess as evidenced by DUI or public intoxication records; or
(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud).
1.15.4 Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the contract. The St. Louis District retains the right to deny any Contractor and sub-contractor employee from working on one of its contracts based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.
1.15.5 Access Control List: The Contractor will provide the Contracting Officer an Access Control List (ACL) which lists all employees to be on site during the duration of contract. Employees not listed on the approved ACL but are on site will be required to leave. As employees are added or deleted from the submitted and approved ACL, this information must be reported immediately to the Contracting Officer. Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.
In the event that an unexpected change in personnel is required, due to sudden absence of a critical employee or unforeseen change in work site condition, the Contractor shall immediately contact the Contracting Officer to obtain written approval for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Letter to the Contracting Officer and will receive written authorization from the Contracting Officer prior to bringing new personnel on site, and will ensure a criminal background check mentioned above is sent to the St. Louis District Security Office no later than 15 days from written notice of approval. Contracting Officer and/or the District Security Office reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.
1.15.6 Contractor and subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:
1) Employee will be on site a total of 15 days or less, for the duration of the project.
2) Employee is added to the ACL as a short term employee.
3) Employee is escorted while on site. This is defined as being in the line of sight of an identified prime contractor employee who has a background check on file with the St. Louis District (as noted on the ACL).
4) Each prime contractor employee can sponsor only five short term employees at a time.
1.15.7 Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the St. Louis District Security Office NLT 30 days prior to arrival on site. Additional background check requirements may be required before being allowed access. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:
1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.
2) Foreign national employee will comply with E-verify requirements (see E-verify paragraph).
3) Approved and identified prime contractor employee shall escort the foreign national employee at ALL times while on site.
4) Each prime contractor employee can sponsor only one short term foreign national at a time.
1.15.8 Suspicious Activity Reporting Training: The contractor and all associated sub-contractors shall receive a brief/training (provided by the COR) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.15.9 OPSEC Training: All new contractor employees will complete Level I OPSEC Training within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with and shall submit certificates to the COR NLT 5 calendar days after the completion of the training.
OPSEC awareness training is available via a localized developed PowerPoint training presentation available from the COR.
1.15.10 All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.15.11 The Contractor must pre-screen employees using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the employee has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible employee must be provided to the COR no later than 3 business days after the initial contract award.
2. DESCRIPTION OF WORK. Lift Station components to be furnished and installed shall conform to the following requirements.
2.1 LIFT STATION, 2nd FLOOR. The Contractor shall remove and replace prepackaged simplex lift station and wet-pit pump, discharge bases, discharge piping as needed, guide rails, float switches, and control panel including wire/cable and conduit as needed. Basic details of existing lift station components are shown in Appendix C.
2.1.1 GENERAL. The existing steel wet well is approximately 42-inches in diameter. Existing piping is installed through the top of the wet well. Existing piping system shall be modified as needed to accommodate side entry of new wet well. Unions shall be used to attach new piping to existing.
2.1.2 DEMOLITION AND REPAIR. Pump, discharge base, piping, valves, float switches, brackets, wet-well and control panels shall be removed. The Contractor shall be responsible for the removal and disposal of waste water and debris. Existing valves and piping as required shall be removed. All demolished equipment and material become property of the contractor. Access to the 2nd Floor lift station shall be via stairs or facility elevator.
Transport of materials and equipment for removal or installation shall be made by stairs or facility elevator.
Government crane capabilities are available for transport of large items from the main level to the 2nd floor. The contractor shall be permitted to request hoisting of large materials or equipment by the government utilizing the onsite crane. All operations of cranes shall be conducted by government personnel, the contractor shall be responsible for attaching all rigging and positioning all materials and equipment at picking locations to the satisfaction of the government crane operator. See Appendix C for typical layout of existing lift station.
2.1.3 PUMPS. Furnish and install Barnes SGV5042L grinder pump or approved equal as described herein.
Pump shall be equipped with 5.75-inch impeller. The motor shall be connected for operation on a 480 volt, 60 HZ, three phase service and shall be an integral part of the pumping unit. The pump discharge shall be 2”. The grinder unit shall be capable of shearing and reducing to a fine slurry all material normally found in domestic and commercial sewage including plastic, rubber, sanitary napkins, and disposable diapers. The slurry shall be capable of freely passing through a 2” piping system including check and gate valves. Pump shall be capable of running dry for extended periods of time and shall be suitable for long term submergence in sewage. Grinder pump(s) shall be U.L.
Listed to Standard 778 and CSA Listed to Standard 108.
Lift Station 2nd Floor Model Number SGV5042L Flow, GPM 30 TDH, Feet 125 Motor HP 5.0 Rated speed, RPM 3450 Power 480V-60hz-3ph
2.1.4 PUMP CONSTRUCTION. The volute, seal plates and motor housing shall be constructed of high quality ASTM A-48 class 30 cast iron. The pump(s) shall be painted with air dry enamel of 2 mil minimum thickness. All exposed hardware shall be 300 series stainless steel. Discharge connection shall be a standard 2.00 inch NPT in the vertical position. The pump impeller shall be of the recessed, vortex design. Pumps with standard centrifugal semi-open impeller designs shall not be acceptable. The impeller shall be of 85-5-5-5 bronze construction and machined for threading to the motor shaft. The impeller shall be capable of being trimmed to meet specific performance characteristics. The pump shall be a three bearing design consisting of an upper ball bearing, an intermediate ball bearing restrained for the purpose of carrying the thrust loads, and an oil lubricated lower bronze sleeve bearing to carry radial loads and prevent shaft deflection imposed by the pump impeller and grinder operation. The oil lubricated sleeve bearing shall be located between two mechanical seals. Lip type seals are not acceptable. Designs reducing the number of bearings or substituting sleeve bearings for ball bearings will not be considered equal.
2.1.4.1 Impeller. The grinder mechanism shall be specifically designed for use in a grinder pump.
Garbage disposal cutting mechanisms are not acceptable. The mechanism shall consist of a radial cutter threaded and locked on the motor shaft by a washer in conjunction with a counter sunk flat head cap screw, and a matching shredding ring. Grinding shall be accomplished by a slicing action as opposed to a chopping action. Chopping-type cutter mechanisms will not be allowed. Grinder design shall be able to alternately engage cutters at start and shall exert a minimum cutting force of 30 pounds, thus eliminating the need for excessive motors. The shredding ring shall be reversible to provide twice the cutting life. All grinding mechanism components, including both the shredding ring and radial cutter and its impeller, shall be constructed of 440C stainless steel hardened to a minimum Rockwell C55 and shall be finish ground for a fine cutting edge. Two stage cutter mechanisms and/or those requiring external adjustment for proper clearance shall not be acceptable. The grinder shall be placed immediately below the pumping elements and shall be direct-driven by a single, one-piece, stainless steel motor shaft. The grinding assembly operate without objectionable noise or vibration over the entire range of recommended operating pressures. The grinder shall be constructed so as to eliminate clogging and jamming under all normal operating conditions including starting. In order to demonstrate adequate flow velocity and grinding capability, the grinder pump shall be capable of passing a series of stringy type solids (diapers, rags, feminine products, etc.) through the pump without roping or winding the material in or immediately below the pump suction. The grinder shall be capable of reducing all components in normal domestic sewage, including a reasonable amount of “foreign objects”, such as paper, wood, plastic, glass, rubber and the like, to finely-divided particles which will pass freely through the passages of the pump and the discharge piping. The grinding mechanism must be capable of handling reasonable amounts of grit, often found in domestic sewage systems.
2.1.4.2 Shaft and Bearings. The common pump and motor shaft shall be 416 stainless steel supported by a heavy duty lower sleeve bearing, and an upper and middle sealed single row ball bearings. The cutting elements and impeller shall be designed to keep the overhung load distance to a minimum. All fasteners shall be 304 stainless steel.
2.1.4.3 Shaft Seals. The pump shall utilize a tandem mechanical shaft seal arrangement and shall operate in an oil atmosphere. Each seal shall be double floating, self-aligning rotary shaft seals to prevent leakage between the motor and pump. The materials of construction shall be carbon for the rotating face and ceramic for the stationary face, lapped and polished to a tolerance of one light band, with 300 stainless steel hardware, with all elastomer parts of Buna-N. The seal shall be commercially available and not a proprietary design of the manufacturer
2.1.4.4 Performance. In order to insure proper operation in all conditions, pump must provide, without overheating in continuous operation, maximum head condition required by the system. Pump must also be capable of operating at zero or negative heads without damage to the pump.
2.1.5 SUBMERSIBLE ELECTRIC MOTOR. Three phase motors shall be of the dual-voltage 240/480, NEMA B design. The motor shall be designed to be non-overloading throughout the entire pump curve. The motor shall be constructed with the open windings operating in a sealed housing, which contains clean dielectric oil for heat dissipation from the windings and for lubrication of the bearings, making it capable of operating in a totally, partially, or non-submerged condition for extended periods of time without damage due to heat being generated. Oil used must be able to be disposed of as non-hazardous waste. Air-filled motors shall not be acceptable. The rotor and stator assembly shall be of the standard frame design and secured to the pump seal plate by four threaded fasteners allowing for easy serviceability. Motor designs incorporating shrink or press fit assemblies between the stator and motor housing shall not be considered acceptable. The motor shaft shall be of 416 stainless steel. Protection against excessive temperature shall be provided by heat sensor thermostat attached to the stator windings and connected in series with the contactor coil to the control panel. The pumps shall be equipped with type SOW power cable. The power cable is connected to the motor via quick disconnect pin terminals. Threaded cord grip type cord entries are not acceptable.
Pin receptacles shall be crimped and molded to the power cord in a PVC plug. The plug shall be secured with a stainless steel compression plate to prevent water from entering the motor housing and to provide strain relief at the point of cable entry. A stainless steel clamp shall compress the PVC molding against the cable jacket to prevent water from entering the jacket. A polybutylene terephthalate terminal block with brass pin inserts shall connect the power cord leads with motor leads. The ground pin shall be longer than the other pins such that the ground connection is the first connection made and the last connection broken when the plug is inserted and removed, respectively. A Buna-N o-ring shall provide isolation sealing between terminal block and the motor housing. The plug assembly shall be guaranteed by the manufacturer to meet UL approval for submersion.
2.1.5.1 480 V Power Feeder. Power for each pump shall be provided by existing 15A breaker located in MCC4 bucket 1T on the 2nd floor EL. 517.5. Existing feeder cable 4P5 (see Appendix C) shall be used. Contractor responsible for supplying submersible pump motor cable and terminating to existing cable 4P5 in wall-mounted junction box located adjacent to wet well.
2.1.6 GUIDE RAIL BASE AND SYSTEM. Basin shall be equipped with a 300 series stainless steel pipe guide rail assembly to facilitate removal of the pump(s) from ground level. A stainless steel lifting chain with harness shall be supplied for pump removal. Pump removal system must not require the loosening of fasteners to facilitate pump removal, and shall provide for automatic alignment and re-connection of discharge piping for the replacement pump.
Pump replacement shall be accomplished while the basin is full of sewage without the need to dewater the basin.
2.1.7 WET WELL. Packaged wet well shall be Barnes simplex BAF-2020 or approved equal. The basin shall be fiberglass reinforced polyester resin with a 3" (76.2 mm) ballast support flange. The basin shall be furnished with one flexible inlet flange (shipped loose to facilitate field location) to accept a 4.50" (114 mm) OD DWV pipe. Inlet location can vary to accommodate ease of installation. Basin capacities and dimensions shall be as shown on the contract drawings or as specified herein. The basin FRP wall laminate thickness shall vary with the wet well depth to provide the aggregate strength to meet the tensile and flexural physical property requirements. The basin FRP wall laminate must be designed to withstand wall collapse or buckling based on a hydrostatic pressure of pounds per square foot, a saturated soil weight of 120 pounds per cubic foot, a soil modulus of 700 pounds per square foot. Basin must comply with the pipe stiffness values as specified in ASTM D 3753. The basin laminate must be constructed to withstand or exceed 150% of the assumed loading on any depth. The finished FRP laminate will have a Barcol hardness of at least 90% of the resin manufactures specified hardness for the fully cured resin. The Barcol Hardness shall be the same for both interior and exterior surfaces. Manufacture must submit documentation including calculation and production certification that basin on the project are in compliance with the above requirements. Aluminum cover shall be natural silver color. All discharge piping shall be constructed of schedule 40 stainless steel and terminate outside the stations with a bulkhead female NPT fitting. The manufacturer shall guarantee all bulkhead penetrations watertight.
2.1.8. FLOAT SWITCH.
2.1.9.1 General. Three level extended stem float level switches shall be Compac Engineering Erecta Switch or equal. The casing shall be chemical resistant polypropylene and provide a liquid tight fitting for cable penetrations through wet-well lid. Device shall be RoHS compliant. The electrical cable shall have length as required to prevent the need for splices between device and control panel.
2.1.9.2 Float Switch Adjustment. The float switches shall be field adjusted to the start, stop, and alarm elevations as shown in the pump/wet-well shop drawings.
2.1.9 PIPE AND VALVES.
2.1.10.1 Station Piping. Provide threaded joint fittings within wet well as required. All new piping inside the wet–well shall be 2” schedule 40 stainless steel. The Contractor shall install 2” stainless steel station discharge piping and connect to the existing force main outside the wet-well using a dielectric union. Piping extending thru the wet-well shall be installed with a bulkhead fitting to form a water-tight seal. Check valve shall be installed at pump discharge after exiting wet well, check shall be dual door type or similar low head loss valve.
2.1.10.2 Valves. The pump discharge shall be equipped with a factory installed, manual valve with separate union. Valve shall be gate valve constructed of brass with a minimum rated pressure of 150 PSI (10.6 kgs/sq. meter). All valves shall be operable from ground level. Shut off valve shall be equal to the size of the station discharge.
2.2 LIFT STATION, 7th FLOOR. The Contractor shall remove and replace prepackaged duplex lift station and wet-pit pump, discharge bases, discharge piping as needed, guide rails, float switches, and control panel. Basic details of existing lift station components are shown in Appendix C.
2.2.1 GENERAL. The existing steel wet well is approximately 48-inches in diameter. Existing piping is installed through the top of the wet well. Existing piping system shall be modified as needed to accommodate side entry of new wet well. Unions shall be used to attach new piping to existing.
2.2.2 DEMOLITION AND REPAIR. Pumps, discharge base, piping, valves, float switches, brackets, wet-well and control panels shall be removed. The Contractor shall be responsible for the removal and disposal of waste water and debris. Existing valves and piping as required shall be removed. All demolished equipment and material become property of the contractor. Access to the 7th Floor lift station shall be via facility elevator. Transport of materials and equipment for removal or installation shall be made by facility elevator. Contractor shall be required to tear down or breakdown lift station components to permit removal through access doors and elevators.
Contractor shall furnish all ventilation and or containment controls for torch, cutting, or burning operations required to remove lift station components to include but not limited to the wet well and such operations shall be in accordance with the EM 385-1-1. See Appendix C for typical layout of existing lift station.
2.2.3 PUMPS. Furnish and install Barnes SGV5042L grinder pumps or approved equal as described herein.
Pumps shall be equipped with 5.125-inch impeller. The motor shall be connected for operation on a 480 volt, 60 HZ, three phase service and shall be an integral part of the pumping unit. The pump discharge shall be 2”. The grinder unit shall be capable of shearing and reducing to a fine slurry all material normally found in domestic and commercial sewage including plastic, rubber, sanitary napkins, and disposable diapers. The slurry shall be capable of freely passing through a 2” piping system including check and gate valves. Pump shall be capable of running dry for extended periods of time and shall be suitable for long term submergence in sewage. Grinder pump(s) shall be U.L.
Listed to Standard 778 and CSA Listed to Standard 108.
Lift Station 7th Floor Model Number SGV5042L Flow, GPM 30 TDH, Feet 95 Motor HP 5.0
2.2.4 PUMP CONSTRUCTION. The volute, seal plates and motor housing shall be constructed of high quality ASTM A-48 class 30 cast iron. The pump(s) shall be painted with air dry enamel of 2 mil minimum thickness. All exposed hardware shall be 300 series stainless steel. Discharge connection shall be a standard 2.00 inch NPT in the vertical position. The pump impeller shall be of the recessed, vortex design. Pumps with standard centrifugal semi-open impeller designs shall not be acceptable. The impeller shall be of 85-5-5-5 bronze construction and machined for threading to the motor shaft. The impeller shall be capable of being trimmed to meet specific performance characteristics. The pump shall be a three bearing design consisting of an upper ball bearing, an intermediate ball bearing restrained for the purpose of carrying the thrust loads, and an oil lubricated lower bronze sleeve bearing to carry radial loads and prevent shaft deflection imposed by the pump impeller and grinder operation. The oil lubricated sleeve bearing shall be located between two mechanical seals. Lip type seals are not acceptable. Designs reducing the number of bearings or substituting sleeve bearings for ball bearings will not be considered equal.
2.2.4.1 Impeller. The grinder mechanism shall be specifically designed for use in a grinder pump.
Garbage disposal cutting mechanisms are not acceptable. The mechanism shall consist of a radial cutter threaded and locked on the motor shaft by a washer in conjunction with a counter sunk flat head cap screw, and a matching shredding ring. Grinding shall be accomplished by a slicing action as opposed to a chopping action. Chopping-type cutter mechanisms will not be allowed. Grinder design shall be able to alternately engage cutters at start and shall exert a minimum cutting force of 30 pounds, thus eliminating the need for excessive motors. The shredding ring shall be reversible to provide twice the cutting life. All grinding mechanism components, including both the shredding ring and radial cutter and its impeller, shall be constructed of 440C stainless steel hardened to a minimum Rockwell C55 and shall be finish ground for a fine cutting edge. Two stage cutter mechanisms and/or those requiring external adjustment for proper clearance shall not be acceptable. The grinder shall be placed immediately below the pumping elements and shall be direct-driven by a single, one-piece, stainless steel motor shaft. The grinding assembly operate without objectionable noise or vibration over the entire range of recommended operating pressures. The grinder shall be constructed so as to eliminate clogging and jamming under all normal operating conditions including starting. In order to demonstrate adequate flow velocity and grinding capability, the grinder pump shall be capable of passing a series of stringy type solids (diapers, rags, feminine products, etc.) through the pump without roping or winding the material in or immediately below the pump suction. The grinder shall be capable of reducing all components in normal domestic sewage, including a reasonable amount of “foreign objects”, such as paper, wood, plastic, glass, rubber and the like, to finely-divided particles which will pass freely through the passages of the pump and the discharge piping. The grinding mechanism must be capable of handling reasonable amounts of grit, often found in domestic sewage systems.
2.2.4.2 Shaft and Bearings. The common pump and motor shaft shall be 416 stainless steel supported by a heavy duty lower sleeve bearing, and an upper and middle sealed single row ball bearings. The cutting elements and impeller shall be designed to keep the overhung load distance to a minimum. All fasteners shall be 304 stainless steel.
2.2.4.3 Shaft Seals. The pump shall utilize a tandem mechanical shaft seal arrangement and shall operate in an oil atmosphere. Each seal shall be double floating, self-aligning rotary shaft seals to prevent leakage between the motor and pump. The materials of construction shall be carbon for the rotating face and ceramic for the stationary face, lapped and polished to a tolerance of one light band, with 300 stainless steel hardware, with all elastomer parts of Buna-N. The seal shall be commercially available and not a proprietary design of the manufacturer
2.2.4.4 Performance. In order to insure proper operation in all conditions, pump must provide, without overheating in continuous operation, maximum head condition required by the system. Pump must also be capable of operating at zero or negative heads without damage to the pump.
2.2.5 SUBMERSIBLE ELECTRIC MOTOR. Three phase motors shall be of the dual-voltage 240/480, NEMA B design. The motor shall be designed to be non-overloading throughout the entire pump curve. The motor shall be constructed with the open windings operating in a sealed housing, which contains clean dielectric oil for heat dissipation from the windings and for lubrication of the bearings, making it capable of operating in a totally, partially, or non-submerged condition for extended periods of time without damage due to heat being generated. Oil used must be able to be disposed of as non-hazardous waste. Air-filled motors shall not be acceptable. The rotor and stator assembly shall be of the standard frame design and secured to the pump seal plate by four threaded fasteners allowing for easy serviceability. Motor designs incorporating shrink or press fit assemblies between the stator and motor housing shall not be considered acceptable. The motor shaft shall be of 416 stainless steel. Protection against excessive temperature shall be provided by heat sensor thermostat attached to the stator windings and connected in series with the contactor coil to the control panel. The pumps shall be equipped with type SOW power cable. The power cable is connected to the motor via quick disconnect pin terminals. Threaded cord grip type cord entries are not acceptable.
Pin receptacles shall be crimped and molded to the power cord in a PVC plug. The plug shall be secured with a stainless steel compression plate to prevent water from entering the motor housing and to provide strain relief at the point of cable entry. A stainless steel clamp shall compress the PVC molding against the cable jacket to prevent water from entering the jacket. A polybutylene terephthalate terminal block with brass pin inserts shall connect the power cord leads with motor leads. The ground pin shall be longer than the other pins such that the ground connection is the first connection made and the last connection broken when the plug is inserted and removed, respectively. A Buna-N o-ring shall provide isolation sealing between terminal block and the motor housing. The plug assembly shall be guaranteed by the manufacturer to meet UL approval for submersion.
2.2.5.1 480 V Power Feeder. Power for each pump shall be provided by existing 30A breaker located in MCC7 bucket 2E on the 5th floor EL. 587.0. Contractor responsible for supply and install of new feeder cable from MCC7 to new duplex control panel on 7th floor.