This is Amendment 0003 to Solicitation W912P826BA041 for the West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Project in St. John the Baptist Parish, Louisiana. The amendment is issued by the U.S. Army Corps of Engineers (USACE), New Orleans District, and is effective June 12, 2026. The primary changes include: (1) postponement of the bid opening date from June 12, 2026 to June 16, 2026 at 11:00 AM CST; (2) provision of follow-up responses to contractor questions submitted under Amendment 0002; (3) notification that USACE will not accept or respond to additional contractor questions; and (4) provision of updated specifications, drawings, and job item quantities.

Specification changes modify Section 31 24 00.00 12 regarding sand fill measurement and payment. The revised scope clarifies that sand fill will be measured by the ton for material satisfactorily placed to design section and grade, and that payment constitutes full compensation for furnishing materials, labor, equipment, control testing, and all necessary operations. The specification also addresses sand placement resulting from soft material displacement and clarifies that no separate payment applies to temporary bypass road maintenance. Drawing Sheet C-021 has been revised to reflect updated wick drain installation details. The contract encompasses construction of levees, floodwalls, and gates from Station 819+87 B/L to 827+95 B/L, with estimated quantities including 22,240 cubic yards of preload degradation and stockpiling, 3,565 cubic yards of levee degradation, 1,266 cubic yards of reinforced concrete floodwall construction, and associated structural steel, sheet pile, and testing requirements. The Questions and Answers section clarifies that all Q&A responses are binding contract terms, provides embankment material quantities, confirms no settlement monitoring or vibration monitoring requirements, and addresses stockpile capacity and material sequencing expectations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I �

CONTRACT ID CODE

I

PAG� OF PAGES

I

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER

5. PROJECT NUMBER (If applicable)

0003 12 JUN 2026 ED 24-025

6. ISSUED BY CODE W912P8 7. ADMINISTERED BY (ff other than Item 6) CODE I

W07V ENDIST N ORLEANS

KO CONTRACTING DIVISION, 7400 LEAKE AVE

NEW ORLEANS, LA 70118-3651 SCD: PAS:

UNITED STATES

MELISSA VAUGHN, EMAIL: MELISSA.A.VAUGHN@USACE.ARMY.MIL TELEPHONE:

1504) 862-2762

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

W912P826BA041

9B. DATED (SEE ITEM 11)

01 MAY 2026

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

� The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers � is extended. D is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (ff required)

SEE SECTION G- CONTRACT ADMINISTRATION DATA

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor Dis not D is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Schedule

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

SHAUN MCAFEE

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

12 JUN 2026

(Signature of Contracting Officer)

R

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The above solicitation W912P826BA041 for West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP-103A Levee, Floodwall and Gate, Sta. 819+87 B/L to Sta. 827+95 B/L, St. John the Baptist Parish, Louisiana is hereby amended as followings:

1. Bid opening date of 12 June 2026 has been changed to 16 June 2026 at 11 :00 AM CST.

2. Provide follow up responses to questions that were submitted for clarification under amendment 0002.

3. USACE will not accept or respond to any more contractors' questions.

4. Provide updated Specifications, drawings and Job Item Quantities.

SPECIFICATIONS:

SECTION 31 24 00.00 12

Page 3, paragraph 1.1 SCOPE. Delete paragraph “1.1 SCOPE” in its entirety and substitute the revised paragraph 1.1 as follows:

“1.1 SCOPE

The work covered by this section consists of furnishing all plant, labor, equipment, and materials, except as otherwise specified in Section 31 23 00.00 12 EXCAVATION, and performing all operations in connection with foundation preparation and construction of sand fill and clay embankments, ramp crossings, access ramps, permanent access roads, temporary bypass road, and other incidental earthwork as may be necessary to complete the embankments as shown on the drawings, and as hereinafter specified.”

Page 3, paragraph 1.2.1.1 Sand Fill. Delete paragraph “1.2.1.1 Sand Fill” in its entirety and substitute the revised paragraph 1.2.1.1 as follows:

“1.2.1.1 Sand Fill

The basis for measurement of sand fill hauled from the commercial sand source to the project site, including sand fill placed by reason of soft material in the foundation being forced outward from the section, will be by the ton for the sand fill satisfactorily placed to the design section and grade, including the allowable tolerance. Sand fill not constructed to the design grade and section will not be accepted. No separate measurement will be made for adding sand for maintenance of the temporary bypass road.”

Page 5, paragraph 1.3.2 Sand Fill. Delete paragraph “1.3.2 Sand Fill” in its entirety and substitute the revised paragraph 1.3.2 as follows:

“1.3.2 Sand Fill

Payment for the sand fill including fill placed by reason of soft material in the foundation being forced outward from the section, will be made at the contract unit price per ton for "Sand Fill". Price and payment shall constitute full compensation for furnishing all plant, labor, equipment and materials, including sand material, control testing, and for performing all operations necessary for foundation preparation and placing and compacting the sand fill. No separate payment will be made for adding sand for maintenance of the temporary bypass road. Price and payment shall be distributed amongst the existing bid items.”

DRAWINGS:

SHEET IDENTIFICATION No. C-021. Delete this drawing in its entirety and substitute the attached revised drawing SHEET IDENTIFICATION No. C-021.

DRAIN (TYP.)

VERTICAL WICK

SAND FILL

EL. 2.5

SPACING

STEP

ROW SPACING

EL. -20.0

FOR DRAIN INSTALLATIONS.

APPROXIMATE 6" SAND BASE

(4in X 4mm X 52ft)

VERTICAL WICK DRAIN

WICK AND HORIZONTAL STRIP DRAINS

6" OF SAND COVER OVER THE VERTICAL

PRELOAD TOE.

BERM AND SLOPE TOWARD AND TERMINATE AT THE

HORIZONTAL STRIP DRAINS WILL DAYLIGHT OUT OF THE

3'

2'

1'

WICK DRAIN OVERLAP

SEE DETAIL BELOW FOR

WICK DRAIN OVERLAP

5.2'

THE WIDTH OF THE ENTIRE PRELOAD.

THE LENGTH OF THE STRIP DRAIN WILL BE DETERMINED BY

HORIZONTAL STRIP DRAIN, (4in X 0.10ft)

OVERLAP FOR THE HORIZONTAL STRIP DRAINS AS SHOWN.

2-FEET ABOVE THE INSTALLATION ELEVATION TO MAKE THE

THE COTRACTOR SHALL CUT THE VERTICAL WICK DRAINS

WICK DRAIN OVERLAP:

LIMITS OF SAND BASE

WICK SPACING

OF VERTICAL WICK DRAINS AT A 5.2' INTERVAL, PERPENDICULAR TO THE LEVEE C/L.

HORIZONTAL STRIP DRAINS SHALL BE INSTALLED CENTERED BETWEEN TWO ROWS

STRIP DRAIN

HORIZONTAL

THEN LAID DOWN AND STAPLED OR PINNED TO THE HORIZONTAL STRIP DRAINS.

PINNING. VERTICAL WICK DRAINS WILL BE CUT 2-FEET ABOUT SAND BASE AND

PER MANUFACTURER RECOMMENDATIONS. OPTIONS INCLUDED STAPLING AND

CONNECTIONS BETWEEN VERTICAL WICK AND HORIZONTAL STRIP DRAINAGE

VERITICAL STRIP DRAINS (3.8in X 0.115in)

C-021

W S

L P

-1 W

IC

K

D R

A

IN

S T

Y P

IC

A

L S

E C

T

IO

N S

H -4

-4 C

-0 .D

G N

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S W

E S

T S

H O

R E

L A

K E

P O

N T

C H

A R

T R

A

IN

L

O U

IS

IA

N A

H U

R R

IC

A

N E

A N

D S

T O

R M

D A

M A

G E

R

IS

K R

E D

U C

T

IO

N P

R O

J E

C T

W S

L P

-1 A

L E

V E

E F

L O

O D

W A

L L

A N

D G

A T

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

A

F E

B R

U A

R Y

A N

S I

D S

T

J O

H N

T H

E B

A P

T

IS

T P

A R

IS

H

H

A C

H O

R D

D M

IC

H

E L

L I

B B

A R

C E

L O

N A

B B

A R

C E

L O

N A

H -4

-4

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

3'

1.503.00 2.60

(FT)

SPACING

WICK

(FT)

SPACING

ROW

(FT)

SPACING

STEP

3'

.5

.5

EXISTING GROUND

W

ID

T H

O F

P R

E L

O A

D

S P

A C

IN

G

C O

N T

IN

U

E S

A C

R O

S

1G

PLAN VIEW - WSLP 110

VERTICAL WICK DRAIN SPACING DETAILS IN

NOT TO SCALE

K11

WSLP 110

WICK DRAIN DETAILS IN PROFILE VIEW -

NOT TO SCALE

B6

CONNECTION DETAIL - WSLP 110

VERTICAL AND HORIZONTAL DRAIN

NOT TO SCALE

C/L NEW LEVEE

LEVEE

NEW

C/L

NOTE: THE SUBSTITUTION OF PIPES FOR WICK DRAINS IS NOT ACCEPTABLE.

S T

A

B /L

T O

S T

A

B /L

A M

E N

D M

E N

T

B6

/1

/2

A M

E N

D M

E N

T

R E

V

IS

E D

S A

N D

B A

S E

T H

IC

K

N E

S

Questions & Answers:

W912P826BA041

West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP-103A Levee, Floodwall and Gate, Sta. 819+87 B/L to Sta. 827+95 B/L, St.

John the Baptist Parish, Louisiana

Question: Please confirm that the questions and answers will be part of the contract and will be binding on both parties (Government and Contractor).

Response: Yes, it will be part of the contract. When USACE issues an amendment, USACE makes it part of the contractor award package.

Question: The responses to several questions requesting the Government’s estimated quantities for Job items state Government’s estimated quantities are attached. No attachment has been provided with the Government’s estimated quantities. Please provide the Government’s estimated quantities

Response: See attached job item quantities.

Question: Referencing question and answer (11838758), “Is settlement for preload to be monitored under this contract – No”. Please confirm that the contractor is compensated for any settlement of material that occurs during construction of the preloads, up until it is accepted by the Government, by use of settlement plates.

Response: Confirmed. See Section 31 24 00.00 12, paragraph 1.2.2.

Question: Referencing question and answer (11841349), “The Government does not anticipate the need for any “outside” fill for this project”. If “outside” fill becomes required to complete the levee and preload sections to contract template, will the contractor be compensated for the necessary material under the change clause?

Response: Yes.

Question: Referencing question and answer (11841371), “Temporary access for Frenier Road traffic to the flood side will be required. See revised sheet C-006 for detail.” Is the sand for the temporary bypass road measured and paid under CLIN 0014?

Response: Yes.

traffic to the flood side will be required. See revised sheet C-006 for detail.” Is maintenance/placement of additional sand for the temporary bypass road measured and paid under CLIN 0014?

Response: No separate measurement or payment will be made for adding sand for maintenance of the temporary bypass road. Price and payment shall be distributed amongst the existing bid items.

traffic to the flood side will be required. See revised sheet C-006 for detail.” Is the location of the access road up to the contractor?

Response: Yes, with approval from the COR and such approval will be provided during the submittal process.

Question: Referencing question and answer (11841969), “DWG C-021 shows detail K11, where the wick drain installation elevation is EL. 2.5 with an approximate sand fill base of 12” in thickness. This would put the cut to EL. 1.5. Please confirm. – Confirmed.” Drawing C-018 states to degrade the existing levee to EL. +2’. Please clarify.

Response: The levee shall be degraded to EL. +2.0. The sand fill is to be placed to EL.

2.5' for installation of the vertical and horizontal wick drains, then 0.5' of sand cover shall be placed over the top of the wick drains for a total of 12" of sand. See amendment for revised sheet C-021.

Question: 1. Referencing question and answer (11842612), please confirm that vibration monitoring is not required.

Response: Confirmed.

Question: Referencing the last question and answer, please provide the quantity of embankment material to construction the final design at the WSLP-103a site.

Response: Estimated 8,328 CY

Question: Referencing the last question and answer, please provide the quantity of embankment material to be removed from the existing levee at the WSLP-110 site.

Response: Estimated 3,565 CY

Question: The Contractor estimates that the available stockpile capacity at 103A is approximately 9,000 CY and that the available stockpile capacity at 110 is also approximately 9,000 CY, for a total available stockpile volume of approximately 18,000 CY. Furthermore, per Addendum No. 2, approximately 22,240 CY of material will be removed from the 103A preloads. Based on these quantities, there does not appear to be sufficient stockpile capacity on site to temporarily store the material removed from the 103A preloads, let alone any additional material generated from degrading the 110 levee. Please confirm whether the Contractor's estimate of the available stockpile quantities is correct. If so, will additional stockpile area and/or stockpile height be made available to the Contractor? Alternatively, will the Contractor be required to either: A) Haul excess material off site and subsequently reimport it at a later date for construction of the 103A levees and the 110 preloads; or B) Sequence the work such that excess material from the degraded 103A preloads is hauled directly to the 110 preload area and placed without intermediate stockpiling. If Option B is the intended approach, please clarify whether this sequencing assumption was considered in the contract duration and schedule development. Degrading the 103A preloads is one of the initial activities required at this site, and the proposed sequencing may affect the Contractor's ability to perform the work within the specified contract duration.

Response: Per Section 01 00 00, paragraph 29, the work at the WSLP-110 preloads shall begin simultaneously with all other work. The intention was to haul the excess material from the degraded 103A preloads directly to the 110 preload site and this was taken into consideration in the contract duration and schedule development.

Question: The government states "See attached job item quantities" as response to multiple inquiries. I did not see that attachment included in Amendment 2. Please provide this attachment.

Response: See attached job item quantities.

WSLP-103A Job Item Quantities

Item DESCRIPTION Estimated Quantity Unit

0002 Temporary Retaining Structures

PZ-27 Sheet Pile 12,100 SF

W21x122 200 LF

0005 Reinforced Concrete Floodwall and Floodgate Monolith 1,266 CY

0010 Degrading and Stockpiling of Preload 22,240 CY

0011 Degrading and Stockpiling of Levees 3,565 CY

0021 PDA Testing

Steel Pipe Piles (18” Dia. x 0.625”) 222 LF

0034 Structural Steel Swing Gate

W 30x108, Gr. 50 71 LF

WT 10.5x25, Gr. 50 139 LF

W 6x20, Gr. 50 34 LF

L 6x6x3/8, Gr. 50 64 LF

L 6x6x9/16, Gr. 50 32 LF

L 6x6x1, Gr. 50 3 LF

L 5x5x1/2, Gr. 50 56 LF

5/16” Plate, Gr. 50 8 SF

3/8” Plate, Gr. 50 423 SF

1/2” Plate, Gr. 50 109 SF

3/4” Plate, Gr. 50 64 SF

1” Plate, Gr. 50 5 SF

1-1/2” Plate, Gr. 50 4 SF

1-5/8” Plate, Gr. 50 5 SF

1-1/2”x1-1/2” Bar 1 LF

3/4” Dia. Rod 13 LF

7/8” Dia. Rod 99 LF