A22W912P917T00100003.pdf
PDF 60 KB Posted
- Attached to
- WASTE WATER TREATMENT
- Solicitation number
- W912P917T0010
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_W912P9-17-T-0010_Amend_04.pdf | ||
| Sign_In_Sheet.pdf | ||
| A22_W912P9-17-T-0010_Amend_02.pdf | ||
| A22_W912P9-17-T-0010_Amend_01.pdf | ||
| A22_W912P917T0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81C8X63477170
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04 EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Feb-2017
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-17-T-0010
X 9B. DATED (SEE ITEM 11)
10-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Feb-2017
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODE CODE
EMAIL: TEL:
W912P9-17-T-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
AMENDMENT 03
The above commercial solicitation is hereby being amended to change the closing date from February 24, 2017 to March 24, 2017 at 11 am central standard time. Also the new bid schedule is being incorporated in this amendment.
BID SCHEDULE
BASE YEAR
ITEM DESCRIPTION QNTY UNIT PRICE AMOUNT
0001 Inspection, Operation and Maintenance 52 WK x _______ = ________ Of South Sandusky Wastewater
Treatment Facility
0002 Inspection, Operation and Maintenance 52 WK x _______ = ________ Of Wastewater Lift Stations
0003 Monitoring Wells Sampling and Testing 4 EA x _______ = ________
0004 Service Calls 10 HR x _______ = ________
0005 Sludge and Debris Removal 27 EA x _______ = ________
0006 Control Panel & Drywell Cleaning 4 EA x _______ = ________
0007 Jetter Services 12 HR x _______ = ________
GRAND TOTAL BASE YEAR ____________
OPTION YEAR 1
ITEM DESCRIPTION QNTY UNIT PRICE AMOUNT
1001 Inspection, Operation and Maintenance 52 WK x _______ = ________ Of South Sandusky Wastewater
Treatment Facility
1002 Inspection, Operation and Maintenance 52 WK x _______ = ________
1003 Monitoring Wells Sampling and Testing 4 EA x _______ = ________
1004 Service Calls 10 HR x _______ = ________
1005 Sludge and Debris Removal 27 EA x _______ = ________
1006 Control Panel & Drywell Cleaning 4 EA x _______ = ________
1007 Jetter Services 12 HR x _______ = ________
GRAND TOTAL OPTION YEAR 1 __________
OPTION YEAR 2
2001 Inspection, Operation and Maintenance 52 WK x _______ = ________ Of South Sandusky Wastewater
Treatment Facility
2002 Inspection, Operation and Maintenance 52 WK x _______ = ________
2003 Monitoring Wells Sampling and Testing 4 EA x _______ = ________
2004 Service Calls 10 HR x _______ = ________
2005 Sludge and Debris Removal 27 EA x _______ = ________
2006 Control Panel & Drywell Cleaning 4 EA x _______ = ________
2007 Jetter Services 12 HR x _______ = ________
GRAND TOTAL OPTION YEAR 2 ________
OPTION YEAR 3
3001 Inspection, Operation and Maintenance 52 WK x _______ = ________ Of South Sandusky Wastewater
Treatment Facility
3002 Inspection, Operation and Maintenance 52 WK x _______ = ________
3003 Monitoring Wells Sampling and Testing 4 EA x _______ = ________
3004 Service Calls 10 HR x _______ = ________
3005 Sludge and Debris Removal 27 EA x _______ = _______3
3006 Control Panel & Drywell Cleaning 4 EA x _______ = ________
3007 Jetter Services 12 HR x _______ = ________
GRAND TOTAL OPTION YEAR 3 __________
OPTION YEAR 4
4001 Inspection, Operation and Maintenance 52 WK x _______ = ________ Of South Sandusky Wastewater
Treatment Facility
4002 Inspection, Operation and Maintenance 52 WK x _______ = ________
4003 Monitoring Wells Sampling and Testing 4 EA x _______ = ________
4004 Service Calls 10 HR x _______ = ________
4005 Sludge and Debris Removal 27 EA x _______ = ________
4006 Control Panel & Drywell Cleaning 4 EA x _______ = ________
4007 Jetter Services 12 HR x _______ = ________
GRAND TOTAL OPTION YEAR 4 __________
GRAND TOTAL BASE + 4 OPTION YEARS ___________
(End of Summary of Changes)