VA-JBNC_Final_Plans_20180703_(1-10_of_78).pdf
PDF 33 MB Posted
- Attached to
- COLUMBARIUM - JEFFERSON BARRACKS
- Solicitation number
- W912P9-18-R-0031
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A24_CLARIFICATION_OF_AMENDMENTS.docx | DOCX document | |
| A22_AMEND_TO_FBO.pdf | ||
| 2am_specs.pdf | ||
| 2am_narrative_qa_signin.pdf | ||
| Soils_Report_for_Contractor.pdf | ||
| Geophysical_Report_for_Contractor.pdf | ||
| 2am_00_00_10.doc | DOC document | |
| 2am_plans.pdf | ||
| PPQ_ONLY.pdf | ||
| A22_AMENDMENT_1.pdf | ||
| JBNC_ColumbariumD_Adv_specs.pdf | ||
| A02_SOLICITITATION_FOR_ANNOUNCEMENT.pdf | ||
| VA-JBNC_Final_Plans_20180703_(11-78_of_78).pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
G-001
AAMJSV
ST. LOUIS, MISSOURI
COVER SHEET
of Engineers
US Army Corps
GENERAL
INDEX OF DRAWINGS
TITLESHT
GEOTECHNICAL
CIVIL
G-001
B-101
CD101
COVER SHEET
G-002
G-003
G-101
B-201
B-202
CG101
CG102
CG301
SS101
STRUCTURAL
SS201
SS202
SS203
SS301
SS302
SS501
SS502
SS503
SS504
SS505
SS506
LANDSCAPE
LP101 PLANTING PLAN
LS101
LS102
LS501
LP501
LS601
LI101
TITLESHT
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
ABBREVIATIONS
CG302
CS101
CS102
LI501
NEW SIGNAGE
SITE AMENITY DETAILS
PLANTING DETAILS
NUMBERING PLAN
U.S. ARMY CORPS OF ENGINEERS G-103 EROSION CONTROL PLAN
CD102 EXCAVATION PLAN
CG103
CG104
CG105
CG106
CU101
CU102
CU103
EROSION CONTROL DETAILS
LI001 IRRIGATION NOTES
PHASE 1 - IRRIGATION PLAN
LI102
LI502
LI503
LI504
IRRIGATION DETAILS - POC VAULT
IRRIGATION DETAILS - SPRINKLERS
IRRIGATION DETAILS - BUBBLERS
IRRIGATION DETAILS - CONTROLLER
G-104 PROJECT CONTROL
G-501
CU501
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
SS001 GENERAL STRUCTURAL NOTES
STRUCTURAL SITE PLAN
RETAINING WALL ELEVATION
COLUMBARIUM CAP PLAN
COLUMBARIUM DETAILS
JEFFERSON BARRACKS NATIONAL CEMETERY
PHASE 1: 5000 NICHE COLUMBARIUM D
W912P9-18-C-00xx
W912P9-18-R-0021
JEFFERSON BARRACKS
NATIONAL CEMETERY
PHASE 1: COLUMBARIUM D
G-100
LOCATION & VICINITY MAPS
SITE PHASING PLAN
SITE KEY PLAN
B-001 BORING LOG LEGEND
BORING LOCATION MAP
B-203
B-204
B-501 FLOWABLE FILL DETAIL
CU502
CG303
CG304
CIVIL DEMOLITION PLAN
DESIGN SECTIONS - COLUMBARIUM & ROAD
PHASE 1 - GRADING PLAN (1 OF 6)
PHASE 1 - GRADING PLAN (2 OF 6)
PHASE 1 - GRADING PLAN (3 OF 6)
PHASE 1 - GRADING PLAN (4 OF 6)
PHASE 1 - STORM SEWER PLAN (1 OF 3)
PHASE 1 - STORM SEWER PLAN (2 OF 3)
STORM SEWER DETAILS (1 OF 2)
STORM SEWER DETAILS (2 OF 2)
DETAIL SECTIONS (2 OF 3)
DETAIL SECTIONS (2 OF 3)
SS102 PAVEMENT JOINT PLAN
OUTLET STRUCTURE - CONCRETE DETAILS
OUTLET STRUCTURE - REINFORCEMENT DETAILS
COLUMBARIUM DETAILS
COLUMBARIUM DETAILS
LS502 SITE SIGNAGE DETAILS
G-004 SYMBOLS & LEGEND
B-102 BORING LOCATION MAP
CD201 EXCAVATION PROFILES
LS103
LS104
LS105
LS106
LS107
LS108
LS109
EXISTING LOCAL SIGNAGE
EXISTING SIGNAGE INVENTORY
EXISTING SIGNAGE INVENTORY
EXISTING SIGNAGE INVENTORY
EXISTING SIGNAGE INVENTORY
SIGN CHANGES
SIGN CHANGES
SIGN CHANGES
G-102 SITE STAGING PLAN
BORING LOGS 17-JBNC-SB-07 & 17-JBNC-SB-02
BORING LOGS 17-JBNC-SB-03 & 17-JBNC-SB-04
BORING LOGS 17-JBNC-SB-05 & 17-JBNC-SB-06
BORING LOGS 17-JBNC-SB-07 & 17-JBNC-SB-08
PHASE 1 - COLUMBARIUM D
B-205
B-206
B-207
B-208
DRILLING LOGS 17-JBNC-SB-07 & 17-JBNC-SB-02
DRILLING LOGS 17-JBNC-SB-03 & 17-JBNC-SB-04
DRILLING LOGS 17-JBNC-SB-05 & 17-JBNC-SB-06
DRILLING LOGS 17-JBNC-SB-07 & 17-JBNC-SB-08
PHASE 2 - GRADING PLAN (5 OF 6) - ( NOT IN THIS CONTRACT )
PHASE 2 - GRADING PLAN (6 OF 6) - ( NOT IN THIS CONTRACT )
PHASE 2 - STORM SEWER PLAN (3 OF 3) - ( NOT IN THIS CONTRACT )
PHASE 1 - CIVIL LAYOUT PLAN (1 OF 2)
PHASE 2 - CIVIL LAYOUT PLAN (2 OF 2) - ( NOT IN THIS CONTRACT )
PHASE 2 - TYPICAL ELEVATIONS - ( NOT IN THIS CONTRACT )
PHASE 1 - TYPICAL ELEVATIONS
PHASE 2 - IRRIGATION PLAN - ( NOT IN THIS CONTRACT )
FOR CONSTRUCTION
STAIR DETAILSSS507
RETAINING WALL PLANS
RETAINING WALL CAPS
DETAIL SECTIONS (1 OF 3)
MAY 2018
MAY 2018
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
G-002
AAM
LOCATION & VICINITY MAPS
PROJECT
LOCATION
SPRINGFIELD
CHESTER
STE.GENEVIEVE
PADUCAHCAIRO
MURPHYSBORO
CARLYLE
VANDALIA
SHELBYVILLE
ST.CHARLES
HERMANN
TROY
HARDIN
HANNIBAL
ST.LOUIS EAST
ST.LOUIS
HAVANA
NEW
LONDON
I L L I N O I S
KY
M I S S O U R I
JEFFERSON CITY
R
UNION
ALTONM
I S S
O U
R
I RIVER
UIVR
E
C
MARK TWAIN
LAKE
B O
U
R B
S E
R
E U
MERA
M
E C
R . B
I
G
R
B L
A C
K R
REND
LAKE
BIG
M
U D
D
Y
R
OHIO
R
I
VER
K A
S K
A S
K I
A
R
CARLYLE
LAKE
LAKE
SHELBYVILLE
I L L I
N O I S
M I S S I S S I P P I
R.
ALS T
RIVE
R
M I S S
I S
SIPPI
R I
V E
R
0 20000 40000
C8
VICINITY MAP
SCALE: NTS
E1
PROJECT LOCATION MAP
SCALE 1" = 1000'
MILLER ST
DUGAN ST
PROJECT LOCATION
JSV
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
MIRAVALLE RD.
G E
N T
R Y R
D
G E
N T
R Y R
D
G R
A N
T D
R
G R
A N
T D
R
G R
A N
T D
R
T R
U M
A N D
R
T R
U M
A N D
R
SHERIDAN RD.
K O
C H R
D
GRAVES DR.
CONTRACTORS ENTRY
MIRAVALLE RD.
STAGING AREA
CONTRACTORS
IL
LI
N O
IS
M
IS
SO
U R I
PARK
BARRACKS
JEFFERSON
CEMETERY
NATIONAL
BARRACKS
JEFFERSON
SAPPINGTON BARRACKS ROAD
TE
LE
G
RA
PH
R
O
AD
M
IS
SI
SS
IP
PI
R
IV
ER
FORDER ROAD
F8
AREA MAP
SCALE: NTS
PROJECT
LOCATION
PHASE 1 - COLUMBARIUM D FOR CONSTRUCTION
N
N
N
NATIONAL CEMETERY
JEFFERSON BARRACKS
PHASE 1: COLUMBARIUM D
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
G-003
AAMJSV
ABBREVIATIONS
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
ABBREVIATIONS
COURSE(S)CRS
CROSS GRAINCRG
CORROSIVE RESISTANT STEELCRES
CIRCUMFERENCECRCMF
CARPETCPT
COMPRESSIBLECPRS
COVERCOV
CORRIDORCORR
CONTRACTORCONTR
CONTINUE CONT
CONSTRUCTIONCONSTR
CONNECTCONN
CONCRETECONC
COMPARTMENTCOMPT
COMBUSTIONCOMB
COMMONCOM
COLUMNCOL
CARBON DIOXIDECO2
CLEANOUTCO
COUNTERCNTR
CORNERCNR
CONDUCTIVE NEOPRENE LATEXCNL
CONDUITCND
CONCRETE MASONRY UNITCMU
COMPOSITECMPST
CORRUGATED METAL PIPECMP
CENTIMETER(S)cm
CLEAR WIRED GLASSCLWG
CLEAR(ANCE)CLR
CLOSURECLOS
CLOSETCLO
CONTRACT LIMIT LINECLL
CLEAR GLASSCLGL
CEILING HEIGHTCLG HT
CEILINGCLG
CENTER LINECL
CIRCUIT BREAKERCKT BRKR
CIRCUITCKT
CONSTRUCTION JOINTCJ
CONTROL JOINTCJ
CIRCULARCIRC
CAST-IN-PLACECIP
CURB INLETCI
CAST IRONCI
CHROME PLATEDCHR PL
CHECKCHK
CHIMNEYCHIM
CHAMFERCHFR
CHALKBOARDCH BD
CORNER GUARDCG
CUBIC FEET PER MINUTECFM
COUNTERFLASHINGCFLG
CONDUCTIVE FLOORINGCFI
CERAMICCER
CEMENT PLASTERCEM PLAS
CEMENTCEM
COVER ELEVATIONCE
CLOSED CIRCUIT TELEVISIONCCTV
CUBICLE CURTAIN TRACKCCT
CATCH BASINCB
CAPACITYCAP
CABINETCAB
BOTH WAYSBW
BUILT-UP ROOFINGBUR
BETWEENBTWN
BTU PER HOURBtuH
BRITISH THERMAL UNITBtu
BASEMENTBSMT
BOTH SIDESBS
BRONZEBRZ
BRACKETBRKT
BRICKBRK
BEARING PLATEBRG PL
BEARINGBRG
BRIDGINGBRDG
BRACINGBRCG
BACK PLASTER(ED)BP
BOTTOMBOT
BOTTOM OF FOOTINGBOF
BOTTOM OFBO
BENCHMARKBM
BELOWBLW
BUILDINGBLDG
BUILDING LINEBL
BED JOINTBJT
BITUMINOUSBITUM
BEVELBEV
BRICK EXPANSION JOINTBEJ
BOUNDARYBDRY
BOARDBD
BOOKCASEBC
BULLETIN BOARDBB
ACOUSTICAL WALL TREATMENTAWT
AMERICAN WIRE GAUGEAWG
AVERAGEAVG
AUTOMATICAUTO
ACOUSTICAL TILE CEILINGATC
ASPHALTASPH
ABOVE SUSPENDED CEILINGASC
ASBESTOSASB
AMERICAN REFRIGERATION INSTITUTEARI
ARCHITECTARCH
APPROXIMATEAPPROX
APPROVEDAPPD
AMERICAN NATIONAL STANDARDS INSTITUTEANSI
ANODIZEANOD
AMPEREAMP
AMBIENTAMB
ALUMINUMALUM
ALTERNATEALT
ACTIVE LEAFA.L.
AMERICAN INSTITUTE OF STEEL CONSTRUCTIONAISC
AMPERE INTERRUPTING CAPACITYAIC
AREA INLETAI
AIR HANDLING UNITAHU
ANCHOR AHR
AGGREGATEAGGR
ABOVE FINISHED FLOORAFF
AUTOMATIC DOOR OPERATORADO
ADJACENT, ADJOINING, ADJUSTABLEADJ
ADHESIVEADH
ADDENDUMADDM
ACOUSTICAL CEILING TILEACT
ACOUSTICACST
ALUMINUM CABLE STEEL REINFORCEDACSR
ACCESS PANELACS PNL
ACCESS DOORACS DR
ACRYLIC PLASTICACR
AMERICAN CONCRETE INSTITUTEACI
ACCESSIBLEACC
ALTERNATING CURRENTAC
ABOVEABV
ANCHOR BOLTAB
AIR CONDITIONING UNITA/C UNIT
AIR CONDITIONINGA/C
ANGLEL
FRAMINGFRMG
FORGEDFRG
FRAMEFR
FIRE RESISTANT FR
FEET PER MINUTEFPM
FIREPROOFFP
FIRE PARTITIONFP
FACE OF STUDFOS
FACE OF MASONRYFOM
FACE OF FINISHFOF
FACE OF CONCRETEFOC
FENCEFN
FLUORESCENTFLUOR
FLOOR PLATEFLR PL
FLOORINGFLG
FLEXIBLEFLEX
FLOORFLR
FLASHINGFLASH
FLOW CENTERLINEFL
FLUSH JOINTFJT
FIXTUREFIXT
FINISH FLOORFIN FLR
FINISHFIN
FIGUREFIG
FLAT HEAD WOOD SCREWFHWS
FIRE HOSE STATIONFHS
FIRE HOSE RACKFHR
FLAT HEAD MACHINE SCREWFHMS
FIRE HOSE CABINETFHC
FLAT HEADFH
FIRE HYDRANTFH
FIBERGLASSFGL
FINISH GRADEFG
FACTORY FINISHFF
FIRE EXTINGUISHER CABINETFEC
FIRE EXTINGUISHER BRACKETFEB
FIRE EXTINGUISHERFE
FOUNDATIONFDTN
FIRE DAMPERFDMPR
FLOOR DRAINFD
FAN COIL UNITFCU
FLOOR CLEANOUTFCO
FLOOR CONSTRUCTION JOINTFCJ
FACINGFCG
FACE BRICKFC BRK
FOOT CANDLEFC
FIRE BRICKF BRK
FRESH AIR INTAKEFAI
FIRE APPARATUS CLOSETFAC
FRESH AIRFA
FIRE ALARMFA
FAHRENHEITF
EXTERIOREXT
EXPANSION BOLTEXP BT
EXPOSEDEXP
EXPANSIONEXP
EXISTINGEXST
EXHAUST AIREXH A
EXHAUSTEXH
EXCAVATEEXC
ENTERING WATER TEMPERATUREEWT
ELECTRIC WATER COOLEREWC
ESTIMATE(D)EST
ESCALATORESCAL
EQUIPMENTEQUIP
EQUALEQ
EPOXY COATINGEPY
EXPLOSION PROOFEPRF
ELECTRICAL PANELBOARDEP
ENTRANCE, ENTERINGENTR
ENCLOSE(URE)ENCL
EMERGENCYEMER
ESTIMATED MAXIMUM DEMANDEMD
EXPANDED METAL EM
ELECTRICELEC
ELEVATION - GRADE OR BUILDINGEL
EXPANSION JOINTEJ
EACH FACEEF
ENTERING AIR TEMPERATUREEAT
EACHEA
EASTE
DIRECT EXPANSIONDX
DUMBWAITERDWTR
DRAWERDWR
DOWELSDWLS
DRAWINGDWG
DOVETAIL DVTL
DRAIN TILEDT
DOWNSPOUTDS
DOUBLE STRENGTH (GLASS)DS
DOOR CLOSERDR CL
DRAINBOARDDRB
DRAINDR
DOORDR
DOWNDN
DEMOUNTABLEDMT
DAMPERDMPR
DAMPPROOFINGDMPF
DEAD LOADDL
DIVISIONDIV
DISTRIBUTION PANELDISTR PNL
DISPENSERDISP
DISCONNECTDISC
DIMENSIONDIM
DIAGONALDIAG
DIAMETERDIA
DUCT HEATERDH
DOUBLE HUNGDH
DRINKING FOUNTAINDF
DETAILDET
DEPARTMENTDEPT
DEPRESSIONDEPR
DEMOLITIONDEMO
DEGREEDEG
DUMMY CONTROL JOINTDCJT
DOWELED CONTROL JOINTDCJ
DOUBLE ACTING DOORDBL ACT DR
DOUBLEDBL
DRY BULBDB
DATUMDAT
PENNY (AS IN NAIL - 10D)d
CYLINDERCYL
COLD WATERCW
CONDUCTIVE VINYL HOMOGENEOUS (SHEET TYPE)CVH
CEILING VENTCV
CUBIC YARDSCU YD
CABINET UNIT HEATERCUH
CUBIC FEETCU FT
COPPERCu
CONDENSING UNITCU
CENTERCTR
CENTER TO CENTERC TO C
CURRENT TRANSFORMERCT
CERAMIC TILECT
CASEMENTCSMT
COUNTERSUNKCSK
CAST STONECS
YARD DRAINYD
YARDYD
TRANSFORMERXFMR
WELDED WIRE REINFORCEMENTWWR
WELDED WIRE MESHWWM
WELDED WIRE FABRICWWF
WALL TO WALLW/W
WIDTHWTH
WEIGHTWT
WAINSCOTWSCT
WASTE STACKW.S.
WATERSTOPWS
WARDROBEWRB
WASTE RECEPTACLEWR
WORKING POINTWP
WEATHERPROOFWP
WATERPROOF(ING)WP
WITHOUTW/O
WIRE MESHWM
WORK SHOPWKSH
WROUGHT IRONWI
WATT-HOUR METERWHM
WHEEL BUMPERWHB
WATER HEATERWH
WALL HUNGWH
WIRED GLASSWGL
WIDE FLANGEWF
WINDOWWDW
WASTE DISPOSERWDSP
WOOD DOORWD
WOODWD
WOOD-CASED OPENINGWCO
WHEELCHAIRW/C
WATER CLOSETWC
WOOD BLOCKINGWBL
WET BULBWB
WITHW/
WESTW
VINYL WALL COVERINGVWC
VENT THRU ROOFVTR
VOLTAGE TRANSFORMERV.T.
VENT STACKVS
VERMICULITEVRM
VAPOR RETARDERVR
VOLUMEVOL
VENEERVNR
V-JOINT(ED)VJ
VINYL HOMOGENEOUSVH
VERTICAL GRAINVG
VINYL FABRICVF
VESTIBULEVEST
VERTICALVERT
VENTILATOR(TION)VENT
VAULT DOORVD
VITRIFIED CLAY TILEVCT
VINYL COMPOSITION TILEVCT
VINYL BASEVB
VARNISHVAR
VOLTV
UNIT VENTILATORUV
UTILITYUTIL
URINALUR
UNINTERRUPTABLE POWER SUPPLYUPS
UNFINISHEDUNFIN
UNEXCAVATEDUNEX
UNDERWRITERS LABORATORIESUL
UNIT HEATERUH
UNDERGROUNDUGND
UNIT COOLERUC
TYPICALTYP
TELEVISIONTV
THERMOSTATTSTAT
TRANSVERSETRANS
TRANSOMTRANS
TOILET PARTITIONTPTN
TOILET PAPER DISPENSERTPD
TOP OF WALLTOW
TOP OF STEELTOS
TOP OF SLABTOS
TOPOGRAPHYTOPO
TOLERANCETOL
TOP OF FOOTINGTOF
TOP OFTO
TACKSTRIPTKS
TACKBOARDTK BD
THRESHOLDTHRES
THICK(NESS)THK
TRUSS HEADTH
TOGGLETGL
TONGUE AND GROOVET&G
TERMINALTERM
TERRAZZOTER
TEMPORARYTEMP
TEMPERATURETEMP
TELEPHONETEL
TERRA COTTATC
TOWEL BARTB
TANGENTTAN
TREADT
SYSTEMSYS
SYNTHETICSYNTH
SYMMETRICALSYMM
SWITCHBOARDSWBD
SWITCHSW
SHEET VINYL SV
SUSPENDEDSUSP
SUBFLOORSUB FL
STAIRWAYSTWY
STRUCTURALSTRUCT
STRINGERSTR
STATIC PRESSUREST PR
STORAGESTOR
STEELSTL
SEATINGSTG
STANDARDSTD
STATIONSTA
STAINLESS STEELSST
STANDING SEAM (ROOF)SS
SERVICE SINKSS
SHELF AND RODS&R
SQUARE HEADSQHD
SQUARESQ
SPEAKERSPKR
SPACE HEATERSPH
SPECIAL FINISHSP FIN
SOUNDPROOFSPF
SPECIFICATIONSPEC
SOUNDPROOF DOORSPD
SPECIALSPCL
SPACERSPC
SHUT OFF VALVESOV
SHEET METAL SCREWSSMS
SHEET METALSM
SLEEVESLV
SEALANTSLNT
SLOPESL
STEEL JOIST INSTITUTESJI
SIMILARSIM
SHELVINGSHV
SHEATHINGSHTHG
SHEETSHT
SHOULDERSHLDR
SHEET GLASSSG
STRUCTURAL FACING UNITSFU
STRUCTURAL FACING TILE UNITSFTU
SAFETY GLASSSFGL
SEQUENCESEQ
SECTIONSECT
STEEL DOOR INSTITUTESDI
STORM DRAINSD
STRUCTURAL CLAY TILESCT
SCREENSCRN
SCHEDULESCHED
SOLID CORESC
SECURITY BARSS.B.
SPLASH BLOCKSB
SUPPLY AIRSA
SOUTHS
RAINWATER CONDUCTORRWC
RIVETRVT
REVERSERVS
RUBBER TILE FLOORRTF
RAISED PATTERN RUBBER TILERPRT
REVOLUTIONS PER MINUTERPM
RETRACTABLE PARTITIONRP
RIGHT OF WAYROW
ROUGH OPENINGRO
ROUNDRND
ROOMRM
RAILINGRLG
RACKRK
ROOF HATCHRH
RIGHT HANDRH
RELATIVE HUMIDITYRH
ROOFINGRFG
REVISIONREV
RETURNRET
RESILIENTRESIL
REQUIREDREQD
REMOVE(ABLE)REM
REINFORCEREINF
REGLETREG
REGISTERREG
REFRIGERATIONREFR
REFLECTREFL
REFERENCEREF
RECTIFIERRECT
RECREATION ROOMREC ROOM
RECEPTACLERECPT
RIGID INSULATIONRDG INS
ROOF DRAINRD
RECEIVERRCVR
REINFORCED CONCRETE PIPERCP
REMOTE CONTROLRC
RUBBERRBR
RUBBLE STONERBL
RUBBER BASE, RESILIENT BASERB
RETURN AIR REGISTERRAR
RETURN AIR GRILLERA GR
RABBETEDRAB
RETURN AIRRA
RISERR
RANGER
RADIUSR
QUANTITYQTY
QUARTER ROUND1/4 RND
QUARTERQTR
QUARTQT.
QUARRY TILEQT
PASS WINDOWPW
PAVINGPVG
POLYVINYL CHLORIDEPVC
PAVEDPV
PAPER TOWEL RECEPTACLEPTR
PARTITIONPTN
PAPER TOWEL DISPENSERPTD
POST-TENSIONED CONCRETEPT CONC
POINTPT.
PNEUMATIC TUBEPT
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PRESTRESSED CONCRETEPS CONC
PRESSED STEELP.S.
PIPE SPACEPS
PRESSURE-REGULATING VALVEPRV
PROJECTPROJ
PARKINGPRKG
PREFORMEDPREFMD
PREFINISHEDPREFIN
PREFABRICATE(D)PREFAB
PAIRPR
PARTS PER MILLIONPPM
POLISHED PLATE GLASSPPGL
PORTABLEPORT
PORCELAINPORC
POLISHEDPOL
PAINT(ED)PT
PANELPNL
PLYWOODPLYWD
PLATE GLASSPL GL
PILINGPLG
POUNDS PER LINEAR FOOTPLF
PLUMBINGPLBG
PLATFORMPLAT
PLASTERPLAS
PLASTIC LAMINATEPLAM
PROPERTY LINEPL
PLATEPL
POST INDICATING VALVEPIV
PREFAB ISOLATION POWER UNITPIPU
POINT OF INTERSECTIONPI
PHARMACYPHAR
PHASEPH
PERIMETERPERIM
PERFORATE(D)PERF
PEDESTALPED
PAVEMENT DRAINPD
CEMENT PLASTER (PORTLAND)PCP
POUNDS PER CUBIC FOOTPCF
PRECAST CONCRETEPCC
PIECEPC
PUSH BUTTON STATIONPBS
PARTICLE BOARDPBD
PANIC BARPB
PARALLELPAR
PUBLIC ADDRESSPA
POLEP
OBSCURE WIRED GLASSOWGL
OUTSIDE SCREW AND YOKEOS & Y
OPERATIONSOPS
OPAQUEOPQ
OPPOSITEOPP
OPENINGOPNG
OPPOSITE HANDOPH
OVALHEAD WOOD SCREWOHWS
OVALHEAD MACHINE SCREWOHMS
OVERHEADOH
OBSCURE GLASSOGL
OFFICEOFC
OUTSIDE DIAMETEROD
ON CENTER EACH WAYOCEW
ON CENTEROC
OBSERVATION WINDOWOBW
OBSCUREOBSC
OUTSIDE AIROA
NOT TO SCALENTS
NOT REQUIREDN’’REQD
NOISE REDUCTION COEFFICIENTNRC
NOISE REDUCTIONNR
NOMINALNOM
NUMBERNO
NORMALLY OPENNO
NONMETALLICNM
NEOPRENE LATEXN.L.
NAILABLENL
NOT IN CONTRACTNIC
NICKELNi
NATIONAL FIRE PROTECTION ASSOCIATIONNFPA
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATIONNEMA
NATIONAL ELECTRICAL CODENEC
NORMALLY CLOSEDNC
NATURALNAT
NORTHN
MULLIONMULL
MOVABLEMVBL
METALMTL
METAL FURRINGMTFR
MOUNTEDMTD
MOUNTMT
METAL THRESHOLDMT
MACHINE SCREWSMS
METAL ROOF DECKINGMRD
MARBLE BASEMRB
MOP RECEPTORMR
MOVABLE PARTITIONMP
MOTORMOT
MODIFIEDMOD.
MODULARMOD
MASONRY OPENINGMO
MATERIAL NOT IN CONTRACT (INSTALLATION BY CONTRACTOR)MNIC
MILLIMETER(S)mm
MILLWORKMLWK
MOULDINGMLDG
MONOLITHICML
METAL LATHML
MISCELLANEOUSMISC
MIRRORMIRR
MINIMUMMIN
MALLEABLE IRONMI
MANHOLEMH
MATTE-GLAZED TILEMGT
MOTOR GENERATORMG
MANUFACTURERMFR
MANUFACTURINGMFG
METAL FLOOR DECKINGMFD
METAL EDGE STRIPMES
MEMBRANEMEMB
MEDIUMMED
MECHANICAL ROOMMECH RM
MECHANICALMECH
METAL DIVIDER STRIPMDS
METAL-CASED OPENINGMCO
MASONRY CONTROL JOINTMCJ
MEDICINE CABINETMC
MEMBERMBR
MACHINE BOLTSMB
MAXIMUMMAX
MATERIAL(S)MATL
MASONRYMAS
MACHINEMACH
MATCHED AND BEADEDM&B
METER(S)m
LEAVING WATER TEMPERATURELWT
LIGHTWEIGHT CONCRETELWC
LOUVERLVR
LIGHTNINGLTNG
LIGHTINGLTG
LIGHTWEIGHTLT WT
LIGHTLT
LAWN SPRINKLERLS
LIVING ROOMLR
LOW POINTLPT
LIGHTPROOF LOUVERLPL
LIGHTPROOF DOORLPD
LIGHTPROOFLP
LONGITUDINALLONG
LINTELLNTL
LIMESTONELMST
LUMENLM
LEAD-LINED DOORLLD
LIVE LOADLL
LOCKERLKR
LINEARLIN
LEFT HAND(ED)LH
LENGTHLG
LOADINGLDG
LOADLD
LIGHT CONTROLLC
LUMBERLBR
LABELLBL
POUNDLB
LAG BOLTLB
LAVATORYLAV
LAUNDRYLAU
LEAVING AIR TEMPERATURELAT
LAMINATELAM
LADDERLAD
LABORATORYLAB
KEYWAYKWY
KILOWATTkW
KILOVOLT AMPERES REACTIVEkVAR
KILOVOLT AMPERESkVA
KILOVOLTSkV
KILOMETERkm
KICKPLATEKPL
KNOCKOUT PANELKOP
KITCHENKIT
KILOPOUND (1000 POUNDS)KIP
JOINTJNT
JOISTJST
JUNCTIONJCT
JUNCTION BOXJ-BOX
JANITOR’S CLOSETJAN CLO
INSIDE PIPE SIZEI.P.S.
IRON PIPE SIZEIPS
IRON PIPEIP
INVERTINV
INTERMEDIATEINTM
INTERIORINT
INSULATIONINSUL
INSULATING FILLINSF
INCLUDEDINCL
INCINERATORINCIN
INCHIN
INTERLOCKILK
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICAIESNA
INSIDE DIAMETERID
INTERCOMIC
HERTZHz
HYDRAULICHYDR
HEATING, VENTILATING AND AIR CONDITIONINGHVAC
HEATERHTR
HEATINGHTG
HEIGHTHT
HOUSEKEEPINGHSKPG
HIGH-STRENGTH GYPSUM PLASTERHSGYP
HIGH STRENGTHHS
HOURHR
HIGH POINTHPT
HORSEPOWERHP
HIGH PRESSUREHP
HORIZONTALHORIZ
HANDRAILHNDRL
HOLLOW METALHM
HOOK(S)HK
HANDHOLEHH
HEXAGONHEX
HIGH EARLY-STRENGTH CEMENTHES
HARDWOODHDWD
HARDWAREHDW
HEADERHDR
HEAD JOINTHD JT
HARDBOARDHDBD
HEAVY DUTYHD
HEADHD
HANDICAPPEDHCP
HALON CONTAINMENT DAMPERHCD
HOLLOW COREHC
HOSE BIBBHB
GYPSUM PLASTERGYP PLAS
GYPSUM BOARDGYP BD
GYPSUMGYP
GLAZED WALL TILEGWT
GROUTGT
GLAZED STRUCTURAL UNITSGSU
GLAZED STRUCTURAL TILEGST
GRATINGGRTG
GRADE LINEGR LN
GRANITEGRAN
GYPSUM TILEGPT
GALLONS PER MINUTEGPM
GOVERNMENTGOVT
GROUNDG
GLAZED CONCRETE MASONRY UNITSGLZ CMU
GLAZINGGLZ
GLASS FIBERGLF
GLASS BLOCKGL BLK
GLASSGL
GASKET(ED)GKT
GALVANIZED IRON PIPEGIP
GALVANIZED IRONGI
GOVERNMENT-FURNISHED EQUIPMENT CONTRACTOR INSTALLEDGFE/CI
GOVERNMENT-FURNISHED EQUIPMENTGFE
GROUND FAULT CIRCUIT INTERRUPTERGFCI
GROUND FACEGF
GENERALGEN
GENERAL CONTRACTORGC
GRAB BARGB
GALVANIZED STEELGALV STL
GALVANIZEDGALV
GALLON(S)GAL
GAGEGA
NATURAL GASG
FABRIC WALL COVERINGFWC
FIRE WATERFW
FUTUREFUT
FURRINGFURG
FOOTINGFTG
FEETFT
FASTEN(ER)FSTNR
FULL SIZEFS
FIRE-RETARDANTFRT
PHASE 1 - COLUMBARIUM D FOR CONSTRUCTION
MAY 2018
NATIONAL CEMETERY
JEFFERSON BARRACKS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
G-004
AAMRCM
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
SYMBOLS & LEGEND
DRAWING/DETAIL LOCATION DESIGNATION
DRAWING/DETAIL TITLE
DRAWING NAME
1/8" = 1' 0"
(DRAWN) SHOWN
DRAWING/DETAIL LIMITS
DETAIL DESIGNATION
DESIGNATION
SECTION/DETAIL LOCATION DESIGNATION
SECTION/DETAIL
DESIGNATION
EXTERIOR ELEVATION
DESIGNATION
INTERIOR ELEVATION### ##
BREAK LINE, MATERIAL
TO CONTINUE
REVISION CLOUD
NORTH ARROW
ELEVATION TARGET
REVISION DESIGNATION
ELEVATION/DETAIL LOCATION DESIGNATION
ELEVATION/DETAIL LOCATION DESIGNATION
DETAIL LOCATION DESIGNATION
MATCH LINE
MATCH LINE
SIMILAR, OR OPPOSITE HAND
SCALE
SHEET NUMBER DESIGNATION WHERE
REF ##/#-###
FOR CONTINUATION
X-XXX
(DRAWN) SHOWN
SHEET NUMBER DESIGNATION WHERE
SHOWN
SHEET NUMBER DESIGNATION WHERE (DRAWN)
SHOWN
SHEET NUMBER DESIGNATION WHERE (DRAWN)
FIRST REFERENCED
SHEET NUMBER DESIGNATION WHERE
LEVEL
GRANULAR FILL
CONCRETE
CMU
PRECAST CONCRETE
CAST STONE OR
BRICK
INDICATES TRUE NORTH
GENERAL SYMBOLS MATERIAL SYMBOLS
KEYNOTE
CIVIL SYMBOLS
LIMITS OF WORK
AND NUMBER
BORING LOCATION
P.I. POINT
AND NUMBER
DWG OUTLINE
SHEET ID X-000
MANHOLE
CURB INLET
CLEAN OUT
IDENT. OF DRAINAGE STRUCTURE
STRUCTURE TYPE
LINE NUMBER
EXISTING NEW DESCRIPTION
CHAIN LINK CONSTRUCTION FENCE
SILT FENCE
EXISTING TREE LINE
X-##
XX-JBNC-SB-03
XX-JBNC-CPT-03
AND NUMBER
CPT LOCATION
EXISTING MINOR TOPOGRAPHIC LINE
EXISTING MAJOR TOPOGRAPHIC LINE440
PROPOSED MINOR TOPOGRAPHIC LINE
PROPOSED MAJOR TOPOGRAPHIC LINE
ALIGNMENT LINE
EXISTING WATER LINE
EXISTING ROAD CENTERLINE
PROJECT CONTROL POINT
CP1
AGGREGATE OR BEDDING
RIPRAP
WELL DRAINED SOIL
WEATHERED ROCK
STEEL
ENGINEERED FILL
EXISTING UNDISTURBED SOIL
COMPACTED SUBGRADE
STONE VENEER
SMOOTH SNAPPED "DOVE GRAY"
PARKING PAVING
PHASE 1 - COLUMBARIUM D FOR CONSTRUCTION
N
NATIONAL CEMETERY
JEFFERSON BARRACKS
MANHOLE
ELECTRIC
TRANSFORMER
T=510.58
ELECTRIC MH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
CP1
G-100
COLUMBARIA D & E
MIRAVALLE RD.
G E
N T
R Y R
D
SITE PHASING PLAN
SITE LOCATION
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
(CONSTRUCTION BY OTHERS)
PHASE 2
COLUMBARIUM E
(CONSTRUCTION THIS CONTRACT)
PHASE 1
COLUMBARIUM D
FULL TONE LINE WORK IS PHASE 1, COLUMBARIUM D
HALF TONE LINE WORK IS PHASE 2, COLUMBARIUM E
LEGEND
(NOT TO SCALE)
N
KEY MAP
20' 40'0
N
F1
SCALE: 1" = 20'
SITE PHASING PLAN
FOR CONSTRUCTION
NATIONAL CEMETERY
JEFFERSON BARRACKS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
W
W
W
W
W
W
CP1
G-101
SHEET LP101
SHEET LS102
MIRAVALLE RD.
G E
N T
R Y R
D
SITE KEY PLAN
SHEET CD101
SHEET G-103
SHEET CS102
SHEET CU102
SHEET CU103
SHEET CG105
SHEET CG106
SHEET CG103
SHEET CG104
SHEET CU101
SHEET CS101
SHEET CG102
SHEET CG101
SHEET LS101
SHEET LI102
SHEET LI101
SHEET CD102
SITE LOCATION
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
(NOT TO SCALE)
N
KEY MAP
20' 40'0
N
F1
SCALE: 1" = 20'
SITE KEY PLAN
PHASE 1 - COLUMBARIUM D FOR CONSTRUCTION
NATIONAL CEMETERY
JEFFERSON BARRACKS
INTERSTATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
SITE STAGING PLAN
E
N T
R Y R
D
G E
N T
R Y R
D
SHERIDAN RD.
G R
A N
T D
R
G R
A N
T D
R
G R
A N
T D
R
K O
C H R
D
K O
C H R
D
K O
C H R
D
GRAVES DR.
HAUL ENTRANCE
CONSTRUCTION AND
SITE LOCATION
CONSTRUCTION & HAUL ACCESS
TEMPORARY CONSTRUCTION STAGING
400'0 200'
G R
A N
T D
R
T R
U M
A N D
R
T R
U M
A N D
R
T R
U M
A N D
R
TRUMAN DR.
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
SITE WORK LIMITS
SHERIDAN RD.
G E
N T
R Y R
D
AREA
STAGING
AREA
STOCKPILE
TRAILER
CONTRACTORS
100'0 50'
S1S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
S13
S14
S15
(SEE INSET)
STAGING AREA
TREE PROTECTION AREA
AREA
PROTECTION
TREE
AREA
TREE PROTECTION
HAUL ENTRANCE
CONSTRUCTION AND
AREA
STOCKPILE
SECONDARY
NOTE 5.)
AREA (SEE
STOCKPILE
PRIMARY
G-102
GENERAL SHEET NOTES
LEGEND
SECONDARY STOCKPILE AREA SHOWN ON PLAN.
ACCEPTABLE LIMITS OF PRIMARY STOCKPILE AREA TO BE PLACED IN
5. EXCESS MATERIAL TO BE STOCKPILED IN THIS AREA. ANY MATERIAL BEYOND
CLEANING EQUIPMENT.
STREETS SHALL BE CLEANED OFF DAILY AS IT OCCURS USING STREET
CONSTRUCTION DIRT AND MUD. CEMETERY ROADS AND ADJACENT PUBLIC
4. EXISTING ROADWAYS THROUGHOUT CEMETERY MUST BE KEPT CLEAN OF
AS SHOWN ON THE DRAWINGS OR TO PRE-CONSTRUCTION CONDITIONS.
3. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED
PROTECTION AREA IS PROHIBITED.
WASTE MATERIAL WHICH MAY BE HARMFUL TO TREE(S) WITHIN THE TREE
2. THE CLEANING OF EQUIPMENT, STORAGE OF MATERIALS OR DISPOSAL OF
SITE ACTIVITIES ARE TO OCCUR WITHIN THE TREE PROTECTION AREAS.
MAINTENANCE GATE 2. NO PARKING, STORAGE OR OTHER CONSTRUCTION
CONSTRUCTION TRAFFIC SHALL ENTER OR EXIT THROUGH THE JBNC
THROUGH THE MAIN JBNC ENTRANCE AT JEFFERSON DRIVE. ALL
1. NO CONSTRUCTION TRAFFIC SHALL BE PERMITTED TO ENTER OR EXIT
N
F1
SCALE: 1" = 200'
N
F7
INSET
SCALE: 1" = 50'
G C
W
A A
M
SITE STAGING PLAN
PHASE 1 - COLUMBARIUM D FOR CONSTRUCTION
NATIONAL CEMETERY
JEFFERSON BARRACKS
W
W
W
W
F L
F L
F L
FL
FL
MANHOLE
ELECTRIC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
CP1
N970550.13
E879772.84
N970525.92
E879734.23
N970558.27
E879874.93
N970539.11
E879898.01
N970485.44
E879707.11
N970485.67
E879715.19
N970476.31
E879704.98
N970479.85
E879710.62
N970423.66
E879758.16
N970415.01
E879744.36
N970405.62
E879744.78 N970392.97
E879757.40
N970390.87
E879754.05 N970380.24
E879765.95
N970363.22
E879767.13
N970349.31
E879759.74
N970221.97
E879785.43
N970166.87
E879812.68
N970190.25
E879859.95
N970193.07
E879861.02
N970196.30
E879868.17
N970194.38
E879873.25
N970201.89
E879925.45
N970198.66
E879884.09
N970155.43
E879804.89
N970179.12
E879781.06
N970153.73
E879783.03
N970465.15
E879711.98
N970467.11
E879756.23
N970495.64
E879714.91
N970498.82
E879711.17
N970507.35
E879716.55
G-103
E
N T
R Y R
D
EROSION CONTROL PLAN
WORK LIMTS
SILT FENCE
TEMPORARY CHAIN LINK FENCE
SILT CURTAIN
INLET EROSION CONTROL
WORK LIMITS
G-501, DETAIL F7
SEE SHEET
SILT FENCE TYP.
GATE, SEE NOTE 9
ENTRANCE WITH
PRIMARY SITE
WITH COR.
SHALL BE COORDINATED
FENCE, FINAL LOCATION
OF TEMPORARY CHAIN LINK
APPROXIMATE LOCATION
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
DETAIL F1
SEE SHEET G-501,
CURB EROSION STOP
DETAIL F1
SEE SHEET G-501,
CURB EROSION STOP
SITE LOCATION
DETAIL B1
DETAIL SHEET G-501,
TRACKING PAD SEE
STABILIZED VEHICLE
EXCAVATION
LOCATION DUE TO
DETERMINE BEST
SIGN, CONTRACTOR TO
OF CONSTRUCTION
POSSIBLE LOCATIONS
LEGEND
(NOT TO SCALE)
N
KEY MAP
N
20' 40'0SCALE: 1" = 20'
F1
GENERAL SHEET NOTES
EROSION CONTROL PLAN
1-800-344-7483 PRIOR TO START OF CONSTRUCTION.
10. CONTRACTOR SHALL CONTACT MISSOURI ONE CALL SYSTEM AT
SITE ACCESS.
9. CONTRACTOR SHALL COORDINATE WITH COR FOR CONSTRUCTION
EXCAVATED AND COMPLETED.
REGARDING THE MANAGEMENT OF STOCK PILE AS SITE IS
8. CONTRACTOR REQUIRED TO SUBMIT PLAN FOR APPROVAL TO COR
EROSION CONTROL AND DRAINAGE MANAGEMENT.
CONSTRUCTION SEQUENCE AND IS RESPONSIBLE FOR TEMPORARY
7. CONTRACTOR TO MAINTAIN BEST PRACTICES DURING EACH STEP OF
PRE-CONSTRUCTION CONDITIONS.
RESTORED AS SHOWN ON THE DRAWINGS OR TO
6. ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE
PLACE PRIOR TO SITE CLEARING.
ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE IN
BARRIERS PLACED UP-SLOPE FROM THE TREE PROTECTION AREAS.
SEDIMENTATION INTRUSION THRU THE USE OF EROSION CONTROL
5. ALL TREE PROTECTION AREAS SHALL BE PROTECTED FROM SOIL
G-102.
WITHIN THE TREE PROTECTION AREA IS PROHIBITED. SEE SHEET
DISPOSAL OF WASTE MATERIAL WHICH MAY BE HARMFUL TO TREE(S)
4. THE CLEANING OF EQUIPMENT, STORAGE OF MATERIALS OR
G-102.
ARE TO OCCUR WITHIN THE TREE PROTECTION AREAS. SEE SHEET
3. NO PARKING, STORAGE OR OTHER CONSTRUCTION SITE ACTIVITIES
RESIDENT ENGINEER.
REPLACED AND/OR REPAIRED AS NEEDED OR DIRECTED BY VA
2. ALL TREE PROTECTION FENCING TO BE INSPECTED DAILY AND
SEE DETAIL F1, SHEET LP501.
MUST REMAIN IN PLACE UNTIL FINAL LANDSCAPING IS INSTALLED.
CLEARING, GRUBBING OR GRADING. TREE PROTECTION DEVICES
1. ALL TREE PROTECTION DEVICES SHALL BE INSTALLED PRIOR TO ANY
PHASE 1 - COLUMBARIUM D FOR CONSTRUCTION
NATIONAL CEMETERY
JEFFERSON BARRACKS
PHASE 1: COLUMBARIUM D
MAY 2018
FLOODPLAIN
ESTIMATED 100YR
ESTIMATED 100YR FLOODPLAIN EXTENT
INTERSTATE
CP1
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
4+68
0+02.09
PI
0+31.76
PI
0+60.33
PI
0+90.95
PI
1+20.35
PI
1+38.68
PI
1+57.30
PI
1+59.43
PI
1+80.78
PI
2+10.85
PI
2+38.04
PI
2+65.10
PI
2+93.92
PI
3+22.62
PI
3+51.99
PI
3+81.68
PI
4+11.12
PI
4+68.06
PI
0+10
0+20
0+30
0+40
0+60
0+70
0+80
0+90
1+10
1+20
1+30
1+40
1+60
1+70
1+80
1+90
2+10
2+20
2+30
2+40
2+60
2+70
2+80
2+90
3+10
3+20
3+30
3+40
3+60
3+70
3+80
3+90
4+10
4+20
4+30
4+40
4+60
JB CEM
CP1
CP2
G-104
E
N T
R Y R
D
G E
N T
R Y R
D
SHERIDAN RD.
G R
A N
T D
R
G R
A N
T D
R
G R
A N
T D
R
K O
C H R
D
K O
C H R
D
K O
C H R
D
GRAVES DR.
G R
A N
T D
R
T R
U M
A N D
R
T R
U M
A N D
R
T R
U M
A N D
R
TRUMAN DR.
PROJECT CONTROL
SITE LOCATION
PHONE: 314-768-6260
ST. LOUIS, MO 63103-2555
2350 MARKET STREET
SEWER - ST. LOUIS METROPOLITAN SEWER
PHONE: 866-430-0820
ST. LOUIS, MO 63141
727 CRAIG ROAD
WATER - MISSOURI AMERICAN WATER CO.
PHONE: 800-887-4173
ST. LOUIS, MO 63101
700 MARKET ST
GAS - LACLEDE GAS COMPANY
PHONE: 855-757-7328
ELECTRIC, FIBER OPTIC, CABLE TV - CHARTER COMMUNICATIONS
PHONE: 800-288-2020
TELEPHONE - ATT DISTRIBUTION
PHONE: 866-992-6619
ST. LOUIS, MO 63179-0352
PO BOX 790352
ELECTRIC - AMEREN MISSOURI ELECTRIC
7. UTILITY PROVIDERS:
CONSIDERED APPROXIMATE.
SURVEYS AND AVAILABLE RECORD DRAWINGS AND SHOULD BE
6. ALL BURIED UTILITIES AND SEWERS SHOWN ARE BASED ON FIELD
ACCURACY OF THE OPUS DERIVED COORDINATES.
ROVER AND THE MODOT REAL TIME GPS NETWORK TO CHECK THE
5. THE PROJECT CONTROL POINTS WERE OBSERVED WITH A GPS
THE BASE STATION.
KINEMATIC GPS OBSERVATIONS WITH CONTROL POINT “JB CEM” AS
4. ADDITIONAL CONTROL POINTS WERE SET USING REAL TIME
CONTROL POINT’S COORDINATES AND ELEVATION.
USER SERVICE (OPUS) AND THE OPUS SOLUTION WAS USED FOR THE
OBSERVATION WAS SUBMITTED TO THE NGS ONLINE POSITIONING
STATIC GPS OBSERVATION ON CONTROL POINT "JB CEM". THE GPS
3. THE HORIZONTAL AND VERTICAL DATUMS WERE ESTABLISHED BY A
2/21-23/2017, 2/28/2017, AND 4/12/2017
SPECIFIC DATES SURVEY WORK COMPLETED:
CONTROL PROCEDURES.
ACCORDANCE WITH USACE QUALITY MANAGEMENT PLAN AND QUALITY
SURVEYING DURING THE MONTHS OF FEBRUARY AND APRIL 2017 IN
2. TOPOGRAPHIC SURVEY CONDUCTED BY BOWEN ENGINEERING AND
VERTICAL: NAVD 1988 (GEOID12B)
ZONE: US STATE PLANE MISSOURI EAST (2401)
HORIZONTAL: NAD 1983
1. PROJECT DATUM:
MIRAVALLE RD.
G E
N T
R Y R
D
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
400'0 200'
N
F1
SCALE: 1" = 200'
GENERAL SHEET NOTES
PROJECT CONTROL
40'0 20'
N
F6
DETAIL PLAN
SCALE: 1" = 20'
PHASE 1 - COLUMBARIUM D FOR CONSTRUCTION
NATIONAL CEMETERY
JEFFERSON BARRACKS
PHASE 1: COLUMBARIUM D
MAY 2018
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A of Veterans Affairs
U.S. Department
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
U N I T
E D
STATES OF
AM
E
R I C
A
E
N T
OF
VETERANS
A F F
A I R
S
N
C
A
ATIONAL
EMETERY
DMINISTRATION
852-CM3-038NCA:
CONTRACT NO: W912P9-17-C-00XX
SOLICITATION NO: W912P9-18-R-0031
(TO BE PLACED AS DIRECTED BY THE ENGINEER)
STRUCTURE
STORM SEWER
BALES (TYP.)
NOTE: TEMPORARY BARRIER OF SEDIMENT CONTROL BALES TO PREVENT
SEDIMENT-LADEN WATER FROM ENTERING INCOMPLETE STORM SEWER
SYSTEM.
3" EARTH FILL
FLOW
10" MINIMUM.
EMBEDDED IN THE GROUND
BARS IN EACH BALE AND
STAKES OR REINFORCING
NOTE: TWO 2"X2" WOOD
10" MINIMUM.
EMBEDDED IN THE GROUND
BARS IN EACH BALE AND
STAKES OR REINFORCING
NOTE: TWO 2"X2" WOOD
G-501
AAM
ST. LOUIS, MISSOURI
RCM
SCALE: N.T.S.
F4
SCALE: N.T.S.
B2
SCALE: N.T.S.
F2
EROSION CONTROL DETAILS
STABILIZED VEHICLE TRACKING PAD
PERIMETER SEDIMENT CONTROL
EXI
STI
NG
PAVED
ROAD
15'R
SILT FENCE IF NEEDED
MINIMUM 3' OVERLAP
GEOTEXTILE FABRIC
UP THROUGH ROCK
UNDER ROCK TO STOP SILT MIGRATION
GRANULAR DRAINAGE FILL PLACED
GEOTEXTILE SEPARATOR FABRIC OR 3"
RUNOFF
TO MIMIMIZE
18" MINIMUM BERM
M
IN
IM
UM
W
ID
TH
30' M
INIM
UM
EROSION FROM SURFACE RUNOFF, AND TO HELP CONTROL DUST.
TRANSPORTING IT ONTO PAVED STREETS, TO CONTROL
VEHICLES CAN DROP THEIR MUD AND SEDIMENT TO AVOID
GRAVEL PAD IS REQUIRED TO PROVIDE BUFFER AREA WHERE
NOTE:
A
A
8' MAX.
WITHIN TOP 8" OF FABRIC
DIAGONAL CABLE TIES
FASTEN WITH 3-50 LB
(9 GA MIN, 6x6 MESH)
WIRE MESH BACKING
FILTER FABRIC OVER
GRADE 6" ANCHOR TRENCH
SEE DETAIL BELOW
SILT FENCE JOINT
* BACKING FOR HEAVY DUTY APPLICATIONS
* ANCHORING AND POST SPACING
* METHOD OF ATTACHMENT
* FILTER FABRIC
VERIFY LOCAL REQUIREMENTS FOR:
4. LAYOUT SILT FENCE ON THE UPHILL SIDE ALONG THE FENCE LINE, AND BACK FILL
3. DRIVE ALL POSTS INTO GROUND AT THE BACK SIDE OF THE TRENCH
2. DIG A 6" TRENCH ALONG INTENDED FENCE LINE
1. INSTALL ON CONTOUR AT CONSTANT ELEVATION
LOCATION TO BE DETERMINED IN THE FIELD.
PLACED AT THE PERIMETER OF THE WORK AREA AS CONSTRUCTION FENCE. FINAL
DRAINAGEWAY, PERPENDICULAR TO THE DIRECTION OF WATER FLOW. IT CAN ALSO BE
AREA. SILT FENCE SHOULD BE PLACED AT THE BOTTOM OF A SLOPE OR MINOR
SILT FENCE SHOULD BE INSTALLED PRIOR TO MAJOR SOIL DISTURBANCE IN THE DRAINAGE
SECTION A-A
P O
S T E
M B
E D
M E
N T
FLOW
M
IN
IM
U M
UNDISTURBED SOIL
6" AT SPLICES
OVERLAP GEOTEXTILE FABRIC
36" MIN. EXPOSED HT.
UV STABILIZED FILTER FABRIC
INTO TRENCH
EXTEND WIRE MESH
NATURAL SOIL
6"X6" BACKFILL WITH TAMPED
FABRIC ANCHORAGE TRENCH
DEPTH
MIN. EMBEDMENT
MAXIMUM SPACING, 2'
STEEL "T" POST AT 8'
6' MIN. LENGTH
(9 GA MIN, 6x6 MESH)
WIRE MESH BACKING
AT A MAXIMUM SPACING OF 1 FOOT.
MESH BACKING ALONG THE UPPER EDGE
GEOTEXTILE AT THE TOP OF THE WIRE
WIRE FASTENERS SHALL FASTEN THE
SILT FENCE A
SILT FENCE B
AROUND FENCE POST
FABRIC TO BE WRAPPED
HAYBALES FOR SEDIMENT CONTROL
U.S. ARMY CORPS OF ENGINEERS
ST. PAUL, MINNESOTA
ST. PAUL DISTRICT
U.S. ARMY CORPS OF ENGINEERS
ST. LOUIS DISTRICT
ST. LOUIS, MISSOURI
DIAMETER WASHED ROCK
6" THICK 3" MINIMUM
FOR CONSTRUCTION
MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER.
MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO
D. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND
WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER.
IT BECOMES ABOUT 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE
C. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN
PROPERLY.
CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS
STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE
B. SEDIMENT WILL BE REMOVED FROM THE INLET PROTECTION DEVICE WHEN
BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED.
BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL
STABILITY AND OPERATION FOLLOWING VERY RUNOFF-PRODUCING RAINFALL
A. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR
8. MAINTENANCE PLAN:
AREA INLETS. SEE SPECIFICATIONS FOR ADDITIONAL DETAIL.
7. INLET SEDIMENT CONTROL FILTERS SHALL BE INSTALLED IN ALL GRATE AND
USACE COR.
CONSTRUCTION PHASES PERMIT, AND ONCE AREA HAS BEEN APPROVED BY
6. ALL DISTURBED AREAS TO BE GRASSED AND LANDSCAPED AS SOON AS
UNTIL PERMANENT VEGETATION IS ESTABLISHED.
MEASURES PRIOR TO COMMENCING CONSTRUCTION AND SHALL MAINTAIN
5. CONTRACTOR SHALL INSTALL REQUIRED EROSION AND SEDIMENT CONTROL
CONTRACTOR.
AFTER EACH RUNOFF PRODUCING RAINFALL AND REPAIRED BY THE
4. EROSION CONTROL MEASURES WILL BE INSPECTED AT LEAST WEEKLY, AND
3. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES.
ACTIVITIES.
PRACTICES SHALL BE ACCOMPLISHED PRIOR TO LAND DISTURBING
2. THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND
REGARDING EROSION CONTROL.
1. SEE SPECIFICATION 31 40 00 FOR APPROPRIATE CODES AND REGULATIONS
GENERAL SHEET NOTES
NATIONAL CEMETERY
JEFFERSON BARRACKS
PHASE 1: COLUMBARIUM D
PHASE 1 - COLUMBARIUM D1
File details come from the government source that posted it.