Clarence_cannon_addtional_questions.docx
DOCX document 13 KB Posted
- Attached to
- Clarence Cannon Wildlife Refuge
- Solicitation number
- W912P9-16-B-0013
About this file
Clarification to Q A posted on 8/16/2016.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clarence_cannon_addtional_questions.docx | DOCX document | |
| 2amnarr.pdf | ||
| 2amplans.pdf | ||
| W912P9-16-B-0013_AMEND_02.pdf | ||
| 2amspecs.pdf | ||
| site_visit_sign_in_sheet.pdf | ||
| links_to_clarence_cannon.docx | DOCX document | |
| W912p9-16-b-0013-01.pdf | ||
| GDrain_AccessRd_AsAdv_Plans.pdf | ||
| A02_South_Unit_WC_Structure_and_Berm_Degrades_Plans.pdf | ||
| A02_CCNWR_South_unit__Access_Rd_Adv_specs.pdf | ||
| W912P9-16-B-0013.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) Is turf to be established on all of the degraded levees in the various subunits?
*Clarification: The answer posted on August 16 conflicts with the specifications and shall be disregarded. The Contractor shall bid the seeding as specified. Degraded levees in various subunits shall require turf establishment."
2) What should be done with the existing aggregate surfacing removed from the roads degraded in the Central Subunit? Wasted off site? Stockpiled for future use?
Where applicable excavated road stone should be stockpiled in close proximity to its source for later use.