17R0018-TO.pdf

PDF 424 KB Posted

Attached to
RIVERS PROJECT OFFICE TREE PLANTING
Solicitation number
W912P9-17-R-0018
Issued by

About this file

SAMPLE TASK ORDER

View the file

Other files

File Type Posted
A22-17R0018-0001-Att1.pdf PDF
A22-17R0018-0001.pdf PDF
17R0018-SOL.pdf PDF
17R0018-PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Westport and Dardenne Islands Task Order XX

Location Stand # Acreage Species/Qty Planting Stock

Westport Island 1 5.5 285 Trees

3 gallon RPM

2 4.3 210 Trees 3 gallon RPM

3 2 95 Trees 3 gallon RPM

4 2.2 105 Trees 3 gallon RPM

6 11.4 550 Trees 3 gallon RPM

7 5.7 275Trees 3 gallon RPM

Dardenne Island A 6.3 295 Trees 3 gallon RPM

H 2 Crop Tree Release

I 3.7 170 Trees 3 gallon RPM

Westport Island Fall 2017: Mow all fields to be planted. Plant RPM container trees on a

30’X30’ foot staggered spacing. Evenly distribute species as much as possible. Ensure proper planting depth, do not plant below root collar. Install tree wrap during planting process.

Remove all tree containers from site.

Dardenne Island Fall 2017: Use Fecon wood shredder to clear old field sites for planting (A, H and I). Thoroughly disk sites to expose bare soil for good seed contact. Broadcast seed with

Virginia wild rye (40 lbs/acre). Ideally this should be done in early September, (See task order for seed quantity) Once seed is broadcast, harrow seed into soil to make good contact.

Plant RPM container tree stock at a staggered 30’ X 30’ spacing within prepared field. Evenly distribute species as much as possible. Ensure proper planting depth, do not plant below root collar. Install tree wrap during planting process. Install tree wrap during planting process.

Remove all tree containers from site.

Dardenne Island Field B Fall 2017: Interplant RPM container stock in centerline between existing tree rows. Space trees 30’ apart within rows.

Dardenne Island Field C 2017: Release crop trees by chainsaw thinning around each identified crop tree. Crop tree spacing should be based on 20’x20’ foot spacing. Crop trees are selected based on species preference, and on total height compared to the regeneration canopy, largest crown, straightest stem, and absence of disease or other defects. Hardmast species such as

Oak take preference over all other species. Cottonwood species are second in preference, followed by green ash and silver maple. Cut all stems that have crowns within 1 ft. of the crown of the crop tree or overtopping the crop tree. Grapevines attached to crop trees will be cut.

Maintenance Westport and Dardenne 2018: Follow‐up March/April 2018 with herbicide application around planted trees. Using a Glyphosate/Oust XP mixture. 1 ½ percent solution of

Glyphosate with ¾ oz per acre of Oust XP pre‐emergent herbicide. Apply the herbicide within a

2 foot radius around planted trees directly. Take care in avoiding chemical contact with tree stem.

Equipment Transport (Mobilization/Demobilization): Transport of Light Weight Equipment with Attachments, mowing equipment, disking/harrowing/cultipacking equipment, ATV/UTV, and seed broadcaster to planting listed in this task order will be required to perform work.

Price for mobilization and demobilization will be negotiated with contractor. Mobilization will be from the Rivers Project Office to the work site at Dardenne Island. Contractor will then calculate mobilization cost from Dardenne Island site to Wesport Island. Demobilization will be from the work site at Westport Island back to the Rivers Project Office. Rivers Project Office address is 301 Riverlands Way, West Alton, MO 63386.

Marine Transport:

Marine Transport will be needed to transport large mechanical equipment to islands listed in task order. Westport Island , river mile 256 and Dardenne Island, river mile 228.

Price for mobilization and demobilization will be negotiated with contractor. Daily rate will reflect line item unit price, reflecting contract option year.

JON DOE

Contractor

Perform:

10/15/XX

AMO

UNT:

0.00 thru :

11/15

/XX

PROJ

ECT:

EMP EMP

LOCATION:

FULL TASK ORDER

QUANTITITES AND

PRICES

Site:

Dardenne

Island

Site:

Westport

Island

ITEM

NUMBE

R

SUPPLIES /

SERVICES

TOT

AL

QUA

NT

UN

ITS

UNI

T

PRI

CE

TOTA

L

AMO

UNT

QUAN

TITY

JOB

TO

TA

L

QUAN

TITY

JOB

TO

TA

L

Furnish Virginia Wild Rye

472 LB 0.00 472 0.00 0.00

Disking/Cultipacki ng/Harrowing

24 AC 0.00 24 0.00 0.00

Broadcast Seeding/Fertilizing

12 AC 0.00 12 0.00 0.00

0106 Mowing 26 AC 0.00 0.00 26 0.00

0095 Wood Shredding 40 HR 0.00 40 0.00

Furnish Container Pecan

562 EA 0.00 172 0.00 390 0.00

Furnish Container Swamp White Oak

184 EA 0.00 54 0.00 130 0.00

Furnish Container Pin Oak

377 EA 0.00 115 0.00 262 0.00

Furnish Container Bur Oak

184 EA 0.00 54 0.00 130 0.00

Furnish Container Persimmon

184 EA 0.00 54 0.00 130 0.00

Furnish Container Overcup Oak

377 EA 0.00 115 0.00 262 0.00

Furnish/Install Tree Wrap

1,868 EA 0.00 564 0.00 1,304 0.00

Plant Material Laborer with Tools

309 HR 0.00 94 0.00 215 0.00

ForestryLaborer with Tools

10 HR 0.00 10 0.00 0.00

0097 Jon Boat 10 DA 0.00 5 0.00 5 0.00

Furnish Systemic Selective Herbicide Mixture

10 GL 0.00 5 0.00 5 0.00

Direct Herbicide Spraying

20 HR 0.00 10 0.00 10 0.00

Furnish Non-Ionic Surfactant

2 GL 0.00 1 0.00 1 0.00

Multi-Purpose Light Weight Equipment with Attachments

40 HR 0.00 40 0.00 0 0.00

Mobilization and Demobilization of Multi-Purpose Light Weight Equipment with Attachments

TB

D

Equipment Mobilization and Demobilization

Marine Transport

II

4 DA 0.00 2 0.00 2 0.00

Mobilization and Demobilization of Marine Transport

II

TO

TA

L

Funding Available

Difference

File details come from the government source that posted it. Updated .