A22-17R0018-0001.pdf

PDF 74 KB Posted

Attached to
RIVERS PROJECT OFFICE TREE PLANTING
Solicitation number
W912P9-17-R-0018
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
A22-17R0018-0001-Att1.pdf PDF
17R0018-SOL.pdf PDF
17R0018-TO.pdf PDF
17R0018-PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page Tw o.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P917R0018

X 9B. DATED (SEE ITEM 11)

13-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jul-2017

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 9.104A

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P917R0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0001

The purpose for this amendment is to attach sign in sheet and post Questions and Answers.

Questions and Answers.

Forestry IDIQ Contractor Meeting Questions 7-18-17

1. Will You Accept Subcontractors for Experience on Tree Planting? – Yes.

Subcontractors will need to be listed during solicitation.

2. Will you allow mechanical planting? Planting will be by hand and not mechanical except 15 gallon potted stock. Requests for alternative planting techniques will be made during RFPs. They will require prior approval by the COR.

3. Can the contractor bill for 5 person fire crew if we mobilize but don’t burn on the day? Yes – the mobilization fee will be covered

4. Does the mobilization for marine transport cover wages under the wage act?

Marine Wage Determination will be attached to Task Order when this effort is needed.

5. Can the contractor get paid for time of training for 130/190 and the annual 1 day refresher training? Contractor will not be reimbursed for S130/190. They will be reimbursed for the annual 1 day refresher training, up to 10 individuals.

6. What is the funding for the contract each year and is it tied to EMP funds? No good average for each year the range is $7,500 ‐ $750,000

7. Is it okay to substitute trees if there is a shortage of trees? Yes, with approval from COR. Request for substitution will be made during RFP process.

8. Do you anticipate an annual budget? Variable from year to year and what will be funded.

Reforestation maintenance should be regular every year. There will be some large tree planting projects but not guaranteed every year. Some potential boundary line maintenance.

9. Does the tree survival requirement for tree planting include flood damage? No, survival is for bud break the following spring after planting and doesn’t include impacts from flooding or storms.

10. Would the mowing be done by ATV? No, variable methods and up to contractor to propose methods. Mowing on islands on the river will most likely be by ATV but other tree plantings can be accessed with other equipment more easily. Typical tree planting spacing is 20’x20’ but can vary from8’x8’ to 30’x30’

11. Is there a requirement for piling and burning on TSI and would it require an air curtain? It is possible to burn residue but not typical for TSI. Would be an additional part of an individual project and not included in the TSI line item rate. Rare to burn on Islands with an air curtain. Most TSI slash materials will be less than 4” as >4” will be killed standing for wildlife habitat.

12. Is the 2’ wide boundary clearing of woody materials all hand work? Yes – most locations are remote and unable to be reached with equipment. Areas that are accessible to equipment will be addressed during RFP.

13. Is boundary maintenance a project every year? Will vary from year to year. Have been maintaining about 25 miles of boundary line each year but not all through contract.

W912P917R0018

14. Are each of the task orders negotiated? Bid sets the rates for each line items but a Request For Proposal will be issued for each task order where you estimate the amount of each line item to complete task and we will see if that matches with our estimate.

Sign In Sheet is attached