W912P9-16-B-0013.pdf

PDF 307 KB Posted

Attached to
Clarence Cannon Wildlife Refuge
Solicitation number
W912P9-16-B-0013
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Clarence_cannon_addtional_questions.docx DOCX document
Clarence_cannon_addtional_questions.docx DOCX document
2amnarr.pdf PDF
2amplans.pdf PDF
W912P9-16-B-0013_AMEND_02.pdf PDF
2amspecs.pdf PDF
site_visit_sign_in_sheet.pdf PDF
links_to_clarence_cannon.docx DOCX document
W912p9-16-b-0013-01.pdf PDF
GDrain_AccessRd_AsAdv_Plans.pdf PDF
A02_South_Unit_WC_Structure_and_Berm_Degrades_Plans.pdf PDF
A02_CCNWR_South_unit__Access_Rd_Adv_specs.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. Project Title: Clarence Cannon National Wildlife Refuge South Unit Water Control Structures and Berm Degrades & Gravity Drain Structure and Pump Station Access Road B. Location: Upper Mississippi River, Pike County C. The Period of Performance: Three Years after issue of Mobilization NTP.

D. The deadline for questions to be received is: 5 Aug 2016 E. POC: Cassandra Range @ 314-331-8528 or cassandra.a.range@usace.army.mil F. Bid opening: 22 Aug 2016 @ 1000 G. A site visit w ill be held 0900, 27 July at the Cannon Nat'l Wildlife Off ice, Annada, MO. prior to the proposal due date. See 52.236-27 Alt I in section 00100 for details.

THERE IS A GUARANTEED MINIMUM OF $500,000.

*This solicitation is 8(a)set aside.

X

CASSANDRA A RANGE 314 331-8528

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

21-Jul-2016

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

314 331-8746FAX:TEL: TEL: FAX:

W912P9-16-B-0013 58

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

BIDDING SCHEDULE

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount _

00010-3

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base Year- Clarence Cannon Wildlife

FFP

FOB: Destination

NET AMT

BID NOTES

BID NOTES

The contractor shall provide firm fixed prices for all 48 line items. The IDIQ award shall be determined by the lowest, fair and reasonable total price.

Sequence of events:

1. The three year, IDIQ will be awarded with the appropriate capacity and the $500,000 guaranteed minimum.

2. Task order 0001 will award the external water control structure as follows:

a. Long lead items and other material will be identified and awarded with a limited NTP. These items cannot be delivered to the construction site due to duck hunting from 01October thru 31 December 2016.

b. The remaining line items will be awarded and obligated, but NTP for construction mobilization will not be issued unti1 2 Jan 2017. Bonds will not be required for task order 0001 until construction mobilization.

All submittals should be provided immediately after award.

3. Task order 0002 will be firm fixed priced and recorded as option items, unless long lead items and other materials are awarded and obligated by a limited NTP. Mobilization will not take place until 02 January 2017, and Bonds are not required until then.

00010-4

All questions concerning this sequence to assure a complete understanding for bidding impact should be directed to Archie C Ringgenberg, Contracting Officer, 314-331-8505.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 23-SEP-2016 TO

22-SEP-2019

N/A CONSTRUCTION BRANCH

JAY FOWLER

1222 SPRUCE STREET

ST. LOUIS MO 63103-2833

314-331-8130 FOB: Destination

966402

00010-5

Section 00100 - Bidding Schedule/Instructions to Bidders

BID SCHEDULE

Gravity Drain Structure and Pump Station Access Road

6001. Mobilization and Demobilization 1 JA $____

6002. Gravity Drain Structure 1 JA $____

6003. PZ40 Sheet Piling - Furnish 1 JA $____

6004. PZ40 Sheet Piling - Install 1 JA $____

6005. Overshot Gate and Hoist 1 JA $____

6006. Crushed Stone Base 8400 TN $ $____

6007. Crushed Stone Surfacing 3350 TN $ $____

6008. 400 lb. Riprap 4700 TN $ $____

6009. 1000 lb. Riprap 1800 TN $ $____

6010. Riprap Bedding Material 1900 TN $ $____

6011. Pump Station Access Road and Channel Realignment 1 JA $____

TOTAL $_______

OPTIONAL ITEMS

South Unit Water Control Structures

0001. Mobilization and Demobilization 1 JA $____

0002. Access Road 1 JA $____

0003. Southwest Subunit Degrade 1 JA $____

0004. Central Subunit Degrade 1 JA $____

0005. Eastern/Big Pond Subunit Degrade 1 JA $____

0006. Portable Electric Operator, 1 JA $____ Stand, and Generator

PS1 Structure

1001. PS1 Structure 1 JA $____

1002. Crushed Stone Base 212 TN $ $____

00010-6

1003. Crushed Stone Surfacing 110 TN $ $____

1004. 140 lb. Riprap 265 TN $ $____

1005. Riprap Bedding Material 90 TN $ $____

1006. Gates and Appurtenances 1 JA $

PS3 Structure

2001. PS3 Structure 1 JA $____

2002. Crushed Stone Base 198 TN $ $____

2003. Crushed Stone Surfacing 102 TN $ $____

2004. 140 lb. Riprap 205 TN $ $____

2005. Riprap Bedding Material 70 TN $ $____

2006. Gates and Appurtenances 1 JA $

PS4 and BP2 Structures

3001. PS4 and BP2 Structures 1 JA $____

3002. Crushed Stone Base 305 TN $ $____

3003. Crushed Stone Surfacing 160 TN $ $____

3004. 140 lb. Riprap 120 TN $ $____

3005. 400 lb. Riprap 212 TN $ $____

3006. Riprap Bedding Material 110 TN $ $____

3007. Gates and Appurtenances 1 JA $

SW2 Structure

4001. SW2 Structure 1 JA $____

4002. Crushed Stone Base 164 TN $ $____

4003. Crushed Stone Surfacing 85 TN $ $____

4004. 140 lb. Riprap 115 TN $ $____

4005. Riprap Bedding Material 38 TN $ $____

4006. Gates and Appurtenances 1 JA $

00010-7

C2 Structure

5001. C2 Structure 1 JA $____

5002. Crushed Stone Base 156 TN $ $____

5003. Crushed Stone Surfacing 80 TN $ $____

5004. 140 lb. Riprap 115 TN $ $____

5005. Riprap Bedding Material 39 TN $ $____

5006. Gates and Appurtenances 1 JA $

ABBREVIATIONS

JA Job TN Ton

W912P9-16-B-0013

BIDDING SCHEDULE NOTES

1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JA".

2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.

4. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.

6. Bidders are encouraged to pay particular attention to the requirements on lab “validation” in Section 01 14 40 of the contract specifications.

7. OPTIONAL BID ITEMS.

Bid Item Nos. 0001-0006, 1001-1006, 2001-2006, 3001-3007, 4001-4006 and 5001-5006 are OPTIONAL ITEMS. Upon the review of inspection at the site, the Contracting Officer, in accordance with the specifications and drawings, will direct the optional bid item work as needed. The Contractor shall perform the appropriate work ONLY when directed by the Contracting Officer. The Government is not obligated to request any work under any optional item(s).

The bid prices for each optional item shall represent your firm price to perform that service. Payment will be made ONLY for work actually requested and performed to the Government’s satisfaction.

xxx

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.236-28 Preparation of Proposals--Construction OCT 1997 52.252-5 Authorized Deviations In Provisions APR 1984 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015

CLAUSES INCORPORATED BY FULL TEXT

REQUIRED INSURANCE

(a) As required by the Contract Clause entitled "Insurance—Work on a Government Installation", the Contractor shall furnish to the Contracting Officer, prior to the commencement of work, a certificate or written statement as evidence of the minimum insurance listed below. The Contractor shall procure and maintain such types and amounts of insurance during the entire period of his performance under this contract. The Contractor shall assure that the certificate or written statement is in accordance with required wording indicated in paragraph b of the aforementioned Contract Clause.

(1) Workmen's Compensation – Amounts required by applicable jurisdictional statutes.

(2) Employer's Liability Insurance – $100,000.00

(3) Comprehensive General Liability Insurance – (No property damage liability insurance is required.)

Bodily Injury — $500,000 per occurrence

(4) Comprehensive Automobile Insurance –

Bodily Injury — $200,000 each person $500,000 each accident Property Damage — $ 20,000 each accident

(b) Certificates of insurance should be submitted to the following address:

Department of the Army St. Louis District, Corps of Engineers 1222 Spruce St St. Louis MO. 63103

(End of clause)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price (FFP), Indefinite Delivery, Indefinite Quantity contract resulting from this solicitation.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 27 July 2016 @ 9:00 am centeral time

(c) Participants will meet at--

Clarence Cannon NWR Visitor Center 37599 County Road 206 Annada, MO 63330

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

WAGE DETERMINATION

General Decision Number: MO160001 07/01/2016 MO1 Superseded General Decision Number:

MO20150001 State: Missouri Construction Types: Heavy and Highway Counties: Missouri Statewide. HEAVY AND HIGHWAY CONSTRUCTION PROJECTS Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/08/2016 1 02/26/2016 2 03/04/2016 3 03/11/2016 4 04/01/2016 5 04/15/2016 6 05/20/2016 7 06/17/2016 8 06/24/2016 9 07/01/2016 CARP0002-002 05/03/2015 ST. LOUIS COUNTY AND CITY Rates Fringes Carpenters.......................$ 36.34 15.55 ------------------------------------------------------------ ---- CARP0005-006 05/03/2015 CASS (Richards-Gebauer AFB ONLY), CLAY, JACKSON, PLATTE AND RAY COUNTIES Rates Fringes Carpenters: CARPENTERS & LATHERS........$ 36.34 15.55 MILLWRIGHTS & PILEDRIVERS...$ 36.34 15.55 ----------------- ----------------------------------------------- CARP0011-001 05/01/2015 Rates Fringes Carpenter and Piledriver ADAIR, AUDRAIN (West of Hwy 19), BOONE, CALLAWAY, CHARITON, COLE, COOPER, HOWARD, KNOX,LINN, MACON, MILLER, MONITEAU,MONROE, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SHELBY AND SULLIVAN COUNTIES...........$ 30.41

15.55 ATCHISON, ANDREW, BATES, CALDWELL, CARROLL,DAVIESS,

DEKALB,GENTRY, GRUNDY, HARRISON, HENRY, HOLT, LIVINGSTON, MERCER,

NODAWAY,ST. CLAIR, SALINE AND WORTH COUNTIES..........$ 29.01 15.55 AUDRAIN

(East of Hwy.19), RALLS, MARION, LEWIS, CLARK AND SCOTLAND COUNTIES.$ 30.42

15.55 BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS,

GREENE, HICKORY,JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON,

OZARK, POLK, STONE, TANEY, VERNON, WEBSTER AND WRIGHT COUNTIES.$

28.64 15.55 BENTON, MORGAN AND PETTIS...$ 29.06 15.55 BOLLINGER, BUTLER,

CAPE GIRARDEAU, DUNKLIN, MISSISSIPPI, NEW MADRID, PEMISCOT, PERRY, STE.

GENEVIEVE, SCOTT, STODDARD AND WAYNE COUNTIES..........$ 30.27 15.55

BUCHANAN, CLINTON, JOHNSON AND LAFAYETTE COUNTIES......$ 29.68 15.55

CARTER, HOWELL, OREGON AND RIPLEY COUNTIES.............$ 29.31 15.55

CRAWFORD, DENT, GASCONADE, IRON, MADISON, MARIES, MONTGOMERY,

PHELPS, PULASKI, REYNOLDS, SHANNON AND TEXAS COUNTIES..........$ 30.26 15.55

FRANKLIN COUNTY.............$ 33.43 15.55 JEFFERSON AND ST. CHARLES

COUNTIES....................$ 35.68 15.55 LINCOLN COUNTY..............$ 31.99 15.55 PIKE, ST.

FRANCOIS AND WASHINGTON COUNTIES.........$ 31.00 15.55 WARREN

COUNTY...............$ 32.39 15.55 ----------------------------------------------------------------

ELEC0001-002 05/31/2015 BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER,

DUNKLIN, FRANKLIN, IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW

MADRID, PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS, ST.

LOUIS (City and County), STE. GENEVIEVE, SCOTT, STODDARD, WARREN, WASHINGTON AND WAYNE COUNTIES Rates Fringes Electricians.....................$ 34.20

17.44 ---------------------------------------------------------------- ELEC0002-001 01/01/2016 ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE, HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCON, LINN, MACON, MARIES, MARION, MILLER, MONITEAU, MONROE, MONTGOMERY, MORGAN, OREGON, OSAGE, PERRY, PHELPS, PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST.

CHARLES, ST. FRANCOIS, ST. LOUIS (City and County), STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHANNON, SHELBY, SULLIVAN, TEXAS, WARREN AND WASHINGTON

COUNTIES Rates Fringes Line Construction: Equipment Operator..........$ 36.45 36%+5.25 Groundman & Truck Driver....$ 28.13 36%+5.25 Lineman & Cable Splicer.....$ 42.27 36%+5.25 ---------------------------------------------------------------- ELEC0053-004 08/30/2015 Rates Fringes Line Construction: (ANDREW, ATCHINSON, BARRY, BARTON, BUCHANAN, CALDWELL, CEDAR, CHRISTIAN, CLINTON, DADE, DALLAS, DAVIES,, DEKALB, DOUGLAS, GENTRY, GREENE, GRUNDY, HARRISON, HICKORY, HOLT, JASPER, LACLEDE, LAWRENCE, LIVINGSTON, MCDONALD, MERCER, NEWTON, NODAWAY, OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER, WORTH AND

WRIGHT COUNTIES) Groundman Powderman.........$ 27.84 33%+5.00 Groundman...................$ 26.67 29.5%+5.00 Lineman Operator............$ 38.37 29.5%+5.00 Lineman.....................$ 41.52 29.5%+5.00 Line Construction; (BATES, BENTON, CARROLL, CASS, CLAY, HENRY, JACKSON, JOHNSON, LAFAYETTE, PETTIS, PLATTE, RAY AND

SALINE COUNTIES) Groundman Powderman.........$ 27.84 33%+5.00 Groundman...................$

26.76 29.5%+5.00 Lineman Operator............$ 38.37 29.5%+5.00 Lineman.....................$ 41.52 29.5%+5.00 ---------------------------------------------------------------- ELEC0095-001 06/01/2015

BARRY, BARTON, CEDAR, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON, ST

CLAIR, AND VERNON COUNTIES Rates Fringes Electricians: Cable Splicers..............$ 25.40

12.19 Electricians................$ 26.46 14.12 ----------------------------------------------------------------

ELEC0124-007 08/31/2015 BATES, BENTON, CARROLL, CASS, CLAY, COOPER,

HENRY, JACKSON, JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY AND

SALINE COUNTIES: Rates Fringes Electricians.....................$ 36.69 20.62 ------------------------- --------------------------------------- ELEC0257-003 03/01/2015 AUDRAIN (Except Cuivre Township), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND

RANDOLPH COUNTIES Rates Fringes Electricians: Cable Splicers..............$ 30.42 16.085 Electricians................$ 31.35 .94%+12.65 ---------------------------------------------------------------- ELEC0350-002 12/01/2013 ADAIR, AUDRAIN (East of Highway 19), CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES Rates Fringes Electricians.....................$ 29.41 5.67+35% ---------------------------------------------------------------- ELEC0453-001 09/01/2015 Rates Fringes Electricians: CHRISITAN, DALLAS, DOUGLAS, GREENE, HICKORY, HOWELL, LACLEDE, OREGON, OZARK, POLK, SHANNON, WEBSTER and WRIGHT COUNTIES.$ 25.15 14.36 PULASKI and TEXAS COUNTIES..$

29.80 14.83 STONE and TANEY COUNTIES....$ 20.94 13.55 -----------------------------------------

----------------------- ELEC0545-003 06/01/2015 ANDREW, BUCHANAN, CLINTON,

DEKALB, ATCHISON, HOLT, MERCER, GENTRY, HARRISON, DAVIESS, GRUNDY,

WORTH, LIVINGSTON, NODAWAY, AND CALDWELL COUNTIES Rates Fringes Electricians:....................$ 31.00 14.35 ----------------------------------------------------------------

ELEC0702-004 01/01/2016 BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN,

MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND

WAYNE COUNTIES Rates Fringes Line Construction: Groundman - Class A.........$ 27.20 29%+6.36 Groundman-Equipment Operator Class II (all other equipment)............$ 34.38 29%+6.36 Heavy-Equipment Operator Class I (all crawler type equipment D-4 and larger)...$

39.15 29%+6.36 Lineman.....................$ 47.60 29%+6.36 -----------------------------------------------

----------------- ENGI0101-001 05/01/2016 ANDREW, ATCHISON, BATES, BENTON,

BUCHANAN, CALDWELL, CARROLL, CHARITON, CLINTON, COOPER, DAVIESS,

DEKALB, GENTRY, GRUNDY, HARRISON, HENRY, HOLT, HOWARD, JOHNSON,

LAFAYETTE, LINN, LIVINGSTON, MERCER, NODAWAY, PETTIS, SALINE, SULLIVAN

AND WORTH COUNITES Rates Fringes Power equipment operators: GROUP 1.....................$

33.38 15.92 GROUP 2.....................$ 32.98 15.92 GROUP 3.....................$ 30.98 15.92 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt roller operator, finish;

asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader;

backhoe; blade operator (all types); boilers - 2; booster pump on dredge; bulldozer operator;

boring machine (truck or crane mounted); clamshell operator; concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drill cat with compressor mounted (self-contained) or similar type self- propelled rotary drill (not air tract); drilling or boring machine (rotary-self-propelled); finishing machine operator; greaser; high loader-fork lift-skid loader (all types); hoisting engineer (2 active drums); locomotive operator (standard guage);

mechanics and welders (field and plants); mucking machine operator; pile drive operator; pitman crane or boom truck (all types); push cat; quad track; scraper operators (all types); shovel operator; sideboom cats; side discharge spreader; skimmer scoop operators; slip form paver operator (CMI, Rex, Gomeco or equal); la tourneau rooter (all tiller types); tow boat operator;

truck crane; wood and log chippers (all types). GROUP 2: A-frame truck operator; articulated dump truck; back filler operator; boilers (1); chip spreader; churn drill operator; compressor;

concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator; distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig; float operator; form grade operator; hoisting engine (one drum); maintenance operator;

multiple compactor; pavement breaker, self-propelled hydra-hammer (or similar type); paymill operator; power shield; pumps; roller operator (with or without blades); screening and washing plant; self-propelled street broom or sweeper; siphons and jets; straw blower; stump cutting machine; siphons and jets; tank car heater operator (combination boiler and booster); welding machine; vibrating machine operator (not hand held); welding machine. GROUP 3: (a) Oiler; (b) Oiiler driver (c) Mechanic. HOURLY PREMIUMS: THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .25) ABOVE GROUP 1 RATE: Dragline operator - 3 yds. & over; shovel 3 yds. & over; clamshell 3 yds. & over; Crane, rigs or piledrivers, 100' of boom or over (incl.

jib.), hoist - each additional active drum over 2 drums THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .50) ABOVE GROUP 1 RATE: Tandem scoop operator; crane, rigs or piledrivers 150' to 200' of boom (incl. jib.) THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .75) ABOVE GROUP 1 RATE: Crane rigs, or piledrivers 200 ft. of boom or over (including jib.) ---------------------------------------------------------------- ENGI0101-005 04/01/2016 CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 35.82 15.99 GROUP 2.....................$ 34.78 15.99 GROUP 3.....................$ 30.31 15.99 GROUP 4.....................$ 33.66 15.99 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers-2; booster pump on dredge; boring machine (truck or crane mounted);

bulldozer operator; clamshell operator; concrete cleaning decontamination machine operator;

concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drillcat with compressor mounted (self-contained) or similar type self propelled rotary drill (not air tract); drilling or boring machine (rotary - self-propelled); finishing machine operator; greaser;

heavy equipment robotics operator/mechanic; horizontal directional drill operator; horizontal directional drill locator; loader-forklift - skid loader (all types); hoisting engineer (2 active drums); locomotive operator (standard guage); master environmental maintenance mechanic;

mechanics and welders (field and plants); mucking machine operator; piledrive operator; pitman crane or boom truck (all types); push cat; quad-track; scraper operators (all types); shovel operator; side discharge spreader; sideboom cats; skimmer scoop operator; slip-form paver (CMI, REX, Gomaco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane; ultra high perssure waterjet cutting tool system operator/mechanic; vacuum blasting machine operator/mechanic; wood and log chippers (all types) GROUP 2: "A" Frame truck operator; back filler operator; boilers (1); chip spreader;churn drill operator; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator; distributor operator;

elevating grader operator; farm tractor (all attachments); fireman rig; float operator; form grader operator; hoisting engine (1 drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra- hammer (or similar type); power shield; paymill operator; pumps;

siphons and jets; stump cutting machine; tank car heater operator (combination boiler and booster); compressor; roller operator (with or without blades); screening and washing plant; self-propelled street broom or sweeper; straw blower; tank car heater operator (combination boiler and booster); vibrating machine operator (not hand held) GROUP 3: Oilers GROUP 4: Oiler Driver (All Types) FOOTNOTE: HOURLY PREMIUMS FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($1.00) ABOVE GROUP 1 RATE: Clamshells - 3 yd. capacity or over;

Cranes or rigs, 80 ft. of boom or over (including jib); Draglines, 3 yd. capacity or over;

Piledrivers 80 ft. of boom or over (including jib); Shovels & backhoes, 3 yd. capacity or over. ---- ------------------------------------------------------------ ENGI0101-022 05/01/2015 BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON, OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER AND WRIGHT COUNTIES and CITY OF SPRINGFIELD Rates Fringes Power equipment operators: GROUP 1.....................$ 30.23

12.84 GROUP 2.....................$ 29.88 12.84 GROUP 3.....................$ 29.68 12.84 GROUP

4.....................$ 27.63 12.84 POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Asphalt finishing machine & trench widening spreader; asphalt plant console operator; autograder; automatic slipform paver; backhoe; blade operator - all types; boat operator

- tow; boilers-2; central mix concrete plant operator; clamshell operator; concrete mixer paver;

crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator;

dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine - 2 active drums; launch hammer wheel; locomotive operator; - standard guage; mechanic and welders;

mucking machine; off-road trucks; piledriver operator; pitman crane operator; push cat operator;

quad trac; scoop operator - all types; shovel operator; sideboom cats; skimmer scoop operators;

trenching machine operator; truck crane. GROUP 2: A-frame; asphalt hot-mix silo; asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant man; asphalt plant mixer operator;

asphalt roller operator; backfiller operator; barber-greene loader; boat operator (bridges and dams); chip spreader; concrete mixer operator - skip loader; concrete plant operator; concrete pump operator; crusher operator; dredge oiler; elevating grader operator; fork lift; greaser-fleet;

hoisting engine - 1; locomotive operator - narrow gauge; multiple compactor; pavement breaker;

powerbroom - self-propelled; power shield; rooter; side discharge concrete spreader; slip form finishing machine; stumpcutter machine; throttle man; tractor operator (over 50 h.p.); winch truck. GROUP 3: Boilers - 1; chip spreader (front man); churn drill operator; clef plane operator;

concrete saw operator (self- propelled); curb finishing machine; distributor operator; finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator;

roller operator, other than high type asphalt; screening & washing plant operator; siphons & jets;

sub-grading machine operator; spreader box operator, self-propelled (not asphalt); tank car heater operator (combination boiler & booster); tractor operator (50 h.p. or less); Ulmac, Ulric or similar spreader; vibrating machine operator, not hand; GROUP 4: Grade checker; Oiler; Oiler- Driver HOURLY PREMIUMS: The following classifications shall receive $ .25 above GROUP 1 rate: Clamshells - 3 yds. or over; Cranes - Rigs or Piledrivers, 100 ft. of boom or over (including jib); Draglines - 3 yds. or over; Hoists - each additional active drum over 2 drums;

Shovels - 3 yds. or over; The following classifications shall receive $ .50 above GROUP 1 rate:

Tandem scoop operator; Cranes - Rigs or Piledrivers, 150 ft. to 200 ft. of boom (including jib);

Tandem scoop. The following classifications shall receive $ .75 above GROUP 1 rate: Cranes - Rigs or Piledrivers, 200 ft. of boom or over (including jib.). ---------------------------------------------

------------------- ENGI0513-004 05/02/2016 FRANKLIN, JEFFERSON, LINCOLN, ST

CHARLES, AND WARREN COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 32.41 24.01 GROUP 2.....................$ 32.41 24.01 GROUP 3.....................$

31.11 24.01 GROUP 4.....................$ 30.66 24.01 POWER EQUIPMENT OPERATORS

CLASSIFICATIONS GROUP 1: Backhoe, Cable; Backhoe, Hydraulic (2 cu yds bucket and under regardless of attachment, one oiler for 2 or 3, two oilers for 4 through 6); Backhoe, Hydraulic over 2 cu yds; Cableway; Crane, Crawler or Truck; Crane, Hydraulic - Truck or Cruiser mounted, 16 tons and over; Crane, Locomotive; crane with boom including jib over 100 ft from pin to pin; Crane using rock socket tool; Derrick, Steam; Derrick Car and Derrick Boat;

Dragline, 7 cu yds and over; Dredge; Gradall, Crawler or tire mounted; Locomotive, Gas, Steam & other powers; Pile Driver, Land or Floating; Scoop, Skimmer; Shovel, Power (Electric, Gas, Steam or other powers); Shovel, Power (7 cu yds and over); Switch Boat; Whirley; Air Tugger with air compressor; Anchor Placing Barge; Asphalt Spreaker; Athey Force Feeder Loader, self-propelled; Backfilling Machine; Boat Operator - Push Boat or Tow Boat (job site); Boiler, High Pressure Breaking in Period; Boom Truck, Placing or Erecting; Boring Machine, Footing Foundation; Bullfloat; Cherry Picker; Combination Concrete Hoist and Mixer (such as Mixermobile); Compressor, Two 125 CFM and under; Compressor, Two through Four over 125 CFM; Compressor when operator runs throttle; Concrete Breaker (Truck or Tractor mounted);

Concrete Pump (such as Pumpcrete machine); Concrete Saw (self-propelled); Concrete Spreader;

Conveyor, Large (not selfpropelled) hoisting or moving brick and concrete into, or into and on floor level, one or both; Crane, Cimbing (such as Linden); Crane, Hydraulic - Rough Terrain, self-propelled; Crane, Hydraulic - Truck or Cruiser mounted - under 16 tons; Drilling machine - Self-powered, used for earth or rock drilling or boring (wagon drills and any hand drills obtaining power from other souces including concrete breakers, jackhammers and Barco equipmnet no engineer required); Elevating Grader; Engine Man, Dredge; Excavator or Powerbelt Machine;

Finishing Machine, self- propelled oscillating screed; Forklift; Generators, Two through Six 30 KW or over; Grader, Road with power blade; Greaser; Highlift; Hoist, Concrete and Brick (Brick cages or concrete skips operating or on tower, Towermobile, or similar equipment); Hoist, Three or more drums in use; Hoist, Stack; Hydro-Hammer; Lad-A-Vator, hoisting brick or concrete;

Loading Machine such as Barber-Greene; Mechanic on job site GROUP 2: Air Tugger with plant air; Boiler (for power or heating shell of building or temporary enclosures in connection with construction work); Boiler, Temporary; Compressor, One over 125 CFM; Compressor, truck mounted; Conveyor, Large (not self- propelled); Conveyor, Large (not self- propelled) moving brick and concrete (distributing) on floor level; Curb Finishing Machine; Ditch Paving Machine;

Elevator (outside); Endless Chain Hoist; Fireman (as required); Form Grader; Hoist, One Drum regardless of size (except brick or concrete); Lad-A-Vator, other hoisting; Manlift; Mixer, Asphalt, over 8 cu ft capacity; Mixer, one bag capacity or less; Mixer, without side loader, two bag capacity or more; Mixer, with side loader, regardless of size, not Paver; Mud Jack (where mud jack is used in conjenction with an air compressor, operator shall be paid $ .55 per hour in addition to his basic hourly rate for covering both operations); Pug Mill operator; Pump, Sump -self powered, automatic controlled over 2"; Scissor Lift (used for hoisting); Skid Steer Loader;

Sweeper, Street; Tractor, small wheel type 50 HP and under with grader blade and similar equipment; Welding Machine, One over 400 amp; Winch, operating from truck GROUP 3: Boat operator - outboard motor, job site; Conveyors (such as Con-Vay-It) regardless of how used;

Elevator (inside); Heater operator, 2 through 6; Sweeper, Floor GROUP 4: Crane type HOURLY PREMIUMS: Backhoe, Hydraulic 2 cu yds or less without oiler - $2.00; Crane,climbing (such as Linden) - $.50; Crane, Pile Driving and Extracting - $ .50 Crane with boom (including job) over 100 ft from pin to pin - add $.01 per foot to maximum of $4.00); Crane, using rock socket tool -

$ .50; Derrick, diesel, gas or electric hoisting material and erecting steel (150 ft or more above ground) - $ .50; Dragline, 7 cu yds and over - $ .50; Hoist, Three or more drums in use - $ .50;

Scoop, Tandem - $.50; Shovel, Power - 7 cu yds and over - $ .50; Tractor, Tandem Crawler - $ .50; Tunnel, man assigned to work in tunnel or tunnel shaft - $ .50; Wrecking, when machines are working on second floor or higher - $ .50 ---------------------------------------------------------------

- ENGI0513-006 05/01/2016 ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER,

CALLAWAY, CAPE GIRARDEAU, CARTER, CLARK, COLE, CRAWFORD, DENT,

DUNKLIN, GASCONADE, HOWELL, IRON, KNOX, LEWIS, MACON, MADISON,

MARIES, MARION, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY,

MORGAN, NEW MADRID, OREGON, OSAGE, PEMISCOT, PERRY, PHELPS, PIKE,

PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. FRANCOIS, STE.

GENEVIEVE, SCHUYLER, SCOTLAND, SCOTT, SHANNON, SHELBY, STODDARD,

TEXAS, WASHINGTON, AND WAYNE COUNTIES Rates Fringes Power equipment operators: GROUP 1.....................$ 27.94 24.87 GROUP 2.....................$ 27.59 24.87 GROUP 3.....................$ 27.39 24.87 GROUP 4.....................$ 23.74 24.87 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Asphalt finishing machine & trench widening spreader, asphalt plant console operator; autograder; automatic slipform paver; back hoe; blade operator - all types; boat operator tow; boiler two; central mix concrete plant operator; clam shell operator; concrete mixer paver; crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader;

hoisting engine 2 active drums; launchhammer wheel; locomotive operator standrad guage;

mechanics and welders; mucking machine; piledriver operator; pitman crane operator; push cat operator; guad-trac; scoop operator; sideboom cats; skimmer scoop operator; trenching machine operator; truck crane, shovel operator. GROUP 2: A-Frame; asphalt hot-mix silo; asphalt roller operator asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant mixer operator;

backfiller operator; barber-greene loader; boat operator (bridge & dams); chip spreader; concrete mixer operator skip loader; concrete plant operator; concrete pump operator; dredge oiler;

elevating graded operator; fork lift; grease fleet; hoisting engine one; locomotive operator narrow guage; multiple compactor; pavement breaker; powerbroom self-propelled; power shield; rooter;

slip-form finishing machine; stumpcutter machine; side discharge concrete spreader; throttleman;

tractor operator (over 50 hp); winch truck; asphalt roller operator; crusher operator. GROUP 3:

Spreader box operator, self-propelled not asphalt; tractor operator (50 h.p. or less); boilers one;

chip spreader (front man); churn drill operator; compressor over 105 CFM 2-3 pumps 4" & over;

2-3 light plant 7.5 KWA or any combination thereof; clef plane operator; compressor maintenance operator 2 or 3; concrete saw operator (self-propelled); curb finishing mancine;

distributor operator; finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator; riller operator other than high type asphalt; screening & washing plant operator; siphons & jets; subgrading machine operator; tank car heater (combination boiler & booster); ulmac, ulric or similar spreader; vibrating machine operator; hydrobroom. GROUP 4: Oiler; grout machine; oiler driver; compressor over 105 CFM one; conveyor operator one;

maintenance operator; pump 4" & over one. FOOTNOTE: HOURLY PREMIUMS Backhoe hydraulic, 2 cu. yds. or under Without oiler - $2.00 Certified Crane Operator - $1.50; Certified Hazardous Material Operator $1.50; Crane, climbing (such as Linden) - $0.50; Crane, pile driving and extracting - $0.50; Crane, with boom (including jib) over 100' from pin to pin add $0.01 per foot to maximum of $4.00; Crane, using rock socket tool - $0.50; Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above the ground) - $0.50; Dragline, 7 cu. yds, and over - $0.50; Hoist, three or more drums in use - $0.50; Scoop, Tandem - $0.50;

Shovel, power - 7 cu. yds. or more - $0.50; Tractor, tandem crawler - $0.50; Tunnel, man assigned to work in tunnel or tunnel shaft - $0.50; Wrecking, when machine is working on second floor or higher - $0.50; ---------------------------------------------------------------- ENGI0513- 007 05/02/2016 ST. LOUIS CITY AND COUNTY Rates Fringes Power equipment operators:

GROUP 1.....................$ 32.41 24.01 GROUP 2.....................$ 32.41 24.01 GROUP 3.....................$ 31.11 24.01 GROUP 4.....................$ 30.66 24.01 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Backhoe, cable or hydraulic; cableway; crane crawler or truck; crane, hydraulic-truck or cruiser mounted 16 tons & over; crane locomotive;

derrick, steam; derrick car & derrick boat; dragline; dredge; gradall, crawler or tire mounted;

locomotive, gas, steam & other powers; pile driver, land or floating; scoop, skimmer; shovel, power (steam, gas, electric or other powers); switch boat; whirley. GROUP 2: Air tugger w/air compressor; anchor-placing barge; asphalt spreader; athey force feeder loader (self- propelled);

backfilling machine; backhoe-loader; boat operator-push boat or tow boat (job site); boiler, high pressure breaking in period; boom truck, placing or erecting; boring machine, footing foundation;

bull- float; cherry picker; combination concrete hoist & mixer (such as mixer mobile);

compressor (when operator runs throttle); concrete breaker (truck or tractor mounted); concrete pump, such as pump-crete machine; concrete saw (self-propelled), concrete spreader; conveyor, large (not self-propelled), hoisting or moving brick and concrete into, or into and on floor level, one or both; crane, hydraulic-rough terrain, self-propelled; crane hydraulic-truck or cruiser mounted-under 16 tons; drilling machines, self-powered use for earth or rock drilling or boring (wagon drills nd any hand drills obtaining power from other sources including concrete breakers, jackhammers and barco equipment-no engineer required); elevating grader; engineman, dredge;

excavator or powerbelt machine; finishing machine, self-propelled oscillating screed; forklift;

grader, road with power blade; highlift. greaser; hoist, stack, hydro-hammer; loading machine (such as barber-greene); machanic, on job site; mixer, pipe wrapping machines; plant asphalt;

plant, concrete producing or ready-mix job site; plant heating-job site; plant mixing-job site;

plant power, generating-job site; pumps, two through six self-powered over 2"; pumps, electric submersible, two through six, over 4"; quad-track; roller, asphalt, top or sub-grade; scoop, tractor drawn; spreader box; sub-grader; tie tamper; tractor-crawler, or wheel type with or without power unit, power take-offs and attachments regardless of size; trenching machine; tunnel boring machine; vibrating machine automatic, automatic propelled; welding machines (gasoline or diesel) two through six; well drilling machine GROUP 3: Conveyor, large (not self-propelled);

conveyor, large (not self-propelled) moving brick and concrete distributing) on floor level; mixer two or more mixers of one bag capacity or less; air tugger w/plant air; boiler, for power or heating on construction projects; boiler, temporary; compressor (mounted on truck; curb finishing machine; ditch paving machine; elevator; endless chain hoist; form grader; hoist, one drum regardless of size; lad-a-vator; manlift; mixer, asphalt, over 8 cu. ft. capacity, without side loader, 2 bag capacity or more; mixer, with side loader, regardless of size; pug mill operator;

pump, sump-self-powered, automatic controlled over 2" during use in connection with construction work; sweeper, street; welding machine, one over 400 amp.; winch operating from truck; scissor lift (used for hoisting); tractor, small wheel type 50 h.p. & under with grader blade & similar equipment; Oiler on dredge and on truck crane. GROUP 4: Boat operator-outboard motor (job site); conveyor (such as con-vay-it) regardless of how used; sweeper, floor HOURLY PREMIUMS: Backhoe, hydraulic 2 cu. yds. or under without oiler $2.00 Certified Crane Operator 1.50 Certified Hazardous Material Operator 1.50 Crane, climbing (such as Linden) .50 Crane, pile driving and extracting .50 Crane, with boom (including jib) over 100' (from pin to pin) add $.01 per foot to maximum of 4.00 Crane, using rock socket tool .50 Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above ground) .50 Dragline, 7 cu.

yds. and over .50 Hoist, three (3) or more drums in use .50 Scoop, Tandem .50 Shovel, power - 7

cu. yds. or more .50 Tractor, tandem crawler .50 Tunnel, man assigned to work in tunnel or tunnel shaft .50 Wrecking, when machine is working on second floor or higher .50 ----------------- ----------------------------------------------- IRON0010-012 04/01/2015 Rates Fringes Ironworkers:

ANDREW, BARTON, BENTON, CAMDEN, CEDAR, CHARITON, CHRISTIAN, COOPER,

DADE, DALLAS, DAVIESS, DE KALB, GENTRY, GREENE, GRUNDY, HARRISON,

HICKORY, HOLT, HOWARD, LACLEDE, LINN, LIVINGSTON, MERCER, MONITEAU,

MORGAN, NODAWAY, PETTIS, POLK, PUTNAM, RANDLOPH, ST. CLAIR, SULLIVAN,

TANEY, VERNON, WEBSTER, WRIGHT and WORTH Counties and portions of ADAIR, BOONE, MACON, MILLER and RANDOLPH Counties....................$ 28.25 27.60

ATCHISON, BATES, BUCHANAN, CALDWELL, CARROLL, CASS, CLAY, CLINTON,

HENRY, JACKSON, JOHNSON, LAFAYETTE, PETTIS, PLATTE, SALINE, AND RAY

COUNTIES....$ 31.25 27.60 ---------------------------------------------------------------- IRON0321- 002 08/01/2012 DOUGLAS, HOWELL and OZARK COUNTIES Rates Fringes Ironworker.......................$ 18.40 14.68 ---------------------------------------------------------------- IRON0396-004 08/05/2015 ST. LOUIS (City and County), ST. CHARLES, JEFFERSON, IRON, FRANKLIN, LINCOLN, WARREN, WASHINGTON, ST. FRANCOIS, STE.

GENEVIEVE, and REYNOLDS Counties; and portions of MADISON, PERRY, BOLLINGER, WAYNE, and CARTER Counties Rates Fringes Ironworker.......................$ 32.88 23.16 ---------- ------------------------------------------------------ IRON0396-009 07/30/2014 AUDRAIN, CALLAWAY, COLE, CRAWFORD, DENT, GASCONADE, MARIES, MONTGOMERY, OSAGE, PHELPS, PIKE, PULASKI, TEXAS and WRIGHT Counties; and portions of BOONE, CAMDEN, DOUGLAS, HOWELL, LACLEDE, MILLER, MONROE, OREGON, SHANNON and RALLS Counties Rates Fringes Ironworker.......................$ 28.01 22.36 ------------------------- --------------------------------------- IRON0577-005 08/01/2015 ADAIR, CLARK, KNOX, LEWIS, MACON, MARION, MONROE, RALLS, SCHUYLER, SCOTLAND, AND SHELBY

COUNTIES Rates Fringes Ironworker.......................$ 25.25 20.85 ------------------------------------

---------------------------- IRON0584-004 06/01/2015 BARRY, JASPER, LAWRENCE,

MCDONALD, NEWTON AND STONE Counties Rates Fringes Ironworkers:.....................$

24.00 13.53 ---------------------------------------------------------------- IRON0782-003 05/01/2016 CAPE GIRARDEAU, MISSISSIPPI, NEW MADRID, SCOTT, & STODDARD Counties; and portions of BOLLINGER, BUTLER, CARTER, DUNKLIN, MADISON, PEMISCOT, PERRY, RIPLEY, and WAYNE Counties Rates Fringes Ironworkers: Locks, Dams, Bridges and other major work on the Mississippi and Ohio River only........................$ 31.63 24.27 All Other Work..............$ 25.12 19.90 ---------------------------------------------------------------- LABO0042- 003 03/04/2016 ST. LOUIS (City and County) Rates Fringes LABORER Plumber

Laborer.............$ 31.12 14.47 ---------------------------------------------------------------- LABO0042- 005 03/04/2016 ST. LOUIS (City and County) Rates Fringes LABORER Dynamiter, Powderman........$ 31.12 14.47 Laborers, Flaggers..........$ 31.12 14.47 Wrecking....................$

31.12 14.47 ---------------------------------------------------------------- LABO0424-002 05/01/2014 Rates Fringes LABORER ADAIR, AUDRAIN, BOONE, CALLAWAY, CHARITON, CLARK, COLE, COOPER, HOWARD, IRON, KNOX, LEWIS, LINN, MACON, MADISON, MARION, MILLER, MONITEAU, MONROE, PERRY, PIKE, PUTNAM, RALLS, RANDOLPH, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHELBY

AND SULLIVAN COUNTIES GROUP 1.