This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract issued by the U.S. Army Corps of Engineers, New Orleans District, dated 08 SEP 2026. The amendment modifies solicitation W912P826BA081 for Lake Pontchartrain Tributaries Tchefuncte River Bar Channel Maintenance Dredging in St. Tammany Parish, Louisiana (Project ED-26-009).
The amendment incorporates revisions to the Project Table of Contents to add Section 00 22 00 Supplementary Instructions, and updates Section 00 10 00 Bidding Schedule and Section 35 20 23.00 12 Dredging specifications. Key modifications include: revised mobilization and demobilization provisions; updated dredging payment terms for two work areas (C/L Stations 17+50 to 72+00 with 90,000 cubic yards estimated and C/L Stations 4+00 to 11+00 for optional work with 5,000 cubic yards); clarified character of materials language specifying sand, silt, clay, shell, logs, stumps, snags, and debris may be encountered; and disposal procedures for stumps and woody debris. The bidding schedule lists four line items: Base Work (Items 0001-0002) and Optional Work (Items 0003-0004), with award to be made as a whole to one bidder. Optional work duration adds 20 calendar days to the base contract period of 56 calendar days. Contractors must bid on all items to avoid non-responsive bid rejection. The revised drawing (Sheet Identification C-101) depicts the channel layout, disposal areas, and design specifications at 125-foot bottom width with 1:2 side slopes to elevation (-)10.0 feet MLG.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01 - Bid Abstract_W912P826BA081_Signed.pdf | ||
| W912P826BA081 Solicitation Package.pdf | ||
| W912P826BA081_Advertised_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
W912P826BA0810001
PROJECT TABLE OF CONTENTS
Delete the Project Table of Contents in its entirety and substitute with the attached revised Project Table of Contents to add Section 00 22 00 Supplementary Instructions.
SECTION 00 10 00
Pages 00010-3, and 4. Delete these pages in their entirety and substitute with the attached revised pages 00010-3, and 4.
SECTION 35 20 23.00 12
1. Page 4, paragraph 1.3.1. Delete the paragraph in its entirety and substitute the following therefore:
“1.3.1 Mobilization and Demobilization
An item to cover the cost of initial mobilization and final demobilization and additional mobilization and demobilization - OW of the Contractor's plant and equipment under this contract is included and will be paid for as stipulated in the Contract provision in Section 00 70 00 GENERAL CONDITIONS entitled PAYMENT FOR MOBILIZATION AND DEMOBILIZATION.”
2. Page 4, paragraph 1.3.2. Delete the paragraph in its entirety and substitute the following therefore:
“1.3.2 Dredging
Payment will be made at the applicable contract unit price per cubic yard for "Dredging – C/L Stas.
17+50 to 72+00" or “Dredging – C/L Stas. 4+00 to 11+00 - OW”. Price and payment shall constitute full compensation for furnishing all plant, labor and materials and performing all work for surveying, including any additional soundings that may be directed, excavation, disposal of materials, furnishing crewboat fully operated, furnishing survey vessel(s) as required in Section 02 21 10.00 12 SURVEYS, pollution control, furnishing and maintaining radio and telephone communications equipment, and all operations incidental thereto.”
3. Page 10, paragraph 3.1.7. Delete the paragraph in its entirety and substitute the following therefore:
“3.1.7 Character of Materials
The material to be removed within the required dimensions specified consists of shoaling that has occurred since the channel was last dredged and insitu material. Sand, silt, clay, shell, logs, stumps, snags, debris, and other obstructions may be encountered. Bidders are expected to examine the site of the work and, after investigation, decide for themselves the character of the materials, The Contractor shall note the following dredging jobs previously performed:
Location Date Design Width Slopes
Dredged Elevation Dimensions Depth (ft-MLG)
Tchefuncte River 02 Dec 2017 (-)10.0' MLG 125' 1V:2H Bar Channel
Tchefuncte River 30 May 1986 (-)10.0' MLG 125' 1V:2H Bar Channel
*Note: Contractor shall note the presence of stumps and woody debris common along the shoreline of Lake Pontchartrain. Although the channel footprint has been dredged previously, woody debris may have been buried in the dredge template during high water events in the channel and movement within the lake during storm events. If option work is exercised, the Contractor should be aware the option reach was not dredged last contract (s). Contractors should estimate production for this option reach as a new cut with virgin material. Consideration of stumps is also required for disposal operations.
Disposal operations will require movement around and over stumps. Stumps, woody debris and all other debris removed during dredging/disposal operations shall be disposed of in accordance with paragraph entitled DISPOSAL OF NON-REGULATED DEBRIS AND OTHER WASTE of Section 01 57 20.01 12 ENVIRONMENTAL PROTECTION, except that stumps and woody debris may be placed within the disposal area. Dredging of access into the disposal areas for disposal of stumps and woody debris is not allowed. Contractor shall make precautions necessary to prevent damage to the dredge pump (screening).”
DRAWINGS
SHEET IDENTIFICATION C-101. Delete the drawing in its entirety and substitute with the attached revised drawing SHEET IDENTIFICATION C-101.
PTC-i Ed 26-009
Lake Pontchartrain Tributaries Tchefuncte River Bar Channel
Maintenance Dredging St. Tammany Parish, Louisiana
PROJECT TABLE OF CONTENTS
Division 00 – PROCUREMENT AND CONTRACTING
SOLICITATION, OFFER AND AWARD SF-1442
00 10 00 BIDDING SCHEDULE
00 21 00 INSTRUCTIONS TO BIDDERS
00 22 00 SUPPLEMENTARY INSTRUCTIONS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
Division 01 - GENERAL REQUIREMENTS
01 10 00 GENERAL PROVISIONS
01 32 16.10 12 CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.00 10 CONTRACTOR QUALITY CONTROL
01 57 20.00 12 ENVIRONMENTAL PROTECTION
01 78 02.00 10 CLOSE OUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 21 10.00 12 SURVEYS
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 20 23.00 12 DREDGING
35 20 23.33 NATIONAL DREDGING QUALITY MANAGEMENT
PROGRAM
SECTION 00010 – BIDDING SCHEDULE
Lake Pontchartrain Tributaries Tchefuncte River Bar Channel
Maintenance Dredging St. Tammany Parish, Louisiana
00010-3 ED 26-009
Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
*0002 Dredging – C/L Stas.
17+50 to 72+00 90,000 CY
TOTAL BASE WORK: $
OPTIONAL WORK - OW
*0003 Additional Mobilization and Demobilization - OW 1 JOB
*0004 Dredging – C/L Stas. 4+00 to 11+00 - OW 5,000 CY
TOTAL OPTION WORK: $
TOTAL BASE WORK + OPTION WORK: $
* Denotes a change from previous Bidding Schedule
Award will be made as a whole to one bidder.
NOTE 1: The unit “JOB” as used in this Bidding Schedule is synonymous with the term “Lump Sum” used elsewhere within these plans and specifications.
NOTE 2: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE
UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY
ITEM, ITS BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE
INELIGIBLE FOR AWARD.
NOTE 3: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or subline items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).
NOTE 4: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442 after Notice of Award. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within 24 hours after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal
00010-4 ED 26-009
process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
*NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
*NOTE 6: OPTION WORK ITEM: This provision pertains to Bid Item(s) 0003 and 0004.
The Government may require the delivery of, in whole or part, the Option Items. The Government may exercise the Option Items by written notice to the contractor at any point between Notice to Proceed and contract completion. If the Government activates an Option Item(s), the activation will occur while the Contractor’s plant is within the limits of work. Bidders shall bid on all items, including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
*NOTE 7: TIME ADJUSTMENT IN THE EVENT OF OPTIONAL WORK. In the event that Optional Work Item 0004 Dredging – OW is exercised under the terms of this contract, the time required for completion of the contract will be increased by 20 calendar days beyond the original duration of 56 calendar days established for the Base Work items specified in Section 00 73 00 SUPPLEMENTARY CONDITIONS, entitled
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
NOTE 8: RAPID VENDOR PAYMENT. Web based instructions for the submission of invoices may be found at the following website:
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment
(End of Clause) http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment
C-101
L A
K E
P O
N T
C H
A R
T R
A
IN
T R
IB
U
T A
R
IE
S
P L
A N
V
IE
W :1
E D
C
-1 .d g n
N
0 500'
SCALE:1"=500'
1000'
LAKE PONTCHARTRAIN
T C
H E
F U
N C
T E R
IV
E R
L 725.63' L 870.76'
R 500.00' R 600.00'
T 443.54'' T 532.25'
DISPOSAL AREA
SECONDARY
DISPOSAL AREA
PRIMARY
DM 2
LIGHTED
DM 4
DM 6
LIGHT
WHITE GUIDE
TOWBOAT
SUNKEN
DM 8
DM 10
CURVE 2 DATA
OF CUT
NORTH EDGE
CURVE 2 DATA
OF CUT
SOUTH EDGE
L 1398.70'
C/L CURVE 1 DATA C/L CURVE 2 DATA
L 798.20'
T 849.64'
R 976.77'
D 5° 51' 54.76"
82° 2' 52.86"
R 550.00'
83° 9' 5.79"
D 10° 25' 02.80"
T 487.90'
D 10° 27' 33.07"
83° 9' 5.79"
D 5° 32' 57.56"
83° 9' 5.79"
Y= 685197.20
X= 3651095.38
P.C. 2+99.94 C/L
Y
.9
X
.1
P .T . 1
.6
C /L
Y
.6
X
.0
P .C . 3
.5
Y= 684362.71
X= 3647651.40
P.T. 42+69.74
Y= 684686.25
X= 3648351.74
BEGIN FLARE
P.O.T 33+71.74
Y= 684838.93
X= 3648172.44
BEGIN FLARE
P.O.T 35+71.89
Y= 684475.70
X= 3647617.26
END FLARE
P.O.T 41+69.38
Y= 684250.00
X= 3647685.53
END FLARE
P.O.T 43+69.54
,6
,3
' 0
,6
,0
,7
,4
,1
688,500
30°23' 0"
685,800
683,100
30°22' 0"
680,400
,6
,1
,4
,7
,0
,3
680,400
30°22' 0"
683,100
685,800
30°23' 0"
688,500
CURVE 2
CURVE 1
X 3651179.529
Y 685485.102
X 3649220.923
Y 686114.350
X 3648925.715
Y 685127.398
X 3647857.519
Y 685436.746
X 3644264.741
Y 686069.662
NOTES:
3. TOPOGRAPHY SHOWN WAS PREPARED FROM BING MAPS 2026.
4. REQUIRED CHANNEL DIMENSIONS ARE 125 FOOT BOTTOM WIDTH, 1H ON 2V SIDE
6. DREDGE DISCHARGE LOCATION SHALL BE MOVED AS DISPOSAL BUILDS TO AN
5. DREDGE MATERIAL SHALL BE PLACED UNCONFINED IN PRIMARY DISPOSAL AREA.
THE SECONDARY DISPOSAL AREA IS TO BE USED ONCE THE PRIMARY AREA IS FILLED.
SLOPES, TO AN ELEVATION OF (-)10.0 FEET M.L.G WITH 1 FOOT ADVANCE MAINTENANCE.
ELEVATION OF (+)3.0 FEET NAVD88.
1. CONTRACTOR SHALL NOT ASCEND THE SHORELINE. ALL WORK SHALL BE DONE
Y 680087.769
X 3646489.339
AZ. 98°20'25.96"
17'33.09"
AZ. 16
A Z
'2
.2
LIGHTHOUSE
X 3648073.115
Y 685377.634
125' C
H A
N N
E L C /L
B O
T T
O M E
D G
E O
F C
U T
B O
T T
O M E
D G
E O
F C
U T
H W
Y
H W
Y
ELEVATION +3.0' NAVD88
MAXIMUM DISPOSAL
FROM THE OPEN WATERS OF LAKE PONTCHARTRAIN. STUMPS AND OTHER DEBRIS
WILL BE ENCOUNTERED.
7. NO DIRECT DISCHARGE OUTSIDE DELINIATED DISPOSAL AREA (EXISTING MARSH).
C/L STA. 87+00
LIMIT OF WORK
C/L STA 0+00
LIMIT OF WORK
TO BE BUILT BY OTHERS
PROPOSED ROCK JETTY
C/L STA 4+00.00
BEGIN DREDGING
C /L S
T A
E N
D D
R E
D G
IN
G
C /L S
T A
B E
G
IN
D
R E
D G
IN
G
2. A FLARE IN THE CHANNEL WILL BE CUT STARTING AT C/L STA. 34+71.54 AND ENDING
AT C/L STA. 42+69.74. THE FLARE HAS A MAXIMUM WIDTH OF 200 FEET AT THE LARGEST
PART.
876 1993 F TIDAL
C/L STA.72+00
END OF DREDGING
TO BE BUILT BY OTHERS
PROPOSED BREAKWATER
C/L STA 4+00 TO 11+00
OPTION REACH
\2
\2
A N
S I
D
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G
S C
O T
T C
L E
M E
N T
S .A
.C
NEW ORLEANS DISTRICT
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S I Z
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E P
L O
T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T
N O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
L A
K E
P O
N T
C H
A R
T R
A
IN
T R
IB
U
T A
R
IE
S
S T
T
A M
M A
N Y
P A
R
IS
H L
A
H -1
-4
J U
N E
T C
H E
F U
N C
T E
R
IV
E R
B A
R C
H A
N N
E L
W
P
C X
X X
X
J A
S O
N B
IN
E
T
J A
S O
N B
IN
E
T P
.E
W
P
B A
E D
-2 -0
Y= 684507.56
X= 3647798.12
STAFF GAGE
A
D D
E D
O P
T
IO
N W
O R
K R
E A
C H
S
E P
T
S
.A .C
© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © Mapbox
File details come from the government source that posted it. Updated .