W81C8X50933100
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION
CONSTRUCTION - OPERATION AND MAINTENANCE (O&M) FY 15, LOWER MISSISSIPPI RIVER MILES (MRM) 195-98.6 AND 98.6-0.
The hour and date specified for receipt of bids remain unchanged.
(SEE CONTINUATION PAGES)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-15-B-0211
X 9B. DATED (SEE ITEM 11)
30-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2015
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P9-15-B-0211
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
AMENDMENT OF SOLICITATION
The following Contractor questions and Government responses are for information purposes:
QUESTION ONE (1):
1. In the drawings the surveys for the Weir and Dike degrade provided are from dates; 11/20/2012, 01/14/2013, 01/16/2013, 01/26/2013, 12/11/2013 and 01/14/2014. Are there any current surveys that show the work locations, with changing river conditions some of the surveys are two and a half years old and could have significant changes to date. The specifications state “No separate payment will be made for the removal of drift and debris, excavation and minor bank grading that may be required”. We feel that a more recent survey should be performed especially since the quantities given on the plans pertaining to line items 5,6,7,12,13,14,15 have been exempted from the VARIATION IN ESTIMATED QUANTITY in the
BIDDING SCHEDULE NOTES.
RESPONSE TO QUESTION ONE (1):
No additional surveys will be performed.
River bed conditions can change significantly from survey to survey, however the portion of the structures that are identified for removal will change little over the course of two years. The majority weirs have been surveyed multiple times and the locations where high points have been identified on the plans have been unchanged from survey to survey.
QUESTION TWO (2):
2. In section 35 31 30.00 15 it states that an As-built survey is to be completed with a multibeam echo sounder after completion of the degradation of the structure. With the specific points the Corps has provided to degrade, what will be required if other points on the Contractors As-built survey show structures not provided by the Corps are above the required elevation.
RESPONSE TO QUESTION TWO (2):
The contractor will not be required to remove additional high spots outside of the work locations identified.
This will not apply if it is determined that the contractor created additional high spots during his removal effort.
It is unlikely that additional locations will be identified. The Corps has done everything within reason to collect the best surveys possible. If an as-built survey is collected and the Corps determines that an area not previously identified in the plans will need remediation, then the normal process for modifying the contract under "differing site conditions" will be followed.
QUESTION THREE (3):
3. In section 00 80 00 it states that “the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage.” This creates a potential safety risk for all vessels involved in the work and commercial traffic. The Corps has in the past given the authority to stop all river traffic for the emergency rock removal in a given reach.
W912P9-15-B-0211
RESPONSE TO QUESTION THREE (3):
A river closure will not be requested by the Corps.
QUESTION FOUR (4):
4. Payment for Weir and Dike Degradation. The payment for these line items are paid by the job, for the most part these line items have multiple weirs or dikes to degrade. Will partial payments be made based on how many of the locations are completed per line item?
RESPONSE TO QUESTION FOUR (4):
Yes, partial payment will be made based on amount of work complete.