A22W912P918B0014.pdf
PDF 681 KB Posted
- Attached to
- Rock, Stone, Sand and Clay for Carlyle Lake
- Solicitation number
- W912P918B0014
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01.BIDSUMMARYSHEET..pdf | ||
| A02AppendixEMVSStoneSourceList.pdf | ||
| A02RockAppendixA1.pdf | ||
| A02AppendixC..pdf | ||
| A02AppendixBwithRedboundary.pdf | ||
| A02RockAppendix_A.PDF | ||
| A02AppendixD1D2D4Standardtest.pdf | ||
| A02RockAppendixA2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls) W912P918B0014 20-Feb-2018
b. TELEPHONE NUMBER 314 331-8965
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 20 Mar 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912P9 9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME Angie Grimes
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED. X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W81C8X73521942
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR: SET ASIDE: UNRESTRICTED OR X
SMALL BUSINESS X
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A 13b. RATING
CODE 15. DELIVER TO CODE 965110 16. ADMINISTERED BY
12. DISCOUNT TERMS 11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFP X
CARLYLE LAKE / KASKASKIA NAV PROJ
N/A
US ARMY ENGR DIST ST LOUIS
801 LAKE ROAD
CARLYLE IL 62231-1267
TEL: 618-594-2484 FAX: 618-594-8569
314 331-8746 FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
212319
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICES ITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24. 22. 21. 19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINAL PARTIAL COMPLETE
36. PAYMENT 35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912P918B0014
Section SF 1449 - CONTINUATION SHEET
SPECIFICATIONS
DESCRIPTION/SPECIFIFICATIONS/WORK STATEMENT
1. GENERAL.
1.1 Scope. The work to be performed under this contract shall consist of furnishing all labor, equipment, permits and materials necessary to supply, transport and deliver various types of rock, stone, sand and clay in varying quantities to locations designated on Corps of Engineers property at Carlyle Lake and the Kaskaskia River Project in accordance with the terms of this contract. The contractor shall perform all work to the satisfaction of the Contracting Officer, or his/her authorized representative.
1.2 Contracting Officer. The term "Contracting Officer" means the person executing this contract on behalf of the Government, and any other officer or civilian employee who is properly designated Contracting Officer; and the term includes, except as otherwise provided in this contract, the authorized representative of the Contracting Officer acting within the limits of his/her authority.
1.3 Safety.
1.3.1 All work and equipment shall conform with the safety requirements set forth in Corps of Engineers Manual, EM 385-1-1, dated November 2014, entitled, Safety and Health Requirements Manual", copies of which are available online at http://www.publications.usace.army.mil/Portals/76/publications/EngineerManuals/EM_385-1-1.pdf
1.3.2 Accident Reporting. An accident constitutes an incident or act involving the contractor, which may or may not have caused obvious damage to persons or property. All accidents shall be reported to the CO within 24 hours of the occurrence. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported immediately.
1.4 Contract Area. The contract areas are located in the central and southwestern part of Illinois. Carlyle Lake is a multi-purpose project on the Kaskaskia River near Carlyle, Illinois approximately 50 miles east of St.
Louis, Missouri. The Kaskaskia River Project extends from the mouth of the Kaskaskia River near Ellis Grove, IL to Fayetteville, IL. See Appendix A for location map. The contract areas are broken into seven bid units. See Appendixes B and C for maps.
2. CONTRACTOR FURNISHED EQUIPMENT, MATERIALS, AND SUPPLIES.
2.1 Supplies. The contractor shall furnish and deliver the following types of rock, sand, or clay to locations as designated by the Contracting Officer or his/her representative. Stone and riprap material shall be new quarried stone that is from the approved St Louis District stone source list Appendix E. It shall be durable and of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used. It shall be free from cracks, seams, and other defects that would tend to increase unduly its deterioration from natural causes, and shall be free of dirt, sand, clay and rock fines. Stone shall also not include or consist of broken concrete, bricks or other reclaimed or recycled materials.
(1) 1500 LB. RIPRAP. Stone shall conform to the following limits:
100% - Passing 600 - 1500 lbs.
50% - Passing 300 - 650 lbs.
15% - Passing 100 - 330 lbs.
(2) 1000 LB. RIPRAP (RR7). Stone shall conform to the following limits:
100% - Passing 1000 lbs.
30-70% - Passing 300 lbs.
0-16% - Passing 12 lbs.
http://www.publications.usace.army.mil/Portals/76/publications/EngineerManuals/EM_385-1-1.pdf
(3) 400 LB. RIPRAP. Stone shall conform to the following limits:
100% - Passing 160 - 400 lbs.
50% - Passing 80 - 160 lbs.
15% - Passing 30 - 80 lbs.
(4) QUARRY RUN STONE. Stone shall conform to the following limits:
90-100% - Passing 250 lbs.
40-60% - Passing 20 lbs.
(5) 150 LB. RIPRAP (RR4). Stone shall conform to the following limits:
100% - Passing 150 lbs.
30-70% - Passing 40 lbs.
(6) 50 LB. RIPRAP (RR3) Stone shall conform to the following limits:
100% - Passing 50 lbs.
30-70% - Passing 10 lbs.
(7) 3" CLEAN CHOKE STONE (RR1). Stone shall conform to the following limits:
U.S. Standard Sq. Mesh Percent by Weight Passing 3" 100 1 1/2" 33-73 No. 4 0-16
(8) 3" STONE (CA-1). Stone shall conform to the following limits:
U.S. Standard Sq. Mesh Percent by Weight Passing 3" 100 2 1/2" 90-100 2" 45-75 1 1/2" 0-30 1" 0-6
(9) 3" MINUS STONE (CA-2). Stone shall conform to the following limits:
U.S. Standard Sq. Mesh Percent by Weight Passing 2 1/2" 100 2" 90-100 1" 60-90 1/2" 35-65 No. 4 20-40 No.16 5-35
(10) CA-10. Stone shall conform to the following limits:
U.S. Standard Sq. Mesh Percent by Weight Passing 1" 100 3/4” 90-100 1/2" 65-95 No. 4 40-60 No. 16 15-45 No. 200 5-13
(11) CA-6. Stone shall conform to the following limits:
U.S. Standard Sq. Mesh Percent by Weight Passing 1 1/2" 100 1" 90-100 1/2" 60-90 No. 4 30-56 No.16 10-40 No. 200 4-12
(12) CM-16 3/8 INCH CHIPS
(13) BEACH SAND. Sand shall meet the following gradations in accordance with FA-3 Illinois
Specifications, Article 703. Fine Aggregates. Sand shall conform to the following limits:
Screen Size Percent Passing No. 4 94-100 No. 10 65-95 No. 40 30-70 No. 80 10-35 No. 200 0-6
(14) CLAY. Soil classified as "Clay" shall be inorganic low plasticity clay classified as CL by the American Society for Testing and Materials pamphlet D 2487. It shall contain at least 90 percent passing the No. 4 Sieve, with a maximum rock size of 1 inch.
(15) TOP SOIL. Top-soil shall be fertile, friable, natural topsoil locality and shall be obtained from a well-drained off-site source. Top-soil shall be without admixture of subsoil or slag, shall be free of organic matter, sticks, branches, plants or their roots, clods of hard earth, stones 1 inch in diameter or larger and other debris.
2.2 Equipment. The contractor shall furnish and maintain sufficient equipment suitable to perform the work. All equipment shall be maintained in safe operating condition in accordance with paragraph 1.3 (Safety).
2.3 Vehicles. All vehicles used in performance of this contract shall be clearly marked with an identification sign showing the contractor's name and address.
2.4 Approval of Equipment and Materials. Prior to commencing work, the contractor shall (i) submit to the Contract Officer, a written statement identifying all necessary permits have been acquired to transport via State, County and Township roads all necessary materials to be delivered and used during the contract period, and (ii) provide a list of all equipment available to perform the services listed in this contract.
The Contracting Officer reserves the right to inspect any and all equipment and rock prior to, and during, the period of this contract. All material, equipment, and operating procedures must be approved by the Contracting Officer prior to the commencement of work and prior to implementing any changes. The contractor shall remove from Government property all unapproved stock and equipment.
2.5 Permits and Licenses. The contractor shall, at his/her own expense, obtain any licenses or permits required for transportation of rock/stone from the point of supply to delivery location. Permits may be required by the State of Illinois, Clinton, Bond and Fayette Counties, for Carlyle Project and Randolph, Monroe and St. Clair Counties for the Kaskaskia River Project and/or local township road commissioners for exceeding weight limits as designated on local roadways. Also, the contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.
3. SPECIFICATIONS FOR ROCK, SAND, AND CLAY DELIVERY.
3.1 The contractor shall supply all rock, sand, or clay as designated by grade/weight and quantities.
3.2 The product shall be transported in such a manner as to conform to industry standards and applicable laws.
3.3 The Contracting Officer may direct, at the Contractor’s expense, testing of material delivered to worksite if the stone appears, by visual inspection, to be of questionable gradation or quality. Testing shall be in accordance with the Standard Test Method for Gradation of Riprap (See Appendix D). For each riprap gradation, a gradation test shall be completed before placement of riprap and after every 15,000 tons placed. The sample size for all riprap gradation tests shall be determined by multiplying the weight of the larges stone in the gradation by 25 (i.e.
400 pound riprap gradation requires a sample weight of 400 x 25 = 10,000 pounds).
3.4 The product will be delivered by semi-truck and tandem truck in the quantities requested by the Contracting Officer and/or his/her representative. The contractor will be notified no less than five days prior to job of the required rock type, quantities and the anticipated time and date to deliver to the specified location. Delivery dates and times will be contingent on weather and Corps of Engineers workload. All deliveries will be coordinated between the hours of 8:00 a.m. and 4:00 p.m.
3.5 No rock, sand, or clay shall be delivered without coordination with the Contracting Officer and/or his/her representative.
4. ENVIRONMENTAL PROTECTION. The contractor shall comply with all Federal, State, and local laws regarding environmental protection. All environmental protection matters shall be coordinated with the Contracting Officer. The contractor may be inspected by the Contracting Officer, or other Federal, State, and local officials without notice. Access for inspection shall be granted by the contractor upon request.
5. MEASUREMENT. The materials will be measured for payment by the ton (2,000 pounds) with final quantities rounded to the nearest whole ton. Weight to be paid for will be determined from certified weight tickets which shall be furnished by the Contractor without additional cost to the Government. A certified weight ticket shall be defined as each truck being weighed empty, and again when loaded and the ticket, identified by the Contractor's name and the contract number, signed by a quarry representative with the statement "certified correct". This procedure shall be followed for each load hauled. The Contractor shall initial each ticket to verify accuracy and completeness of each ticket before submitting it to the Government. Certification stating that the scales were tested and approved by the local authority shall be furnished by the Contractor.
6. INSPECTION AND ACCEPTANCE. The work will be conducted under the general direction of the Contracting Officer, and is subject to inspection by his/her appointed inspectors. No inspector is authorized to change any provision of the specifications without written authorization by the Contracting Officer, nor shall the presence or absence of an inspector relieve the contractor from any of the requirements of the contract. Formal acceptance will be made by the Contracting Officer for and in behalf of the Government.
7. PAYMENTS. Payment will be made for the rock/stone actually supplied and delivered. NOTE: Payment for each bid item shall constitute full compensation for furnishing all plant, labor, equipment, and material and performing all operations necessary for the work required. Any inability to complete the work stated above will result in a reduction in contract quantities and total amount due the contractor.
BIS SHEETS
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Furnish all labor, equipment and materials necessary to supply, transport and deliver various types of rock, stone, sand and clay to Carlyle Lake, Carlyle Illinois and the Kaskaskia River Project in accordance with solicitation specifications, maps and provisions.
PLEASE NOTE THE FOLLOWING:
(a) All estimated quantities are to be used for bid evaluation only.
(b) All prices must be on a firm basis.
(c) Services listed in Section B shall be performed following the issuance of a delivery order ONLY.
(d) AMOUNTS APPLICABLE TO DELIVERY ORDERS UNDER THIS CONTRACT.
Cumulative Guaranteed Minimum - $8,000.00- base year $4,000.00- option years Cumulative Maximum - $400,000.00 x 5 years = $2,000,000.00 Minimum and Maximum delivery order amounts are referenced in Section I, Contract Clauses.
(e) RENEWAL OPTION NOTICE - This solicitation contains a renewal option clause (Section I, Contract Clauses, and Option to Extend the Term of The Contract). The renewal option is to be exercised at the discretion of the Government only and will be binding on the Contractor if a decision is made by the Government to exercise the option. Bidders are advised that specific renewal option year.
(f) Bidders must bid on all bid items. Failure to bid on any item will be cause for the Government to deem the bid non-responsive.
BASE YEAR
ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT
0001 1000 LB RIP RAP (RR7)
Area 1, Delivered in Semi Truck 150 TN
0002 1000 LB RIP RAP (RR7)
Area 2, Delivered in Semi Truck 150 TN
0003 1000 LB RIP RAP (RR7)
Area 3, Delivered in Semi Truck 1000 TN
0004 1000 LB RIP RAP (RR7)
Area 4, Delivered in Semi Truck 1000 TN
0005 1000 LB RIP RAP (RR7)
Area 5, Delivered in Semi Truck 500 TN
0006 1000 LB RIP RAP (RR7)
Area 6, Delivered in Semi Truck 500 TN
0007 1000 LB RIP RAP (RR7)
Area 7, Delivered in Semi Truck 500 TN
0008 400 LB RIP RAP (RR5)
Area 1, Delivered in Semi-Truck 50 TN
0009 400 LB RIP RAP (RR5)
Area 2, Delivered in Semi-Truck 50 TN
0010 400 LB RIP RAP (RR5)
Area 3, Delivered in Semi-Truck 1000 TN
0011 400 LB RIP RAP (RR5)
Area 4, Delivered in Semi-Truck 1000 TN
0012 400 LB RIP RAP (RR5)
Area 5, Delivered in Semi-Truck 500 TN
0013 400 LB RIP RAP (RR5)
Area 6, Delivered in Semi-Truck 500 TN
0014 400 LB RIP RAP (RR5)
Area 7, Delivered in Semi-Truck 500 TN
0015 400 LB RIP RAP (RR5)
Area 1, Delivered in Tandem-Truck 50 TN
0016 400 LB RIP RAP (RR5)
Area 2, Delivered in Tandem-Truck 50 TN
0017 400 LB RIP RAP (RR5)
Area 3, Delivered in Tandem-Truck 50 TN
0018 400 LB RIP RAP (RR5)
Area 4, Delivered in Tandem-Truck 50 TN
0019 400 LB RIP RAP (RR5)
Area 5, Delivered in Tandem-Truck 50 TN
0020 400 LB RIP RAP (RR5)
Area 6, Delivered in Tandem-Truck 50 TN
0021 400 LB RIP RAP (RR5)
Area 7, Delivered in Tandem-Truck 50 TN
0022 150 LB RIP RAP (RR4)
Area 1, Delivered in Semi-Truck 40 TN
0023 150 LB RIP RAP (RR4)
Area 2, Delivered in Semi-Truck 40 TN
0024 150 LB RIP RAP (RR4)
Area 3, Delivered in Semi-Truck 1000 TN
0025 150 LB RIP RAP (RR4)
Area 4, Delivered in Semi-Truck 1000 TN
0026 150 LB RIP RAP (RR4)
Area 5, Delivered in Semi-Truck 500 TN
0027 150 LB RIP RAP (RR4)
Area 6, Delivered in Semi-Truck 500 TN
0028 150 LB RIP RAP (RR4)
Area 7, Delivered in Semi-Truck 500 TN
0029 150 LB RIP RAP (RR4)
Area 1, Delivered in Tandem-Truck 100 TN
0030 150 LB RIP RAP (RR4)
Area 2, Delivered in Tandem-Truck 100 TN
0031 150 LB RIP RAP (RR4)
Area 3, Delivered in Tandem-Truck 1000 TN
0032 150 LB RIP RAP (RR4)
Area 4, Delivered in Tandem-Truck 1000 TN
0033 150 LB RIP RAP (RR4)
Area 5, Delivered in Tandem-Truck 500 TN
0034 150 LB RIP RAP (RR4)
Area 6, Delivered in Tandem-Truck 500 TN
0035 150 LB RIP RAP (RR4)
Area 7, Delivered in Tandem-Truck 500 TN
0036 50 LB RIP RAP (RR3)
Area 1, Delivered in Semi-Truck 50 TN
0037 50 LB RIP RAP (RR3)
Area 2, Delivered in Semi-Truck 50 TN
0038 50 LB RIP RAP (RR3)
Area 3, Delivered in Semi-Truck 50 TN
0039 50 LB RIP RAP (RR3)
Area 4, Delivered in Semi-Truck 50 TN
0040 50 LB RIP RAP (RR3)
Area 5, Delivered in Semi-Truck 50 TN
0041 50 LB RIP RAP (RR3)
Area 6, Delivered in Semi-Truck 50 TN
0042 50 LB RIP RAP (RR3)
Area 7, Delivered in Semi-Truck 50 TN
0043 50 LB RIP RAP (RR3)
Area 1, Delivered in Tandem-Truck 100 TN
0044 50 LB RIP RAP (RR3)
Area 2, Delivered in Tandem-Truck 100 TN
0045 50 LB RIP RAP (RR3)
Area 3, Delivered in Tandem-Truck 100 TN
0046 50 LB RIP RAP (RR3)
Area 4, Delivered in Tandem-Truck 100 TN
0047 50 LB RIP RAP (RR3)
Area 5, Delivered in Tandem-Truck 100 TN
0048 50 LB RIP RAP (RR3)
Area 6, Delivered in Tandem-Truck 100 TN
0049 50 LB RIP RAP (RR3)
Area 7, Delivered in Tandem-Truck 100 TN
0050 3" CLEAN CHOKE STONE (RR1)
Area 1, Delivered in Semi-Truck 100 TN
0051 3" CLEAN CHOKE STONE (RR1)
Area 2, Delivered in Semi-Truck 100 TN
0052 3" CLEAN CHOKE STONE (RR1)
Area 3, Delivered in Semi-Truck 100 TN
0053 3" CLEAN CHOKE STONE (RR1)
Area 4, Delivered in Semi-Truck 100 TN
0054 3" CLEAN CHOKE STONE (RR1)
Area 5, Delivered in Semi-Truck 100 TN
0055 3" CLEAN CHOKE STONE (RR1)
Area 6, Delivered in Semi-Truck 100 TN
0056 3" CLEAN CHOKE STONE (RR1)
Area 7, Delivered in Semi-Truck 100 TN
0057 3" CLEAN CHOKE STONE (RR1)
Area 1, Delivered in Tandem-Truck 100 TN
0058 3" CLEAN CHOKE STONE (RR1)
Area 2, Delivered in Tandem-Truck 100 TN
0059 3" CLEAN CHOKE STONE (RR1)
Area 3, Delivered in Tandem-Truck 100 TN
0060 3" CLEAN CHOKE STONE (RR1)
Area 4, Delivered in Tandem-Truck 100 TN
0061 3" CLEAN CHOKE STONE (RR1)
Area 5, Delivered in Tandem-Truck 100 TN
0062 3" CLEAN CHOKE STONE (RR1)
Area 6, Delivered in Tandem-Truck 100 TN
0063 3" CLEAN CHOKE STONE
Area 7, Delivered in Tandem-Truck 100 TN
0064 3” STONE (CA-1)
Area 1, Delivered in Semi Truck 40 TN
0065 3” STONE (CA-1)
Area 2, Delivered in Semi Truck 40 TN
0066 3” STONE (CA-1)
Area 3, Delivered in Semi Truck 40 TN
0067 3” STONE (CA-1)
Area 4, Delivered in Semi Truck 40 TN
0068 3” STONE (CA-1)
Area 5, Delivered in Semi Truck 40 TN
0069 3” STONE (CA-1)
Area 6, Delivered in Semi Truck 40 TN
0070 3” STONE (CA-1)
Area 7, Delivered in Semi Truck 40 TN
0071 3” STONE (CA-1)
Area 1, Delivered in Tandem-Truck 50 TN
0072 3” STONE (CA-1)
Area 2, Delivered in Tandem-Truck 150 TN
0073 3” STONE (CA-1)
Area 3, Delivered in Tandem-Truck 50 TN
0074 3” STONE (CA-1)
Area 4, Delivered in Tandem-Truck 50 TN
0075 3” STONE (CA-1)
Area 5, Delivered in Tandem-Truck 50 TN
0076 3” STONE (CA-1)
Area 6, Delivered in Tandem-Truck 50 TN
0077 3” STONE (CA-1)
Area 7, Delivered in Tandem-Truck 50 TN
0078 3" MINUS STONE (CA-2)
Area 1, Delivered in Semi-Truck 40 TN
0079 3" MINUS STONE (CA-2)
Area 2, Delivered in Semi-Truck 40 TN
0080 3" MINUS STONE (CA-2)
Area 3, Delivered in Semi-Truck 40 TN
0081 3" MINUS STONE (CA-2)
Area 4, Delivered in Semi-Truck 40 TN
0082 3" MINUS STONE (CA-2)
Area 5, Delivered in Semi-Truck 40 TN
0083 3" MINUS STONE (CA-2)
Area 6, Delivered in Semi-Truck 40 TN
0084 3" MINUS STONE (CA-2)
Area 7, Delivered in Semi-Truck 40 TN
0085 3" MINUS STONE (CA-2)
Area 1, Delivered in Tandem-Truck 30 TN
0086 3" MINUS STONE (CA-2)
Area 2, Delivered in Tandem-Truck 30 TN
0087 3" MINUS STONE (CA-2)
Area 3, Delivered in Tandem-Truck 30 TN
0088 3" MINUS STONE (CA-2)
Area 4, Delivered in Tandem-Truck 30 TN
0089 3" MINUS STONE (CA-2)
Area 5, Delivered in Tandem-Truck 30 TN
0090 3" MINUS STONE (CA-2)
Area 6, Delivered in Tandem-Truck 30 TN
0091 3" MINUS STONE (CA-2)
Area 7, Delivered in Tandem-Truck 30 TN
0092 CA-10 STONE
Area 1, Delivered in Semi-Truck 20 TN
0093 CA-10 STONE
Area 2, Delivered in Semi-Truck 20 TN
0094 CA-10 STONE
Area 3, Delivered in Semi-Truck 20 TN
0095 CA-10 STONE
Area 4, Delivered in Semi-Truck 20 TN
0096 CA-10 STONE
Area 5, Delivered in Semi-Truck 20 TN
0097 CA-10 STONE
Area 6, Delivered in Semi-Truck 20 TN
0098 CA-10 STONE
Area 7, Delivered in Semi-Truck 20 TN
0099 CA-10 STONE
Area 1, Delivered in Tandem-Truck 150 TN
0100 CA-10 STONE
Area 2, Delivered in Tandem-Truck 150 TN
0101 CA-10 STONE
Area 3, Delivered in Tandem-Truck 150 TN
0102 CA-10 STONE
Area 4, Delivered in Tandem-Truck 150 TN
0103 CA-10 STONE
Area 5, Delivered in Tandem-Truck 150 TN
0104 CA-10 STONE
Area 6, Delivered in Tandem-Truck 150 TN
0105 CA-10 STONE
Area 7, Delivered in Tandem-Truck 150 TN
0106 CA-6 STONE
Area 1, Delivered in Semi-Truck 20 TN
0107 CA-6 STONE
Area 2, Delivered in Semi-Truck 20 TN
0108 CA-6 STONE
Area 3, Delivered in Semi-Truck 20 TN
0109 CA-6 STONE
Area 4, Delivered in Semi-Truck 20 TN
0110 CA-6 STONE
Area 5, Delivered in Semi-Truck 20 TN
0111 CA-6 STONE
Area 6, Delivered in Semi-Truck 20 TN
0112 CA-6 STONE
Area 7, Delivered in Semi-Truck 20 TN
0113 CA-6 STONE
Area 1, Delivered in Tandem-Truck 150 TN
0114 CA-6 STONE
Area 2, Delivered in Tandem-Truck 150 TN
0115 CA-6 STONE
Area 3, Delivered in Tandem-Truck 150 TN
0116 CA-6 STONE
Area 4, Delivered in Tandem-Truck 150 TN
0117 CA-6 STONE
Area 5, Delivered in Tandem-Truck 150 TN
0118 CA-6 STONE
Area 6, Delivered in Tandem-Truck 150 TN
0119 CA-6 STONE
Area 7, Delivered in Tandem-Truck 150 TN
0120 3/8 INCH CHIPS (CM-16)
Area 1, Delivered in Semi-Truck 20 TN
0121 3/8 INCH CHIPS (CM-16)
Area 2, Delivered in Semi-Truck 20 TN
0122 3/8 INCH CHIPS (CM-16)
Area 3, Delivered in Semi-Truck 20 TN
0123 3/8 INCH CHIPS (CM-16)
Area 4, Delivered in Semi-Truck 20 TN
0124 3/8 INCH CHIPS (CM-16)
Area 5, Delivered in Semi-Truck 20 TN
0125 3/8 INCH CHIPS (CM-16)
Area 6, Delivered in Semi-Truck 20 TN
0126 3/8 INCH CHIPS (CM-16)
Area 7, Delivered in Semi-Truck 20 TN
0127 3/8 INCH CHIPS (CM-16)
Area 1, Delivered in Tandem-Truck 30 TN
0128 3/8 INCH CHIPS (CM-16)
Area 2, Delivered in Tandem-Truck 30 TN
0129 3/8 INCH CHIPS (CM-16)
Area 3, Delivered in Tandem-Truck 30 TN
0130 3/8 INCH CHIPS (CM-16)
Area 4, Delivered in Tandem-Truck 30 TN
0131 3/8 INCH CHIPS (CM-16)
Area 5, Delivered in Tandem-Truck 30 TN
0132 3/8 INCH CHIPS (CM-16)
Area 6, Delivered in Tandem-Truck 30 TN
0133 3/8 INCH CHIPS (CM-16)
Area 7, Delivered in Tandem-Truck 30 TN
0134 BEACH SAND
Area 1, Delivered in Semi-Truck 500 TN
0135 BEACH SAND
Area 2, Delivered in Semi-Truck 500 TN
0136 BEACH SAND
Area 3, Delivered in Semi-Truck 1000 TN
0137 BEACH SAND
Area 4, Delivered in Semi-Truck 500 TN
0138 BEACH SAND
Area 5, Delivered in Semi-Truck 500 TN
0139 BEACH SAND
Area 6, Delivered in Semi-Truck 500 TN
0140 BEACH SAND
Area 7, Delivered in Semi-Truck 500 TN
0141 BEACH SAND
Area 1, Delivered in Tandem-Truck 500 TN
0142 BEACH SAND
Area 2, Delivered in Tandem-Truck 500 TN
0143 BEACH SAND
0144 BEACH SAND
Area 4, Delivered in Tandem-Truck 500 TN
0145 BEACH SAND
Area 5, Delivered in Tandem-Truck 500 TN
0146 BEACH SAND
Area 6, Delivered in Tandem-Truck 500 TN
0147 BEACH SAND
Area 7, Delivered in Tandem-Truck 500 TN
0148 CLAY
Area 1, Delivered in Semi-Truck 100 TN
0149 CLAY
Area 2, Delivered in Semi-Truck 400 TN
0150 CLAY
Area 3, Delivered in Semi-Truck 100 TN
0151 CLAY
Area 4, Delivered in Semi-Truck 100 TN
0152 CLAY
Area 5, Delivered in Semi-Truck 100 TN
0153 CLAY
Area 6, Delivered in Semi-Truck 100 TN
0154 CLAY
Area 7, Delivered in Semi-Truck 100 TN
0155 CLAY
Area 1, Delivered in Tandem-Truck 15 TN
0156 CLAY
Area 2, Delivered in Tandem-Truck 400 TN
0157 CLAY
Area 3, Delivered in Tandem-Truck 15 TN
0158 CLAY
Area 4, Delivered in Tandem-Truck 15 TN
0159 CLAY
Area 5, Delivered in Tandem-Truck 15 TN
0160 CLAY
Area 6, Delivered in Tandem-Truck 15 TN
0161 CLAY
Area 7, Delivered in Tandem-Truck 15 TN
0162 QUARRY RUN STONE
Area 1, Delivered in Semi-Truck 100 TN
0163 QUARRY RUN STONE
Area 2, Delivered in Semi-Truck 100 TN
0164 QUARRY RUN STONE
Area 3, Delivered in Semi-Truck 100 TN
0165 QUARRY RUN STONE
Area 4, Delivered in Semi-Truck 100 TN
0166 QUARRY RUN STONE
Area 5, Delivered in Semi-Truck 100 TN
0167 QUARRY RUN STONE
Area 6, Delivered in Semi-Truck 100 TN
0168 QUARRY RUN STONE
Area 7, Delivered in Semi-Truck 100 TN
0169 QUARRY RUN STONE
Area 1, Delivered in Tandem-Truck 100 TN
0170 QUARRY RUN STONE
Area 2, Delivered in Tandem-Truck 100 TN
0171 QUARRY RUN STONE
Area 3, Delivered in Tandem-Truck 100 TN
0172 QUARRY RUN STONE
Area 4, Delivered in Tandem-Truck 100 TN
0173 QUARRY RUN STONE
Area 5, Delivered in Tandem-Truck 100 TN
0174 QUARRY RUN STONE
Area 6, Delivered in Tandem-Truck 100 TN
0175 QUARRY RUN STONE
0176 TOP SOIL
Area 1, Delivered in Semi-Truck 100 TN
0177 TOP SOIL
Area 2, Delivered in Semi-Truck 100 TN
0178 TOP SOIL
Area 3, Delivered in Semi-Truck 100 TN
0179 TOP SOIL
Area 4, Delivered in Semi-Truck 100 TN
0180 TOP SOIL
Area 5, Delivered in Semi-Truck 100 TN
0181 TOP SOIL
Area 6, Delivered in Semi-Truck 100 TN
0182 TOP SOIL
Area 7, Delivered in Semi-Truck 100 TN
0183 TOP SOIL
Area 1, Delivered in Tandem-Truck 100 TN
0184 TOP SOIL
Area 2, Delivered in Tandem-Truck 100 TN
0185 TOP SOIL
Area 3, Delivered in Tandem-Truck 100 TN
0186 TOP SOIL
Area 4, Delivered in Tandem-Truck 100 TN
0187 TOP SOIL
Area 5, Delivered in Tandem-Truck 100 TN
0188 TOP SOIL
Area 6, Delivered in Tandem-Truck 100 TN
0189 TOP SOIL
TOTAL BASE YEAR $_________________________
FIRST OPTION YEAR
1001 1000 LB RIP RAP (RR7)
Area 1, Delivered in Semi Truck 150 TN
1002 1000 LB RIP RAP (RR7)
Area 2, Delivered in Semi Truck 150 TN
1003 1000 LB RIP RAP (RR7)
Area 3, Delivered in Semi Truck 1000 TN
1004 1000 LB RIP RAP (RR7)
Area 4, Delivered in Semi Truck 1000 TN
1005 1000 LB RIP RAP (RR7)
Area 5, Delivered in Semi Truck 500 TN
1006 1000 LB RIP RAP (RR7)
Area 6, Delivered in Semi Truck 500 TN
1007 1000 LB RIP RAP (RR7)
Area 7, Delivered in Semi Truck 500 TN
1008 400 LB RIP RAP (RR5)
Area 1, Delivered in Semi-Truck 50 TN
1009 400 LB RIP RAP (RR5)
Area 2, Delivered in Semi-Truck 50 TN
1010 400 LB RIP RAP (RR5)
Area 3, Delivered in Semi-Truck 1000 TN
1011 400 LB RIP RAP (RR5)
Area 4, Delivered in Semi-Truck 1000 TN
1012 400 LB RIP RAP (RR5)
Area 5, Delivered in Semi-Truck 500 TN
1013 400 LB RIP RAP (RR5)
Area 6, Delivered in Semi-Truck 500 TN
1014 400 LB RIP RAP (RR5)
Area 7, Delivered in Semi-Truck 500 TN
1015 400 LB RIP RAP (RR5)
1016 400 LB RIP RAP (RR5)
Area 2, Delivered in Tandem-Truck 50 TN
1017 400 LB RIP RAP (RR5)
Area 3, Delivered in Tandem-Truck 50 TN
1018 400 LB RIP RAP (RR5)
Area 4, Delivered in Tandem-Truck 50 TN
1019 400 LB RIP RAP (RR5)
Area 5, Delivered in Tandem-Truck 50 TN
1020 400 LB RIP RAP (RR5)
Area 6, Delivered in Tandem-Truck 50 TN
1021 400 LB RIP RAP (RR5)
Area 7, Delivered in Tandem-Truck 50 TN
1022 150 LB RIP RAP (RR4)
Area 1, Delivered in Semi-Truck 40 TN
1023 150 LB RIP RAP (RR4)
Area 2, Delivered in Semi-Truck 40 TN
1024 150 LB RIP RAP (RR4)
Area 3, Delivered in Semi-Truck 1000 TN
1025 150 LB RIP RAP (RR4)
Area 4, Delivered in Semi-Truck 1000 TN
1026 150 LB RIP RAP (RR4)
Area 5, Delivered in Semi-Truck 500 TN
1027 150 LB RIP RAP (RR4)
Area 6, Delivered in Semi-Truck 500 TN
1028 150 LB RIP RAP (RR4)
Area 7, Delivered in Semi-Truck 500 TN
1029 150 LB RIP RAP (RR4)
Area 1, Delivered in Tandem-Truck 100 TN
1030 150 LB RIP RAP (RR4)
Area 2, Delivered in Tandem-Truck 100 TN
1031 150 LB RIP RAP (RR4)
1032 150 LB RIP RAP (RR4)
Area 4, Delivered in Tandem-Truck 1000 TN
1033 150 LB RIP RAP (RR4)
Area 5, Delivered in Tandem-Truck 500 TN
1034 150 LB RIP RAP (RR4)
Area 6, Delivered in Tandem-Truck 500 TN
1035 150 LB RIP RAP (RR4)
Area 7, Delivered in Tandem-Truck 500 TN
1036 50 LB RIP RAP (RR3)
Area 1, Delivered in Semi-Truck 50 TN
1037 50 LB RIP RAP (RR3)
Area 2, Delivered in Semi-Truck 50 TN
1038 50 LB RIP RAP (RR3)
Area 3, Delivered in Semi-Truck 50 TN
1039 50 LB RIP RAP (RR3)
Area 4, Delivered in Semi-Truck 50 TN
1040 50 LB RIP RAP (RR3)
Area 5, Delivered in Semi-Truck 50 TN
1041 50 LB RIP RAP (RR3)
Area 6, Delivered in Semi-Truck 50 TN
1042 50 LB RIP RAP (RR3)
Area 7, Delivered in Semi-Truck 50 TN
1043 50 LB RIP RAP (RR3)
Area 1, Delivered in Tandem-Truck 100 TN
1044 50 LB RIP RAP (RR3)
Area 2, Delivered in Tandem-Truck 100 TN
1045 50 LB RIP RAP (RR3)
Area 3, Delivered in Tandem-Truck 100 TN
1046 50 LB RIP RAP (RR3)
Area 4, Delivered in Tandem-Truck 100 TN
1047 50 LB RIP RAP (RR3)
1048 50 LB RIP RAP (RR3)
Area 6, Delivered in Tandem-Truck 100 TN
1049 50 LB RIP RAP (RR3)
Area 7, Delivered in Tandem-Truck 100 TN
1050 3" CLEAN CHOKE STONE (RR1)
Area 1, Delivered in Semi-Truck 100 TN
1051 3" CLEAN CHOKE STONE (RR1)
Area 2, Delivered in Semi-Truck 100 TN
1052 3" CLEAN CHOKE STONE (RR1)
Area 3, Delivered in Semi-Truck 100 TN
1053 3" CLEAN CHOKE STONE (RR1)
Area 4, Delivered in Semi-Truck 100 TN
1054 3" CLEAN CHOKE STONE (RR1)
Area 5, Delivered in Semi-Truck 100 TN
1055 3" CLEAN CHOKE STONE (RR1)
Area 6, Delivered in Semi-Truck 100 TN
1056 3" CLEAN CHOKE STONE (RR1)
Area 7, Delivered in Semi-Truck 100 TN
1057 3" CLEAN CHOKE STONE (RR1)
Area 1, Delivered in Tandem-Truck 100 TN
1058 3" CLEAN CHOKE STONE (RR1)
Area 2, Delivered in Tandem-Truck 100 TN
1059 3" CLEAN CHOKE STONE (RR1)
Area 3, Delivered in Tandem-Truck 100 TN
1060 3" CLEAN CHOKE STONE (RR1)
Area 4, Delivered in Tandem-Truck 100 TN
1061 3" CLEAN CHOKE STONE (RR1)
Area 5, Delivered in Tandem-Truck 100 TN
1062 3" CLEAN CHOKE STONE (RR1)
Area 6, Delivered in Tandem-Truck 100 TN
1063 3" CLEAN CHOKE STONE
1064 3” STONE (CA-1)
Area 1, Delivered in Semi Truck 40 TN
1065 3” STONE (CA-1)
Area 2, Delivered in Semi Truck 40 TN
1066 3” STONE (CA-1)
Area 3, Delivered in Semi Truck 40 TN
1067 3” STONE (CA-1)
Area 4, Delivered in Semi Truck 40 TN
1068 3” STONE (CA-1)
Area 5, Delivered in Semi Truck 40 TN
1069 3” STONE (CA-1)
Area 6, Delivered in Semi Truck 40 TN
1070 3” STONE (CA-1)
Area 7, Delivered in Semi Truck 40 TN
1071 3” STONE (CA-1)
Area 1, Delivered in Tandem-Truck 50 TN
1072 3” STONE (CA-1)
Area 2, Delivered in Tandem-Truck 150 TN
1073 3” STONE (CA-1)
Area 3, Delivered in Tandem-Truck 50 TN
1074 3” STONE (CA-1)
Area 4, Delivered in Tandem-Truck 50 TN
1075 3” STONE (CA-1)
Area 5, Delivered in Tandem-Truck 50 TN
1076 3” STONE (CA-1)
Area 6, Delivered in Tandem-Truck 50 TN
1077 3” STONE (CA-1)
Area 7, Delivered in Tandem-Truck 50 TN
1078 3" MINUS STONE (CA-2)
Area 1, Delivered in Semi-Truck 40 TN
1079 3" MINUS STONE (CA-2)
1080 3" MINUS STONE (CA-2)
Area 3, Delivered in Semi-Truck 40 TN
1081 3" MINUS STONE (CA-2)
Area 4, Delivered in Semi-Truck 40 TN
1082 3" MINUS STONE (CA-2)
Area 5, Delivered in Semi-Truck 40 TN
1083 3" MINUS STONE (CA-2)
Area 6, Delivered in Semi-Truck 40 TN
1084 3" MINUS STONE (CA-2)
Area 7, Delivered in Semi-Truck 40 TN
1085 3" MINUS STONE (CA-2)
Area 1, Delivered in Tandem-Truck 30 TN
1086 3" MINUS STONE (CA-2)
Area 2, Delivered in Tandem-Truck 30 TN
1087 3" MINUS STONE (CA-2)
Area 3, Delivered in Tandem-Truck 30 TN
1088 3" MINUS STONE (CA-2)
Area 4, Delivered in Tandem-Truck 30 TN
1089 3" MINUS STONE (CA-2)
Area 5, Delivered in Tandem-Truck 30 TN
1090 3" MINUS STONE (CA-2)
Area 6, Delivered in Tandem-Truck 30 TN
1091 3" MINUS STONE (CA-2)
Area 7, Delivered in Tandem-Truck 30 TN
1092 CA-10 STONE
Area 1, Delivered in Semi-Truck 20 TN
1093 CA-10 STONE
Area 2, Delivered in Semi-Truck 20 TN
1094 CA-10 STONE
Area 3, Delivered in Semi-Truck 20 TN
1095 CA-10 STONE
1096 CA-10 STONE
Area 5, Delivered in Semi-Truck 20 TN
1097 CA-10 STONE
Area 6, Delivered in Semi-Truck 20 TN
1098 CA-10 STONE
Area 7, Delivered in Semi-Truck 20 TN
1099 CA-10 STONE
Area 1, Delivered in Tandem-Truck 150 TN
1100 CA-10 STONE
Area 2, Delivered in Tandem-Truck 150 TN
1101 CA-10 STONE
Area 3, Delivered in Tandem-Truck 150 TN
1102 CA-10 STONE
Area 4, Delivered in Tandem-Truck 150 TN
1103 CA-10 STONE
Area 5, Delivered in Tandem-Truck 150 TN
1104 CA-10 STONE
Area 6, Delivered in Tandem-Truck 150 TN
1105 CA-10 STONE
Area 7, Delivered in Tandem-Truck 150 TN
1106 CA-6 STONE
Area 1, Delivered in Semi-Truck 20 TN
1107 CA-6 STONE
Area 2, Delivered in Semi-Truck 20 TN
1108 CA-6 STONE
Area 3, Delivered in Semi-Truck 20 TN
1109 CA-6 STONE
Area 4, Delivered in Semi-Truck 20 TN
1110 CA-6 STONE
Area 5, Delivered in Semi-Truck 20 TN
1111 CA-6 STONE
1112 CA-6 STONE
Area 7, Delivered in Semi-Truck 20 TN
1113 CA-6 STONE
Area 1, Delivered in Tandem-Truck 150 TN
1114 CA-6 STONE
Area 2, Delivered in Tandem-Truck 150 TN
1115 CA-6 STONE
Area 3, Delivered in Tandem-Truck 150 TN
1116 CA-6 STONE
Area 4, Delivered in Tandem-Truck 150 TN
1117 CA-6 STONE
Area 5, Delivered in Tandem-Truck 150 TN
1118 CA-6 STONE
Area 6, Delivered in Tandem-Truck 150 TN
1119 CA-6 STONE
Area 7, Delivered in Tandem-Truck 150 TN
1120 3/8 INCH CHIPS (CM-16)
Area 1, Delivered in Semi-Truck 20 TN
1121 3/8 INCH CHIPS (CM-16)
Area 2, Delivered in Semi-Truck 20 TN
1122 3/8 INCH CHIPS (CM-16)
Area 3, Delivered in Semi-Truck 20 TN
1123 3/8 INCH CHIPS (CM-16)
Area 4, Delivered in Semi-Truck 20 TN
1124 3/8 INCH CHIPS (CM-16)
Area 5, Delivered in Semi-Truck 20 TN
1125 3/8 INCH CHIPS (CM-16)
Area 6, Delivered in Semi-Truck 20 TN
1126 3/8 INCH CHIPS (CM-16)
Area 7, Delivered in Semi-Truck 20 TN
1127 3/8 INCH CHIPS (CM-16)
1128 3/8 INCH CHIPS (CM-16)
Area 2, Delivered in Tandem-Truck 30 TN
1129 3/8 INCH CHIPS (CM-16)
Area 3, Delivered in Tandem-Truck 30 TN
1130 3/8 INCH CHIPS (CM-16)
Area 4, Delivered in Tandem-Truck 30 TN
1131 3/8 INCH CHIPS (CM-16)
Area 5, Delivered in Tandem-Truck 30 TN
1132 3/8 INCH CHIPS (CM-16)
Area 6, Delivered in Tandem-Truck 30 TN
1133 3/8 INCH CHIPS (CM-16)
Area 7, Delivered in Tandem-Truck 30 TN
1134 BEACH SAND
Area 1, Delivered in Semi-Truck 500 TN
1135 BEACH SAND
Area 2, Delivered in Semi-Truck 500 TN
1136 BEACH SAND
Area 3, Delivered in Semi-Truck 1000 TN
1137 BEACH SAND
Area 4, Delivered in Semi-Truck 500 TN
0138 BEACH SAND
Area 5, Delivered in Semi-Truck 500 TN
1139 BEACH SAND
Area 6, Delivered in Semi-Truck 500 TN
1140 BEACH SAND
Area 7, Delivered in Semi-Truck 500 TN
1141 BEACH SAND
Area 1, Delivered in Tandem-Truck 500 TN
1142 BEACH SAND
Area 2, Delivered in Tandem-Truck 500 TN
1143 BEACH SAND
1144 BEACH SAND
Area 4, Delivered in Tandem-Truck 500 TN
1145 BEACH SAND
Area 5, Delivered in Tandem-Truck 500 TN
1146 BEACH SAND
Area 6, Delivered in Tandem-Truck 500 TN
1147 BEACH SAND
Area 7, Delivered in Tandem-Truck 500 TN
1148 CLAY
Area 1, Delivered in Semi-Truck 100 TN
1149 CLAY
Area 2, Delivered in Semi-Truck 400 TN
1150 CLAY
Area 3, Delivered in Semi-Truck 100 TN
1151 CLAY
Area 4, Delivered in Semi-Truck 100 TN
1152 CLAY
Area 5, Delivered in Semi-Truck 100 TN
1153 CLAY
Area 6, Delivered in Semi-Truck 100 TN
1154 CLAY
Area 7, Delivered in Semi-Truck 100 TN
1155 CLAY
Area 1, Delivered in Tandem-Truck 15 TN
1156 CLAY
Area 2, Delivered in Tandem-Truck 400 TN
1157 CLAY
Area 3, Delivered in Tandem-Truck 15 TN
1158 CLAY
Area 4, Delivered in Tandem-Truck 15 TN
1159 CLAY
1160 CLAY
Area 6, Delivered in Tandem-Truck 15 TN
1161 CLAY
Area 7, Delivered in Tandem-Truck 15 TN
1162 QUARRY RUN STONE
Area 1, Delivered in Semi-Truck 100 TN
1163 QUARRY RUN STONE
Area 2, Delivered in Semi-Truck 100 TN
1164 QUARRY RUN STONE
Area 3, Delivered in Semi-Truck 100 TN
1165 QUARRY RUN STONE
Area 4, Delivered in Semi-Truck 100 TN
1166 QUARRY RUN STONE
Area 5, Delivered in Semi-Truck 100 TN
1167 QUARRY RUN STONE
Area 6, Delivered in Semi-Truck 100 TN
1168 QUARRY RUN STONE
Area 7, Delivered in Semi-Truck 100 TN
1169 QUARRY RUN STONE
Area 1, Delivered in Tandem-Truck 100 TN
1170 QUARRY RUN STONE
Area 2, Delivered in Tandem-Truck 100 TN
1171 QUARRY RUN STONE
Area 3, Delivered in Tandem-Truck 100 TN
1172 QUARRY RUN STONE
Area 4, Delivered in Tandem-Truck 100 TN
1173 QUARRY RUN STONE
Area 5, Delivered in Tandem-Truck 100 TN
1174 QUARRY RUN STONE
Area 6, Delivered in Tandem-Truck 100 TN
1175 QUARRY RUN STONE
1176 TOP SOIL
Area 1, Delivered in Semi-Truck 100 TN
1177 TOP SOIL
Area 2, Delivered in Semi-Truck 100 TN
1178 TOP SOIL
Area 3, Delivered in Semi-Truck 100 TN
1179 TOP SOIL
Area 4, Delivered in Semi-Truck 100 TN
1180 TOP SOIL
Area 5, Delivered in Semi-Truck 100 TN
1181 TOP SOIL
Area 6, Delivered in Semi-Truck 100 TN
1182 TOP SOIL
Area 7, Delivered in Semi-Truck 100 TN
1183 TOP SOIL
Area 1, Delivered in Tandem-Truck 100 TN
1184 TOP SOIL
Area 2, Delivered in Tandem-Truck 100 TN
1185 TOP SOIL
Area 3, Delivered in Tandem-Truck 100 TN
1186 TOP SOIL
Area 4, Delivered in Tandem-Truck 100 TN
1187 TOP SOIL
Area 5, Delivered in Tandem-Truck 100 TN
1188 TOP SOIL
Area 6, Delivered in Tandem-Truck 100 TN
1189 TOP SOIL
TOTAL FIRST OPTION YEAR $_________________________
SECOND OPTION YEAR
2001 1000 LB RIP RAP (RR7)
Area 1, Delivered in Semi Truck 150 TN
2002 1000 LB RIP RAP (RR7)
Area 2, Delivered in Semi Truck 150 TN
2003 1000 LB RIP RAP (RR7)
Area 3, Delivered in Semi Truck 1000 TN
2004 1000 LB RIP RAP (RR7)
Area 4, Delivered in Semi Truck 1000 TN
2005 1000 LB RIP RAP (RR7)
Area 5, Delivered in Semi Truck 500 TN
2006 1000 LB RIP RAP (RR7)
Area 6, Delivered in Semi Truck 500 TN
2007 1000 LB RIP RAP (RR7)
Area 7, Delivered in Semi Truck 500 TN
2008 400 LB RIP RAP (RR5)
Area 1, Delivered in Semi-Truck 50 TN
2009 400 LB RIP RAP (RR5)
Area 2, Delivered in Semi-Truck 50 TN
2010 400 LB RIP RAP (RR5)
Area 3, Delivered in Semi-Truck 1000 TN
2011 400 LB RIP RAP (RR5)
Area 4, Delivered in Semi-Truck 1000 TN
2012 400 LB RIP RAP (RR5)
Area 5, Delivered in Semi-Truck 500 TN
2013 400 LB RIP RAP (RR5)
Area 6, Delivered in Semi-Truck 500 TN
2014 400 LB RIP RAP (RR5)
Area 7, Delivered in Semi-Truck 500 TN
2015 400 LB RIP RAP (RR5)
2016 400 LB RIP RAP (RR5)
Area 2, Delivered in Tandem-Truck 50 TN
2017 400 LB RIP RAP (RR5)
Area 3, Delivered in Tandem-Truck 50 TN
2018 400 LB RIP RAP (RR5)
Area 4, Delivered in Tandem-Truck 50 TN
2019 400 LB RIP RAP (RR5)
Area 5, Delivered in Tandem-Truck 50 TN
2020 400 LB RIP RAP (RR5)
Area 6, Delivered in Tandem-Truck 50 TN
2021 400 LB RIP RAP (RR5)
Area 7, Delivered in Tandem-Truck 50 TN
2022 150 LB RIP RAP (RR4)
Area 1, Delivered in Semi-Truck 40 TN
2023 150 LB RIP RAP (RR4)
Area 2, Delivered in Semi-Truck 40 TN
2024 150 LB RIP RAP (RR4)
Area 3, Delivered in Semi-Truck 1000 TN
2025 150 LB RIP RAP (RR4)
Area 4, Delivered in Semi-Truck 1000 TN
2026 150 LB RIP RAP (RR4)
Area 5, Delivered in Semi-Truck 500 TN
2027 150 LB RIP RAP (RR4)
Area 6, Delivered in Semi-Truck 500 TN
2028 150 LB RIP RAP (RR4)
Area 7, Delivered in Semi-Truck 500 TN
2029 150 LB RIP RAP (RR4)
Area 1, Delivered in Tandem-Truck 100 TN
2030 150 LB RIP RAP (RR4)
Area 2, Delivered in Tandem-Truck 100 TN
2031 150 LB RIP RAP (RR4)
2032 150 LB RIP RAP (RR4)
Area 4, Delivered in Tandem-Truck 1000 TN
2033 150 LB RIP RAP (RR4)
Area 5, Delivered in Tandem-Truck 500 TN
2034 150 LB RIP RAP (RR4)
Area 6, Delivered in Tandem-Truck 500 TN
2035 150 LB RIP RAP (RR4)
Area 7, Delivered in Tandem-Truck 500 TN
2036 50 LB RIP RAP (RR3)
Area 1, Delivered in Semi-Truck 50 TN
2037 50 LB RIP RAP (RR3)
Area 2, Delivered in Semi-Truck 50 TN
2038 50 LB RIP RAP (RR3)
Area 3, Delivered in Semi-Truck 50 TN
2039 50 LB RIP RAP (RR3)
Area 4, Delivered in Semi-Truck 50 TN
2040 50 LB RIP RAP (RR3)
Area 5, Delivered in Semi-Truck 50 TN
2041 50 LB RIP RAP (RR3)
Area 6, Delivered in Semi-Truck 50 TN
2042 50 LB RIP RAP (RR3)
Area 7, Delivered in Semi-Truck 50 TN
2043 50 LB RIP RAP (RR3)
Area 1, Delivered in Tandem-Truck 100 TN
2044 50 LB RIP RAP (RR3)
Area 2, Delivered in Tandem-Truck 100 TN
2045 50 LB RIP RAP (RR3)
Area 3, Delivered in Tandem-Truck 100 TN
2046 50 LB RIP RAP (RR3)
Area 4, Delivered in Tandem-Truck 100 TN
2047 50 LB RIP RAP (RR3)
2048 50 LB RIP RAP (RR3)
Area 6, Delivered in Tandem-Truck 100 TN
2049 50 LB RIP RAP (RR3)
Area 7, Delivered in Tandem-Truck 100 TN
2050 3" CLEAN CHOKE STONE (RR1)
Area 1, Delivered in Semi-Truck 100 TN
2051 3" CLEAN CHOKE STONE (RR1)
Area 2, Delivered in Semi-Truck 100 TN
2052 3" CLEAN CHOKE STONE (RR1)
Area 3, Delivered in Semi-Truck 100 TN
2053 3" CLEAN CHOKE STONE (RR1)
Area 4, Delivered in Semi-Truck 100 TN
2054 3" CLEAN CHOKE STONE (RR1)
Area 5, Delivered in Semi-Truck 100 TN
2055 3" CLEAN CHOKE STONE (RR1)
Area 6, Delivered in Semi-Truck 100 TN
2056 3" CLEAN CHOKE STONE (RR1)
Area 7, Delivered in Semi-Truck 100 TN
2057 3" CLEAN CHOKE STONE (RR1)
Area 1, Delivered in Tandem-Truck 100 TN
2058 3" CLEAN CHOKE STONE (RR1)
Area 2, Delivered in Tandem-Truck 100 TN
2059 3" CLEAN CHOKE STONE (RR1)
Area 3, Delivered in Tandem-Truck 100 TN
2060 3" CLEAN CHOKE STONE (RR1)
Area 4, Delivered in Tandem-Truck 100 TN
2061 3" CLEAN CHOKE STONE (RR1)
Area 5, Delivered in Tandem-Truck 100 TN
2062 3" CLEAN CHOKE STONE (RR1)
Area 6, Delivered in Tandem-Truck 100 TN
2063 3" CLEAN CHOKE STONE
2064 3” STONE (CA-1)
Area 1, Delivered in Semi Truck 40 TN
2065 3” STONE (CA-1)
Area 2, Delivered in Semi Truck 40 TN
2066 3” STONE (CA-1)
Area 3, Delivered in Semi Truck 40 TN
2067 3” STONE (CA-1)
Area 4, Delivered in Semi Truck 40 TN
2068 3” STONE (CA-1)
Area 5, Delivered in Semi Truck 40 TN
2069 3” STONE (CA-1)
Area 6, Delivered in Semi Truck 40 TN
2070 3” STONE (CA-1)
Area 7, Delivered in Semi Truck 40 TN
2071 3” STONE (CA-1)
Area 1, Delivered in Tandem-Truck 50 TN
2072 3” STONE (CA-1)
Area 2, Delivered in Tandem-Truck 150 TN
2073 3” STONE (CA-1)
Area 3, Delivered in Tandem-Truck 50 TN
2074 3” STONE (CA-1)
Area 4, Delivered in Tandem-Truck 50 TN
2075 3” STONE (CA-1)
Area 5, Delivered in Tandem-Truck 50 TN
2076 3” STONE (CA-1)
Area 6, Delivered in Tandem-Truck 50 TN
2077 3” STONE (CA-1)
Area 7, Delivered in Tandem-Truck 50 TN
2078 3" MINUS STONE (CA-2)
Area 1, Delivered in Semi-Truck 40 TN
2079 3" MINUS STONE (CA-2)
2080 3" MINUS STONE (CA-2)
Area 3, Delivered in Semi-Truck 40 TN
2081 3" MINUS STONE (CA-2)
Area 4, Delivered in Semi-Truck 40 TN
2082 3" MINUS STONE (CA-2)
Area 5, Delivered in Semi-Truck 40 TN
2083 3" MINUS STONE (CA-2)
Area 6, Delivered in Semi-Truck 40 TN
2084 3" MINUS STONE (CA-2)
Area 7, Delivered in Semi-Truck 40 TN
2085 3" MINUS STONE (CA-2)
Area 1, Delivered in Tandem-Truck 30 TN
2086 3" MINUS STONE (CA-2)
Area 2, Delivered in Tandem-Truck 30 TN
2087 3" MINUS STONE (CA-2)
Area 3, Delivered in Tandem-Truck 30 TN
2088 3" MINUS STONE (CA-2)
Area 4, Delivered in Tandem-Truck 30 TN
2089 3" MINUS STONE (CA-2)
Area 5, Delivered in Tandem-Truck 30 TN
2090 3" MINUS STONE (CA-2)
Area 6, Delivered in Tandem-Truck 30 TN
2091 3" MINUS STONE (CA-2)
Area 7, Delivered in Tandem-Truck 30 TN
2092 CA-10 STONE
Area 1, Delivered in Semi-Truck 20 TN
2093 CA-10 STONE
Area 2, Delivered in Semi-Truck 20 TN
2094 CA-10 STONE
Area 3, Delivered in Semi-Truck 20 TN
2095 CA-10 STONE
2096 CA-10 STONE
Area 5, Delivered in Semi-Truck 20 TN
2097 CA-10 STONE
Area 6, Delivered in Semi-Truck 20 TN
2098 CA-10 STONE
Area 7, Delivered in Semi-Truck 20 TN
2099 CA-10 STONE
Area 1, Delivered in Tandem-Truck 150 TN
2100 CA-10 STONE
Area 2, Delivered in Tandem-Truck 150 TN
2101 CA-10 STONE
Area 3, Delivered in Tandem-Truck 150 TN
2102 CA-10 STONE
Area 4, Delivered in Tandem-Truck 150 TN
2103 CA-10 STONE
Area 5, Delivered in Tandem-Truck 150 TN
2104 CA-10 STONE
Area 6, Delivered in Tandem-Truck 150 TN
2105 CA-10 STONE
Area 7, Delivered in Tandem-Truck 150 TN
2106 CA-6 STONE
Area 1, Delivered in Semi-Truck 20 TN
2107 CA-6 STONE
Area 2, Delivered in Semi-Truck 20 TN
2108 CA-6 STONE
Area 3, Delivered in Semi-Truck 20 TN
2109 CA-6 STONE
Area 4, Delivered in Semi-Truck 20 TN
2110 CA-6 STONE
Area 5, Delivered in Semi-Truck 20 TN
2111 CA-6 STONE
2112 CA-6 STONE
Area 7, Delivered in Semi-Truck 20 TN
2113 CA-6 STONE
Area 1, Delivered in Tandem-Truck 150 TN
2114 CA-6 STONE
Area 2, Delivered in Tandem-Truck 150 TN
2115 CA-6 STONE
Area 3, Delivered in Tandem-Truck 150 TN
2116 CA-6 STONE
Area 4, Delivered in Tandem-Truck 150 TN
2117 CA-6 STONE
Area 5, Delivered in Tandem-Truck 150 TN
2118 CA-6 STONE
Area 6, Delivered in Tandem-Truck 150 TN
2119 CA-6 STONE
Area 7, Delivered in Tandem-Truck 150 TN
2120 3/8 INCH CHIPS (CM-16)
Area 1, Delivered in Semi-Truck 20 TN
2121 3/8 INCH CHIPS (CM-16)
Area 2, Delivered in Semi-Truck 20 TN
2122 3/8 INCH CHIPS (CM-16)
Area 3, Delivered in Semi-Truck 20 TN
2123 3/8 INCH CHIPS (CM-16)
Area 4, Delivered in Semi-Truck 20 TN
2124 3/8 INCH CHIPS (CM-16)
Area 5, Delivered in Semi-Truck 20 TN
2125 3/8 INCH CHIPS (CM-16)
Area 6, Delivered in Semi-Truck 20 TN
2126 3/8 INCH CHIPS (CM-16)
Area 7, Delivered in Semi-Truck 20 TN
2127 3/8 INCH CHIPS (CM-16)
2128 3/8 INCH CHIPS (CM-16)
Area 2, Delivered in Tandem-Truck 30 TN
2129 3/8 INCH CHIPS (CM-16)
Area 3, Delivered in Tandem-Truck 30 TN
2130 3/8 INCH CHIPS (CM-16)
Area 4, Delivered in Tandem-Truck 30 TN
2131 3/8 INCH CHIPS (CM-16)
Area 5, Delivered in Tandem-Truck 30 TN
2132 3/8 INCH CHIPS (CM-16)
Area 6, Delivered in Tandem-Truck 30 TN
2133 3/8 INCH CHIPS (CM-16)
Area 7, Delivered in Tandem-Truck 30 TN
2134 BEACH SAND
Area 1, Delivered in Semi-Truck 500 TN
2135 BEACH SAND
Area 2, Delivered in Semi-Truck 500 TN
2136 BEACH SAND
Area 3, Delivered in Semi-Truck 1000 TN
2137 BEACH SAND
Area 4, Delivered in Semi-Truck 500 TN
2138 BEACH SAND
Area 5, Delivered in Semi-Truck 500 TN
2139 BEACH SAND
Area 6, Delivered in Semi-Truck 500 TN
2140 BEACH SAND
Area 7, Delivered in Semi-Truck 500 TN
2141 BEACH SAND
Area 1, Delivered in Tandem-Truck 500 TN
2142 BEACH SAND
Area 2, Delivered in Tandem-Truck 500 TN
2143 BEACH SAND
2144 BEACH SAND
Area 4, Delivered in Tandem-Truck 500 TN
2145 BEACH SAND
Area 5, Delivered in Tandem-Truck 500 TN
2146 BEACH SAND
Area 6, Delivered in Tandem-Truck 500 TN
2147 BEACH SAND
Area 7, Delivered in Tandem-Truck 500 TN
2148 CLAY
Area 1, Delivered in Semi-Truck 100 TN
2149 CLAY
Area 2, Delivered in Semi-Truck 400 TN
2150 CLAY
Area 3, Delivered in Semi-Truck 100 TN
2151 CLAY
Area 4, Delivered in Semi-Truck 100 TN
2152 CLAY
Area 5, Delivered in Semi-Truck 100 TN
2153 CLAY
Area 6, Delivered in Semi-Truck 100 TN
2154 CLAY
Area 7, Delivered in Semi-Truck 100 TN
2155 CLAY
Area 1, Delivered in Tandem-Truck 15 TN
2156 CLAY
Area 2, Delivered in Tandem-Truck 400 TN
2157 CLAY
Area 3, Delivered in Tandem-Truck 15 TN
2158 CLAY
Area 4, Delivered in Tandem-Truck 15 TN
2159 CLAY
2160 CLAY
Area 6, Delivered in Tandem-Truck 15 TN
2161 CLAY
Area 7, Delivered in Tandem-Truck 15 TN
2162 QUARRY RUN STONE
Area 1, Delivered in Semi-Truck 100 TN
2163 QUARRY RUN STONE
Area 2, Delivered in Semi-Truck 100 TN
2164 QUARRY RUN STONE
Area 3, Delivered in Semi-Truck 100 TN
2165 QUARRY RUN STONE
Area 4, Delivered in Semi-Truck 100 TN
2166 QUARRY RUN STONE
Area 5, Delivered in Semi-Truck 100 TN
2167 QUARRY RUN STONE
Area 6, Delivered in Semi-Truck 100 TN
2168 QUARRY RUN STONE
Area 7, Delivered in Semi-Truck 100 TN
2169 QUARRY RUN STONE
Area 1, Delivered in Tandem-Truck 100 TN
2170 QUARRY RUN STONE
Area 2, Delivered in Tandem-Truck 100 TN
2171 QUARRY RUN STONE
Area 3, Delivered in Tandem-Truck 100 TN
2172 QUARRY RUN STONE
Area 4, Delivered in Tandem-Truck 100 TN
2173 QUARRY RUN STONE
Area 5, Delivered in Tandem-Truck 100 TN
2174 QUARRY RUN STONE
Area 6, Delivered in Tandem-Truck 100 TN
2175 QUARRY RUN STONE
2176 TOP SOIL
Area 1, Delivered in Semi-Truck 100 TN
2177 TOP SOIL
Area 2, Delivered in Semi-Truck 100 TN
2178 TOP SOIL
Area 3, Delivered in Semi-Truck 100 TN
2179 TOP SOIL
Area 4, Delivered in Semi-Truck 100 TN
2180 TOP SOIL
Area 5, Delivered in Semi-Truck 100 TN
2181 TOP SOIL
Area 6, Delivered in Semi-Truck 100 TN
2182 TOP SOIL
Area 7, Delivered in Semi-Truck 100 TN
2183 TOP SOIL
Area 1, Delivered in Tandem-Truck 100 TN
2184 TOP SOIL
Area 2, Delivered in Tandem-Truck 100 TN
2185 TOP SOIL
Area 3, Delivered in Tandem-Truck 100 TN
2186 TOP SOIL
Area 4, Delivered in Tandem-Truck 100 TN
2187 TOP SOIL
Area 5, Delivered in Tandem-Truck 100 TN
2188 TOP SOIL
Area 6, Delivered in Tandem-Truck 100 TN
2189 TOP SOIL
TOTAL SECOND OPTION YEAR $_________________________
THIRD OPTION YEAR
3001 1000 LB RIP RAP (RR7)
Area 1, Delivered in Semi Truck 150 TN
3002 1000 LB RIP RAP (RR7)
Area 2, Delivered in Semi Truck 150 TN
3003 1000 LB RIP RAP (RR7)
Area 3, Delivered in Semi Truck 1000 TN
3004 1000 LB RIP RAP (RR7)
Area 4, Delivered in Semi Truck 1000 TN
3005 1000 LB RIP RAP (RR7)
Area 5, Delivered in Semi Truck 500 TN
3006 1000 LB RIP RAP (RR7)
Area 6, Delivered in Semi Truck 500 TN
3007 1000 LB RIP RAP (RR7)
Area 7, Delivered in Semi Truck 500 TN
3008 400 LB RIP RAP (RR5)
Area 1, Delivered in Semi-Truck 50 TN
3009 400 LB RIP RAP (RR5)
Area 2, Delivered in Semi-Truck 50 TN
3010 400 LB RIP RAP (RR5)
Area 3, Delivered in Semi-Truck 1000 TN
3011 400 LB RIP RAP (RR5)
Area 4, Delivered in Semi-Truck 1000 TN
3012 400 LB RIP RAP (RR5)
Area 5, Delivered in Semi-Truck 500 TN
3013 400 LB RIP RAP (RR5)
Area 6, Delivered in Semi-Truck 500 TN
3014 400 LB RIP RAP (RR5)
Area 7, Delivered in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.