W81C8X50933100
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION
CONSTRUCTION - OPERATION AND MAINTENANCE (O&M) FY 15, LOWER MISSISSIPPI RIVER MILES (MRM) 195-98.6 AND 98.6-0.
The hour and date specified for receipt of bids remain unchanged.
(SEE CONTINUATION PAGES)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-15-B-0211
X 9B. DATED (SEE ITEM 11)
30-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jul-2015
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P9-15-B-0211
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
AMENDMENT OF SOLICITATION
The following Contractor questions and Government responses are for information purposes:
QUESTION ONE (1):
1. The specifications do not address where it is permissible to place the weir and dike degradation stone.
It is permissible to “pull or cast” the excavated stone below the desire grade at the site without placing the material on a barge for another location?
RESPONSE TO QUESTION ONE (1):
For the Priority I weir and dike degradation work, material can be dragged downstream and left in place as long as it remains below the specified removal elevation.
QUESTION TWO (2):
For example, Weir 174.35 drawing C-103 Point No. 1 requires a 0.1 ft. cut. Section 35 31 25.00 15-3.8 Construction Tolerance permits the weir crown elevation tolerance to be 1 ft. above and 2
ft. below the degradation required/needed. Is the contractor to assume it is permissible to leave the site 2 ft. below the stated elevation desired at each site?
Note: the specification has two paragraphs 3.8 on page 17.
RESPONSE TO QUESTION TWO (2):
Further down in the table Weir/Dike Degradation tolerances are listed. The above tolerance is 0 ft but the below tolerance is 2 ft if it is necessary for the removal of larger sized material.
The error in section numbering is noted and will be corrected in future advertisements.
QUESTION THREE (3):
We assume the contractor is not responsible for the existing conditions of the weirs' or dikes' slopes and no work is required or anticipated - correct?
RESPONSE TO QUESTION THREE (3):
The contractor will only be responsible for the degradation of weir/dike heights and will not be responsible for any modifications to the weir/dike slopes.
All other terms and conditions remain unchanged.
(End of Summary of Changes)