This document is Amendment 0002 to a construction quality assurance and testing services Indefinite Delivery/Indefinite Quantity (IDIQ) contract solicitation (W912P826RA007) issued by the U.S. Army Corps of Engineers, New Orleans District. The amendment, effective January 28, 2026, provides answers to 36 contractor questions and notifies offerors that updated forms (fillable PPQ PDF and Volume III: Price Excel file) have been uploaded to SAM.gov. Key clarifications include: (1) no pre-proposal meeting will be held; (2) prime contractors must have employed at least eight QAR III personnel within the past 10 years—this requirement is non-negotiable; (3) Standard Form 1449 is required instead of SF 33; (4) no separate Performance Work Statement will be issued; (5) FTR refers to Federal Travel Regulations flat rates determined by GSA with no pricing submission required; (6) per diem lodging CLINs require no estimated amounts and per diem meals are not required to be GSA-based; and (7) quantities for vehicles and materials are estimated for bidding purposes only.
The solicitation is a 100% Total Small Business Set-aside for construction quality assurance and testing services supporting USACE operations. Offerors must submit four volumes: Volume I (Technical, 50-page maximum), Volume II (Past Performance, 25-page maximum), Volume III (Cost/Price, no page limit), and Volume IV (Solicitation documents and certifications). Proposals require minimum staffing of 15 QAR IIIs with heavy civil construction experience in the New Orleans District, one Construction Manager, one Project Engineer, one Senior Engineer, one Cost Estimator, and one Scheduler. Past performance must include 1-5 similar contracts exceeding $1 million completed within the past five years (projects need not be complete at submission). Prime contractors must perform at least 50% of work with their own forces. Electronic submissions in PDF format (except Excel price schedules) should be emailed to evan.g.woitha@usace.army.mil with file attachments not exceeding 50MB, with offerors responsible for confirming receipt prior to the deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912P826RA0070004.pdf | ||
| W912P826RA0007 - CM Services Bid Schedule.xlsx | XLSX spreadsheet | |
| Solicitation Amendment W912P826RA0070003.pdf | ||
| W912P826RA0007-CM Services Bid Schedule.xlsx | XLSX spreadsheet | |
| Updated PPQ.pdf | ||
| Solicitation Amendment W912P826RA0070001.pdf | ||
| Solicitation Package - W912P826RA007.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
This Solicitation has been amended as Block 14 (Description of Amendment/Modification):
follows:
1) To provide answers to contractor questions.
2) To upload an updated fillable PPQ PDF and Volume III: Price excel file into SAM.gov.
NOTE: Please be sure to acknowledge all amendments as part of your bid submission.
W912P826RA0070002
1. Will there be a pre-proposal or pre-bid meeting? If so, please provide the date, time, and meeting link.
No.
2. In Section L, Proposal Submission, Subsection 2.A.b, the solicitation requires that the Prime Contractor shall have employed at least eight (8) of the proposed QAR III's within the last 10 years. Our recruiting services are able to successfully recruit and hire these roles rapidly, but they will not have worked for us in the past. Would the Government consider removing the requirement for at least eight QAR III's to have worked for the Prime in the past?
3. On page 106 of the Solicitation document, item D. Volume IV requires the following documents:
Section A Standard form 33 Section K- Representations, Certification and other Statements of OƯerors Can you please provide or let us know where to access these?
Section A – “Standard Form 33” has been revised via this amendment to stated “Standard form 1449”, which is page 1 of the solicitation.
Section K – Instructions regarding Representations, Certification and other Statements of OƯerors can be found under FAR 52.212-3 beginning on page 82 of the solicitation.
4. Will a separate and full scope of work or Performance Work Statement (PWS)/Statement of Work (SOW) in Section C, for specific projects, tasks, or locations where services will be performed (e.g., within the New Orleans District or elsewhere) be issued?
No. Reference Section C, paragraph C.1.3 Authorization and Performance of Work.
5. What does "FTR" stand for as a unit (e.g., in additional mileage or per diem lodging)? Is it "flat rate," "per trip," or something else, and how should it be interpreted for pricing?
Federal Travel Regulations. It’s the flat rate determined by the GSA. No pricing submission required.
6. For per diem items (lodging and meals), should rates be based on the current GSA per diem rates for the performance location(s), and will they be adjusted annually per FAR 52.222-43 or similar clauses?
The CLIN for per diem lodging does not require an estimated amount.
The CLIN for per diem meals is not required to be based on the GSA rates.
As no estimate is required for the per diem lodging CLIN, no contractual adjustments will be necessary.
7. What are the detailed qualification requirements for key personnel categories (e.g., QAR II, QAR III, QAR V, Certified Welding Inspector, NACE Coating Inspector)? Are specific certifications, years of experience, or education levels required beyond what's implied in the schedule?
Reference Section C, paragraphs C.3.1 Personnel Requirements and C.4.1.d Field Personnel.
8. How should the price proposal be structured?
Should oƯerors fill in unit prices on the provided schedule for all line items (including straight time, overtime, and Sunday/double time), Reference PROPOSAL SUBMISSION (Section L), Instructions, Conditions and Notices to Bidders, VOLUME II – Cost/Price beginning on page 105.
and will the evaluated price be based on estimated quantities times unit prices, including options?
Reference Evaluation Factors for Award (Section M), Volume III: Cost/Price
9. What are the specific evaluation subfactors under Technical Capability and Past Performance, and what is their relative importance? For example, are resumes, management plans, or subcontractor qualifications weighted?
This procurement is a Best Value - Lowest Price Technical Acceptable procurement, not a Best Value – Trade OƯ procurement. Reference Evaluation Factors for Award (Section M).
10. How will Past Performance be evaluated? How many references should be provided, what forms (e.g., CPARS or questionnaires), and will relevance to similar USACE construction QA/testing work be considered?
Reference PROPOSAL SUBMISSION (Section L), Instructions, Conditions and Notices to Bidders, Volume II and Evaluation Factors for Award (Section M), Volume II.
11. Are there page limits, font requirements, or specific volume structures for the proposal (e.g., Volume 1: Technical, Volume 2: Price, Volume 3: Past Performance)? The instructions mention a Table of Contents and Summary, but clarification on overall limits would help.
Reference PROPOSAL SUBMISSION (Section L), Instructions, Conditions and Notices to Bidders.
12. How will answers to submitted questions be distributed (e.g., via amendment on SAM.gov)?
Answers to submitted questions will be posted via AM0002 on SAM.gov.
13. For electronic submission, is there a file size limit, required format (e.g., PDF with searchable text), or portal (e.g., PIEE or email only to evan.g.woitha@usace.army.mil)?
Electronic submission should be made in PDF for all volumes other than Volume III: Price.
Volume III should be submitted in Excel Spreadsheet, which has been uploaded to SAM.gov for use. Proposals should be emailed directly to evan.g.woitha@usace.army.mil and attachments should not exceed 50MB. Please allow for possible electronic delays and it is the OƯerors responsibility to confirm receipt with Mr. Woitha when submitting proposals prior to due date and time.
14. Are any key personnel required to have security clearances or undergo background checks (e.g., under the Continuous Evaluation program mentioned in the clauses)?
Reference Section C, paragraph C.12 SECURITY PROVISIONS.
15. How will options be evaluated for price reasonableness, and can unbalanced pricing in options lead to rejection?
Reference Evaluation Factors for Award (Section M), Volume III.
16. Are there any mandatory teaming or subcontracting goals (e.g., small business, HUBZone), even though the solicitation is unrestricted?
This requirement is a 100% Total Small Business Set-aside.
17. For lab testing items (e.g., ASTM standards for soils and concrete), are there specific accreditation requirements for the oƯeror's lab, or can third-party labs be used?
Labs that are in accordance with Section C, paragraph C.4 TESTING LAB REQUIREMENTS are allowed
18. What insurance, bonding, or indemnity requirements apply, if any, given the services involve field inspections and testing?
Reference Section H - Special Contract Requirements, Section C, paragraph C.1.12 Insurance Requirements, and FAR 52.228-15 – Performance and Payment Bonds- Construction (Deviation 2020-O0016).
19. On page 5 of SECTION C DESCRIPTION/ SPECIFICATIONS/STATEMENT OF WORK of the Solicitation Package, under item C.3.1.2 Specific Qualifications, the table lists 15 positions. While on page 103 of the Solicitation Package, under A. PROPOSAL SUBMISSION (Section L) Instructions, Conditions and Notices to Bidders, item b.
StaƯing Plan and Qualifications notes that there should be a minimum of 15 QARs, and five (5) additional resumes for the disciplines listed. Between the two lists there is overlap but there are also positions that only appear in one place vs. both. Please clarify how many resumes should be included in the OƯeror's proposal and for which positions.
Provide the personnel information requested in PROPOSAL SUBMISSION (Section L), Instructions, Conditions and Notices to Bidders.
20. As a follow up question, should the OƯeror provide full resumes or just the information listed under b. StaƯing Plan and StaƯ Qualifications?
Reference Section L, paragraph 2.A.1.b StaƯing Plan and StaƯ Qualifications.
21. On page 104 of the Solicitation Package, under item B. VOLUME II - Past Performance, it states, "This volume shall contain past performance information regarding at least one
(1) and no more than five (5) similar multi-year contract(s) that is greater than $1 million and occurred within the last five (5) years." Please clarify whether or not the project(s) have to be complete at the time of submission.
Project does not need to be completed at the time of submission.
22. As a follow up question, can the procurement team clarify if the $1M is the contract (OƯerors Fee) or construction value (Project Value)?
Contract Value.
23. On the Past Performance Questionnaire, please note that between pages 4 and 5, questions #13 and #14 are missing, and the last question is not labeled, thinking that it should be question #20. Can an updated PPQ be released prior to the release of all responses to the questions, so that the OƯerors can send it to our clients in a timely manner?
Apologies for the outdated PPQ. The correct fillable USACE PPQ template has been uploaded to SAM.gov for your use.
24. How will task orders be issued under this IDIQ contract, Reference Section C, paragraph C.1.3 Authorization and Performance of Work.
and what is the expected turnaround time for acceptance?
Reference Section C, paragraph C.1.5 Contractor Performance.
25. Is there a minimum or maximum dollar value per task order?
Reference FAR 52.216-19.
26. What is the expected lead time for mobilizing QAR III personnel after a task order award?
Reference Section C, paragraph C.1.5 Contractor Performance.
27. Are remote work arrangements permitted for roles such as Scheduler or Cost Estimator?
28. Are there any preferred ERDC-validated labs, or is contractor selection fully discretionary?
No preference as long as the lab is in accordance with Section C, paragraph C.4 TESTING
LAB REQUIREMENTS
29. What are the reporting requirements for progress updates and quality control documentation?
Reference Section C, paragraphs C.3.5 Daily Quality Assurance Reports and C.3.6 Daily Safety Inspections.
30. Will the Government provide access to its project management systems, or should the contractor use its own?
The Government will provide access to its project management system to the contracted personnel.
31. Are there any site-specific safety standards beyond EM 385-1-1 that must be followed?
Reference Section C, paragraph C.6 SAFETY PROVISIONS.
32. Will the Government conduct joint safety audits, or are contractor-led audits expected?
The Contractor is responsible for safety. The Government reserves the right to conduct additional safety inspections.
33. How will performance be measured for each task order (e.g., timeliness, quality metrics)?
Performance will be measured through the Contractor Performance Assessment Reporting System (CPARS).
34. Under what conditions will the optional six-month extension be exercised?
Reference FAR Clause 52.217-9 Option to Extend the Term of the Contract.
35. Will pricing adjustments be allowed during the optional period(s)?
Reference FAR Clause 52.217-8 Option to Extend Services.
36. I just noticed that the on page 2 of the solicitation, item 0016 for 4x2 pickup trucks has a quantity of 8000 days for each year. As such working every day of a year, number of truck required will be 8000/260= 30.77 trucks. Say 31 trucks. I understand that each field persons will require a truck, but do you need that many trucks? I understand that quantities are estimated
Quantities are estimated for bidding purposes only. Reference Section C, paragraph C.5.3 Number of Vehicles.
A. PROPOSAL SUBMISSION (Section L) Instructions, Conditions and Notices to Bidders
1. PROPOSAL FILES FORMAT
A. The submission should be clearly indexed and logically assembled. Each volume should be clearly identified and should begin at the top of a page. All pages of each volume should be appropriately numbered and identified by the complete company name, date and Request for Proposal (RFP) number in the header and/or footer. A Table of Contents should be created. Files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer – 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
B. Each paragraph should be single spaced. Standard, 12-point minimum font sizes utilizing Arial or Times New Roman typeface shall be used for all documents, except for tables and illustrations, which may use a reduced font size. No less than an 8-point font size shall be used for tables and illustrations, which may also be produced in landscape mode.
C. Proposal submission organization shall follow the following format, while noting that all forms, examples, letters, and sample documents shall be excluded from the page limit:
Volume Title Maximum Pages I Technical 50
II Past Performance 25 (see exclusions in Volume II)
III Cost/Price No Page Limit
IV
Solicitation, Offer and Award Documents, and Certifications/Representations
No Page Limit
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government
2. CONTENT REQUIREMENT: All information shall be confined to the appropriate volume. The volumes shall be submitted as two (2) separate files. One (1) file will consist of Volumes I, II, and IV, while the other will solely consist of Volume III. The Offeror should confine submissions to essential matters and should be able to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. The first two volumes of the proposal should consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section should contain a brief abstract of the file. Proprietary information should be clearly marked. The following shall be included:
A. VOLUME I – Technical Acceptability. The volume shall be organized into the following sections:
1. Management Plan. Describe your approach and methodology to plan and execute the task of providing construction management services primarily to support the U.S. Army Corps of Engineers, New Orleans District. The management plan should be clear and concise and should demonstrate a complete understanding of all the Contractor performance requirements. In the event that work greatly increases, the Offeror should address their plans to manage the additional volume of work. Your plan shall further address the following elements, at a minimum:
a. Quality Program: To be technically acceptable, at a minimum, the proposal shall include a Quality Program. The Quality Program shall include a letter of intent with one (1) Engineer Research and Development Center (ERDC) validated testing lab for quality assurance testing services that is located within the limits of the New Orleans District. The proposal should provide the following information:
i. A description that includes a chart showing lines of authority and acknowledgement that the quality staff shall report to the project manager or someone higher in the Contractor’s organization.
ii. The name, qualifications, duties, responsibilities, and authority of each person within the Quality Program.
iii. A training plan assuring all personnel will have the required training to adequately perform their tasks.
iv. Processes to ensure acceptable quality services will be continuously provided.
v. General procedures for performing materials testing, to include the ERDC validation letter for the lab submitted.
b. Staffing Plan and Staff Qualifications: The Offeror should demonstrate number of personnel and personnel job classifications available to the firm and indicate whether personnel are currently employed by the prime or subcontractor(s). Within the last ten (10) years, the Prime Contractor shall have employed at least eight (8) of the proposed Quality Assurance Representative (QAR) III’s. The proposal shall display compliance with this requirement. The proposed staff shall meet all the requirements mentioned in section C.3.1.2. See the wage determination section for additional information on positions. The proposal shall include a short summary of experience per individual, identifying the name, qualifications, and experience level of each staff member that is included in the proposal. Each summary should have approximately five
(5) sentences per credential. To be considered technically acceptable, the Offeror shall meet the following requirements:
i. A minimum of fifteen (15) QAR III’s who have heavy civil construction experience with the site conditions encountered within the New Orleans District.
ii. At a minimum, the proposal shall include at least one staff member for each of the additional disciplines, as follows: Construction Manager, Project Engineer, Senior Engineer, Cost Estimator, and Scheduler.
c. Safety Program: To be technically acceptable, at a minimum, a contractor shall provide a program that contains the following:
i. General safety statement for all employees
ii. Program goals and objectives
iii. Policies and procedures for non-compliance for employees and managers
d. Invoicing and Payments: To show invoicing capabilities when there are multiple concurrent task orders, a contractor shall provide sample invoices with associated sample supporting timesheets, depicting clocked hours that match invoicing from at least two (2) theoretical task orders.
e. Letter(s) of Commitment from Subcontractor(s): If applicable, qualifications of proposed subcontractors will be included in the evaluation, as the prime and subs are considered to be a "team" or "firm"; however, the prime contractor shall perform at least fifty percent (50%) of the contract work with their own forces. As applicable, the Offeror shall provide a list of subcontractors, including letter(s) from the individual subcontractor(s) attesting to this fact, and their intent to provide services under the contract. In accordance with FAR 52.219-14, as a service contract, it is essential that the prime contractor performs at least fifty percent (50%) of the work. This includes demonstrating that at least half of the QAR III’s are employed by the prime contractor.
B. VOLUME II – Past Performance. This volume shall contain past performance information regarding at least one (1) and no more than five (5) similar multi-year contract(s) that is greater than $1 million and occurred within the last five (5) years. This volume shall not exceed 25 pages, excluding the Past Performance Questionnaire Form and CPARS ratings and full reports. Either the Questionnaire or the CPARS report shall be provided for each contract. Offerors shall submit Government and/or commercial contracts, relevant to the efforts required by this solicitation, for the prime Offeror awarded during the past five (5) years, from the issue date of this RFP. Relevant services are defined as the same as or similar to the services under the NAICS code 541330. The past performance information provided shall have a satisfactory or higher rating. No ratings in the last five (5) years, from the issue date of this RFP, shall be less than satisfactory. The Government may verify CPARS ratings independently. This volume should have the information described below for each contract referenced.
1. Contract Descriptions. This section should include the following information in the following format.
a. Your firm’s role (Prime Contractor or Subcontractor)
b. Client name/organization (company/firm/government agency)
c. Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, current address, email address, and telephone number)
d. Scope of work, emphasizing how it is relevant to this solicitation (scope and magnitude).
e. Government contracting activity, current address, Procuring Contracting Officer’s name, email address, telephone number.
f. Government’s technical representative/Contracting Officer’s Representative’s name, current email address and telephone number.
g. Government contract administration activity, the Administrative Contracting Officer’s name, current email address, and telephone number.
h. Government contract administration activity’s Pre-Award Monitor’s name, current email address, and telephone number.
i. Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and
Blanket Purchase Agreements, including Delivery Order Numbers.
j. Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement (CR), Time &
Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).
k. Number of construction management services personnel used and classification
l. Awarded price/cost.
m. Final or projected final price/cost.
n. Original delivery schedule, including dates of start and completion of work.
o. Final or projected final, delivery schedule, including dates of start and completion of work.
2. Performance. Offerors should provide a specific narrative explanation of each contract listed in Contract Description describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.
a. For any contracts that did not/do not meet original schedule or technical performance requirements, the Offeror shall provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offeror should list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver should be addressed with respect to causes and corrective actions. The Offeror shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. If any of the contracts listed were terminated, the Offeror shall indicate the type and reason for the termination.
b. CPARS ratings and full reports shall be provided for previous Corps projects, and a Past Performance Questionnaire shall be completed and submitted for each non-Corps client. The Offeror shall complete Part I of the Past Performance Questionnaire and email the questionnaire to the email listed on the solicitation. The POCs shall be instructed to electronically complete Part II of the questionnaire and email the entire questionnaire to the Contracting Specialist no later than the proposal due date. The Offeror shall email to the Contracting Specialist a list of all the POCs who were sent a questionnaire. The Government shall receive this list no later than the proposal due date. The POC List should include the following fields: Client; Contract Number; POC Contact Information (First and Last Name, Title, Telephone Number, Email Address); and Date Questionnaire Emailed to POC (month/day).
3. Subcontracts. As applicable, Offerors should provide an outline of how the effort required by the RFP will be assigned for performance within the Offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor shall include the entire company name, company address, CAGE Code, DUNS Number, and type of work to be performed. This includes all subcontractors who will be providing critical services.
4. New Corporate Entities. As applicable, new corporate entities may submit data on prior contracts involving their offices and employees. However, in addition to the other requirements in this section, the Offeror should discuss in detail the role performed by the individuals cited in the prior contracts. Information should be included in the files described in the sections above.
C. VOLUME III – Cost/Price. The volume shall be organized into the following sections:
1. Bid Schedule. Fill in the unit prices in Section B in a MS Excel file. Then, explain how the unit prices in Section B were developed in narrative format, where the following information shall be included:
a. The name(s) and title(s) of the person(s) authorized to negotiate and sign a contract.
b. The labor rates based on supporting payroll data for all position classifications anticipated to be used under the contract by the prime firm and any subcontractors. Include the basis for any escalation in labor rates. The Government reserves the right to obtain any supporting payroll data to confirm the validity of the proposed line items.
c. Financial data and the methodology used to calculate the proposed overhead rates for the prime firm and any subcontractors. Identify costs not allowed by FAR 31.2.
d. If audited by any Government agency within the last calendar year, bidders should provide the name and address of the auditor.
e. Executed Section B, Supplies or Services and Prices/Costs
2. Compliance. Failure to comply with the requirements in Volume III-Cost/Price may result in an adverse assessment of an Offeror’s proposal and reduce or eliminate its chance of being selected for award. Offerors should ensure that the information presented in this volume is consistent and correlates with the information contained in the other proposal volumes. Also, the Offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF33 and continuation sheets.
3. General Instructions. In accordance with Federal Acquisition Regulation (FAR) 15.402 and 15.403-1, certified cost or pricing data are not required based on the fact that adequate competition is expected for this procurement. Information other than certified cost or pricing data may be required. Information submitted should be prepared following the instruction in FAR 15.403-5. If after receipt of proposals the Contracting Officer determines that there is insufficient information available to determine price reasonableness and none of the exceptions at FAR 15.403-1 apply, the Offeror may be required to submit cost or pricing data. Additionally, in the event that adequate competition is not obtained, the Contracting Officer may incorporate FAR 52.215-20 entitled, “Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data,” into the solicitation and request a Certificate of Current Cost or Pricing Data.
There are no page limitations for this volume. Proposal information included in this volume which is not directly related to Cost/Price will be disregarded.
D. VOLUME IV – SOLICITATIONS, OFFER AND AWARD DOCUMENTS, AND
CERTIFICATIONS/REPRESENTATIONS
Each Offeror shall complete (fill-in and sign) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP, as well as any amendments. The Offeror is not required to provide evidence of insurance at the time of proposal submission; however, documentation shall be submitted by the selected Offeror prior to contract award. An authorized official of the firm shall sign the SF 1449 and all certifications requiring original signature. Section K is not required to have original signatures. A PDF file should be created to capture the signatures for submission.
Section A – Standard Form 1449 (SF 1449) Section K – Representations, Certification and Other Statements of Offerors
PROPOSAL SUBMISSION
A. PROPOSAL SUBMISSION
1. PROPOSAL SUBMISSION PROCEDURES
a. Each volume shall be submitted electronically via the email address listed on the solicitation. Any portion of the proposal that is changed (as a result of negotiations or proposal revisions) shall be annotated and dated. Each volume shall be clearly labeled with its title.
b. All of the proposal files shall be separate uploads in read-only format, using PDF files, except for the MS Excel Price Schedule.
2. General Instructions:
a. Each part of the proposal shall be separate and complete so that evaluation of each may be accomplished independently from evaluation of the other.
b. The full proposal shall be submitted electronically to Evan Woitha: evan.g.woitha@usace.army.mil by the RFP due date and time.
c. All Offerors agree to all of the requirements of Section C, Description of Services, and shall provide sufficient information to allow evaluation of the proposals in accordance with Section M, Evaluation Factors for Award.
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0002 |
| EffDate: 28 JAN 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912P8 |
| AdmCode: |
| IssuedBy: W07V ENDIST N ORLEANS |
KO CONTRACTING DIVISION, 7400 LEAKE AVE
NEW ORLEANS, LA 70118-3651
UNITED STATES
EVAN WOITHA, EMAIL: EVAN.G.WOITHA@USACE.ARMY.MIL TELEPHONE: (504) 862-1214
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912P826RA007 |
| SolDate: 06 JAN 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |