A22W912P918B0014.pdf

PDF 681 KB Posted

Attached to
Rock, Stone, Sand and Clay for Carlyle Lake
Solicitation number
W912P918B0014
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
B01.BIDSUMMARYSHEET..pdf PDF
A02AppendixEMVSStoneSourceList.pdf PDF
A02RockAppendixA1.pdf PDF
A02AppendixC..pdf PDF
A02AppendixBwithRedboundary.pdf PDF
A02RockAppendix_A.PDF PDF
A02AppendixD1D2D4Standardtest.pdf PDF
A02RockAppendixA2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls) W912P918B0014 20-Feb-2018

b. TELEPHONE NUMBER 314 331-8965

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 20 Mar 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912P9 9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME Angie Grimes

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED. X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81C8X73521942

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR: SET ASIDE: UNRESTRICTED OR X

SMALL BUSINESS X

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A 13b. RATING

CODE 15. DELIVER TO CODE 965110 16. ADMINISTERED BY

12. DISCOUNT TERMS 11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFP X

CARLYLE LAKE / KASKASKIA NAV PROJ

N/A

US ARMY ENGR DIST ST LOUIS

801 LAKE ROAD

CARLYLE IL 62231-1267

TEL: 618-594-2484 FAX: 618-594-8569

314 331-8746 FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

212319

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICES ITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24. 22. 21. 19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINAL PARTIAL COMPLETE

36. PAYMENT 35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912P918B0014

Section SF 1449 - CONTINUATION SHEET

SPECIFICATIONS

DESCRIPTION/SPECIFIFICATIONS/WORK STATEMENT

1. GENERAL.

1.1 Scope. The work to be performed under this contract shall consist of furnishing all labor, equipment, permits and materials necessary to supply, transport and deliver various types of rock, stone, sand and clay in varying quantities to locations designated on Corps of Engineers property at Carlyle Lake and the Kaskaskia River Project in accordance with the terms of this contract. The contractor shall perform all work to the satisfaction of the Contracting Officer, or his/her authorized representative.

1.2 Contracting Officer. The term "Contracting Officer" means the person executing this contract on behalf of the Government, and any other officer or civilian employee who is properly designated Contracting Officer; and the term includes, except as otherwise provided in this contract, the authorized representative of the Contracting Officer acting within the limits of his/her authority.

1.3 Safety.

1.3.1 All work and equipment shall conform with the safety requirements set forth in Corps of Engineers Manual, EM 385-1-1, dated November 2014, entitled, Safety and Health Requirements Manual", copies of which are available online at http://www.publications.usace.army.mil/Portals/76/publications/EngineerManuals/EM_385-1-1.pdf

1.3.2 Accident Reporting. An accident constitutes an incident or act involving the contractor, which may or may not have caused obvious damage to persons or property. All accidents shall be reported to the CO within 24 hours of the occurrence. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported immediately.

1.4 Contract Area. The contract areas are located in the central and southwestern part of Illinois. Carlyle Lake is a multi-purpose project on the Kaskaskia River near Carlyle, Illinois approximately 50 miles east of St.

Louis, Missouri. The Kaskaskia River Project extends from the mouth of the Kaskaskia River near Ellis Grove, IL to Fayetteville, IL. See Appendix A for location map. The contract areas are broken into seven bid units. See Appendixes B and C for maps.

2. CONTRACTOR FURNISHED EQUIPMENT, MATERIALS, AND SUPPLIES.

2.1 Supplies. The contractor shall furnish and deliver the following types of rock, sand, or clay to locations as designated by the Contracting Officer or his/her representative. Stone and riprap material shall be new quarried stone that is from the approved St Louis District stone source list Appendix E. It shall be durable and of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used. It shall be free from cracks, seams, and other defects that would tend to increase unduly its deterioration from natural causes, and shall be free of dirt, sand, clay and rock fines. Stone shall also not include or consist of broken concrete, bricks or other reclaimed or recycled materials.

(1) 1500 LB. RIPRAP. Stone shall conform to the following limits:

100% - Passing 600 - 1500 lbs.

50% - Passing 300 - 650 lbs.

15% - Passing 100 - 330 lbs.

(2) 1000 LB. RIPRAP (RR7). Stone shall conform to the following limits:

100% - Passing 1000 lbs.

30-70% - Passing 300 lbs.

0-16% - Passing 12 lbs.

http://www.publications.usace.army.mil/Portals/76/publications/EngineerManuals/EM_385-1-1.pdf

(3) 400 LB. RIPRAP. Stone shall conform to the following limits:

100% - Passing 160 - 400 lbs.

50% - Passing 80 - 160 lbs.

15% - Passing 30 - 80 lbs.

(4) QUARRY RUN STONE. Stone shall conform to the following limits:

90-100% - Passing 250 lbs.

40-60% - Passing 20 lbs.

(5) 150 LB. RIPRAP (RR4). Stone shall conform to the following limits:

100% - Passing 150 lbs.

30-70% - Passing 40 lbs.

(6) 50 LB. RIPRAP (RR3) Stone shall conform to the following limits:

100% - Passing 50 lbs.

30-70% - Passing 10 lbs.

(7) 3" CLEAN CHOKE STONE (RR1). Stone shall conform to the following limits:

U.S. Standard Sq. Mesh Percent by Weight Passing 3" 100 1 1/2" 33-73 No. 4 0-16

(8) 3" STONE (CA-1). Stone shall conform to the following limits:

U.S. Standard Sq. Mesh Percent by Weight Passing 3" 100 2 1/2" 90-100 2" 45-75 1 1/2" 0-30 1" 0-6

(9) 3" MINUS STONE (CA-2). Stone shall conform to the following limits:

U.S. Standard Sq. Mesh Percent by Weight Passing 2 1/2" 100 2" 90-100 1" 60-90 1/2" 35-65 No. 4 20-40 No.16 5-35

(10) CA-10. Stone shall conform to the following limits:

U.S. Standard Sq. Mesh Percent by Weight Passing 1" 100 3/4” 90-100 1/2" 65-95 No. 4 40-60 No. 16 15-45 No. 200 5-13

(11) CA-6. Stone shall conform to the following limits:

U.S. Standard Sq. Mesh Percent by Weight Passing 1 1/2" 100 1" 90-100 1/2" 60-90 No. 4 30-56 No.16 10-40 No. 200 4-12

(12) CM-16 3/8 INCH CHIPS

(13) BEACH SAND. Sand shall meet the following gradations in accordance with FA-3 Illinois

Specifications, Article 703. Fine Aggregates. Sand shall conform to the following limits:

Screen Size Percent Passing No. 4 94-100 No. 10 65-95 No. 40 30-70 No. 80 10-35 No. 200 0-6

(14) CLAY. Soil classified as "Clay" shall be inorganic low plasticity clay classified as CL by the American Society for Testing and Materials pamphlet D 2487. It shall contain at least 90 percent passing the No. 4 Sieve, with a maximum rock size of 1 inch.

(15) TOP SOIL. Top-soil shall be fertile, friable, natural topsoil locality and shall be obtained from a well-drained off-site source. Top-soil shall be without admixture of subsoil or slag, shall be free of organic matter, sticks, branches, plants or their roots, clods of hard earth, stones 1 inch in diameter or larger and other debris.

2.2 Equipment. The contractor shall furnish and maintain sufficient equipment suitable to perform the work. All equipment shall be maintained in safe operating condition in accordance with paragraph 1.3 (Safety).

2.3 Vehicles. All vehicles used in performance of this contract shall be clearly marked with an identification sign showing the contractor's name and address.

2.4 Approval of Equipment and Materials. Prior to commencing work, the contractor shall (i) submit to the Contract Officer, a written statement identifying all necessary permits have been acquired to transport via State, County and Township roads all necessary materials to be delivered and used during the contract period, and (ii) provide a list of all equipment available to perform the services listed in this contract.

The Contracting Officer reserves the right to inspect any and all equipment and rock prior to, and during, the period of this contract. All material, equipment, and operating procedures must be approved by the Contracting Officer prior to the commencement of work and prior to implementing any changes. The contractor shall remove from Government property all unapproved stock and equipment.

2.5 Permits and Licenses. The contractor shall, at his/her own expense, obtain any licenses or permits required for transportation of rock/stone from the point of supply to delivery location. Permits may be required by the State of Illinois, Clinton, Bond and Fayette Counties, for Carlyle Project and Randolph, Monroe and St. Clair Counties for the Kaskaskia River Project and/or local township road commissioners for exceeding weight limits as designated on local roadways. Also, the contractor shall comply with all current Federal, State, and local laws and regulations and shall comply with any subsequent changes.

3. SPECIFICATIONS FOR ROCK, SAND, AND CLAY DELIVERY.

3.1 The contractor shall supply all rock, sand, or clay as designated by grade/weight and quantities.

3.2 The product shall be transported in such a manner as to conform to industry standards and applicable laws.

3.3 The Contracting Officer may direct, at the Contractor’s expense, testing of material delivered to worksite if the stone appears, by visual inspection, to be of questionable gradation or quality. Testing shall be in accordance with the Standard Test Method for Gradation of Riprap (See Appendix D). For each riprap gradation, a gradation test shall be completed before placement of riprap and after every 15,000 tons placed. The sample size for all riprap gradation tests shall be determined by multiplying the weight of the larges stone in the gradation by 25 (i.e.

400 pound riprap gradation requires a sample weight of 400 x 25 = 10,000 pounds).

3.4 The product will be delivered by semi-truck and tandem truck in the quantities requested by the Contracting Officer and/or his/her representative. The contractor will be notified no less than five days prior to job of the required rock type, quantities and the anticipated time and date to deliver to the specified location. Delivery dates and times will be contingent on weather and Corps of Engineers workload. All deliveries will be coordinated between the hours of 8:00 a.m. and 4:00 p.m.

3.5 No rock, sand, or clay shall be delivered without coordination with the Contracting Officer and/or his/her representative.

4. ENVIRONMENTAL PROTECTION. The contractor shall comply with all Federal, State, and local laws regarding environmental protection. All environmental protection matters shall be coordinated with the Contracting Officer. The contractor may be inspected by the Contracting Officer, or other Federal, State, and local officials without notice. Access for inspection shall be granted by the contractor upon request.

5. MEASUREMENT. The materials will be measured for payment by the ton (2,000 pounds) with final quantities rounded to the nearest whole ton. Weight to be paid for will be determined from certified weight tickets which shall be furnished by the Contractor without additional cost to the Government. A certified weight ticket shall be defined as each truck being weighed empty, and again when loaded and the ticket, identified by the Contractor's name and the contract number, signed by a quarry representative with the statement "certified correct". This procedure shall be followed for each load hauled. The Contractor shall initial each ticket to verify accuracy and completeness of each ticket before submitting it to the Government. Certification stating that the scales were tested and approved by the local authority shall be furnished by the Contractor.

6. INSPECTION AND ACCEPTANCE. The work will be conducted under the general direction of the Contracting Officer, and is subject to inspection by his/her appointed inspectors. No inspector is authorized to change any provision of the specifications without written authorization by the Contracting Officer, nor shall the presence or absence of an inspector relieve the contractor from any of the requirements of the contract. Formal acceptance will be made by the Contracting Officer for and in behalf of the Government.

7. PAYMENTS. Payment will be made for the rock/stone actually supplied and delivered. NOTE: Payment for each bid item shall constitute full compensation for furnishing all plant, labor, equipment, and material and performing all operations necessary for the work required. Any inability to complete the work stated above will result in a reduction in contract quantities and total amount due the contractor.

BIS SHEETS

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Furnish all labor, equipment and materials necessary to supply, transport and deliver various types of rock, stone, sand and clay to Carlyle Lake, Carlyle Illinois and the Kaskaskia River Project in accordance with solicitation specifications, maps and provisions.

PLEASE NOTE THE FOLLOWING:

(a) All estimated quantities are to be used for bid evaluation only.

(b) All prices must be on a firm basis.

(c) Services listed in Section B shall be performed following the issuance of a delivery order ONLY.

(d) AMOUNTS APPLICABLE TO DELIVERY ORDERS UNDER THIS CONTRACT.

Cumulative Guaranteed Minimum - $8,000.00- base year $4,000.00- option years Cumulative Maximum - $400,000.00 x 5 years = $2,000,000.00 Minimum and Maximum delivery order amounts are referenced in Section I, Contract Clauses.

(e) RENEWAL OPTION NOTICE - This solicitation contains a renewal option clause (Section I, Contract Clauses, and Option to Extend the Term of The Contract). The renewal option is to be exercised at the discretion of the Government only and will be binding on the Contractor if a decision is made by the Government to exercise the option. Bidders are advised that specific renewal option year.

(f) Bidders must bid on all bid items. Failure to bid on any item will be cause for the Government to deem the bid non-responsive.

BASE YEAR

ITEM DESCRIPTION QUANTITY U/I UNIT PRICE AMOUNT

0001 1000 LB RIP RAP (RR7)

Area 1, Delivered in Semi Truck 150 TN

0002 1000 LB RIP RAP (RR7)

Area 2, Delivered in Semi Truck 150 TN

0003 1000 LB RIP RAP (RR7)

Area 3, Delivered in Semi Truck 1000 TN

0004 1000 LB RIP RAP (RR7)

Area 4, Delivered in Semi Truck 1000 TN

0005 1000 LB RIP RAP (RR7)

Area 5, Delivered in Semi Truck 500 TN

0006 1000 LB RIP RAP (RR7)

Area 6, Delivered in Semi Truck 500 TN

0007 1000 LB RIP RAP (RR7)

Area 7, Delivered in Semi Truck 500 TN

0008 400 LB RIP RAP (RR5)

Area 1, Delivered in Semi-Truck 50 TN

0009 400 LB RIP RAP (RR5)

Area 2, Delivered in Semi-Truck 50 TN

0010 400 LB RIP RAP (RR5)

Area 3, Delivered in Semi-Truck 1000 TN

0011 400 LB RIP RAP (RR5)

Area 4, Delivered in Semi-Truck 1000 TN

0012 400 LB RIP RAP (RR5)

Area 5, Delivered in Semi-Truck 500 TN

0013 400 LB RIP RAP (RR5)

Area 6, Delivered in Semi-Truck 500 TN

0014 400 LB RIP RAP (RR5)

Area 7, Delivered in Semi-Truck 500 TN

0015 400 LB RIP RAP (RR5)

Area 1, Delivered in Tandem-Truck 50 TN

0016 400 LB RIP RAP (RR5)

Area 2, Delivered in Tandem-Truck 50 TN

0017 400 LB RIP RAP (RR5)

Area 3, Delivered in Tandem-Truck 50 TN

0018 400 LB RIP RAP (RR5)

Area 4, Delivered in Tandem-Truck 50 TN

0019 400 LB RIP RAP (RR5)

Area 5, Delivered in Tandem-Truck 50 TN

0020 400 LB RIP RAP (RR5)

Area 6, Delivered in Tandem-Truck 50 TN

0021 400 LB RIP RAP (RR5)

Area 7, Delivered in Tandem-Truck 50 TN

0022 150 LB RIP RAP (RR4)

Area 1, Delivered in Semi-Truck 40 TN

0023 150 LB RIP RAP (RR4)

Area 2, Delivered in Semi-Truck 40 TN

0024 150 LB RIP RAP (RR4)

Area 3, Delivered in Semi-Truck 1000 TN

0025 150 LB RIP RAP (RR4)

Area 4, Delivered in Semi-Truck 1000 TN

0026 150 LB RIP RAP (RR4)

Area 5, Delivered in Semi-Truck 500 TN

0027 150 LB RIP RAP (RR4)

Area 6, Delivered in Semi-Truck 500 TN

0028 150 LB RIP RAP (RR4)

Area 7, Delivered in Semi-Truck 500 TN

0029 150 LB RIP RAP (RR4)

Area 1, Delivered in Tandem-Truck 100 TN

0030 150 LB RIP RAP (RR4)

Area 2, Delivered in Tandem-Truck 100 TN

0031 150 LB RIP RAP (RR4)

Area 3, Delivered in Tandem-Truck 1000 TN

0032 150 LB RIP RAP (RR4)

Area 4, Delivered in Tandem-Truck 1000 TN

0033 150 LB RIP RAP (RR4)

Area 5, Delivered in Tandem-Truck 500 TN

0034 150 LB RIP RAP (RR4)

Area 6, Delivered in Tandem-Truck 500 TN

0035 150 LB RIP RAP (RR4)

Area 7, Delivered in Tandem-Truck 500 TN

0036 50 LB RIP RAP (RR3)

Area 1, Delivered in Semi-Truck 50 TN

0037 50 LB RIP RAP (RR3)

Area 2, Delivered in Semi-Truck 50 TN

0038 50 LB RIP RAP (RR3)

Area 3, Delivered in Semi-Truck 50 TN

0039 50 LB RIP RAP (RR3)

Area 4, Delivered in Semi-Truck 50 TN

0040 50 LB RIP RAP (RR3)

Area 5, Delivered in Semi-Truck 50 TN

0041 50 LB RIP RAP (RR3)

Area 6, Delivered in Semi-Truck 50 TN

0042 50 LB RIP RAP (RR3)

Area 7, Delivered in Semi-Truck 50 TN

0043 50 LB RIP RAP (RR3)

Area 1, Delivered in Tandem-Truck 100 TN

0044 50 LB RIP RAP (RR3)

Area 2, Delivered in Tandem-Truck 100 TN

0045 50 LB RIP RAP (RR3)

Area 3, Delivered in Tandem-Truck 100 TN

0046 50 LB RIP RAP (RR3)

Area 4, Delivered in Tandem-Truck 100 TN

0047 50 LB RIP RAP (RR3)

Area 5, Delivered in Tandem-Truck 100 TN

0048 50 LB RIP RAP (RR3)

Area 6, Delivered in Tandem-Truck 100 TN

0049 50 LB RIP RAP (RR3)

Area 7, Delivered in Tandem-Truck 100 TN

0050 3" CLEAN CHOKE STONE (RR1)

Area 1, Delivered in Semi-Truck 100 TN

0051 3" CLEAN CHOKE STONE (RR1)

Area 2, Delivered in Semi-Truck 100 TN

0052 3" CLEAN CHOKE STONE (RR1)

Area 3, Delivered in Semi-Truck 100 TN

0053 3" CLEAN CHOKE STONE (RR1)

Area 4, Delivered in Semi-Truck 100 TN

0054 3" CLEAN CHOKE STONE (RR1)

Area 5, Delivered in Semi-Truck 100 TN

0055 3" CLEAN CHOKE STONE (RR1)

Area 6, Delivered in Semi-Truck 100 TN

0056 3" CLEAN CHOKE STONE (RR1)

Area 7, Delivered in Semi-Truck 100 TN

0057 3" CLEAN CHOKE STONE (RR1)

Area 1, Delivered in Tandem-Truck 100 TN

0058 3" CLEAN CHOKE STONE (RR1)

Area 2, Delivered in Tandem-Truck 100 TN

0059 3" CLEAN CHOKE STONE (RR1)

Area 3, Delivered in Tandem-Truck 100 TN

0060 3" CLEAN CHOKE STONE (RR1)

Area 4, Delivered in Tandem-Truck 100 TN

0061 3" CLEAN CHOKE STONE (RR1)

Area 5, Delivered in Tandem-Truck 100 TN

0062 3" CLEAN CHOKE STONE (RR1)

Area 6, Delivered in Tandem-Truck 100 TN

0063 3" CLEAN CHOKE STONE

Area 7, Delivered in Tandem-Truck 100 TN

0064 3” STONE (CA-1)

Area 1, Delivered in Semi Truck 40 TN

0065 3” STONE (CA-1)

Area 2, Delivered in Semi Truck 40 TN

0066 3” STONE (CA-1)

Area 3, Delivered in Semi Truck 40 TN

0067 3” STONE (CA-1)

Area 4, Delivered in Semi Truck 40 TN

0068 3” STONE (CA-1)

Area 5, Delivered in Semi Truck 40 TN

0069 3” STONE (CA-1)

Area 6, Delivered in Semi Truck 40 TN

0070 3” STONE (CA-1)

Area 7, Delivered in Semi Truck 40 TN

0071 3” STONE (CA-1)

Area 1, Delivered in Tandem-Truck 50 TN

0072 3” STONE (CA-1)

Area 2, Delivered in Tandem-Truck 150 TN

0073 3” STONE (CA-1)

Area 3, Delivered in Tandem-Truck 50 TN

0074 3” STONE (CA-1)

Area 4, Delivered in Tandem-Truck 50 TN

0075 3” STONE (CA-1)

Area 5, Delivered in Tandem-Truck 50 TN

0076 3” STONE (CA-1)

Area 6, Delivered in Tandem-Truck 50 TN

0077 3” STONE (CA-1)

Area 7, Delivered in Tandem-Truck 50 TN

0078 3" MINUS STONE (CA-2)

Area 1, Delivered in Semi-Truck 40 TN

0079 3" MINUS STONE (CA-2)

Area 2, Delivered in Semi-Truck 40 TN

0080 3" MINUS STONE (CA-2)

Area 3, Delivered in Semi-Truck 40 TN

0081 3" MINUS STONE (CA-2)

Area 4, Delivered in Semi-Truck 40 TN

0082 3" MINUS STONE (CA-2)

Area 5, Delivered in Semi-Truck 40 TN

0083 3" MINUS STONE (CA-2)

Area 6, Delivered in Semi-Truck 40 TN

0084 3" MINUS STONE (CA-2)

Area 7, Delivered in Semi-Truck 40 TN

0085 3" MINUS STONE (CA-2)

Area 1, Delivered in Tandem-Truck 30 TN

0086 3" MINUS STONE (CA-2)

Area 2, Delivered in Tandem-Truck 30 TN

0087 3" MINUS STONE (CA-2)

Area 3, Delivered in Tandem-Truck 30 TN

0088 3" MINUS STONE (CA-2)

Area 4, Delivered in Tandem-Truck 30 TN

0089 3" MINUS STONE (CA-2)

Area 5, Delivered in Tandem-Truck 30 TN

0090 3" MINUS STONE (CA-2)

Area 6, Delivered in Tandem-Truck 30 TN

0091 3" MINUS STONE (CA-2)

Area 7, Delivered in Tandem-Truck 30 TN

0092 CA-10 STONE

Area 1, Delivered in Semi-Truck 20 TN

0093 CA-10 STONE

Area 2, Delivered in Semi-Truck 20 TN

0094 CA-10 STONE

Area 3, Delivered in Semi-Truck 20 TN

0095 CA-10 STONE

Area 4, Delivered in Semi-Truck 20 TN

0096 CA-10 STONE

Area 5, Delivered in Semi-Truck 20 TN

0097 CA-10 STONE

Area 6, Delivered in Semi-Truck 20 TN

0098 CA-10 STONE

Area 7, Delivered in Semi-Truck 20 TN

0099 CA-10 STONE

Area 1, Delivered in Tandem-Truck 150 TN

0100 CA-10 STONE

Area 2, Delivered in Tandem-Truck 150 TN

0101 CA-10 STONE

Area 3, Delivered in Tandem-Truck 150 TN

0102 CA-10 STONE

Area 4, Delivered in Tandem-Truck 150 TN

0103 CA-10 STONE

Area 5, Delivered in Tandem-Truck 150 TN

0104 CA-10 STONE

Area 6, Delivered in Tandem-Truck 150 TN

0105 CA-10 STONE

Area 7, Delivered in Tandem-Truck 150 TN

0106 CA-6 STONE

Area 1, Delivered in Semi-Truck 20 TN

0107 CA-6 STONE

Area 2, Delivered in Semi-Truck 20 TN

0108 CA-6 STONE

Area 3, Delivered in Semi-Truck 20 TN

0109 CA-6 STONE

Area 4, Delivered in Semi-Truck 20 TN

0110 CA-6 STONE

Area 5, Delivered in Semi-Truck 20 TN

0111 CA-6 STONE

Area 6, Delivered in Semi-Truck 20 TN

0112 CA-6 STONE

Area 7, Delivered in Semi-Truck 20 TN

0113 CA-6 STONE

Area 1, Delivered in Tandem-Truck 150 TN

0114 CA-6 STONE

Area 2, Delivered in Tandem-Truck 150 TN

0115 CA-6 STONE

Area 3, Delivered in Tandem-Truck 150 TN

0116 CA-6 STONE

Area 4, Delivered in Tandem-Truck 150 TN

0117 CA-6 STONE

Area 5, Delivered in Tandem-Truck 150 TN

0118 CA-6 STONE

Area 6, Delivered in Tandem-Truck 150 TN

0119 CA-6 STONE

Area 7, Delivered in Tandem-Truck 150 TN

0120 3/8 INCH CHIPS (CM-16)

Area 1, Delivered in Semi-Truck 20 TN

0121 3/8 INCH CHIPS (CM-16)

Area 2, Delivered in Semi-Truck 20 TN

0122 3/8 INCH CHIPS (CM-16)

Area 3, Delivered in Semi-Truck 20 TN

0123 3/8 INCH CHIPS (CM-16)

Area 4, Delivered in Semi-Truck 20 TN

0124 3/8 INCH CHIPS (CM-16)

Area 5, Delivered in Semi-Truck 20 TN

0125 3/8 INCH CHIPS (CM-16)

Area 6, Delivered in Semi-Truck 20 TN

0126 3/8 INCH CHIPS (CM-16)

Area 7, Delivered in Semi-Truck 20 TN

0127 3/8 INCH CHIPS (CM-16)

Area 1, Delivered in Tandem-Truck 30 TN

0128 3/8 INCH CHIPS (CM-16)

Area 2, Delivered in Tandem-Truck 30 TN

0129 3/8 INCH CHIPS (CM-16)

Area 3, Delivered in Tandem-Truck 30 TN

0130 3/8 INCH CHIPS (CM-16)

Area 4, Delivered in Tandem-Truck 30 TN

0131 3/8 INCH CHIPS (CM-16)

Area 5, Delivered in Tandem-Truck 30 TN

0132 3/8 INCH CHIPS (CM-16)

Area 6, Delivered in Tandem-Truck 30 TN

0133 3/8 INCH CHIPS (CM-16)

Area 7, Delivered in Tandem-Truck 30 TN

0134 BEACH SAND

Area 1, Delivered in Semi-Truck 500 TN

0135 BEACH SAND

Area 2, Delivered in Semi-Truck 500 TN

0136 BEACH SAND

Area 3, Delivered in Semi-Truck 1000 TN

0137 BEACH SAND

Area 4, Delivered in Semi-Truck 500 TN

0138 BEACH SAND

Area 5, Delivered in Semi-Truck 500 TN

0139 BEACH SAND

Area 6, Delivered in Semi-Truck 500 TN

0140 BEACH SAND

Area 7, Delivered in Semi-Truck 500 TN

0141 BEACH SAND

Area 1, Delivered in Tandem-Truck 500 TN

0142 BEACH SAND

Area 2, Delivered in Tandem-Truck 500 TN

0143 BEACH SAND

0144 BEACH SAND

Area 4, Delivered in Tandem-Truck 500 TN

0145 BEACH SAND

Area 5, Delivered in Tandem-Truck 500 TN

0146 BEACH SAND

Area 6, Delivered in Tandem-Truck 500 TN

0147 BEACH SAND

Area 7, Delivered in Tandem-Truck 500 TN

0148 CLAY

Area 1, Delivered in Semi-Truck 100 TN

0149 CLAY

Area 2, Delivered in Semi-Truck 400 TN

0150 CLAY

Area 3, Delivered in Semi-Truck 100 TN

0151 CLAY

Area 4, Delivered in Semi-Truck 100 TN

0152 CLAY

Area 5, Delivered in Semi-Truck 100 TN

0153 CLAY

Area 6, Delivered in Semi-Truck 100 TN

0154 CLAY

Area 7, Delivered in Semi-Truck 100 TN

0155 CLAY

Area 1, Delivered in Tandem-Truck 15 TN

0156 CLAY

Area 2, Delivered in Tandem-Truck 400 TN

0157 CLAY

Area 3, Delivered in Tandem-Truck 15 TN

0158 CLAY

Area 4, Delivered in Tandem-Truck 15 TN

0159 CLAY

Area 5, Delivered in Tandem-Truck 15 TN

0160 CLAY

Area 6, Delivered in Tandem-Truck 15 TN

0161 CLAY

Area 7, Delivered in Tandem-Truck 15 TN

0162 QUARRY RUN STONE

Area 1, Delivered in Semi-Truck 100 TN

0163 QUARRY RUN STONE

Area 2, Delivered in Semi-Truck 100 TN

0164 QUARRY RUN STONE

Area 3, Delivered in Semi-Truck 100 TN

0165 QUARRY RUN STONE

Area 4, Delivered in Semi-Truck 100 TN

0166 QUARRY RUN STONE

Area 5, Delivered in Semi-Truck 100 TN

0167 QUARRY RUN STONE

Area 6, Delivered in Semi-Truck 100 TN

0168 QUARRY RUN STONE

Area 7, Delivered in Semi-Truck 100 TN

0169 QUARRY RUN STONE

Area 1, Delivered in Tandem-Truck 100 TN

0170 QUARRY RUN STONE

Area 2, Delivered in Tandem-Truck 100 TN

0171 QUARRY RUN STONE

Area 3, Delivered in Tandem-Truck 100 TN

0172 QUARRY RUN STONE

Area 4, Delivered in Tandem-Truck 100 TN

0173 QUARRY RUN STONE

Area 5, Delivered in Tandem-Truck 100 TN

0174 QUARRY RUN STONE

Area 6, Delivered in Tandem-Truck 100 TN

0175 QUARRY RUN STONE

0176 TOP SOIL

Area 1, Delivered in Semi-Truck 100 TN

0177 TOP SOIL

Area 2, Delivered in Semi-Truck 100 TN

0178 TOP SOIL

Area 3, Delivered in Semi-Truck 100 TN

0179 TOP SOIL

Area 4, Delivered in Semi-Truck 100 TN

0180 TOP SOIL

Area 5, Delivered in Semi-Truck 100 TN

0181 TOP SOIL

Area 6, Delivered in Semi-Truck 100 TN

0182 TOP SOIL

Area 7, Delivered in Semi-Truck 100 TN

0183 TOP SOIL

Area 1, Delivered in Tandem-Truck 100 TN

0184 TOP SOIL

Area 2, Delivered in Tandem-Truck 100 TN

0185 TOP SOIL

Area 3, Delivered in Tandem-Truck 100 TN

0186 TOP SOIL

Area 4, Delivered in Tandem-Truck 100 TN

0187 TOP SOIL

Area 5, Delivered in Tandem-Truck 100 TN

0188 TOP SOIL

Area 6, Delivered in Tandem-Truck 100 TN

0189 TOP SOIL

TOTAL BASE YEAR $_________________________

FIRST OPTION YEAR

1001 1000 LB RIP RAP (RR7)

Area 1, Delivered in Semi Truck 150 TN

1002 1000 LB RIP RAP (RR7)

Area 2, Delivered in Semi Truck 150 TN

1003 1000 LB RIP RAP (RR7)

Area 3, Delivered in Semi Truck 1000 TN

1004 1000 LB RIP RAP (RR7)

Area 4, Delivered in Semi Truck 1000 TN

1005 1000 LB RIP RAP (RR7)

Area 5, Delivered in Semi Truck 500 TN

1006 1000 LB RIP RAP (RR7)

Area 6, Delivered in Semi Truck 500 TN

1007 1000 LB RIP RAP (RR7)

Area 7, Delivered in Semi Truck 500 TN

1008 400 LB RIP RAP (RR5)

Area 1, Delivered in Semi-Truck 50 TN

1009 400 LB RIP RAP (RR5)

Area 2, Delivered in Semi-Truck 50 TN

1010 400 LB RIP RAP (RR5)

Area 3, Delivered in Semi-Truck 1000 TN

1011 400 LB RIP RAP (RR5)

Area 4, Delivered in Semi-Truck 1000 TN

1012 400 LB RIP RAP (RR5)

Area 5, Delivered in Semi-Truck 500 TN

1013 400 LB RIP RAP (RR5)

Area 6, Delivered in Semi-Truck 500 TN

1014 400 LB RIP RAP (RR5)

Area 7, Delivered in Semi-Truck 500 TN

1015 400 LB RIP RAP (RR5)

1016 400 LB RIP RAP (RR5)

Area 2, Delivered in Tandem-Truck 50 TN

1017 400 LB RIP RAP (RR5)

Area 3, Delivered in Tandem-Truck 50 TN

1018 400 LB RIP RAP (RR5)

Area 4, Delivered in Tandem-Truck 50 TN

1019 400 LB RIP RAP (RR5)

Area 5, Delivered in Tandem-Truck 50 TN

1020 400 LB RIP RAP (RR5)

Area 6, Delivered in Tandem-Truck 50 TN

1021 400 LB RIP RAP (RR5)

Area 7, Delivered in Tandem-Truck 50 TN

1022 150 LB RIP RAP (RR4)

Area 1, Delivered in Semi-Truck 40 TN

1023 150 LB RIP RAP (RR4)

Area 2, Delivered in Semi-Truck 40 TN

1024 150 LB RIP RAP (RR4)

Area 3, Delivered in Semi-Truck 1000 TN

1025 150 LB RIP RAP (RR4)

Area 4, Delivered in Semi-Truck 1000 TN

1026 150 LB RIP RAP (RR4)

Area 5, Delivered in Semi-Truck 500 TN

1027 150 LB RIP RAP (RR4)

Area 6, Delivered in Semi-Truck 500 TN

1028 150 LB RIP RAP (RR4)

Area 7, Delivered in Semi-Truck 500 TN

1029 150 LB RIP RAP (RR4)

Area 1, Delivered in Tandem-Truck 100 TN

1030 150 LB RIP RAP (RR4)

Area 2, Delivered in Tandem-Truck 100 TN

1031 150 LB RIP RAP (RR4)

1032 150 LB RIP RAP (RR4)

Area 4, Delivered in Tandem-Truck 1000 TN

1033 150 LB RIP RAP (RR4)

Area 5, Delivered in Tandem-Truck 500 TN

1034 150 LB RIP RAP (RR4)

Area 6, Delivered in Tandem-Truck 500 TN

1035 150 LB RIP RAP (RR4)

Area 7, Delivered in Tandem-Truck 500 TN

1036 50 LB RIP RAP (RR3)

Area 1, Delivered in Semi-Truck 50 TN

1037 50 LB RIP RAP (RR3)

Area 2, Delivered in Semi-Truck 50 TN

1038 50 LB RIP RAP (RR3)

Area 3, Delivered in Semi-Truck 50 TN

1039 50 LB RIP RAP (RR3)

Area 4, Delivered in Semi-Truck 50 TN

1040 50 LB RIP RAP (RR3)

Area 5, Delivered in Semi-Truck 50 TN

1041 50 LB RIP RAP (RR3)

Area 6, Delivered in Semi-Truck 50 TN

1042 50 LB RIP RAP (RR3)

Area 7, Delivered in Semi-Truck 50 TN

1043 50 LB RIP RAP (RR3)

Area 1, Delivered in Tandem-Truck 100 TN

1044 50 LB RIP RAP (RR3)

Area 2, Delivered in Tandem-Truck 100 TN

1045 50 LB RIP RAP (RR3)

Area 3, Delivered in Tandem-Truck 100 TN

1046 50 LB RIP RAP (RR3)

Area 4, Delivered in Tandem-Truck 100 TN

1047 50 LB RIP RAP (RR3)

1048 50 LB RIP RAP (RR3)

Area 6, Delivered in Tandem-Truck 100 TN

1049 50 LB RIP RAP (RR3)

Area 7, Delivered in Tandem-Truck 100 TN

1050 3" CLEAN CHOKE STONE (RR1)

Area 1, Delivered in Semi-Truck 100 TN

1051 3" CLEAN CHOKE STONE (RR1)

Area 2, Delivered in Semi-Truck 100 TN

1052 3" CLEAN CHOKE STONE (RR1)

Area 3, Delivered in Semi-Truck 100 TN

1053 3" CLEAN CHOKE STONE (RR1)

Area 4, Delivered in Semi-Truck 100 TN

1054 3" CLEAN CHOKE STONE (RR1)

Area 5, Delivered in Semi-Truck 100 TN

1055 3" CLEAN CHOKE STONE (RR1)

Area 6, Delivered in Semi-Truck 100 TN

1056 3" CLEAN CHOKE STONE (RR1)

Area 7, Delivered in Semi-Truck 100 TN

1057 3" CLEAN CHOKE STONE (RR1)

Area 1, Delivered in Tandem-Truck 100 TN

1058 3" CLEAN CHOKE STONE (RR1)

Area 2, Delivered in Tandem-Truck 100 TN

1059 3" CLEAN CHOKE STONE (RR1)

Area 3, Delivered in Tandem-Truck 100 TN

1060 3" CLEAN CHOKE STONE (RR1)

Area 4, Delivered in Tandem-Truck 100 TN

1061 3" CLEAN CHOKE STONE (RR1)

Area 5, Delivered in Tandem-Truck 100 TN

1062 3" CLEAN CHOKE STONE (RR1)

Area 6, Delivered in Tandem-Truck 100 TN

1063 3" CLEAN CHOKE STONE

1064 3” STONE (CA-1)

Area 1, Delivered in Semi Truck 40 TN

1065 3” STONE (CA-1)

Area 2, Delivered in Semi Truck 40 TN

1066 3” STONE (CA-1)

Area 3, Delivered in Semi Truck 40 TN

1067 3” STONE (CA-1)

Area 4, Delivered in Semi Truck 40 TN

1068 3” STONE (CA-1)

Area 5, Delivered in Semi Truck 40 TN

1069 3” STONE (CA-1)

Area 6, Delivered in Semi Truck 40 TN

1070 3” STONE (CA-1)

Area 7, Delivered in Semi Truck 40 TN

1071 3” STONE (CA-1)

Area 1, Delivered in Tandem-Truck 50 TN

1072 3” STONE (CA-1)

Area 2, Delivered in Tandem-Truck 150 TN

1073 3” STONE (CA-1)

Area 3, Delivered in Tandem-Truck 50 TN

1074 3” STONE (CA-1)

Area 4, Delivered in Tandem-Truck 50 TN

1075 3” STONE (CA-1)

Area 5, Delivered in Tandem-Truck 50 TN

1076 3” STONE (CA-1)

Area 6, Delivered in Tandem-Truck 50 TN

1077 3” STONE (CA-1)

Area 7, Delivered in Tandem-Truck 50 TN

1078 3" MINUS STONE (CA-2)

Area 1, Delivered in Semi-Truck 40 TN

1079 3" MINUS STONE (CA-2)

1080 3" MINUS STONE (CA-2)

Area 3, Delivered in Semi-Truck 40 TN

1081 3" MINUS STONE (CA-2)

Area 4, Delivered in Semi-Truck 40 TN

1082 3" MINUS STONE (CA-2)

Area 5, Delivered in Semi-Truck 40 TN

1083 3" MINUS STONE (CA-2)

Area 6, Delivered in Semi-Truck 40 TN

1084 3" MINUS STONE (CA-2)

Area 7, Delivered in Semi-Truck 40 TN

1085 3" MINUS STONE (CA-2)

Area 1, Delivered in Tandem-Truck 30 TN

1086 3" MINUS STONE (CA-2)

Area 2, Delivered in Tandem-Truck 30 TN

1087 3" MINUS STONE (CA-2)

Area 3, Delivered in Tandem-Truck 30 TN

1088 3" MINUS STONE (CA-2)

Area 4, Delivered in Tandem-Truck 30 TN

1089 3" MINUS STONE (CA-2)

Area 5, Delivered in Tandem-Truck 30 TN

1090 3" MINUS STONE (CA-2)

Area 6, Delivered in Tandem-Truck 30 TN

1091 3" MINUS STONE (CA-2)

Area 7, Delivered in Tandem-Truck 30 TN

1092 CA-10 STONE

Area 1, Delivered in Semi-Truck 20 TN

1093 CA-10 STONE

Area 2, Delivered in Semi-Truck 20 TN

1094 CA-10 STONE

Area 3, Delivered in Semi-Truck 20 TN

1095 CA-10 STONE

1096 CA-10 STONE

Area 5, Delivered in Semi-Truck 20 TN

1097 CA-10 STONE

Area 6, Delivered in Semi-Truck 20 TN

1098 CA-10 STONE

Area 7, Delivered in Semi-Truck 20 TN

1099 CA-10 STONE

Area 1, Delivered in Tandem-Truck 150 TN

1100 CA-10 STONE

Area 2, Delivered in Tandem-Truck 150 TN

1101 CA-10 STONE

Area 3, Delivered in Tandem-Truck 150 TN

1102 CA-10 STONE

Area 4, Delivered in Tandem-Truck 150 TN

1103 CA-10 STONE

Area 5, Delivered in Tandem-Truck 150 TN

1104 CA-10 STONE

Area 6, Delivered in Tandem-Truck 150 TN

1105 CA-10 STONE

Area 7, Delivered in Tandem-Truck 150 TN

1106 CA-6 STONE

Area 1, Delivered in Semi-Truck 20 TN

1107 CA-6 STONE

Area 2, Delivered in Semi-Truck 20 TN

1108 CA-6 STONE

Area 3, Delivered in Semi-Truck 20 TN

1109 CA-6 STONE

Area 4, Delivered in Semi-Truck 20 TN

1110 CA-6 STONE

Area 5, Delivered in Semi-Truck 20 TN

1111 CA-6 STONE

1112 CA-6 STONE

Area 7, Delivered in Semi-Truck 20 TN

1113 CA-6 STONE

Area 1, Delivered in Tandem-Truck 150 TN

1114 CA-6 STONE

Area 2, Delivered in Tandem-Truck 150 TN

1115 CA-6 STONE

Area 3, Delivered in Tandem-Truck 150 TN

1116 CA-6 STONE

Area 4, Delivered in Tandem-Truck 150 TN

1117 CA-6 STONE

Area 5, Delivered in Tandem-Truck 150 TN

1118 CA-6 STONE

Area 6, Delivered in Tandem-Truck 150 TN

1119 CA-6 STONE

Area 7, Delivered in Tandem-Truck 150 TN

1120 3/8 INCH CHIPS (CM-16)

Area 1, Delivered in Semi-Truck 20 TN

1121 3/8 INCH CHIPS (CM-16)

Area 2, Delivered in Semi-Truck 20 TN

1122 3/8 INCH CHIPS (CM-16)

Area 3, Delivered in Semi-Truck 20 TN

1123 3/8 INCH CHIPS (CM-16)

Area 4, Delivered in Semi-Truck 20 TN

1124 3/8 INCH CHIPS (CM-16)

Area 5, Delivered in Semi-Truck 20 TN

1125 3/8 INCH CHIPS (CM-16)

Area 6, Delivered in Semi-Truck 20 TN

1126 3/8 INCH CHIPS (CM-16)

Area 7, Delivered in Semi-Truck 20 TN

1127 3/8 INCH CHIPS (CM-16)

1128 3/8 INCH CHIPS (CM-16)

Area 2, Delivered in Tandem-Truck 30 TN

1129 3/8 INCH CHIPS (CM-16)

Area 3, Delivered in Tandem-Truck 30 TN

1130 3/8 INCH CHIPS (CM-16)

Area 4, Delivered in Tandem-Truck 30 TN

1131 3/8 INCH CHIPS (CM-16)

Area 5, Delivered in Tandem-Truck 30 TN

1132 3/8 INCH CHIPS (CM-16)

Area 6, Delivered in Tandem-Truck 30 TN

1133 3/8 INCH CHIPS (CM-16)

Area 7, Delivered in Tandem-Truck 30 TN

1134 BEACH SAND

Area 1, Delivered in Semi-Truck 500 TN

1135 BEACH SAND

Area 2, Delivered in Semi-Truck 500 TN

1136 BEACH SAND

Area 3, Delivered in Semi-Truck 1000 TN

1137 BEACH SAND

Area 4, Delivered in Semi-Truck 500 TN

0138 BEACH SAND

Area 5, Delivered in Semi-Truck 500 TN

1139 BEACH SAND

Area 6, Delivered in Semi-Truck 500 TN

1140 BEACH SAND

Area 7, Delivered in Semi-Truck 500 TN

1141 BEACH SAND

Area 1, Delivered in Tandem-Truck 500 TN

1142 BEACH SAND

Area 2, Delivered in Tandem-Truck 500 TN

1143 BEACH SAND

1144 BEACH SAND

Area 4, Delivered in Tandem-Truck 500 TN

1145 BEACH SAND

Area 5, Delivered in Tandem-Truck 500 TN

1146 BEACH SAND

Area 6, Delivered in Tandem-Truck 500 TN

1147 BEACH SAND

Area 7, Delivered in Tandem-Truck 500 TN

1148 CLAY

Area 1, Delivered in Semi-Truck 100 TN

1149 CLAY

Area 2, Delivered in Semi-Truck 400 TN

1150 CLAY

Area 3, Delivered in Semi-Truck 100 TN

1151 CLAY

Area 4, Delivered in Semi-Truck 100 TN

1152 CLAY

Area 5, Delivered in Semi-Truck 100 TN

1153 CLAY

Area 6, Delivered in Semi-Truck 100 TN

1154 CLAY

Area 7, Delivered in Semi-Truck 100 TN

1155 CLAY

Area 1, Delivered in Tandem-Truck 15 TN

1156 CLAY

Area 2, Delivered in Tandem-Truck 400 TN

1157 CLAY

Area 3, Delivered in Tandem-Truck 15 TN

1158 CLAY

Area 4, Delivered in Tandem-Truck 15 TN

1159 CLAY

1160 CLAY

Area 6, Delivered in Tandem-Truck 15 TN

1161 CLAY

Area 7, Delivered in Tandem-Truck 15 TN

1162 QUARRY RUN STONE

Area 1, Delivered in Semi-Truck 100 TN

1163 QUARRY RUN STONE

Area 2, Delivered in Semi-Truck 100 TN

1164 QUARRY RUN STONE

Area 3, Delivered in Semi-Truck 100 TN

1165 QUARRY RUN STONE

Area 4, Delivered in Semi-Truck 100 TN

1166 QUARRY RUN STONE

Area 5, Delivered in Semi-Truck 100 TN

1167 QUARRY RUN STONE

Area 6, Delivered in Semi-Truck 100 TN

1168 QUARRY RUN STONE

Area 7, Delivered in Semi-Truck 100 TN

1169 QUARRY RUN STONE

Area 1, Delivered in Tandem-Truck 100 TN

1170 QUARRY RUN STONE

Area 2, Delivered in Tandem-Truck 100 TN

1171 QUARRY RUN STONE

Area 3, Delivered in Tandem-Truck 100 TN

1172 QUARRY RUN STONE

Area 4, Delivered in Tandem-Truck 100 TN

1173 QUARRY RUN STONE

Area 5, Delivered in Tandem-Truck 100 TN

1174 QUARRY RUN STONE

Area 6, Delivered in Tandem-Truck 100 TN

1175 QUARRY RUN STONE

1176 TOP SOIL

Area 1, Delivered in Semi-Truck 100 TN

1177 TOP SOIL

Area 2, Delivered in Semi-Truck 100 TN

1178 TOP SOIL

Area 3, Delivered in Semi-Truck 100 TN

1179 TOP SOIL

Area 4, Delivered in Semi-Truck 100 TN

1180 TOP SOIL

Area 5, Delivered in Semi-Truck 100 TN

1181 TOP SOIL

Area 6, Delivered in Semi-Truck 100 TN

1182 TOP SOIL

Area 7, Delivered in Semi-Truck 100 TN

1183 TOP SOIL

Area 1, Delivered in Tandem-Truck 100 TN

1184 TOP SOIL

Area 2, Delivered in Tandem-Truck 100 TN

1185 TOP SOIL

Area 3, Delivered in Tandem-Truck 100 TN

1186 TOP SOIL

Area 4, Delivered in Tandem-Truck 100 TN

1187 TOP SOIL

Area 5, Delivered in Tandem-Truck 100 TN

1188 TOP SOIL

Area 6, Delivered in Tandem-Truck 100 TN

1189 TOP SOIL

TOTAL FIRST OPTION YEAR $_________________________

SECOND OPTION YEAR

2001 1000 LB RIP RAP (RR7)

Area 1, Delivered in Semi Truck 150 TN

2002 1000 LB RIP RAP (RR7)

Area 2, Delivered in Semi Truck 150 TN

2003 1000 LB RIP RAP (RR7)

Area 3, Delivered in Semi Truck 1000 TN

2004 1000 LB RIP RAP (RR7)

Area 4, Delivered in Semi Truck 1000 TN

2005 1000 LB RIP RAP (RR7)

Area 5, Delivered in Semi Truck 500 TN

2006 1000 LB RIP RAP (RR7)

Area 6, Delivered in Semi Truck 500 TN

2007 1000 LB RIP RAP (RR7)

Area 7, Delivered in Semi Truck 500 TN

2008 400 LB RIP RAP (RR5)

Area 1, Delivered in Semi-Truck 50 TN

2009 400 LB RIP RAP (RR5)

Area 2, Delivered in Semi-Truck 50 TN

2010 400 LB RIP RAP (RR5)

Area 3, Delivered in Semi-Truck 1000 TN

2011 400 LB RIP RAP (RR5)

Area 4, Delivered in Semi-Truck 1000 TN

2012 400 LB RIP RAP (RR5)

Area 5, Delivered in Semi-Truck 500 TN

2013 400 LB RIP RAP (RR5)

Area 6, Delivered in Semi-Truck 500 TN

2014 400 LB RIP RAP (RR5)

Area 7, Delivered in Semi-Truck 500 TN

2015 400 LB RIP RAP (RR5)

2016 400 LB RIP RAP (RR5)

Area 2, Delivered in Tandem-Truck 50 TN

2017 400 LB RIP RAP (RR5)

Area 3, Delivered in Tandem-Truck 50 TN

2018 400 LB RIP RAP (RR5)

Area 4, Delivered in Tandem-Truck 50 TN

2019 400 LB RIP RAP (RR5)

Area 5, Delivered in Tandem-Truck 50 TN

2020 400 LB RIP RAP (RR5)

Area 6, Delivered in Tandem-Truck 50 TN

2021 400 LB RIP RAP (RR5)

Area 7, Delivered in Tandem-Truck 50 TN

2022 150 LB RIP RAP (RR4)

Area 1, Delivered in Semi-Truck 40 TN

2023 150 LB RIP RAP (RR4)

Area 2, Delivered in Semi-Truck 40 TN

2024 150 LB RIP RAP (RR4)

Area 3, Delivered in Semi-Truck 1000 TN

2025 150 LB RIP RAP (RR4)

Area 4, Delivered in Semi-Truck 1000 TN

2026 150 LB RIP RAP (RR4)

Area 5, Delivered in Semi-Truck 500 TN

2027 150 LB RIP RAP (RR4)

Area 6, Delivered in Semi-Truck 500 TN

2028 150 LB RIP RAP (RR4)

Area 7, Delivered in Semi-Truck 500 TN

2029 150 LB RIP RAP (RR4)

Area 1, Delivered in Tandem-Truck 100 TN

2030 150 LB RIP RAP (RR4)

Area 2, Delivered in Tandem-Truck 100 TN

2031 150 LB RIP RAP (RR4)

2032 150 LB RIP RAP (RR4)

Area 4, Delivered in Tandem-Truck 1000 TN

2033 150 LB RIP RAP (RR4)

Area 5, Delivered in Tandem-Truck 500 TN

2034 150 LB RIP RAP (RR4)

Area 6, Delivered in Tandem-Truck 500 TN

2035 150 LB RIP RAP (RR4)

Area 7, Delivered in Tandem-Truck 500 TN

2036 50 LB RIP RAP (RR3)

Area 1, Delivered in Semi-Truck 50 TN

2037 50 LB RIP RAP (RR3)

Area 2, Delivered in Semi-Truck 50 TN

2038 50 LB RIP RAP (RR3)

Area 3, Delivered in Semi-Truck 50 TN

2039 50 LB RIP RAP (RR3)

Area 4, Delivered in Semi-Truck 50 TN

2040 50 LB RIP RAP (RR3)

Area 5, Delivered in Semi-Truck 50 TN

2041 50 LB RIP RAP (RR3)

Area 6, Delivered in Semi-Truck 50 TN

2042 50 LB RIP RAP (RR3)

Area 7, Delivered in Semi-Truck 50 TN

2043 50 LB RIP RAP (RR3)

Area 1, Delivered in Tandem-Truck 100 TN

2044 50 LB RIP RAP (RR3)

Area 2, Delivered in Tandem-Truck 100 TN

2045 50 LB RIP RAP (RR3)

Area 3, Delivered in Tandem-Truck 100 TN

2046 50 LB RIP RAP (RR3)

Area 4, Delivered in Tandem-Truck 100 TN

2047 50 LB RIP RAP (RR3)

2048 50 LB RIP RAP (RR3)

Area 6, Delivered in Tandem-Truck 100 TN

2049 50 LB RIP RAP (RR3)

Area 7, Delivered in Tandem-Truck 100 TN

2050 3" CLEAN CHOKE STONE (RR1)

Area 1, Delivered in Semi-Truck 100 TN

2051 3" CLEAN CHOKE STONE (RR1)

Area 2, Delivered in Semi-Truck 100 TN

2052 3" CLEAN CHOKE STONE (RR1)

Area 3, Delivered in Semi-Truck 100 TN

2053 3" CLEAN CHOKE STONE (RR1)

Area 4, Delivered in Semi-Truck 100 TN

2054 3" CLEAN CHOKE STONE (RR1)

Area 5, Delivered in Semi-Truck 100 TN

2055 3" CLEAN CHOKE STONE (RR1)

Area 6, Delivered in Semi-Truck 100 TN

2056 3" CLEAN CHOKE STONE (RR1)

Area 7, Delivered in Semi-Truck 100 TN

2057 3" CLEAN CHOKE STONE (RR1)

Area 1, Delivered in Tandem-Truck 100 TN

2058 3" CLEAN CHOKE STONE (RR1)

Area 2, Delivered in Tandem-Truck 100 TN

2059 3" CLEAN CHOKE STONE (RR1)

Area 3, Delivered in Tandem-Truck 100 TN

2060 3" CLEAN CHOKE STONE (RR1)

Area 4, Delivered in Tandem-Truck 100 TN

2061 3" CLEAN CHOKE STONE (RR1)

Area 5, Delivered in Tandem-Truck 100 TN

2062 3" CLEAN CHOKE STONE (RR1)

Area 6, Delivered in Tandem-Truck 100 TN

2063 3" CLEAN CHOKE STONE

2064 3” STONE (CA-1)

Area 1, Delivered in Semi Truck 40 TN

2065 3” STONE (CA-1)

Area 2, Delivered in Semi Truck 40 TN

2066 3” STONE (CA-1)

Area 3, Delivered in Semi Truck 40 TN

2067 3” STONE (CA-1)

Area 4, Delivered in Semi Truck 40 TN

2068 3” STONE (CA-1)

Area 5, Delivered in Semi Truck 40 TN

2069 3” STONE (CA-1)

Area 6, Delivered in Semi Truck 40 TN

2070 3” STONE (CA-1)

Area 7, Delivered in Semi Truck 40 TN

2071 3” STONE (CA-1)

Area 1, Delivered in Tandem-Truck 50 TN

2072 3” STONE (CA-1)

Area 2, Delivered in Tandem-Truck 150 TN

2073 3” STONE (CA-1)

Area 3, Delivered in Tandem-Truck 50 TN

2074 3” STONE (CA-1)

Area 4, Delivered in Tandem-Truck 50 TN

2075 3” STONE (CA-1)

Area 5, Delivered in Tandem-Truck 50 TN

2076 3” STONE (CA-1)

Area 6, Delivered in Tandem-Truck 50 TN

2077 3” STONE (CA-1)

Area 7, Delivered in Tandem-Truck 50 TN

2078 3" MINUS STONE (CA-2)

Area 1, Delivered in Semi-Truck 40 TN

2079 3" MINUS STONE (CA-2)

2080 3" MINUS STONE (CA-2)

Area 3, Delivered in Semi-Truck 40 TN

2081 3" MINUS STONE (CA-2)

Area 4, Delivered in Semi-Truck 40 TN

2082 3" MINUS STONE (CA-2)

Area 5, Delivered in Semi-Truck 40 TN

2083 3" MINUS STONE (CA-2)

Area 6, Delivered in Semi-Truck 40 TN

2084 3" MINUS STONE (CA-2)

Area 7, Delivered in Semi-Truck 40 TN

2085 3" MINUS STONE (CA-2)

Area 1, Delivered in Tandem-Truck 30 TN

2086 3" MINUS STONE (CA-2)

Area 2, Delivered in Tandem-Truck 30 TN

2087 3" MINUS STONE (CA-2)

Area 3, Delivered in Tandem-Truck 30 TN

2088 3" MINUS STONE (CA-2)

Area 4, Delivered in Tandem-Truck 30 TN

2089 3" MINUS STONE (CA-2)

Area 5, Delivered in Tandem-Truck 30 TN

2090 3" MINUS STONE (CA-2)

Area 6, Delivered in Tandem-Truck 30 TN

2091 3" MINUS STONE (CA-2)

Area 7, Delivered in Tandem-Truck 30 TN

2092 CA-10 STONE

Area 1, Delivered in Semi-Truck 20 TN

2093 CA-10 STONE

Area 2, Delivered in Semi-Truck 20 TN

2094 CA-10 STONE

Area 3, Delivered in Semi-Truck 20 TN

2095 CA-10 STONE

2096 CA-10 STONE

Area 5, Delivered in Semi-Truck 20 TN

2097 CA-10 STONE

Area 6, Delivered in Semi-Truck 20 TN

2098 CA-10 STONE

Area 7, Delivered in Semi-Truck 20 TN

2099 CA-10 STONE

Area 1, Delivered in Tandem-Truck 150 TN

2100 CA-10 STONE

Area 2, Delivered in Tandem-Truck 150 TN

2101 CA-10 STONE

Area 3, Delivered in Tandem-Truck 150 TN

2102 CA-10 STONE

Area 4, Delivered in Tandem-Truck 150 TN

2103 CA-10 STONE

Area 5, Delivered in Tandem-Truck 150 TN

2104 CA-10 STONE

Area 6, Delivered in Tandem-Truck 150 TN

2105 CA-10 STONE

Area 7, Delivered in Tandem-Truck 150 TN

2106 CA-6 STONE

Area 1, Delivered in Semi-Truck 20 TN

2107 CA-6 STONE

Area 2, Delivered in Semi-Truck 20 TN

2108 CA-6 STONE

Area 3, Delivered in Semi-Truck 20 TN

2109 CA-6 STONE

Area 4, Delivered in Semi-Truck 20 TN

2110 CA-6 STONE

Area 5, Delivered in Semi-Truck 20 TN

2111 CA-6 STONE

2112 CA-6 STONE

Area 7, Delivered in Semi-Truck 20 TN

2113 CA-6 STONE

Area 1, Delivered in Tandem-Truck 150 TN

2114 CA-6 STONE

Area 2, Delivered in Tandem-Truck 150 TN

2115 CA-6 STONE

Area 3, Delivered in Tandem-Truck 150 TN

2116 CA-6 STONE

Area 4, Delivered in Tandem-Truck 150 TN

2117 CA-6 STONE

Area 5, Delivered in Tandem-Truck 150 TN

2118 CA-6 STONE

Area 6, Delivered in Tandem-Truck 150 TN

2119 CA-6 STONE

Area 7, Delivered in Tandem-Truck 150 TN

2120 3/8 INCH CHIPS (CM-16)

Area 1, Delivered in Semi-Truck 20 TN

2121 3/8 INCH CHIPS (CM-16)

Area 2, Delivered in Semi-Truck 20 TN

2122 3/8 INCH CHIPS (CM-16)

Area 3, Delivered in Semi-Truck 20 TN

2123 3/8 INCH CHIPS (CM-16)

Area 4, Delivered in Semi-Truck 20 TN

2124 3/8 INCH CHIPS (CM-16)

Area 5, Delivered in Semi-Truck 20 TN

2125 3/8 INCH CHIPS (CM-16)

Area 6, Delivered in Semi-Truck 20 TN

2126 3/8 INCH CHIPS (CM-16)

Area 7, Delivered in Semi-Truck 20 TN

2127 3/8 INCH CHIPS (CM-16)

2128 3/8 INCH CHIPS (CM-16)

Area 2, Delivered in Tandem-Truck 30 TN

2129 3/8 INCH CHIPS (CM-16)

Area 3, Delivered in Tandem-Truck 30 TN

2130 3/8 INCH CHIPS (CM-16)

Area 4, Delivered in Tandem-Truck 30 TN

2131 3/8 INCH CHIPS (CM-16)

Area 5, Delivered in Tandem-Truck 30 TN

2132 3/8 INCH CHIPS (CM-16)

Area 6, Delivered in Tandem-Truck 30 TN

2133 3/8 INCH CHIPS (CM-16)

Area 7, Delivered in Tandem-Truck 30 TN

2134 BEACH SAND

Area 1, Delivered in Semi-Truck 500 TN

2135 BEACH SAND

Area 2, Delivered in Semi-Truck 500 TN

2136 BEACH SAND

Area 3, Delivered in Semi-Truck 1000 TN

2137 BEACH SAND

Area 4, Delivered in Semi-Truck 500 TN

2138 BEACH SAND

Area 5, Delivered in Semi-Truck 500 TN

2139 BEACH SAND

Area 6, Delivered in Semi-Truck 500 TN

2140 BEACH SAND

Area 7, Delivered in Semi-Truck 500 TN

2141 BEACH SAND

Area 1, Delivered in Tandem-Truck 500 TN

2142 BEACH SAND

Area 2, Delivered in Tandem-Truck 500 TN

2143 BEACH SAND

2144 BEACH SAND

Area 4, Delivered in Tandem-Truck 500 TN

2145 BEACH SAND

Area 5, Delivered in Tandem-Truck 500 TN

2146 BEACH SAND

Area 6, Delivered in Tandem-Truck 500 TN

2147 BEACH SAND

Area 7, Delivered in Tandem-Truck 500 TN

2148 CLAY

Area 1, Delivered in Semi-Truck 100 TN

2149 CLAY

Area 2, Delivered in Semi-Truck 400 TN

2150 CLAY

Area 3, Delivered in Semi-Truck 100 TN

2151 CLAY

Area 4, Delivered in Semi-Truck 100 TN

2152 CLAY

Area 5, Delivered in Semi-Truck 100 TN

2153 CLAY

Area 6, Delivered in Semi-Truck 100 TN

2154 CLAY

Area 7, Delivered in Semi-Truck 100 TN

2155 CLAY

Area 1, Delivered in Tandem-Truck 15 TN

2156 CLAY

Area 2, Delivered in Tandem-Truck 400 TN

2157 CLAY

Area 3, Delivered in Tandem-Truck 15 TN

2158 CLAY

Area 4, Delivered in Tandem-Truck 15 TN

2159 CLAY

2160 CLAY

Area 6, Delivered in Tandem-Truck 15 TN

2161 CLAY

Area 7, Delivered in Tandem-Truck 15 TN

2162 QUARRY RUN STONE

Area 1, Delivered in Semi-Truck 100 TN

2163 QUARRY RUN STONE

Area 2, Delivered in Semi-Truck 100 TN

2164 QUARRY RUN STONE

Area 3, Delivered in Semi-Truck 100 TN

2165 QUARRY RUN STONE

Area 4, Delivered in Semi-Truck 100 TN

2166 QUARRY RUN STONE

Area 5, Delivered in Semi-Truck 100 TN

2167 QUARRY RUN STONE

Area 6, Delivered in Semi-Truck 100 TN

2168 QUARRY RUN STONE

Area 7, Delivered in Semi-Truck 100 TN

2169 QUARRY RUN STONE

Area 1, Delivered in Tandem-Truck 100 TN

2170 QUARRY RUN STONE

Area 2, Delivered in Tandem-Truck 100 TN

2171 QUARRY RUN STONE

Area 3, Delivered in Tandem-Truck 100 TN

2172 QUARRY RUN STONE

Area 4, Delivered in Tandem-Truck 100 TN

2173 QUARRY RUN STONE

Area 5, Delivered in Tandem-Truck 100 TN

2174 QUARRY RUN STONE

Area 6, Delivered in Tandem-Truck 100 TN

2175 QUARRY RUN STONE

2176 TOP SOIL

Area 1, Delivered in Semi-Truck 100 TN

2177 TOP SOIL

Area 2, Delivered in Semi-Truck 100 TN

2178 TOP SOIL

Area 3, Delivered in Semi-Truck 100 TN

2179 TOP SOIL

Area 4, Delivered in Semi-Truck 100 TN

2180 TOP SOIL

Area 5, Delivered in Semi-Truck 100 TN

2181 TOP SOIL

Area 6, Delivered in Semi-Truck 100 TN

2182 TOP SOIL

Area 7, Delivered in Semi-Truck 100 TN

2183 TOP SOIL

Area 1, Delivered in Tandem-Truck 100 TN

2184 TOP SOIL

Area 2, Delivered in Tandem-Truck 100 TN

2185 TOP SOIL

Area 3, Delivered in Tandem-Truck 100 TN

2186 TOP SOIL

Area 4, Delivered in Tandem-Truck 100 TN

2187 TOP SOIL

Area 5, Delivered in Tandem-Truck 100 TN

2188 TOP SOIL

Area 6, Delivered in Tandem-Truck 100 TN

2189 TOP SOIL

TOTAL SECOND OPTION YEAR $_________________________

THIRD OPTION YEAR

3001 1000 LB RIP RAP (RR7)

Area 1, Delivered in Semi Truck 150 TN

3002 1000 LB RIP RAP (RR7)

Area 2, Delivered in Semi Truck 150 TN

3003 1000 LB RIP RAP (RR7)

Area 3, Delivered in Semi Truck 1000 TN

3004 1000 LB RIP RAP (RR7)

Area 4, Delivered in Semi Truck 1000 TN

3005 1000 LB RIP RAP (RR7)

Area 5, Delivered in Semi Truck 500 TN

3006 1000 LB RIP RAP (RR7)

Area 6, Delivered in Semi Truck 500 TN

3007 1000 LB RIP RAP (RR7)

Area 7, Delivered in Semi Truck 500 TN

3008 400 LB RIP RAP (RR5)

Area 1, Delivered in Semi-Truck 50 TN

3009 400 LB RIP RAP (RR5)

Area 2, Delivered in Semi-Truck 50 TN

3010 400 LB RIP RAP (RR5)

Area 3, Delivered in Semi-Truck 1000 TN

3011 400 LB RIP RAP (RR5)

Area 4, Delivered in Semi-Truck 1000 TN

3012 400 LB RIP RAP (RR5)

Area 5, Delivered in Semi-Truck 500 TN

3013 400 LB RIP RAP (RR5)

Area 6, Delivered in Semi-Truck 500 TN

3014 400 LB RIP RAP (RR5)

Area 7, Delivered in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.