About this file

This is a Past Performance Questionnaire (PPQ) template form (PPQ-0) used by NAVFAC and USACE to evaluate contractor performance on federal contracts. The form is designed to be completed collaboratively, with contractors providing contract information in Blocks 1-4 and clients providing performance evaluations in Blocks 5-8.

The contractor sections require identification information (firm name, CAGE code, DUNs number, contact details), work performance role (prime contractor, subcontractor, joint venture, or other), contract details (number, type, title, location, award date, completion dates, and pricing information), and project description including complexity level. The client evaluation sections assess performance across seven primary categories: Quality (technical data preparation, quality standards compliance, problem resolution, and quality control), Schedule/Timeliness of Performance (delivery schedule compliance and resource utilization), Customer Satisfaction (end user satisfaction, contractor reasonableness and cooperation, and overall satisfaction), Management/Personnel/Labor (on-site management effectiveness, workforce qualification and retention, government property control, personnel expertise, small business utilization, multi-project management capability, and change management), Cost/Financial Management (pricing compliance, innovative cost-reduction methods, invoice timeliness and accuracy for cost-type contracts, accounting system adequacy, contract termination history, and financial stability), Safety/Security (safety compliance and security requirements), and General (emergency response capability, contractual compliance, and overall performance). Each performance element uses a standardized five-point rating scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory) plus Not Applicable, with detailed definitions provided to guide consistent evaluation. The form includes narrative sections for strengths, weaknesses, and deficiencies assessment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC / USACE Past Performance Questionnaire (PPQ) Form PPQ -0 (9/30/11)

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

NAVFAC / USACE Past Performance Questionnaire (PPQ) Form PPQ -0 (9/30/11)

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below. Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

CONTRACT INFORMATION Contractor to complete Blocks 14:
CAGE Code:
Firm Name:
DUNs Number:
Address:
Phone Number:
Email Address:
Point of Contact:
Contact Phone Number:
Prime Contractor: Off
Sub Contractor: Off
Joint Venture: Off
Other Explain: Off
Percent of project work performed:
If subcontractor who was the prime NamePhone:
Contract Number:
DeliveryTask Order Number if applicable:
Firm Fixed Price: Off
Cost Reimbursement: Off
undefined: Off
Other Please specify:
Contract Title:
Contract Location:
Award Date mmddyy:
Contract Completion Date mmddyy:
Actual Completion Date mmddyy:
Explain Differences:
Original Contract Price Award Amount:
Final Contract Price to include all modifications if applicable:
Explain Differences_2:
High: Off
Med: Off
Routine: Off
conditions etc 1:
conditions etc 2:
conditions etc 3:
CLIENT INFORMATION Client to complete Blocks 58:
5 Client Information Name Title Phone Number Email Address:
Name:
Title:
Phone Number_2:
Email Address 1:
Email Address 2:
6 Describe the clients role in the project 1:
6 Describe the clients role in the project 2:
undefined_2:
7 Date Questionnaire was completed mmddyy:
undefined_3:
8 Clients Signature:
A: Choice10
B: Choice16
PPQ: Choice16
C: Off
D: Off
E: Off
F: Off
G: Off
H: Off
I: Off
J: Off
K: Off
L: Off
M: Off
N: Off
O: Off
P: Off
Q: Off
R: Off
which may assist our office in evaluating performance risk please attach additional pages if necessary 1:
which may assist our office in evaluating performance risk please attach additional pages if necessary 2:
which may assist our office in evaluating performance risk please attach additional pages if necessary 3:
which may assist our office in evaluating performance risk please attach additional pages if necessary 4:
which may assist our office in evaluating performance risk please attach additional pages if necessary 5:
which may assist our office in evaluating performance risk please attach additional pages if necessary 6:
which may assist our office in evaluating performance risk please attach additional pages if necessary 7:
which may assist our office in evaluating performance risk please attach additional pages if necessary 8:
which may assist our office in evaluating performance risk please attach additional pages if necessary 9:
which may assist our office in evaluating performance risk please attach additional pages if necessary 10:
which may assist our office in evaluating performance risk please attach additional pages if necessary 11:
S: Off
T: Off
U: Off
V: Off
W: Off
X: Off
Y: Off
Z: Off
AA: Off
AB: Off
AC: Off

File details come from the government source that posted it. Updated .