A02_-_SOW_-_ATTACH__1_-_3.pdf
PDF 2 MB Posted
- Solicitation number
- W912P918Q0001
About this file
ATTACHMENTS 1 - 3 TO THE SCOPE OF WORK
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_-_W912P918Q0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SC
O
PE
O
F W O
R K
A T
T A
C H
M E
N T
R ope A ccess Rigging and Supervision and N
D T testing of D am Spillway gates at
Tuttle C reek D am , M anhattan, K S
Location of Tuttle C reek D am
A
C
TIV
ITY
H
A Z
A R
D A
N A
LY
IS
D ate P rep ared ate R evised
R evisio n
N o
P ro ject o r Jo b
Task
Lo catio n ffice:
rep ared b y:
ccep ted b y:
Tuttle C
Tuttle C obert H eer
(see C over M em orandum ctivity o r Jo b
S tep s
H azard eco m m en d ed C o n tro ls
S ee attach ed Job
H azard
A n alysis for R op e A ccess G ate In sp ectio n ee attach ed Job
H azard
A n alysis for R op e A ccess G ate In sp ee attach ed Job
H azard
A n alysis for R op e A ccess G ate In sp ectio n
A C
TIV
ITY S
U
M M
A
Y
Eq u ip m en t to b e u sed
In sp ectio n
R eq u irem en ts
Train in g
R eq u irem en ts
S tandard R ope A ccess Industry equipm ent such that inspector w orks from tw o ropes for w ork positioning and fall arrest/fall protection - a w orking rope and a back-up, safety rope - and is perm anently attached to both. R igging Equipm ent w ill be provided by contractor.
Inspection w ill be via industrial rope access techniques. The S
PR
A
T/IR
A
TA
Level 3 R ope
A ccess S upervisor w ill provide rigging, supervision, rescue services. S tructural engineers from U
S A C
E-M V S w ill perform visual inspections. U
A C E-M
V S inspectors are S
PR
A T Level 1/2 certified rope access technicians.
R ope A ccess rigging and supervision w ill be perform ed by S
PR
A
T/IR
A
TA
certified Level 3 R ope A ccess S upervisor.
R ope A ccess w ork and inspection w ill be perform ed by S
PR
A T certified Level 1/2 R ope ccess Technicians.
TIV
ITY
H A
ZA
R
D A
N A
LY
SIS
Em ployee R eview
I have review ed and understand the hazards and required controls to perform this activity.
Em ployee Print N e
Em ployee Signature ate o p e A ccess - G ate In sp
Jo b
H azard
A n alysis (JH A
P roject/C on tract # tart D
Finish D
Prepared By ate Prepared pproved B y ate A pproved
Facility ontact
Phone em ail pecific Location escription
Project Location/Em ergency M ap and D irections op e A ccess - G ate In sp
Job azard
A n alysis (JH erso n n el B y signing below
I agree that:
I have been briefed and understand the contents of this JH
A and w ork plan. I understand m y responsibilities and I am com petent to use the equipm ent required and carry out the intended tasks safely.
C ontact Inform ation Em erg. C ontact e A ccess S
P R
A
T/IR
A
TA
Level III S u p ervisor (P roject C om p eten t P erson
In sp ection u p ervisor R
A
LV
III
C on tractor
N am e:
C ell:
O ffice:
Em ail:
N e:
ign
P h ope A ccess C ontractor
R A Level __
N am e:
C ell:
O ffice:
Em ail:
N ign:
Phone:
ope A ccess C ontractor
R A Level __
N am e:
C ell:
O ffice:
Em ail:
N
U
A C E
Project Lead R A Level __
N am e:
C ell:
O ffice:
Em ail:
N am e:
S
A C E
Inspector R A Level __
N am e:
C ell:
O ffice:
Em ail:
N am e:
S
A C E
Inspector R A Level __
N am e:
C ell:
O ffice:
Em ail:
N
A C E
Inspector R A Level __
N am e:
C ell:
O ffice:
Em ail:
N erg en cy In fo rm atio
EM
ergency C ontact N am e &
EM
A ccess Life-flight?
ergency G athering S ite
N earest H ospital Location &
ED
Location om m unication:
C ell Phone S ervice- (Y/N )____ C h eck service on site R adio (Y/N
) C hannel:
Project Phone: ( ) - - Ex. Location:
A dditional N otes:
e A ccess - G ate In sp azard
A n alysis (JH
Pre-W ork
C hecklist
__ D iscuss project, goals and personnel roles.
__ S chedule C learances; Lock-outs etc.
__ D iscuss lock-out procedures w ith all personnel on site. Attach locks as necessary.
__ C ollect/D iscuss Em ergency C ontact Inform ation, special dialing instructions, nearest hospital, etc.
__ C heck C om m unication m ethods – radio, m obile phone, landline etc.
__ Em ergency vehicle access clear? K eys for vehicles available?
__ Em ergency G athering S ite discussed.
__ First aid kit/A
ED
available and location announced.
__ Location of drinking w ater and toilet facilities.
A dditional Item s:
escription of
W ork ite Locations
Potential H azards
M itigation M ethods
Inspection operations
A ctivities
Potential H azards
M itigation M ethods
LV
3 S upervisor and
LV
1 Technician um an error, joint and m uscle strains and exhaustion, harness discom fort.
A dhere to S
PR
A
T/IR
A TA Training, K eep physically fit, w arm up m uscles, use good technique during rope skills, take necessary breaks, fit harness appropriately.
U S A C E inspectors
H um an error, joint and m uscle strains and exhaustion, harness discom fort.
A dhere to S
PR
A T Training, K eep physically fit, w arm up m uscles, use good technique during rope skills, take necessary breaks, fit harness appropriately.
e A ccess - G ate In sp azard
A n alysis (JH
Individual Equipm ent __ H elm et __ Eye protection __ Foot protection __ G loves __ Protective clothing __ R eflective C lothing __ R espiratory protection __ H earing Protection __ H arness __ C onnectors
__ D escender __ A scender __ Belay D evice __ 2 B ackup D evices __ Lanyards __ Pulleys __ M ulti-tool __ headlam p __ C learance Locks __ other:
Equipm ent m aintenance records shall be available upon request.
A ll load bearing equipm ent are A N
SI Z
359.4*, w ith the exception of the follow ing:
Tool (N am e/M an u f.): Petzl A
S A P Lock P u rp ose: B ackup D evice (Second Point) Ju stification for U se*
: This device is w idely used in the rope access industry. The device is one of the accepted backup devices used by S
PR
A T during required trainings. O ther w idely tested/accepted
A N
SI devices are not know
n. The device is also approved by EN
353-2.
Tool (N am e/M an u f.): Petzl C roll and H andle Ascender P u rpose: A scent
Ju stification for U se*
: This device is w idely used in the rope access industry. The device is one of the accepted backup devices used by S
PR
A T during required trainings. O ther w idely tested/accepted
A N
SI devices are not know
n. The device is also approved by EN
567.
Tool (N am e/M an u f.): P u rpose:
Ju stification for U se*
Tool (N am e/M an u f.): P u rpose:
Ju stification for U se*
Tool (N am e/M an u f.): P u rpose:
Ju stification for U se*
*A ll equipm ent shall be w idely accepted w ithin standard S
PR
A
T/IR
A TA practice.
**Include description of availability of an alternate, R A society recognition, specialty application, alternate standard approval (i.e. EU ), etc.
G roup
Equipm ent
__ R opes __ Edge Protection __ R igging S traps __ C onnectors __ other:
N ote: group equipm ent being supplied by C ontractor.
Equipm ent m aintenance records shall be available upon request.
A ll load bearing equipm ent are A N
SI Z
359.4*, w ith the exception of the follow ing:
Tool (N am e/M an u f.): P u rpose:
Ju stification for U se*
Tool (N am e/M an u f.): P u rpose:
Ju stification for U se*
Tool (N am e/M an u f.): P u rpose:
Ju stification for U se*
*A ll equipm ent shall be w idely accepted w ithin standard S
PR
A
T/IR
A TA practice.
**Include description of availability of an alternate, R A society recognition, specialty application, alternate standard approval (i.e. EU ), etc.
e A ccess - G ate In sp azard
A n alysis (JH
M achinery
Lock-out/tag-out
D oes m achinery, valves, or gates need to be locked-out? __ Yes __ N o
__ M achinery Locked-out/Tagged out of service __ Tags visually checked by R
A S upervisor Equipm ent N eeded for Lockout:
C ontact person for C learance: Phone:
C learance held by: Phone:
A ccess (Fall) and H azard
Z one
H azard Z one:
A ccess Z one:
nchor
D escription/ escue and
R etrieval
M ethods
R ope R escue and R etrieval M ethods should be consistent w ith those outlined in R ope A ccess
Industry S tandards. The equipm ent needed for rescue shall alw ays be available in the inspection area. A trained rescue supervisor shall be geared up and ready to respond w henever anyone is on rope.
R escue m ethod to be discussed on site prior to beginning w ork. A ll R ope A ccess personnel and available project personnel w ill assist in rescue operations as directed by the Level III R ope Access supervisor.
R escue K it __ First A id K it __ Patient Packaging __ Pulleys __ R ope G rabs __ C onnectors __ S pare Equipm ent __ O ther:
e A ccess - G ate In sp azard
A n alysis (JH
(x) ondition D escription of H azards ontrol M easures x Falling
G ravity-induced injury or death _x_ lw ays use appropriate fall-protection or rope-access equipm ent w hen 6 feet from unprotected edge w ith a fall potential of 6 feet or m ore
A ll personnel m ust be properly trained (certified in S
P R
AT/IR
A
TA
as required) x um an Error
R igging E rrors se 2-rope system w hen w orking line is prim ary m eans of support U se independent anchorages A lw ays do 4-point check: R opes (including anchors), H ardw are, H arness, H elm et om m unication D ifficulty
Loud am bient noise (traffic, m achinery, running w ater, w ind, etc.)
M alfunctioning or dropped radios
C onditions change
A gree upon and use standardized com m unication signals C heck com m unication system esignate alternate com m unication system in case conditions change or technical difficulties arise R eview hand signals (as appropriate)
Sharp, hot or abrasive
R ope or anchor dam age and/or failure
A brasions or cuts to hands
M elted rope
B urns sustained by operator
U se proper edge protection and padding
U se re-direct or interm ediate anchors as needed ear gloves and proper clothing
Electrical Lines
Inadvertent contact w ith energized lines
B urns or electrocution from contact
E xam ine lines that m ight be contacted by w ind-blow n ropes G et appropriate clearances Follow lock-out/tag-out procedure
M achinery
Inadvertent operation of m achinery
Injury sustained from m achinery
H azardous condition created (e.g. release of w ater)
G et appropriate clearances
Follow lock-out/tag-out procedure
C onfirm lock-out/tag-out
Injury from Tools
H azards depend on tools used
D am age to rope-access or fall-protection system
Follow all m anufacturers instructions and keep all protective guards in place S eparate suspension rope m ay be required for tools greater than 10 kg ropped Tools or
M aterials
P ossible injury to personnel and public
Loss of im portant tools for w ork or egress
D am age to structures or equipm ent
_x_ _x_ _x_ _x_ C learly m ark and barricade H azard Zone H elm ets or hard hats m ust be w orn in H azard Zone K eep a clean and orderly w orksite
A ll tools and devices m ust be tethered or secured A void w orking or standing below other w orkers ock fall or loose debris
P ossible injury to personnel and public
D am age to structures or equipm ent
S evered ropes
C areful scaling or clearing of slope m ay be needed prior to beginning w ork Loose m aterials or rock m ay need to be secured (either tem porarily or perm anently) M anage ropes carefully to avoid dislodging loose m aterials ater
(w orking around/over m oving/standing w ater)
W et surfaces can be slippery
P otential for D row ning
Trapped in current w hile tied off (drow ning hazard)
S top w ork if conditions becom e dangerous
R escue boat shall be readily available if w orking directly over w ater, especially if descent is a viable m ethod of egress.
Fall protection or rope access equipm ent should not allow w orker to fall into w ater (especially m oving w ater) P ersonal flotation devices not required if proper fall protection in place eather-
R ain/Snow
/Ice
Insulating qualities of w et clothing decreases
P ossible hypotherm ia (dangerously low body tem perature)
Loss of dexterity in extrem ities
W et or icy surfaces can be slippery
D ecreased friction on descent and rope-grab devices
D anger of stray current around im properly insulated and grounded electrical equipm ent
D ecreased visibility
Frozen R opes
_x_ _x_ _x_ _x_
S top w ork if conditions becom e dangerous
W ear proper footw ear and clothing W aterproof rain gear should be available B e aw are of slippery conditions
E lectrical equipm ent m ust be adequately grounded and equipped w ith G
FC
I’s.
H and w arm ers should be available in case of em ergency e A ccess - G ate In sp azard
A n alysis (JH ondition D escription of H azards ontrol M easures
Sun/H eat
P ossible dehydration, heat exhaustion or heat stroke
B urns from tools, equipm ent, and structural steel
A dhesives and first-aid supplies m ay be degraded by heat
S top w ork if conditions becom e dangerous
Am ple w ater and/or electrolytes m ust be on hand for w orkers
S chedule proper breaks and w ork in m orning or evening to avoid peak tem peratures ear gloves and proper clothing to protect hands from hot surfaces old/Freezing Tem peratures
P ossible hypotherm ia, frostbite, loss of dexterity in extrem ities
D ecrease in efficiency, adhesives and first-aid supplies m ay not function properly due to cold, w ater for drinking and w ork m ay be frozen; slippery surfaces
S top w ork if conditions becom e dangerous
W ear proper footw ear and clothing, including gloves and hat W arm liquids should be available to w orkers E nsure w arm ing station is available to w orkers ind
P ossible increased cooling or hypotherm ia risk, increased dehydration risk in dry hum idity
D ecrease in efficiency, hindrance to com m unications betw een team m em bers
D anger of unsecured equipm ent or m aterial being blow n into the access zone
D ifficulty com m unicating
_x_ top w ork if conditions becom e dangerous
W ear proper footw ear and clothing, including gloves and hat S ecure loose m aterials at w ork site B e w ary of w ind developing slack in ropes w here they m ay be blow n in to areas m aking retrieval difficult
Lightning
P ossible electrocution due to lightning strike, loss of consciousness or life
R ope-access equipm ent m ay provide a pathw ay to the operative for electrical strikes
S top w ork w hen lightning threatens im ly lit or night w ork
S harp or protruding objects (m etal, nails, bolts, etc.) m ay not be visible to m oving operatives, drow siness of em ployees
_x_ P rovide adequate lighting: area lighting and/or head-and hand-lam ps rovide spare batteries, light sources, and bulbs onfined space entry/toxic air
W ork areas m ay contain toxic gases or insufficient oxygen levels for w ork.
S pace m ay have restricted entry/exit m aking access difficult.
Follow confined space procedures
U se air m onitor- check batteries, recalibrate as needed Toxic rescue plan m ay be needed ust/C hem ical Exposure
D ifficulty in breathing, possible allergic reaction
P ossible long-term health hazard
C hem ical burns to skin, eyes, internal organs
P rovide adequate engineering controls
P rovide P
PE
w here engineering controls not possible or im practical W orkers m ust have M
S D
S on site for all chem icals used in w ork R espirators m ust be the correct type for the exposure and personnel m ay need m edical clearance and be correctly fitted.
igh-noise area
P erm anent or tem porary dam age to hearing
C om m unications betw een team m em bers m ay be difficult
H igh-noise levels m ay m ask w arning buzzers or other alert sounds
H earing protection required, in extrem ely loud environm ents (+120 dB ), m ultiple types of protection m ay be necessary.
A gree on hand signals before w ork starts
W orkers m ay be equipped w ith sound-isolating hearing protection for radios.
Insect or anim al bites or stings
P ossible injury or incapacitation of personnel depending on severity of bite or venom areful access into areas w here spiders, snakes, scorpions, or other creatures m ay reside.
U se of gloves at all tim es, equip first aid kit w ith m edical supplies appropriate for bites and stings.
Vehicular Traffic
P ossible im pact or crushing injury
C areful dem arcation of access and hazard zones, U se flags, signs, flag persons, lighting as needed P rovide high-visibility clothing for personnel P rovide traffic control per D O rs M U
TC
D as needed nim al/B ird
Feces
P ossible inhalation of disease carried by feces
_x_
P ersonnel need to be w ary of contact w ith the droppings.
W orkers m ay need to w ear protective gloves or respirators.
ther e A ccess - G ate In sp azard
A n alysis (JH tractor sh all attach stan d ard d aily tailg ate m eetin g sh eet.
A t a m inim um
, the follow ing item s shall be included:
Project nam e
D ate
N am e of designated Level III/S afety S upervisor
N am es of inspectors
B asic R ope, H elm et, H arness, and H ardw are checklist
Item s for discussion from initial onsite review or previous day’s w ork
S ignature sheet for all inspectors and additional personnel present e A ccess - G ate In sp azard
A n alysis (JH
A C
E S P
R A
T C ertification e A ccess - G ate In sp azard
A n alysis (JH e A ccess - G ate In sp azard
A n alysis (JH e A ccess - G ate In sp azard
A n alysis (JH tractor S P
R A
T C ertification
PE
O
F W O
R K
A T
T A
C H
M E
N T
R ope A ccess Rigging and Supervision and N
D T testing of D am Spillway gates at
Tuttle C reek D am , M
Tainter gates at Tow n Bluff D
PE
O
F W O
R K
A T
T A
C H
M E
N T
R ope A ccess Rigging and Supervision and N
D T testing of D am Spillway gates at
Tuttle C reek D am , M
Select D raw ings
PE
O
F W O
R K
A T
T A
C H
M E
N T
R ope A ccess Rigging and Supervision and N
D T testing of D am Spillway gates at
Tuttle C reek D am , M
Select D raw ings
SCOPE OF WORK ATTACHMENT 3
Rope Access Rigging and Supervision and NDT testng of
Dam Spillway gates at Tuttle Creek Dam, Manhattan, KS
NDT Locations
NDT Locations
Standard NDT Form
| A02 - SOW - Attach 2- Rope Access AHA_JHA_SSHO_USACE .pdf |
| Emergency Information |
File details come from the government source that posted it. Updated .