A22W912P918B0019Amend01.pdf

PDF 544 KB Posted

Attached to
Lake Shelbyville Trilateration Rehabiltation
Solicitation number
w912p918b0019
Issued by

About this file

Amendment 01 Questions and Answers

View the file

Other files

File Type Posted
B01.BIDSUMMARYSHEET.pdf PDF
A02AppendixBConceptDesigns.pdf PDF
A22W912P918B0019.pdf PDF
A02Specifications.pdf PDF
A02AppendixAReferenceDwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81C8X81928983

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to post the questions and answ ers for the Shelbyville Trilat Rehab. This requirement is not being extended. There are no other changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P918B0019

X 9B. DATED (SEE ITEM 11)

24-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Aug-2018

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P918B0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

QUESTIONS & ANSWERS

Questions and Answers

1. Do the existing footings get removed or cut off below ground.

Government Response: Per Section 02 01 00, Paragraph 2.2.5, "Existing Concrete footings shall be removed and replaced as specified by the SER." To clarify, concrete footings in their entirety should be removed and replaced unless the Contractor SER determines that they are adequately sized, SER approves them for reuse with the new steel trilateration stations, and SER submits certified calculations and verification that existing concrete footings are acceptable for reuse to the government for approval.

2. Is it mandatory that the existing foundations be removed or is it up to the design/build engineer whether the existing footings can be reused?

Government Response: Per Section 02 01 00, Paragraph 2.2.5, "Existing Concrete footings shall be removed and replaced as specified by the SER." To clarify, concrete footings in their entirety should be removed and replaced unless the Contractor SER determines that they are adequately sized, SER approves them for reuse with the new steel trilateration stations, and SER submits certified calculations and verification that existing concrete footings are acceptable for reuse to the government for approval.

3. Please confirm that a fulltime QC Manager with no other duties be on-site during construction.

Government Response: Per Section 01 14 40 Paragraph 3.4, "CQC System Manager shall be on the site at all times during construction." Per Section 01 14 40, Paragraph 3.4.1.2, " The CQC System Manager and staff shall be assigned no scheduling or other duties."

4. Please confirm that the superintendent can perform site safety requirements.

Government Response. The Superintendent may also serve as the Site Safety officer.

(End of Summary of Changes)