This document is a Standard Form 30 Amendment to Solicitation (Amendment 0002) for the Calcasieu River and Pass Dredged Material Management Plan, CDF-22 Degrading project, issued by W07D ENDIST N ORLEANS (USACE New Orleans District). The effective date is 08 SEP 2026, with solicitation number W912P826BA068, originally dated 13 AUG 2026. The amendment makes technical revisions to Section 01 57 20.01 12 (Environmental Specifications) and replaces drawings C-104 through C-109 with revised versions. Specifically, the amendment deletes the reference to the "Changes (FAR 52.243-4)" clause in paragraph 3.3.1.3 and replaces it with "Default (Fixed-Price Construction) (FAR 52.249-10)," clarifying that contractors will receive schedule adjustments rather than equitable cost adjustments for Government-directed environmental work stoppages related to bird nesting protection requirements.

The accompanying Bid Inquiry Contractor Report documents 44 contractor questions and Government responses addressing project execution details. Key topics include excavation quantity calculations (1,220,000 cubic yards estimated), payment based on average-end-area methods using contractor pre-grading surveys, Government review timelines of up to 30 days, material reuse requirements within disposal areas, clearing and grubbing scope (40 acres estimated), environmental compliance measures (bird nesting prevention, manatee protection), work hour restrictions (6:00 a.m. to 9:00 p.m.), and survey control access requirements. The Government confirmed that concurrent excavation/fill operations are permitted, no additional borrow material will be provided, all cleared debris must be removed offsite, GPS machine-controlled equipment is acceptable, and the 224-calendar-day contract performance period was developed considering adverse weather conditions. The bid opening date remains unchanged at 11 September 2026, 11:00 AM Local Time.

View the file

Other files

File Type Posted
W912P826BA068 Bid Abstract.pdf PDF
AM_0002 CDF-22 Survey.xlsx XLSX spreadsheet
W912P826BA068 AM_0001.pdf PDF
W912P826BA068.pdf PDF
Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Classified information is NOT permitted on this site.

Bid Inquiry Contractor Report All Inquiries

Project: CDF-22 Degrading Review: Contractor Questions and Answers (00001) (sorted by CommentID ) Displaying 44 inquiries.

Id Discipline Sheet Detail Spec

11978276 Civil Section 00 10 00, Item 0003; Section 31 23 00.00 20, Paragraph 1.2.1; Section 02 21 10.00 12

Comment Classification: Unclassified (U)

The Bidding Schedule identifies an estimated excavation quantity of 1,220,000 CY. Section 31 23 00 states that payment quantities will be determined by the Government using the average-end-area method based upon the Contractor's Pre-Grading Survey and actual final grade. Please confirm whether 1,220,000 CY represents the Government's current calculated estimate based on the March 2026 survey and contract grading limits. Please also provide the Government's quantity calculation, existing/proposed digital terrain models, cross-section quantity files, or other supporting earthwork quantity data used to establish the 1,220,000 CY bid quantity, if available.

On: Aug 25 2026.

Government Response. . The estimated excavation quantity of 1,220,000 CY identified in the Bidding Schedule

(CLIN 0001) represents the Government's estimate and is based on March 2026 survey.

However, the contract documents stipulate that the final payment quantity will not be based on this initial estimate.

Instead, the final paid quantity will be determined using the average-end-area method based upon the Contractor's pre-grading survey and the actual final grade. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978283 General Section 31 23 00.00 20, Paragraph 3.3.1; Section 02 21 10.00 12 Comment Classification: Unclassified (U)

The specifications indicate that grades shown on the drawings are prior to clearing and grubbing and that, following clearing and grubbing, the Contractor shall field verify the new grade elevations. This verification survey becomes the original survey for determining excavation quantities. Please confirm that the Contractor will be paid for the actual quantity calculated between the approved post-clearing Pre-Grading Survey and accepted final grade, regardless of whether the actual quantity is greater or less than the estimated 1,220,000 CY. Please also confirm that no excavation may begin until the Government has reviewed and accepted the Pre-Grading Survey that will establish the pay quantity baseline.

On: Aug 25 2026.

Government Response. . Yes, the contractor is paid on actual quantity calculated. No excavation may begin until the Pre-Grading Survey has been approved by the Government. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978287 General Section 02 21 10.00 12; Section 31 23 00.00 20 Comment Classification: Unclassified (U)

Please identify the anticipated Government review period for the Pre-Grading Survey and clarify the procedure to be followed if the Government and Contractor disagree regarding the pre-grading surface, final surface, or calculated excavation quantity.

Please confirm whether a mutually accepted quantity surface or signed quantity computation will be established before excavation progresses beyond initial grading.

On: Aug 25 2026.

Government Response. . Review will be completed as soon as practicable, but the Government will be allowed up to 30 calendar days for review and return of each submittal.

If the contractor and the Contracting Officer cannot agree on the survey elevations, the Government's calculation will be provisionally used. If the contractor does not agree with the Government's computation, the "Disputes" clause of the contract can be invoked.

The process does not mandate that all excavation must cease until a initial quantity is signed off on; rather, it relies on the accepted pre-grade survey as the established starting point. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978294 General Drawings G-003 and C-101 through C-114; Section 02 21 10.00 12 Comment Classification: Unclassified (U)

9/8/26, 1:09 PM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 1/11

The drawings state that existing grades are based upon survey data collected in March 2026. Please provide the March 2026 survey in electronic format, including available XYZ/point files, breaklines, contours, CAD files, TIN/surface files, or other digital terrain data used to develop the contract drawings.

On: Aug 25 2026.

Government Response. . Survey data will be provided.

EMC26-028_USACE_New_Orleans_Calcasieu_River_and_ Pass_-_NG.zip On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978297 General Drawing G-003 General Notes 3 and 4; Section 31 23 00.00 20, Paragraphs 2.1, 3.1 and 3.4

Comment Classification: Unclassified (U)

The contract requires excavated material generated by CDF-22 degradation to be used as fill, first within CDF-22 and then within FDDA-22, and prohibits borrow excavation outside the grading limits. If actual post-clearing survey quantities demonstrate that insufficient suitable material exists within the permitted excavation limits to bring all required areas to the specified grades and slopes, please identify the required procedure. Specifically, please confirm whether the Government would furnish additional borrow, authorize an outside borrow source by modification, revise the required grades, or otherwise adjust the work.

On: Aug 25 2026.

Government Response. . No additional borrow material will be provided. The contractor shall utilize all currently available material to bring CDF-22 to final grade first prior to placing material in FDDA-22. If the volume of available material is insufficient to achieve final grade across the entire site, the contractor shall bring as much of the site to final grade as possible using only the currently available borrow. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978301 General Drawings C-104 through C-109, Note 2; Section 31 23 00.00 20 Comment Classification: Unclassified (U)

The drawings state that if excess excavated material remains after the site has been graded to EL. +15.1 NAVD88, additional material shall be spread evenly within the right-of-way. Please provide the allowable final elevation, maximum permissible additional fill thickness, and grading criteria for placement of excess material. Please confirm whether the +0.2-foot grade tolerance remains applicable after excess material is directed to be spread above the proposed EL. +15.1 surface.

On: Aug 25 2026.

Government Response. . Minimal to no excess material is anticipated following clearing and grubbing operations. If excess material is encountered, the Contractor may determine the stockpile location at their discretion. The Contractor remains responsible for ensuring the selected location does not interfere with post-construction survey measurements or final quantity verifications. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978303 General Section 31 23 00.00 20, Paragraphs 2.1 and 3.1; Drawings C-104 through C-

Comment Classification: Unclassified (U)

The excavation specification requires excavated material to be placed as fill within CDF-22 and FDDA-22; however, no specific lift thickness, moisture conditioning, compaction equipment, density requirement, Proctor value, proof rolling requirement, or field density testing frequency is identified. Please confirm the required standard for placement and acceptance of fill. If controlled compaction is not required, please confirm that fill may be placed, spread, and tracked with earthmoving equipment to the required lines and grades without density testing.

On: Aug 25 2026.

Government Response. . Fill may be placed, spread, and tracked with earthmoving equipment to the required lines and grades without density testing. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978306 General Section 31 23 00.00 20 Comment Classification: Unclassified (U)

Please confirm whether the Government has information regarding the moisture content, consistency, bearing capacity, or trafficability of the existing dredged material within CDF-22. If material encountered within the required excavation limits is https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 2/11 excessively wet, saturated, pumping, or otherwise unsuitable for direct hauling and placement, please clarify whether drying, aeration, mixing, stabilization, geotextile, undercutting, or other conditioning will be required. Please identify how such work would be measured and paid if not reasonably achievable by ordinary excavation, hauling, spreading, and tracking operations.

On: Aug 25 2026.

Government Response. . Recommend that the contractor evaluate existing site conditions to determine the best means/methods to successfully execute the work. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978308 General Section 31 23 00.00 20; Section 01 57 20.01 12 Comment Classification: Unclassified (U)

Please confirm whether active dewatering, pumping, ditching, temporary drainage construction, or management of ponded water is anticipated within the CDF or FDDA during construction. If pumping or discharge is required, please identify approved discharge locations and any water-quality, treatment, turbidity, permitting, or monitoring requirements applicable to the discharge.

On: Aug 25 2026.

Government Response. . It is not anticipated that dewatering will be required for ponding water. However, it is encouraged that the contractor make a site visit before bidding to determine means and methods needed to accomplish work. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978310 General Drawing C-101, Access Corridor Comment Classification: Unclassified (U)

Drawing C-101 identifies a single "Access Corridor" at the northwest portion of CDF-22. Please provide the limits, width, ownership/access rights, existing surface condition, allowable equipment loading, and any restrictions applicable to use of this corridor. Please also confirm whether construction, widening, stabilization, maintenance, aggregate surfacing, culvert installation, or restoration of the access corridor is required and, if so, under which bid item the work is to be included.

On: Aug 25 2026.

Government Response. . Survey control points are given on sheet C-101 that outline the access corridor. The access corridor is approximately 30 feet wide and an unpaved dirt road. The contract provides the right for the contractor to use it to access the site. It is not anticipated that any of the mentioned work to use the corridor will be required. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978319 General Drawing C-101; Section 01 57 20.01 12 Comment Classification: Unclassified (U)

Please identify areas within the project limits that may be used for Contractor staging, equipment parking, fuel/lubricant storage, maintenance, field offices, employee parking, and material laydown. If no designated staging area is available, please confirm that the Contractor may establish temporary staging areas within the ROW subject to the approved Environmental Protection Plan.

On: Aug 25 2026.

Government Response. . The contractor is responsible for and permitted to establish their own temporary staging areas within the project's right-of-way, subject to Government approval and the conditions of the Environmental Protection Plan. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978326 General Drawing C-101 Note 1; Section 31 11 00.00 12 Comment Classification: Unclassified (U)

Drawing C-101 states that the entire CDF and Foreshore Dike Disposal Area within the ROW must be cleared and grubbed prior to degradation. Please confirm whether clearing and grubbing is required throughout the entire project ROW, including areas that will not be cut or filled, the access corridor, dike side slopes, and areas immediately adjacent to the existing stone dike. If available, please provide the Government's estimated acreage of clearing and grubbing.

On: Aug 25 2026.

Government Response. . The contract documents confirm that clearing and grubbing are required throughout the entire project ROW. 40 acres was estimated for clearing and grubbing. This estimate does not relieve the contractor of https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 3/11 doing their own due diligence. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978334 General Section 31 11 00.00 12, Paragraph 3.4; Section 01 57 20.01 12 Comment Classification: Unclassified (U)

Please confirm whether cleared and grubbed vegetation, roots, timber, wood and other debris must be removed from Government property and disposed of at an approved offsite facility. If onsite disposal is permissible, please identify the approved onsite disposal location and method. If all material must be hauled offsite, please confirm that all loading, hauling, tipping fees and disposal charges are included in Bid Item 0002, Clearing and Grubbing.

On: Aug 25 2026.

Government Response. . No onsite disposal is permissible and all cleared and grubbed material is to be disposed

of. Means and methods for disposal are the contractors' responsibility and to be provided and approved beforehand.

On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978339 General Section 31 11 00.00 12, Paragraph 3.4.2 Comment Classification: Unclassified (U)

Please confirm whether burning of clearing and grubbing debris will be permitted on the project site. If permitted, please identify required Federal, State, parish, fire-marshal, environmental, or USACE approvals and any restrictions regarding burn locations, wind conditions, fire watch, or burning periods.

On: Aug 25 2026.

Government Response. . The contractor is responsible for determining if burning is a proper means of disposal.

"The Contractor shall be solely responsible for determining whether open burning is permitted in the areas where the work will occur and for obtaining any required approvals, permits, notifications, or authorizations from the appropriate agencies or authorities having jurisdiction." On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978343 General Drawings C-101 and C-104 through C-109; Section 31 23 00.00 20 Comment Classification: Unclassified (U)

The final grading is required to transition toward the existing channel-side stone dike beginning approximately 100 feet from the stone dike. Please clarify whether excavation, trafficking, stockpiling, equipment operation, or fill placement is prohibited on or immediately adjacent to the existing stone dike. Please provide any required equipment setback or protection criteria and confirm whether damage resulting from normal construction access adjacent to the dike is the Contractor's responsibility.

On: Aug 25 2026.

Government Response. . It is not advised to drive on the existing stone dike. There are no restrictions of normal construction adjacent to the existing stone dike. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978346 General Drawings C-104 through C-109 Note 3; Section 31 23 00.00 20, Paragraph 3.3.1

Comment Classification: Unclassified (U)

The contract requires a continuous slope beginning 100 feet from the existing stone dike and extending from proposed final grade to top of rock, provided the entire FDDA area has been filled. Please confirm whether the 100-foot dimension is measured horizontally perpendicular from the landward edge/top of the existing stone dike. Please also provide the intended grading surface or digital breakline for this transition where the existing top-of-rock elevation varies.

On: Aug 25 2026.

Government Response. . The 100 foot offset distance is measured horizontally inward from the edge of the existing rock dike, establishing a break line parallel to the dike. The final grade may intercept the rock dike at any elevation, provided fill material is not placed above the crest or over the top of the existing rock dike. On: Sep 08

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978351 General Section 31 23 00.00 20, Paragraph 3.3.1 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 4/11

Comment Classification: Unclassified (U)

Section 31 23 00 requires the final surface to tie into existing ground at the edge of ROW using a 1V:4H slope, except at the existing stone dike. Please confirm whether this 1V:4H tie-in applies continuously around all remaining ROW boundaries, regardless of the available distance between EL. +15.1 and the ROW. Where the required 1V:4H slope would extend outside the ROW, please provide the required grading treatment.

On: Aug 25 2026.

Government Response. . The 1V:4H tie-in slope applies continuously along all remaining ROW boundaries except at the existing stone dike. All sloped grading must remain entirely within the ROW limits. The Contractor is responsible for field-adjusting the top (hinge point) of the slope as necessary to ensure no portion of the final grade extends beyond the ROW boundary. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978356 General Drawing G-003 Note 5; Drawing C-101; Section 31 23 00.00 20, Paragraph 3.6

The specifications require the existing spill box to be removed from its current location and placed "in its entirety approximately 150 feet from the existing rock dike." Please provide the exact proposed spill box location by station/offset or northing/easting and required final elevation. Please also clarify whether the 150-foot dimension is measured from the nearest edge, crest, centerline, or toe of the existing stone dike.

On: Aug 25 2026.

Government Response. . The approximate location of the spill box is reference on sheet C-101. The 150 foot dimension is measured from the nearest edge of existing dike. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978359 General Section 31 23 00.00 20, Paragraph 3.6 Comment Classification: Unclassified (U)

Please clarify the complete scope associated with relocating the existing spill box, including required excavation;

disconnection/removal of existing pipe; demolition or removal of foundations; lifting and transport; new foundation or bedding;

placement and leveling; reconnection or extension of pipe; backfill; erosion protection; and testing or functional requirements.

Please confirm whether the spill box is simply to be relocated and stored/set at the designated location or must remain operational after relocation.

On: Aug 25 2026.

Government Response. . The spill box is simply to be relocated and stored/set at the designated location. It does not need to remain operational. Some disassembly may be required to move. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978364 General Drawing C-101; Section 31 23 00.00 20, Paragraph 3.6 Comment Classification: Unclassified (U)

Please provide available record drawings, dimensions, approximate weight, construction material, foundation configuration and existing pipe sizes/elevations for the spill box scheduled to be relocated. If no information is available, please confirm the Contractor is to base its bid upon field-observed conditions.

On: Aug 25 2026.

Government Response. . Contractor is to base bid upon field observed conditions. It is encouraged that the contractor make a site visit before bidding to determine means and methods needed to accomplish work. On: Sep 08

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978368 General Drawings C-101 through C-114; FAR 52.236-9 Comment Classification: Unclassified (U)

Please confirm whether any active or abandoned pipelines, electrical services, communications lines, drainage structures, monitoring wells, discharge piping, or other utilities exist within the excavation, fill, access or staging limits. If known utilities exist, please provide available utility surveys or record drawings. Please also confirm whether utility locating beyond normal Louisiana One Call coordination is required prior to mass excavation.

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 5/11

On: Aug 25 2026.

Government Response. . There are no known utilities within the project site. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978371 General Section 00 10 00 Item 0004; Section 01 57 20.01 12, Paragraph 1.4.2 and 3.3.1.4

Comment Classification: Unclassified (U)

Bid Item 0004 establishes an estimated quantity of 30 DAY for Bird Nesting Prevention and Avoidance Measures. Please define a compensable "DAY" under this item. Specifically, please confirm whether payment is made for each calendar day that required prevention measures, inspections, patrols, flagging/streamers or other approved measures are actively maintained, regardless of whether other construction activity occurs that day.

On: Aug 25 2026.

Government Response. . Yes, payment under CLIN 0004 is made for each calendar day that the required bird nesting prevention measures are actively and effectively maintained, regardless of whether other construction activities occur on that day. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978374 General Section 00 10 00 Item 0004; Section 01 57 20.01 12 Comment Classification: Unclassified (U)

Please confirm that the 30 days identified in Bid Item 0004 are an estimated quantity only and that the Contractor will be paid the contract unit price for the actual number of authorized days of Bird Nesting Prevention and Avoidance Measures performed.

Please confirm that required performance beyond 30 days will be paid at the contract unit price rather than being included without additional compensation.

On: Aug 25 2026.

Government Response. . If performance is required beyond the estimated quantity of 30 days for bird nesting prevention and avoidance measures, then yes, the contractor will be paid at the contract unit price for additional days.

On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978377 General Section 01 57 20.01 12, Paragraph 3.3.1.4; Section 00 10 00 Note 3 Comment Classification: Unclassified (U)

The environmental specification requires implementation of bird nesting prevention measures prior to construction, while the Bidding Schedule notes that physical work cannot begin until specified preconstruction submittals and meetings have been completed. Please confirm whether the Contractor will be authorized site access to implement approved bird nesting prevention measures prior to authorization for other physical construction. Please identify the anticipated date on which the Contractor is expected to commence bird prevention activities relative to Notice of Award and NTP.

On: Aug 25 2026.

Government Response. . Bird nesting prevention measures would not be allowed until specified preconstruction submittals and meetings are complete. The contractor can commence bird prevention activities after notice of award and once all submittals have been approved. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978381 General Section 01 57 20.01 12, Paragraph 3.3.1.4 Comment Classification: Unclassified (U)

The specification requires at least one terrain vehicle and/or person to travel throughout the entire project area at least once per hour from dawn to dusk as a bird deterrent. Please confirm whether this requirement is intended to apply seven days per week while bird nesting prevention measures are active, including weekends, holidays, weather shutdown days, and days when no construction occurs.

On: Aug 25 2026.

Government Response. . Yes, bird deterrent measures would be enforced 7 days per week including weekends and holidays. The only time to suspend measures would be for safety reasons during inclement weather. On: Sep 08

Current Request Status: Request Closed https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 6/11

11978385 General Section 01 57 20.01 12, Paragraphs 3.3.1.3 through 3.3.1.5 Comment Classification: Unclassified (U)

The specifications establish no-work distances of 650 feet for coastal birds, 1,000 feet for wading birds, 2,000 feet for pelicans and 660 feet for eagles, and state that schedule adjustment may be made if work is stopped due to nesting birds. Please clarify whether a Government-directed shutdown or restriction caused by protected bird nesting will also entitle the Contractor to an equitable adjustment for demonstrable additional costs, including idle labor/equipment, remobilization or changed sequencing, in accordance with the Changes clause.

On: Aug 25 2026.

Government Response. . The Contractor will not be entitled to an equitable adjustments for additional costs;

however, he will be compensated by an adjustment to the schedule under the Default (Fixed-Price Construction) clause. An amendment will be issued to revise Sec 01 57 20.01 12 para 3.3.1.3 No Work Distances to incorporate Default (Fixed-Price Construction) (RFO 52.249-10) and delete Changes (FAR 52.243-4). On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978388 General Section 01 57 20.01 12 Comment Classification: Unclassified (U)

Please identify whether any active or recently documented coastal bird, wading bird, pelican or eagle nesting areas presently exist within or near the CDF-22 project limits. Please provide the most recent environmental survey, nesting survey, USFWS coordination, or known exclusion-zone information applicable to the site.

On: Aug 25 2026.

Government Response. . There are no known active or recorded nests within the limits of CDF-22, and environmental surveys have thus far not been justifiable due to the absence of bird colonies. However, nesting colonies occur seasonally throughout south Louisiana and the spec is intended to inform the contractor that notifications and controls may be necessary should suspected nesting activity be observed during construction. On:

Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978389 General Section 01 57 20.01 12, Paragraph 3.3.2 Comment Classification: Unclassified (U)

Please confirm whether the manatee protection provisions apply only if the Contractor performs marine or in-water operations. If all construction equipment remains land-based and no vessels or in-water work are performed, please confirm that no dedicated manatee observer or additional marine protection measures will be required.

On: Aug 25 2026.

Government Response. . Correct. Due to restricted access to the project site being waterways, it can be assumed a contractor will regularly be using marine vessels to access the site. Therefore, when operating within waters, manatee protection is applicable. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978391 General Section 01 57 20.01 12, Paragraph 3.2.3 Comment Classification: Unclassified (U)

Please identify the stormwater permit, erosion-control permit, or other environmental permit currently applicable to the construction work. Please clarify whether the Government has obtained project-level environmental permits or whether the Contractor is responsible for obtaining an LDEQ construction stormwater permit and preparing/maintaining a SWPPP or equivalent plan.

On: Aug 25 2026.

Government Response. . The Government has obtained all necessary environmental compliance for the work and the Contractor does not need to apply for any additional permits. Further, commitments made by the Government during environmental compliance coordination have been incorporated into the contract as engineering controls and other similar measures. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978395 General Section 01 57 20.01 12 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 7/11

Please identify any minimum required temporary erosion and sediment controls, including silt fence, wattles, stabilized entrances, temporary berms, sediment basins, check dams or other measures. If the Contractor is responsible for determining the type and quantity through its Environmental Pollution Control Plan, please confirm that no specific minimum quantities are prescribed by the Government.

On: Aug 25 2026.

Government Response. . There are no minimum required erosion control measures, but the contractor must still meet all environmental protection requirements within the specifications. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978398 General Section 31 23 00.00 20 Comment Classification: Unclassified (U)

Please provide any available geotechnical investigations, boring logs, laboratory testing, dredged-material characterization, moisture-content data, historical placement records or other information concerning the material within CDF-22 and FDDA-22. Of particular interest are soil classification, moisture content, organic content, shear strength and expected trafficability.

On: Aug 25 2026.

Government Response. . No recent geotechnical or site field investigations have been performed. Bidders are strongly encouraged to conduct a site visit to inspect existing field conditions and independently determine the appropriate means, methods, techniques, and equipment required to accomplish the work. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978402 General Section 31 23 00.00 20, Paragraph 3.2 Comment Classification: Unclassified (U)

The specifications prohibit vegetation, timber/wood, oversized stones/rocks and other debris from being incorporated into fill. If buried debris, timber, riprap, concrete, metallic debris, trash or other non-soil material is encountered during excavation below the cleared surface, please clarify whether removal, handling, hauling and offsite disposal will be considered incidental to the Excavation bid item or paid separately.

On: Aug 25 2026.

Government Response. . Any materials mentioned found during excavation would need to be removed and considered incidental and not paid for separately. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978403 General Section 31 23 00.00 20; Drawings C-101 through C-109 Comment Classification: Unclassified (U)

The excavation unit price is required to include push/haul distances necessary to place excavated material within CDF-22 and FDDA-22. Please confirm that the Contractor may establish temporary internal haul roads anywhere within the grading limits and ROW, subject to environmental requirements and final restoration to contract grades. Please identify any prohibited travel areas or required crossings.

On: Aug 25 2026.

Government Response. . The contractor may establish temporary haul roads within the ROW, subject to environmental requirements and final restoration to contract grades. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978404 General Drawing G-003 Note 4; Section 31 23 00.00 20, Paragraph 3.1.1 Comment Classification: Unclassified (U)

The contract requires borrow material to first fill low areas within the existing CDF footprint prior to placement within FDDA-22.

Please clarify whether the entire CDF-22 must be brought to final grade before any excavated material may be placed in FDDA- 22, or whether concurrent excavation/fill operations are permitted provided sufficient material is first allocated to satisfy the CDF- 22 fill requirement.

On: Aug 25 2026.

Government Response. . Concurrent excavation/fill operations are permitted provided sufficient material is first allocated to satisfy the CDF-22 fill requirement. On: Sep 08 2026 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 8/11

Current Request Status: Request Closed

11978406 General Section 01 General Requirements; SF 1442 Performance Period Comment Classification: Unclassified (U)

Please identify any restrictions on Contractor work hours, night work, weekend work, holiday work or multiple-shift operations at CDF-22. If no specific restrictions apply, please confirm that the Contractor may propose extended-hour, weekend and/or multi-shift earthwork operations subject to approved safety and environmental plans.

On: Aug 25 2026.

Government Response. . Permissible hours of work are identified under section 01 10 00 – General Provisions, 11.

Permissible hours of work. "No work shall be done at the jobsite between 9:00 p.m. and 6:00 a.m. The Contractor will be allowed to work on Saturdays, Sundays, and Holidays. Prior to 6:00 a.m. the Contractor shall not start up any equipment nor have any trucks for delivery, service, hauling, etc. arrive at the jobsite. Trucks shall remain on designated truck routes until 6:00 a.m. When the Contractor elects to work weekends and holidays, notice shall be given to the Contracting Officer, in writing, 36 hours in advance of commencement of such operations to permit suitable arrangements for inspections to be made. Adequate lighting for safe operations and thorough inspection of night operations 01 10 00-13 ED 26-021 conducted within the permissible hours of work shall be provided by the Contractor at his/her own expense." On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978408 General SF 1442; Section 01 57 20.01 12 Comment Classification: Unclassified (U)

Please confirm that the 224-calendar-day contract performance period was developed considering normal seasonal rainfall, wet-ground conditions, hurricane-season exposure and the specified bird nesting avoidance requirements. Please clarify whether Government-directed environmental restrictions, exclusion zones or site closures that are beyond the Contractor's control will be treated as excusable delay and evaluated for appropriate time adjustment under the contract.

On: Aug 25 2026.

Government Response. . The contract performance period was developed considering adverse weather. Any

Government-directed environmental restrictions, exclusion zones or sites closures beyond the contractor's control will be treated as a non-compensable time extension under the Default clause. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11978411 General Drawing C-101; Section 01 57 20.01 12 Comment Classification: Unclassified (U)

Please identify whether CDF-22 is subject to regular tidal inundation, storm surge, high-water restrictions, mandatory evacuation or Government-directed closure. Please identify any known elevation or water condition at which Contractor access or work must cease.

On: Aug 25 2026.

Government Response. . CDF-22 could experience storm surge and a mandatory evacuation pending a hurricane in that area. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978414 General Section 31 23 00.00 20, Paragraph 3.5 Comment Classification: Unclassified (U)

The specification establishes an excavation grade tolerance of +/-0.2 feet and states that no additional payment will be made for excavation above the design grade. Please confirm that excavation quantities within the permitted +/-0.2-foot tolerance will be measured to the actual accepted final surface for payment. Please also confirm that material excavated below the lower tolerance is non-pay and must be corrected by the Contractor at no additional cost.

On: Aug 25 2026.

Government Response. . Confirm that the material excavated below the lower tolerance is non-pay and must be corrected by the contractor at no additional cost. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978415 General Section 02 21 10.00 12; Section 31 23 00.00 20 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 9/11

Please confirm that GPS machine-control equipment may be used for excavation and grading operations provided all contract survey and Licensed Professional Land Surveyor requirements are satisfied. Please provide available digital design surfaces or CAD grading files if they exist.

On: Aug 25 2026.

Government Response. . GPS machine-controlled equipment may be used provided all contract survey and

Licensed Professional Land Surveyor requirements are satisfied. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11978417 General Drawing G-002; Section 02 21 10.00 12 Comment Classification: Unclassified (U)

Drawing G-002 indicates that Benchmark 18-078C-1 and Primary Benchmark 18-078C-2 are accessible only by boat. Please confirm whether usable horizontal and vertical survey control is available on or immediately accessible from the CDF-22 site without marine access. If not, please confirm whether the Contractor is responsible for providing boat access necessary to establish project control from the specified benchmarks.

On: Aug 25 2026.

Government Response. . There are no usable horizontal and vertical survey controls available on or immediately accessible from CDF-22 without marine access. The contractor is responsible for providing boat access to establish project controls. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11986607 Civil G-002 All All Comment Classification: Controlled Unclassified Information (CUI)

1.Please confirm whether CDF-22 is divided into two separate work locations, as indicated on Drawing G-002.

On: Aug 31 2026.

Government Response. . The project site is currently divided into CDF-22 and FDDA-22. CDF-22 is the portion of the site most recently used for disposal of dredged material. The purpose of this contract is to expand the usable disposal footprint from CDF-22 into FDDA-22 in order to increase overall site capacity and support future dredging operations. On: Sep 08 2026

Current Request Status: Request Closed Information for this report is procurement sensitive.

11986608 Civil All All All Comment Classification: Controlled Unclassified Information (CUI)

2.Due to the anticipated quantity and extent of excavation work required, will the Government consider increasing the contract duration?

On: Aug 31 2026.

Government Response. . No. The contract duration was calculated based on the anticipated quantities included in the scope of work. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11986610 Civil All All All Comment Classification: Controlled Unclassified Information (CUI)

3.With two tropical disturbances currently forecasted to potentially impact the southern Gulf Coast of Louisiana, will the Government consider extending the bid due date to allow contractors adequate opportunity to visit and evaluate the project site under safe weather conditions?

On: Aug 31 2026.

Government Response. . The bid opening date remains unchanged and will occur as scheduled. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

11986613 Civil All All All https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 10/11

Comment Classification: Controlled Unclassified Information (CUI)

4.Please provide the estimated quantities associated with the project scope, including clearing and grubbing and any other major pay items applicable to the work.

On: Aug 31 2026.

Government Response. . Please see the previous comment regarding the quantities for clearing and grubbing. All other major pay item quantities are provided in the bid schedule. On: Sep 08 2026 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

Classified information is NOT permitted on this site.

Patent 11/892,984 ProjNet property of ERDC since 2004.

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 11/11

SECTION 01 57 20.01 12

Page 9, Paragraph 3.3.1.3, last sentence. Delete the Clause “CHANGES (FAR 52.243-4)” and replace with “DEFAULT (FIXED-PRICE CONSTRUCTION) (FAR 52.249-10)”.

DRAWINGS

SHEET ID C-104 through C-109. Delete these drawings in their entirety and substitute with the attached revised drawings SHEET ID C-104 through C-109.

All Contractor questions have been answered by the Government.

5+00

-10

-10

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 15000-100-200-300-400-500-600-700-800-900-1000

10+00

-10

-10

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 15000-100-200-300-400-500-600-700-800-900-1000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

100' 200'0

WEST EAST

WESTEAST

10' 20'0

VERTICAL HORIZONTAL

SCALE: V:1"=10'; H:1"=100'

CDF-22 EXISTING CONDITIONS NORTH-SOUTH CROSS SECTIONSA1

AL

IC

E

KE

R L

PA

TR

IC

K

D U

FR

EN

E

PA

TR

IC

K

D U

FR

EN

E

JA

SO

N B

IN

ET

, P .E

N

O R

TH

-S

O U

TH

C

R O

SS

S

EC

TI

O N

S C

D F-

E

XI

ST

IN

G

C O

N D

IT

IO

N S

C-104

N

EW

O R

LE

AN

S D

IS

TR

IC

T

N

EW

O R

LE

AN

S, L

O U

IS

IA

N A

W

2P

6C

JU

N

E

FI

LE

N U

M

BE

R

AN

SI

D

W

2P

6B A0

C

AL

C

AS

IE

U

R

IV

ER

A

N D

P

AS

S D

R

ED

G

ED

M

AT

ER

IA

L M

AN

AG

EM

EN

T

PL

AN

C

D F-

D

EG

R

AD

IN

G C

AM

ER

O N

P

AR

IS

H

, L O

U

IS

IA

N

A

NOTES:

1. PROPOSED FINAL GRADE SHALL BE EL. +15.1 FEET (NAVD88).

2. ALL EXCESS EXCAVATED MATERIAL ENCOUNTERED ABOVE EL. +15.1 FT (NAVD88) MAY BE STOCKPILED AT THE

CONTRACTOR'S DISCRETION WITHIN ROW LIMITS. STOCKPILE LOCATIONS SHALL NOT INTERFERE WITH

POST-SURVEY QUANTITY VERIFICATIONS.

3. BEGINNING 100 FEET HORIZONTALLY FROM THE EDGE OF THE EXISTING ROCK DIKE, THE CONTRACTOR SHALL PROVIDE A CONTINUOUS SLOPE TO INTERCEPT THE EXISTING ROCK DIKE AT ANY ELEVATION (TOP, FACE, OR TOE), PROVIDED THE ENTIRE FDDA AREA HAS BEEN FILLED AND NO MATERIAL IS PLACED ABOVE THE CREST OF THE DIKE.

4. SURVEY DATA WAS COLLECTED IN MARCH 2026 AND IS BASED ON NAVD88 (2009.55).

LEGEND

EXISTING GRADE

FINAL GRADE

CUT MATERIAL

FILL MATERIAL

EL

EV

AT

IO

N F

EE

T

(N

AV

D

EL

EV

AT

IO

N

F

EE

T (N

AV

D

EL

EV

AT

IO

N F

EE

T

(N

AV

D

EL

EV

AT

IO

N

F

EE

T (N

AV

D

FEET

FEET

R

EV

IS

E

N O

TE

R

EV

IS

E N

O

TE

1 2

15+00

-10

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 15000-100-200-300-400-500-600-700-800-900-1000

20+00

-10

-10

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 15000-100-200-300-400-500-600-700-800-900-1000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

100' 200'010' 20'0

VERTICAL HORIZONTAL

SCALE: V:1"=10'; H:1"=100'

CDF-22 EXISTING CONDITIONS NORTH-SOUTH CROSS SECTIONSA1

AL

IC

E

KE

R L

PA

TR

IC

K

D U

FR

EN

E

PA

TR

IC

K

D U

FR

EN

E

JA

SO

N B

IN

ET

, P .E

N

O R

TH

-S

O U

TH

C

R O

SS

S

EC

TI

O N

S C

D F-

E

XI

ST

IN

G

C O

N D

IT

IO

N S

C-105

N

EW

O R

LE

AN

S D

IS

TR

IC

T

N

EW

O R

LE

AN

S, L

O U

IS

IA

N A

W

2P

6C

JU

N

E

FI

LE

N U

M

BE

R

AN

SI

D

W

2P

6B A0

C

AL

C

AS

IE

U

R

IV

ER

A

N D

P

AS

S D

R

ED

G

ED

M

AT

ER

IA

L M

AN

AG

EM

EN

T

PL

AN

C

D F-

D

EG

R

AD

IN

G C

AM

ER

O N

P

AR

IS

H

, L O

U

IS

IA

N

A

WEST EAST

WESTEAST

LEGEND

EXISTING GRADE

FINAL GRADE

CUT MATERIAL

FILL MATERIAL

EL

EV

AT

IO

N F

EE

T

(N

AV

D

EL

EV

AT

IO

N

F

EE

T (N

AV

D

EL

EV

AT

IO

N F

EE

T

(N

AV

D

EL

EV

AT

IO

N

F

EE

T (N

AV

D

FEET

FEET

NOTES:

1. PROPOSED FINAL GRADE SHALL BE EL. +15.1 FEET (NAVD88).

2. ALL EXCESS EXCAVATED MATERIAL ENCOUNTERED ABOVE EL. +15.1 FT (NAVD88) MAY BE STOCKPILED AT THE

CONTRACTOR'S DISCRETION WITHIN ROW LIMITS. STOCKPILE LOCATIONS SHALL NOT INTERFERE WITH

POST-SURVEY QUANTITY VERIFICATIONS.

3. BEGINNING 100 FEET HORIZONTALLY FROM THE EDGE OF THE EXISTING ROCK DIKE, THE CONTRACTOR SHALL PROVIDE A CONTINUOUS SLOPE TO INTERCEPT THE EXISTING ROCK DIKE AT ANY ELEVATION (TOP, FACE, OR TOE), PROVIDED THE ENTIRE FDDA AREA HAS BEEN FILLED AND NO MATERIAL IS PLACED ABOVE THE CREST OF THE DIKE.

4. SURVEY DATA WAS COLLECTED IN MARCH 2026 AND IS BASED ON NAVD88 (2009.55).

1 2 R

EV

IS

E N

O

TE

R

EV

IS

E

N O

25+00

-10

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 15000-100-200-300-400-500-600-700-800-900-1000

30+00

-10

-10

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 15000-100-200-300-400-500-600-700-800-900-1000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

100' 200'010' 20'0

VERTICAL HORIZONTAL

SCALE: V:1"=10'; H:1"=100'

CDF-22 EXISTING CONDITIONS EAST-WEST CROSS SECTIONSA1

AL

IC

E

KE

R L

PA

TR

IC

K

D U

FR

EN

E

PA

TR

IC

K

D U

FR

EN

E

JA

SO

N B

IN

ET

, P .E

N

O R

TH

-S

O U

TH

C

R O

SS

S

EC

TI

O N

S C

D F-

E

XI

ST

IN

G

C O

N D

IT

IO

N S

C-106

N

EW

O R

LE

AN

S D

IS

TR

IC

T

N

EW

O R

LE

AN

S, L

O U

IS

IA

N A

W

2P

6C

JU

N

E

FI

LE

N U

M

BE

R

AN

SI

D

W

2P

6B A0

C

AL

C

AS

IE

U

R

IV

ER

A

N D

P

AS

S D

R

ED

G

ED

M

AT

ER

IA

L M

AN

AG

EM

EN

T

PL

AN

C

D F-

D

EG

R

AD

IN

G C

AM

ER

O N

P

AR

IS

H

, L O

U

IS

IA

N

A

WEST EAST

WESTEAST

LEGEND

EXISTING GRADE

FINAL GRADE

CUT MATERIAL

FILL MATERIAL

EL

EV

AT

IO

N F

EE

T

(N

AV

D

EL

EV

AT

IO

N

F

EE

T (N

AV

D

EL

EV

AT

IO

N F

EE

T

(N

AV

D

EL

EV

AT

IO

N

F

EE

T (N

AV

D

FEET

FEET

NOTES:

1. PROPOSED FINAL GRADE SHALL BE EL. +15.1 FEET (NAVD88).

2. ALL EXCESS EXCAVATED MATERIAL ENCOUNTERED ABOVE EL. +15.1 FT (NAVD88) MAY BE STOCKPILED AT THE

CONTRACTOR'S DISCRETION WITHIN ROW LIMITS. STOCKPILE LOCATIONS SHALL NOT INTERFERE WITH

POST-SURVEY QUANTITY VERIFICATIONS.

3. BEGINNING 100 FEET HORIZONTALLY FROM THE EDGE OF THE EXISTING ROCK DIKE, THE CONTRACTOR SHALL PROVIDE A CONTINUOUS SLOPE TO INTERCEPT THE EXISTING ROCK DIKE AT ANY ELEVATION (TOP, FACE, OR TOE), PROVIDED THE ENTIRE FDDA AREA HAS BEEN FILLED AND NO MATERIAL IS PLACED ABOVE THE CREST OF THE DIKE.

4. SURVEY DATA WAS COLLECTED IN MARCH 2026 AND IS BASED ON NAVD88 (2009.55).

1 2 R

EV

IS

E N

O

TE

R

EV

IS

E

N

35+00

-10

0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 15000-100-200-300-400-500-600-700-800-900-1000

40+00

-10

-10

0 100 200 300 400 500 600 700 800 900 1000…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .