A02AppendixBConceptDesigns.pdf
PDF 2 MB Posted
- Attached to
- Lake Shelbyville Trilateration Rehabiltation
- Solicitation number
- w912p918b0019
About this file
Appendix B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01.BIDSUMMARYSHEET.pdf | ||
| A22W912P918B0019Amend01.pdf | ||
| A22W912P918B0019.pdf | ||
| A02Specifications.pdf | ||
| A02AppendixAReferenceDwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECORD DRAWINGS
G-001
TRILATERATION STATION REHABILITATION PROJECT
ARRA / STIMULUS
MISSISSIPPI RIVER, IL & MO
FRIDAY, AUGUST 13, 2010
NOTE: AS-BUILT DATA WAS PROVIDED BY
THE CONTRACTOR ON JULY 16, 2010
C O
V E
R S
H
EE
T
D C
F
JB D
C F
G-1
R E
C O
R D
D R
A W
IN
G
S
APPENDIX B - CONCEPT DESIGN
G E
N E
R A
L N
O
TE
S
D C
F D
C F
S-0
D C
F
STRUCTURAL NOTES
GENERAL REQUIREMENTS & DESIGN CRITERIA
SUBMITTALS & INSPECTIONS
SOILS AND FOUNDATIONS
CAST-IN-PLACE CONCRETE
CONCRETE REINFORCEMENT
STRUCTURAL STEEL
STEEL GRATING
R E
C O
R D
D R
A W
IN
CM-01 L27
CM-02 L27
CM-03 L27
CM-04 L27
CM-05 L27
CM-06 L27
FO
U
N D
A
TI
O N
F
LO
O
R F
R A
M
IN
G P
LA
N
S
D C
F D
C F
D C
F
R E
C O
R D
D R
A W
IN
G
S-1
CM-02 MPLD
CM-03 MPLD
CM-05 MPLD
CM-01 MPLD
CM-04 MPLD
FO
U
N D
A
TI
O N
F
LO
O
R F
R A
M
IN
G P
LA
N
S
D C
F D
C F
D C
F
S-2
R E
C O
R D
D R
A W
IN
CM-03 LD25
CM-04 LD25
CM-05 LD25
CM-01 LD25
CM-06 LD25
FO
U
N D
A
TI
O N
F
LO
O
R F
R A
M
IN
G P
LA
N
S
D C
F D
C F
S-3
D C
F
R E
C O
R D
D R
A W
IN
CM-03 LD24
CM-04 LD24
CM-01 LD24
CM-02 LD24
CM-05 LD24
FO
U
N D
A
TI
O N
F
LO
O
R F
R A
M
IN
G P
LA
N
S
D C
F D
C F
S-4
D C
F
R E
C O
R D
D R
A W
IN
TYPICAL BRACE-TO-COLUMN CONNECTION
TYPICAL WF BEAM TO COL. CONN.
TYPICAL WF BEAM TO COL. CONN.
TYPICAL WF BEAM-TO-WF BEAM CONN.
TYPICAL L- BEAM-TO-WF BEAM CONN.
TYPICAL BRACE-TO-BEAM CONNECTION
C12 STRINGER TO C3 POST CONNECTION
TYPICAL BASE PLATE CONNECTION
C3 POST TO BASE PLATE CONNECTION
C12 KINKED STAIRWAY STRINGER CONNECTIONS
TYP. FRAME ELEVATION
TYP. FRAME ELEVATION
D E
TA
IL
S
D C
F D
C F
S-5
D C
F
R E
C O
R D
D R
A W
IN
TYPICAL W5 BEAM TO EXIST HSS COLUMN
CONNECTION SECTION
CONNECTION WELD PLATE
TYPICAL C12 STAIR STRINGER TO W5 BEAM
TYPICAL C12 STAIR STRINGER TO FOOTING
D E
TA
IL
S
D C
F D
C F
S-6
D C
F
R E
C O
R D
D R
A W
IN
TYPICAL PLAN-01
TYPICAL PLAN-02
TYPICAL PLAN-03
TYPICAL GUARD RAIL-01
TYPICAL GUARD RAIL-02
TYP. RAIL @ T.O. STAIR
TYP. RAIL @ BOTTOM OF STAIR
R A
IL
IN
G D
ET
AI
LS
JB D
C
F
S-7
D C
F
R E
C O
R D
D R
A W
IN
| G-1 COVER SHEET |
| G-1 COVER SHEET |
| S-0 GENERAL NOTES |
| Layout1 |
| S-1 FRAME PLANS |
| Layout1 |
| S-2 FRAME PLANS |
| Layout1 |
| S-3 FRAME PLANS |
| Layout1 |
| S-4 FRAME PLANS |
| Layout1 |
| S-5 STRUCT DETAILS |
| Layout1 |
| S-6 STRUCT DETAILS |
| Layout1 |
| S-7 RAILS |
| Layout1 |
File details come from the government source that posted it.