W912P9-17-R-0010 Amendment 0001 is hereby posted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P9-17-R-0010-0002.pdf | ||
| Attachment_8_MATOC_Specs.pdf | ||
| Question_and_Answers_20_-_29.pdf | ||
| Stone_Sources_St._Louis_District.pdf | ||
| Question_and_Answers_1_through_19.pdf | ||
| Attachment_6_IDIQ_Unit_Prices.pdf | ||
| Attachment_6_IDIQ_Unit_Prices.xlsx | XLSX spreadsheet | |
| Question_and_Answers_1_through_19.pdf | ||
| Pre-Proposal_Conference_Attendance_Sheet.pdf | ||
| Attachmen_8_MATOC_Typical_Sections.pdf | ||
| Pre-Proposal_Conference.pdf | ||
| Attachment_6_IDIQ_Unit_Prices.xlsx | XLSX spreadsheet | |
| W912P9-17-R-0010.pdf | ||
| Attachment_1_Past_Performance_References.docx | DOCX document | |
| W912P9-17-R-0010_Attachments.pdf | ||
| Attachment_7_Seed_Task_Orders_1_-4_Pricing_and_TEP_Spreadsheet.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add MATOC typical sections to attachment 8, update proposal submission address, deleted "all" from from paragraph 4 Past Peformance within Proposal Submission, clarified definition of recent, add bid schedule notes in attachment 6, and change fair opportunity verbiage. All changes are highlighted in blue.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-17-R-0010
X 9B. DATED (SEE ITEM 11)
28-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2017
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 9.104A
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P9-17-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS
The following have been modified:
EVALUATION FACTORS
PROPOSAL SUBMISSION
1. GENERAL INSTRUCTIONS
a. General
i. The US Army Corps of Engineers St. Louis Contracting Office is the point of contact for this acquisition.
ii. Address any questions or concerns to both of the individuals identified below.
iii. Formal communications, such as request for clarifications, questions, and/or written information concerning this solicitation should be submitted via email.
vi. Written questions will be answered in writing and provided to all offerors via FedBizOpps. Solicitation changes will be made via amendment. Due to the time required to research a question and provide and answer, questions received less than ten calendar days prior to the due date of offers specified in this solicitation may not be answered.
vii. Formal communication should be submitted in the following format:’
Reference: Section____. Page____. Paragraph____.
Question:____________.
b. Submittals
i. The offeror’s proposal shall be submitted on a Compact Disk to the following address:
Attn: Mr. Scott Amos and Ms. Patricia Voss 1222 Spruce Street 9th Floor, Room 104A St. Louis, MO 63103
ii. Accompanying digital copies emailed to Mr. Scott Amos, scott.b.amos@usace.army.mil and Ms. Patricia Voss, patricia.b.voss@usace.army.mil The RFP shall provide the receipt date for proposal submittal. Files shall not contain classified data. The use of hyperlinks and imbedded documents in proposals is prohibited.
Proposals shall be submitted electronically on 8 ½ x 11, margins 1”, gutter 0”, header/footer 0.5” (from edge), double-sided, Arial or Times New Roman, 12 font. Font size maybe adjusted for charts, graphs, or titles. 11 x 17 folded pages are acceptable for tables/graphic representations; an 11 x 17 pages is considered one page.
By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation.
The offeror’s proposal shall consist of one (1) volume:
Volume I – Section 1 Business Proposal
Volume I – Section 2 Technical (Three Separate Factors included) Technical 1: Items of Work Technical 2: Detailed Work Schedule (Two Subfactors) Technical 3: Organizational Chart
Volume I – Section 3 Past Performance Volume I –Price
Price 1: IDIQ Rates Price 2: Seed Task Order Rates
The following volumes of material shall be submitted:
Volume Title Maximum Pages Volume I
Section 1 – Business Proposal
N/A
Section 2 – Technical Proposal
12*
Section 3 – Past Performance
Section 4 – Cost/Price N/A
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
* Pages furnished for organizational purposes only, such as Table of Contents or divider tabs, are not included in the page limitation.
c. File Packaging All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version
6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs. Zip disks are not permitted. Files shall be in read-only format, using PDF files. All price breakdown information to aide in the price evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting .exe files are not acceptable.
Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked.
2. VOLUME I, SECTION 1 – BUSINESS PROPOSAL
Offerors are required to comply with the following format and content requirements for Volume 1 of their business proposal.
a. Solicitation/Contract Form. Offerors shall complete the SF Form 1442, blocks 14, 15, 17, 18, 20a, 20b, and
20c. Block 14 should include the CAGE code. Signature by the offeror on the SF 1442 constitutes an offer, which Government may accept, and acknowledgment by the offeror that they accede to the contract terms and conditions and the specifications.
b. Block 16. Check this block if your remittance address is different, identify the remittance address in your proposal, and ensure this address is in the System for Award Management (SAM) database.
c. Acknowledge of Solicitation Amendments (if any): Page 2 for RFP block 19.
d. Letter. Signed identifying individuals who are authorized to negotiate and sign documents on the behalf of the contractor.
3. VOLUME I, SECTION 2 – TECHNICAL PROPOSAL
(THREE Factors) This volume shall not exceed 12 pages.
a. Section 2, Tab 1 – Factor 1, Items of Work
The proposal shall address the manner in which the unit priced items of work in the IDIQ UNIT PRICE will be accomplished. Provide a narrative description describing the typical equipment, materials, personnel, testing, and the process used to accomplish each unit priced item of work in the IDIQ UNIT PRICE as specified and shown on the MATOC plans and specifications.
Technical Factor 1 shall be no more than five (5) pages in length.
b. Section 2, Tab 2 – Factor 2, Detailed work schedule (Two Subfactors).
- Subfactor 2(a), Factor 2, Detailed work schedule SEED TASK ORDER #1 and SEED TASK
ORDER #2.
The offeror shall submit a detailed work schedule for providing in a timely manner, appropriate resources (labor, equipment, and materials) in order to perform the work required in the SEED TASK ORDER #1 and SEED TASK ORDER #2 (Attachments 2 and 3) in an expeditious, quality, compliant, and safe manner. The detailed work schedule shall include durations for all major phases of construction and items of work as per the plans and specifications. The offeror shall demonstrate in their schedule how they will complete work concurrently in the multiple geographic locations of SEED TASK ORDER #1 and SEED TASK ORDER #2 (Attachments 2 and 3).
The detailed work schedule of technical subfactor 2(a) shall be no more than five (5) pages.
- Subfactor 2(b): Detailed work schedule SEED TASK ORDER #3, Levee Closure Under Emergency Flood Conditions.
Using SEED TASK ORDER #3, PRARIE DU ROCHER LEVEE DISTRICT seed order #3 schedule items (Attachment 4), the offeror shall demonstrate the contractor’s ability to perform an emergency levee closure within three (3) days, realizing the requirements of Specification Section 21 22 24.99 15, especially paragraph LEVEE CLOSURE UNDER EMERGENCY FLOOD CONDITIONS. Provide a narrative description describing the maximum quantity of levee material which would be degraded at any given time, the onsite equipment which would be utilized to complete the emergency levee closure, personnel which would be used to accomplish the emergency levee closure, and the process used to accomplish the emergency levee closure. Assume work is currently being accomplish and an emergency levee closure is needed. Contractors shall only utilize onsite equipment used to execute the items of work in seed task order #3.
The emergency levee closure narrative of technical subfactor 2(b) shall be no more than 1 page in length.
c. Section 2, Tab 3 – Factor 3, Organization Chart
The offeror shall submit an organization chart identifying key positions for executing all the items of work in the IDIQ UNIT PRICE. The organization chart shall identify all key positions required to execute the items of work in a quality, compliant, and safe manner. The organization chart shall clearly identify lines of authority and be in compliance with the specifications; realizing Specification Section 01 14 40 which requires the Contractor Quality Control (CQC) Manager to be independent of the Site Superintendent.
Technical Factor 3 shall be no more than one (1) page in length.
4. VOLUME I, SECTION 3 – PAST PERFORMANCE
This volume shall contain a list of a minimum of three (3) references; however, no more than five (5) references for past performance information by submitting the information on the past performance reference sheet (Attachment 1) regarding similar contracts. Offerors shall submit Government and/or commercial contracts in performance or awarded within the past three (3) years, from the close date of this RFP, which are relevant to the efforts required by this solicitation. Relevant efforts are defined as efforts that are the same as or similar to the effort (as compared to NAICS code 237990) required by the RFP.
5. VOLUME I – PRICE
This volume shall consist of all information, required to support proposed prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. The information submitted in this volume shall comply with FAR 15.408, Table 15-2, and the requirements set forth below.
The offeror shall submit unit prices for the IDIQ schedule on the IDIQ Unit Prices spreadsheet (Attachment 6).
Offerors shall not provide pricing for CLIN 0001 Mobilization and Demobilization, 0002 Hauling, 0003 Care of Water, 0015 Miscellaneous, or 0016 Bonds; these will be negotiated during Request for Task Order Proposal (RFTP). From the specifications for a seed task orders 1 through 4 (Attachments 2, 3, 4, and 5), the contractor shall enter the unit price from the IDIQ Unit Prices spreadsheet on the seed task order 1-4 pricing and Total Evaluation Price (TEP) spreadsheet (Attachment 7). Offerors shall not provide unit prices that are lower, or higher, on the seed task orders compared to their IDIQ rates. If an offeror lowers a rate on their seed task order compared to their IDIQ rates, the offeror will no longer be considered for an award. Offerors shall note that each seed task order has a designated tab to fill in the unit price within Attachment 7. The totals of the seed projects automatically are totaled on the Total Evaluated Price tab. These tabs should not be altered; any alteration of these spreadsheets by the offerors will no longer be considered for an award.
The seed task orders are based upon requirements that represents the type of work contemplated for the MATOC. Offers will be compared to the Independent Government Estimate (IGE) and evaluated by a pricing team to determine whether prices are fair and reasonable in accordance with FAR 15.404-1(b).
EVALUATION FACTORS AND SUBFACTORS
Awards will be made to approximately three (3) offerors based on Best Value, using the LPTA process for proposals in accordance with FAR Part 15.101-2, FAR Part 15.3, and DoD DFARS Source Selection Procedures.
1. The offerors will first be listed by Total Evaluated Price (TEP) from attachment 7 tab “Total Evaluated Price”.
2. Technical factors 1, 2, and 3, to include subfactors 2(a) and 2(b) will be evaluated.
3. Past performance will be evaluated.
If the lowest priced offeror is rated acceptable for all technical factors and past performance, the Government will award one (1) of the approximately three (3) contracts and continue to the second lowest price based on the Seed Task Order 1-4 Pricing and TEP Spreadsheet (Attachment 7) tab “Total Evaluated Price”. If an offeror is rated unacceptable for any technical part, to include any technical subfactors, and/or past performance, the offeror will not be considered for award and the Government will continue to the next lowest price based on the Seed Task Order 1- 4 Pricing and TEP Spreadsheet (Attachment 7) tab “Total Evaluated Price”. The Government will continue until it has determined that approximately three (3) offerors have acceptable technical ratings (to include all technical subfactors) and past performance is determined acceptable or all proposals are evaluated. The Government will not evaluate any offerors after the Government has determined it has approximately three (3) responsible contractors with acceptable technical proposals, to include all technical factors, subfactors, and past performance. Once the Government obtains approximately three (3) contracts, the Government will cease evaluations.
Offerors are informed that the Government does not intend to conduct discussions as a part of the evaluation and selection process. However, the Government reserves the right to conduct discussions if it is determined by the Government’s Source Selection Authority to be in the best interests of the Government to do so. Therefore, offerors are cautioned to provide all the information required and requested by the solicitation at the time of its initial proposal submission.
1. TECHNICAL EVALUATION FACTORS
The Government technical evaluation team shall evaluate the technical proposals at the subfactor level on an acceptable/unacceptable basis, assigning ratings of Acceptable or Unacceptable as defined below. An overall factor level rating will not be assigned. Proposals with “Unacceptable” technical rating(s) at the subfactor level will not be considered for award.
Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
a. Factor 1: Items of work.
The measure of merit for this subfactor is met when the offeror’s proposed narrative adheres to the requirements of specifications describing the typical equipment, materials, personnel, testing, and the process used to accomplish each unit priced item of work in the IDIQ UNIT PRICES.
b. Factor 2: Detailed Work Schedule.
- Subfactor 2(a); Detailed work schedule SEED TASK ORDER #1 and SEED TASK ORDER #2: The measure of merit for this subfactor is met when the offeror proposes a detailed work schedule providing in a timely manner, appropriate resources (labor, equipment, and materials) in order to perform the work required in the SEED TASK ORDER #1 and SEED TASK ORDER #2 (Attachments 2 and 3) in an expeditious, quality, compliant, and safe manner. The detailed work schedule shall include durations for all major phases of construction and items of work as per the plans and specifications. The offeror shall demonstrate in their schedule how they will complete work concurrently in the multiple geographic locations of SEED TASK ORDER #1 and SEED TASK ORDER #2 (Attachments 2 and 3).
- Subfactor 2(b): Detailed work schedule SEED TASK ORDER #3, Levee Closure Under Emergency Flood
Conditions: The measure of merit for this subfactor is met when the offeror proposed narrative describes a detailed work schedule describing the maximum quantity of levee material which would be degraded at any given time, the onsite equipment which would be utilized to complete the emergency levee closure, personnel which would be used to accomplish the emergency levee closure, and the process used to accomplish the emergency levee closure.
Assume work is currently being accomplish and an emergency levee closure is needed. Contractors shall only utilize onsite equipment used to execute the items of work in seed task order #3.
c. Factor 3: Organizational Chart.
The measure of merit for this subfactor is met when the offeror proposes an organizational chart that identifies all key positions required to execute the items of work in a quality, compliant, and safe manner. The organization chart shall clearly identify lines of authority and be in compliance with the specifications; realizing Specification Section 01 14 40 which requires the Contractor Quality Control (CQC) Manager to be independent of the Site Superintendent.
2. PAST PERFORMANCE
Using past performance references sheets (Attachment 1) and other information independently obtained from
Government or commercial sources, the Government will perform an evaluation of the offerors past performance in order of lowest price listed offeror. The purpose of the past performance evaluation is to allow the Government to assess the offeror’s probability of meeting the minimum past performance solicitation requirement. Past performance will be evaluated on the basis of recency, relevancy, and the quality of performance. The Government will first evaluate the recency (current within the last three years) and then relevancy. Past performance submitted which exceeds the three (3) year limitation will not be considered.
a. Recency
The first aspect of past performance is recency. The government will first evaluate the recency (completed, or ongoing, within three (3) years prior to the solicitation closing date) and then the relevancy. Past performance information submitted which exceeds the three (3) year limitation will not be considered.
b. Relevancy
The second aspect of the past performance evaluation is relevancy. The government will assess the offeror’s past performance to determine whether a contractor’s recently accomplished efforts are relevant to the effort to be acquired through this source selection. Relevancy is not separately rated; however, the following criteria will be used to establish what is relevant, which shall include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming.
Past Performance Relevancy Ratings
Rating Definition
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
c. Quality Assessment
The third aspect of past performance is quality assessment. The Government will assess the quality of the offeror’s past performance on those recent efforts that were determined relevant by determining how well the contractor performed on the contracts. Documented results from past performance reference sheet (Attachment 1), interviews, CPARS, and other sources. Quality assessments of past performance shall be at rated at a minimum of satisfactory to receive an acceptable rating.
d. Performance Confidence Assessment
The final step is for the team to arrive at a single consensus performance confidence assessment for the offeror, selecting the most appropriate rating from the chart below. This rating considers the assessed quality of the relevant/recent efforts gathered. Ensure the rationale for the conclusions reached are included.
Adjectival Rating Definition
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below)
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
3. PRICE
IDIQ Contract Prices: The Government will review the rates proposed for fairness and reasonableness utilizing some, or all, or the price analysis techniques identified in FAR 15.404-1(b).
Note 1: All questions for pre-proposal site visit must received before 2:00 Central Time 6 July 2017.
Note 2: All RFP questions must be received before 2:00 Central Time 19 July 2017.
All question shall be submitted to Mr. Scott Amos via email scott.b.amos@USACE.army.mil
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
FAIR OPPORTUNITY
Ordering Procedures Contractor Selection
“Fair Opportunity Process”
1. Fair Opportunity to Compete:
Fair Opportunity to Compete for Request for Task Order Awards. Under the PL 84-99 multiple award process and in accordance with FAR 16.505, all multiple award contractors shall be provided the fair opportunity to be considered for each order in excess of $2,000 pursuant to procedures established in this section.
1.1. Only the CEMVS-CT Contracting Officer is authorized to order under this contract. For the purposes of this contract, CEMVS-CT will email a cover sheet, specifications, and Task Order Pricing Spreadsheet to all contractors holding a PL 84-99 MATOC. The cover sheet will state the evaluation criteria (i.e. trade off or Lowest Price Technically Acceptable). Utilizing the unit prices agreed upon on the MATOC, contractors are to place unit prices for all request Contract Line Items (CLINs). The Government seeks discounted prices from the MATOC unit prices. The quantities, multiplied by unit price, will equal the extended amount for each CLIN. The sum of the CLINs will equal the offerors total evaluated price for the task order.
1.2. 84-99 MATOC contract holders will have approximately 14 calendar days to respond to the Government’s Request for Task Order Proposal (RFTOP). However, the Government reserves the right to request responses less than 14 calendar days.
1.3. 84-99 MATOC are highly encourage to accomplish a site visit before proposing. Site visits will may or may not be accompanies by Government personnel.
LIST OF ATTACHMENTS
Attachments: Name Date Attachment 1 Past Performance Reference Sheet 26 June 2017
Attachment 2 Seed 1 (Hartwell, Swan 26 June 2017 Hillview & McGee Creek)
Attachment 3 Seed 2 (Elm Point & Wood River) 26 June 2017
Attachment 4 Seed 3 (Prairie Du Rocher 26 June 2017 & Kaskaskia Island)
Attachment 5 Seed 4 (Carlyle Lake) 26 June 2017
Attachment 6 IDIQ Prices 19 July 2017
Attachment 7 Seed Task Order 1-4 Pricing 26 June 2017 and TEP Spreadsheet
Attachment 8 MATOC Specifications 19 July 2017
Attachment 9 USACE St. Louis District Reservoirs 26 June 2017
Attachment 10 St. Louis District Missouri Levee Map 26 June 2017
Attachment 11 St. Louis District Illinois Levee Map 26 June 2017
Attachment 12 Missouri Wage Determination 26 June 2017
Attachment 13 Illinois Wage Determination 26 June 2017
(End of Summary of Changes)
File details come from the government source that posted it. Updated .