clarification.pdf

PDF 34 KB Posted

Attached to
Grand Tower Phase 5 & Dogtooth Bend Phase 6
Solicitation number
W912P9-16-B-0012
Issued by

About this file

Clarification-error on SF 30 stating there are revised drawings. It should have stated revised specs.

View the file

Other files

File Type Posted
B01_ABSTRACT_OF_BIDS.xls XLS spreadsheet
Revised_35_31_25.pdf PDF
w912p9-16-b-0012-01.pdf PDF
Dogtooth_Bend_Phase_6_(Len_Small)_07-07-2016.pdf PDF
GT_DB_Adv_Specs.pdf PDF
FY_16_Grand_Tower_Phase_5_Plans_07-07-2016.pdf PDF
16-B-0012_Grand_Tower.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 26, 2016

*Clarification

Amendment 01 was posted 25 July 2016 for Solicitation W912P9-16-B-0012. In section 14 it states:

C. revised drawings

It should have stated revised specs. The original drawings are the only drawings so far. The revised specs are included in the package uploaded on 25 July 2016. They are labeled Revised 35 31 25.

Another amendment will be coming out at a later date to correct the error.

Thanks, Cassandra Range

File details come from the government source that posted it. Updated .