This is a Standard Form 30 Amendment to Solicitation for federal construction services related to the West Shore Lake Pontchartrain Hurricane and Storm Damage Risk Reduction Project (WSLP-103A) in Louisiana. Amendment 0002, effective June 5, 2026, modifies solicitation W912P826BA041 issued by the U.S. Army Corps of Engineers, New Orleans District.

The amendment makes four substantive changes: (1) extends the bid opening date from June 9, 2026 to June 12, 2026 at 11:00 AM CST; (2) provides answers to bidders' questions submitted during the solicitation period; (3) establishes a new deadline of June 8, 2026 at 10:00 AM CST for questions regarding this amendment only, with no additional questions accepted thereafter; and (4) provides updated Bidding Schedule, Specifications, and drawings. Specification revisions include modifications to Section 31 05 19.05 12 (geotextile overlap requirements), Section 31 26 00.00 12 (approved suppliers for vertical wick and horizontal strip drain materials), Section 31 41 16.00 12 (Z-Type steel sheet piling substitution criteria), and Section 31 62 17.00 12 (dynamic pile analysis requirements for steel pipe piles). Updated drawings include revised sheets G-003 and C-006, and addition of new sheet C-019A depicting WSLP-110 preload instrumentation. The bidding schedule reflects changes to items 0007, 0013, 0014, 0019, and 0020. The work includes construction of levee, floodwall, and gate structures with associated earthwork, drainage systems, steel sheet piling, concrete work, and specialized testing requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The above solicitation W912P826BA041 Block 14 (Description of Amendment/Modification):

for West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP-103A Levee, Floodwall and Gate, Sta. 819+87 B/L to Sta. 827+95 B/L, St. John the Baptist Parish, Louisiana is hereby amended as followings:

1. Bid opening date of 9 June 2026 has been changed to 12 June 2026 at 11:00 AM CST.

2. Provide answer to Bidders' Questions.

3. Questions regarding this amendment ONLY will be due NLT 8 June 2026 10:00 AM CST, NO

ADDITIONAL QUESTIONS WILL BE ACCEPTED.

4. Provide updated Bidding Schedule, Specifications and drawings.

W912P826BA0410002

SPECIFICATIONS:

SECTION 00 10 00

Pages 3 thru 6. Delete the Bidding Schedule in its entirety and substitute the attached revised Pricing Schedule, page 00 10 00-3 thru 6.

SECTION 31 05 19.05 12

Page 6, paragraph 3.2.2 Overlaps. Delete paragraph “3.2.2 Overlaps” in its entirety and substitute the revised paragraph 3.2.2 as follows:

“3.3.2 Overlaps

All seams and overlaps shall be placed perpendicular to the centerline of the levee. A minimum of two feet is required at each overlap.”

SECTION 31 26 00.00 12

Page 7, paragraph 2.1.3 Suppliers. Delete paragraph “2.1.3 Suppliers” in its entirety and substitute revised paragraph 2.1.3 as follows:

“2.1.3 Suppliers

Suppliers of vertical wick and horizontal strip drain materials include the following or others approved in writing by the Contracting Officer.

Colbond Geosynthetics (AKZO Nobel Geosynthetics Company) Sand Hill Road P.O. Box 1057 Enka, NC 28728 Toll Free: 800-365-7391 Phone: (828) 665-5050 Fax: (828) 665-5009

Nilex Corporation 15171 E. Fremont Drive Centennial, CO 80112 Phone: (303) 766-2000 Fax: (303) 766-1110

Amerdrain American Wick Drain Co.

1209 Airport Road Monroe, NC 28110

Phone: 1-800-242-WICK(9425) Fax: (704) 238-9200

US Wick Drain, Inc.

8869 King Road P.O. Box 919 Leland, NC 28451 Phone: (910) 371-1899 Fax: (910) 371-3290

Keller North America 7989 Cherrywood Loop Kiowa, CO 80117 Phone: (303) 627-1100 Fax: (303) 951-5800

CeTeau USA Independence, LA 70443 Phone: (985) 606-0032 Email: mark.palmatier@ceteau.com”

SECTION 31 41 16.00 12

Page 6, paragraph 2.1.2 Z-Type Steel Sheet Piling, ASTM A 572. Delete paragraph “2.1.2 Z-Type Steel Sheet Piling, ASTM A 572” in its entirety and substitute the revised paragraph 2.1.2 as follows:

“2.1.2 Z-Type Steel Sheet Piling, ASTM A 572

At no additional cost to the Government, new Z- type hot rolled steel sheet piling conforming to ASTM A572/A572M Grade 50, with a minimum material thickness of .375 inches and meeting the following section properties, may be substituted in kind for the listed sections:

Type of Section _____________Substitute Section_________________ Minimum Section Modulus

_(in3/ft of wall)_ Nominal Depth

_(inches)_ Z Section For PZ-22 18.1 9”

SECTION 31 62 17.00 12

Page 19, paragraph 3.3. DYNAMIC PILE ANALYSIS FOR STEEL PIPE PILES. Delete paragraph “3.3. DYNAMIC PILE ANALYSIS FOR STEEL PIPE PILES” in its entirety and substitute the revised paragraph 3.3 as follows:

“3.3. DYNAMIC PILE ANALYSIS FOR STEEL PIPE PILES

A dynamic pile analysis shall be performed on the test piles in the location shown on the drawings. The Contractor shall not order and furnish any other pipe piles until the pile driving analyzer testing and review of the test report is complete, and the Government has provided the actual production pile lengths. The Contractor shall submit a performance report in pdf and MS Word format summarizing dynamic test results for test piles within 5 calendar days of completing field work. Dynamic testing provides supplemental information for evaluating pile integrity, hammer, and drive system performance, assessing pile installation driving stresses, and pile capacities.

Dynamic testing will validate the static testing results previously performed for the production piles. These results may require adjustments to the pile lengths. The pile load testing includes dynamic load tests with the results used to determine the pile length bid quantities. Two test piles will be tested for this project, both driven to EL. -108 at the location indicated on the contract drawings. Perform dynamic testing on the test piles during the full length of the pile driving (i.e., from the ground surface around EL. 0 to the end of driving) and during restrike a minimum of 14 days after initial driving. If the piles are spliced, the gauges shall then be installed on each pile segment. Upon completion of testing, the test piles shall be pulled and may be reused as production piles provided, they are cleaned, painted, in satisfactory condition as determined by the Contracting Officer, and do not require an additional splice. Provide equipment to obtain dynamic measurements, record, reduce and display its data that meet the requirements of ASTM D4945. The equipment must have been calibrated within 6 months prior to the start of the testing operations and thereafter throughout the contract duration. Drive test piles at the locations indicated.

The Contractor shall employ an independent inspection firm, hereinafter referred to as the “Contractor’s Geotechnical Consultant,” experienced in the pile driving process, monitoring of test pile installation, and in the use of the Pile Driving Analyzer and its related equipment. Perform dynamic pile analyses as follows:”

DRAWINGS:

SHEET IDENTIFICATION Nos. G-003 and C-006. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. G-003 and C-006.

Add the new attached SHEET IDENTIFICATION No. C-019A to this contract after sheet C-019.

00 10 00-3 ED 24-025

SECTION 00 10 00 – BIDDING SCHEDULE

West Shore Lake Pontchartrain, Louisiana Hurricane and Storm Damage Risk Reduction Project

WSLP-103A Levee, Floodwall and Gate Sta. 819+87 B/L to Sta. 827+95 B/L

St. John the Baptist Parish, Louisiana

Item DESCRIPTION Estimated Quantity Unit Unit Price Estimated Amount

0001 Mobilization and Demobilization 1 JOB

0002 Temporary Retaining Structures 1 JOB

0003 Traffic Control and Coordination 1 JOB

0004 Truck Wash-Down Rack 1 JOB

0005 Reinforced Concrete Floodwall and Floodgate Monolith 1 JOB

0006 Miscellaneous Metalwork 1 JOB

*0007 Separator Geotextile 1,810 SY

0008 Reinforcement Geotextile 5,365 SY

0009 Clearing and Grubbing 1 JOB

0010 Degrading and Stockpiling of Preload 1 JOB

0011 Degrading and Stockpiling of Levees 1 JOB

0012 Construction Dewatering 1 JOB

*0013 Reuse of Stockpile Material 22,060 CY

*0014 Sand Fill 6,335 TON

0015 Vertical Wick Drains 179,010 LF

0016 Horizontal Strip Drains 12,240 LF

0017 Grouted Riprap 920 CY

0018 Piling, Steel Sheet, Type PZ-22 21,633 SF

*0019 Furnish Steel Pipe Piles (18” Dia. x

0.625”) 24,741 LF

*0020 Drive Steel Pipe Piles (18” Dia. x

0.625” 24,741 LF

0021 PDA Testing 1 JOB

00 10 00-4 ED 24-025

0022 Asphaltic Paving 1,000 SY

0023 Surfacing 645 TON

0024 Seeding and Mulching 2 AC

0025 Fertilizer

0025AA First 280 LBS 280 LBS

0025AB All Over 280 LBS 280 LBS

0026++ Lime Soil Amendment 2 TON

0027++ Sulfur Soil Amendment 1 TON

0028 Pipe Sleeve (C-009 Uniti Fiber Optic) 1 JOB

0029 Pipe Sleeve (G-058 Energy Transfer) 1 JOB

0030 Jacking Frame (C-009 Uniti Fiber Optic) 1 JOB

0031 Jacking Frame (G-058 Energy Transfer) 1 JOB

0032 Pipeline and Valve Removal (G- 060 and V-001 Enlink) 1 JOB

0033 Culvert Drain Pipe 235 LF

0034 Structural Steel Swing Gate 1 JOB

0035 R90 Stone 35 TON

TOTAL BASE WORK: $

* Denote changes from previous Bidding Schedule.

* ++Items not subject to the requirements of Contract provision in Section 00 72 00 GENERAL CONDITIONS entitled VARIATION IN ESTIMATED QUANTITY.

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

00 10 00-5 ED 24-025

Award will be made as a whole to one bidder.

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE

DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR

AWARD.

* NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See RFO 14.306-3, Rejection of Individual Bids).

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

00 10 00-6 ED 24-025

EVALUATION OF SUBLINE ITEMS (Dec 2019).

Item No. 0025 is subdivided into two or more estimated quantities and is to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS (Dec 2019).

This variation in estimated quantities clause is applicable only to item No. 0025.

(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.

*(b) Where the actual quantity of work performed for item No. 0025 is less than 85% of the quantity of the first subline item listed under such item, the contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the provision entitled VARIATION IN ESTIMATED QUANTITY.

*(c) If the actual quantity of work performed under item No. 0025 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with provision entitled VARIATION IN ESTIMATED QUANTITY.

NUMBER

DETAIL

DETAILED INFORMATION

AREA ENLARGED FOR

DETAILED INFORMATION

AREA ENLARGED FOR

NUMBER

DETAIL

IS SHOWN

DETAIL

WHERE

SHEET

DOWN BELOW SURFACE, 2100 FT DOWN ACCESS ROAD B.

CENTER OF ACCESS ROAD B. ROD IS SET 1 FT WEST OF WITNESS POST. ROD IS 0.7 FT

STAINLESS STEEL ROD DRIVEN TO 40FT DEPTH. ROD IS IN ALUMINUM CAP 21FT EAST OF

Y= 575928.613

X= 3510221.296

LON. -90°36'28.95458

LAT. 30°04'54.10946

(2009.55)

NAVD88

El. 1.85

PBM WSLP-B02

BELOW SURFACE LEVEL.

OF ACCESS ROAD B. 1 FT SOUTH OF WITNESS POST. DEEPROD IS RECESSED 0.8 FT

CENTER OF THE WESTBOUND LANES OF THE 61 HWY. 41 FT EAST OF THE CENTER

STAINLESS STEEL DEEPROD SET @ 40FT DEPTH. DEEPROD IS 54 FT NORTH OF THE

Y= 573987.962

X = 3510879.875

LON. -90"36'21.59861

LAT. 30°04'34.85765"

(2009.55)

NAVD 88

EL. 6.19 FT

PBM WSLP-B01

ACCESS COVER STAMPED GARYVILLE 2018.

A DEPTH OF 44 FT ENCASED IN 6 INCH PVC SET IN CONCRETE WITH AN ALUMINUM

OF A TRAFFIC SIGNAL POST. MARK IS A HALF INCH STAINLESS STEAL ROD DRIVEN TO

OF THE CENTERLINE OF THE EASTBOUND LANE OF HWY 61 AND 26.3 FT SOUTHEAST

HEAD EAST ALONG HWY 61 A DISTANCE OF 108 FT TO A POINT. MARK IS 75 FT SOUTH

BEGINNING AT THE INTERSECTION OF HWY 54 AND THE EASTBOUND LANE OF HWY 61,

Y= 573635.38

X= 3504918.97

LON .- 9037'29.46899

LAT. 30°4'31.73713

(2009.55)

NAVD 88

EL. 4.96 ft

(PID: BBGG71)

(PRIMARY)

PBM GARYVILLE 2018

LOCATED IN THE MEDIAN NORTH OF THE INTERSECTION, 12.9 FEET NORTH OF HIGHWAY SIGN.

INTERSECTION WITH 1-55 ON-RAMP TO THE LEFT IS FRENIER BEACH ROAD ON RIGHT. MARK IS

FROM EXIT 209 ON INTERSTATE 10, TRAVEL NORTH ON US HIGHWAY 51 0.6 MILES TO THE

Y= 581,601.62

X= 3,564,076.53

90° 26' 15.45655"LON.

. 30° 05' 46.49535"LAT

(2009.55)

NAVD 88

El. 5.74

F 381

6 INCH PVC SET IN CONCRETE WITH AN ALUMINUM ACCESS COVER STAMPED EASTBOUND 2018.

MARK IS A HALF INCH STAINLESS STEAL ROD DRIVEN TO A DEPTH OF 48 FT ENCASED IN

HWY 51 IN THE MEDIAN OF HWY 51 AND 25 FT SOUTH OF WELCOME LA PLACE SIGN POST.

.24 MILES TO A POINT. MARK IS 29 FT NORTH OF THE CENTERLINE OF EASTBOUND LANE OF

BEGINNING AT THE WESTBOUND I10 EXIT 209 AND HWY 51, HEAD SOUTHWEST A DISTANCE OF

Y= 578,263.96

X= 3,562,113.33

LON.-90° 26' 38.10035"

LAT. 30° 05' 13.60767"

(2009.55)

NAVD 88

4.14 ftEL.

EASTBOUND

PVC SET IN CONCRETE WITH AN ALUMINUM ACCESS COVER STAMPED FRENIER 2018.

A HALF INCH STAINLESS STEAL ROD DRIVEN TO A DEPTH OF 60 FT ENCASED IN 6 INCH

HWY 51 AND 259 FT NORTH OF THE CENTERLINE OF PEAVINE ROAD. MARK IS

1.37 MILES MORE OR LESS TO A POINT. MARK IS 32 FT EAST OF THE CENTERLINE OF

BEGINNING AT THE WESTBOUND I10 EXIT 209 AND HWY 51, HEAD NORTH A DISTANCE OF

Y = 585,931.39 3,562,836.82X =

LON. -90° 26' 29.18564"

LAT. 30° 06' 29.45081"

(2009.55)

NAVD 88

EL. 1.67 FT

(PRIMARY)

FRENIER

DESCRIPTION

(EPOCH)

(NAVD 88)

ELEVATION

BENCHMARK

BENCHMARKS

SWING GATE LATCHING DETAILS IIS-766

SWING GATE LATCHING DETAILS IS-765

SWING GATE HINGE DETAILS IIS-764

SWING GATE HINGE DETAILS IS-763

SWING GATE LOWER HINGE SECTIONSS-762

SWING GATE UPPER HINGE SECTIONSS-761

SWING GATE HINGES (ISOMETRIC)S-760

SWING GATE SEAL DETAILS IIS-753

SWING GATE SEAL DETAILS IS-752

SWING GATE SECTIONS AND DETAILSS-751

SWING GATE ELEVATION AND SECTIONSS-750

SWING GATE SEAL PLATE DETAILSS-743

STORAGE MONOLITH (T-5)S-742

SWING GATE MONOLITH REINFORCEMENTS-741

SWING GATE MONOLITHS-740

INDEX OF DRAWINGSNO.

GATE

PIPELINE SETTLEMENT MONITOR DETAILSS-407

TEMPORARY RETAINING STRUCTURE AT FIBER OPTIC LINES-406

TEMPORARY RETAINING STRUCTURE AT NATURAL GAS LINES-405

UNDERGROUND UTILITY PENETRATION DETAIL G-058S-404

UNDERGROUND UTILITY PENETRATION DETAILS C-009S-403

FLOOD PROTECTION PENETRATION OF UTILITIES BY JACKING OF SHEET PILES-402

UTILITY CROSSINGS MONOLITH T-6 AND T-7S-401

WATERSTOP DETAILSS-306

SHEET PILE SCHEDULE AND DETAILSS-305

PILE SCHEDULE AND DETAILSS-304

MONOLITH SECTIONS SHEET 3 OF 3S-303

MONOLITH SECTIONS SHEET 2 OF 3S-302

MONOLITH SECTIONS SHEET 1 OF 3S-301

FLOODWALL PILE PLAN SHEET 3 OF 3S-103

FLOODWALL PILE PLAN SHEET 2 OF 3S-102

FLOODWALL PILE PLAN SHEET 1 OF 3S-101

FLOODWALL PLAN AND PROFILES-100

INDEX OF DRAWINGSNO.

FLOODWALL

STAGE HYDROGRAPH PASS MANCHAC NEAR PONTCHATOULAH-002

STAGE HYDROGRAPH WEST END GAGEH-001

CONE PENETRATION TESTB-004

CONE PENETRATION TESTB-003

SOIL BORING LOGSB-002

SOIL BORING LEGENDB-001

TYPICAL EMBANKMENT ALONG FLOODWALLC-306

MONOLITH T-12 SCOUR PROTECTIONC-305

MONOLITH T-12 SCOUR PROTECTIONC-304

MONOLITH T-1 SCOUR PROTECTIONC-303

MONOLITH T-1 SCOUR PROTECTION AND SHEET PILEC-302

GROUTED RIP-RAP AND SHEET PILEC-301

WSLP-110 VICINITY MAPC-022

WSLP-110 WICK DRAINS TYPICAL SECTIONSC-021

WSLP-110 TYPICAL LEVEE DEGRADE AND STOCKPILE SECTIONSC-020

WSLP-110 PRELOAD INSTRUMENTATIONC-019A

WSLP-110 WICK DRAIN FIELD PLAN AND PROFILEC-019

WSLP-110 LEVEE DEGRADE PLAN AND PROFILEC-018

STOCKPILE PLAN AND TYPICAL SECTIONC-017

PRE-LOAD EXCAVATION PROFILEC-016

CONSTRUCTION SEQUENCE STA. 53+99 C/L TO STA. 55+95 C/LC-015

CONSTRUCTION SEQUENCE STA. 53+99 C/L TO STA. 55+95 C/LC-014

CONSTRUCTION SEQUENCE STA. 55+95 C/L TO STA. 56+85 C/LC-013

CONSTRUCTION SEQUENCE T-WALLS OUTSIDE PRE-LOAD AREAC-012

CONSTRUCTION SEQUENCE T-WALLS OUTSIDE PRE-LOAD AREAC-011

CONSTRUCTION SEQUENCE STA. 50+20 C/L TO STA. 52+16 C/LC-010

CONSTRUCTION SEQUENCE STA. 50+20 C/L TO STA. 52+16 C/LC-009

CONSTRUCTION SEQUENCE STA. 49+30 C/L TO STA. 50+20 C/LC-008

TRUCK WASH DOWN RACK AND SETTLEMENT PLATE DETAILSC-007

ALL WEATHER ACCESS ROAD, EMERGENCY BYPASS RAMP, AND TEMPORARY BYPASS DETAILSC-006

ALL WEATHER ACCESS ROAD AND EMERGENCY BYPASS RAMP PROFILEC-005

ALL WEATHER ACCESS ROAD AND EMERGENCY BYPASS RAMP PLAN VIEWC-004

FRENIER RD. PROFILE AND SECTION VIEWC-003

PLAN AND PROFILE FINALC-002

PLAN AND PROFILE EXISTINGC-001

GENERAL NOTES AND GENERAL DRAWINGSG-005

TABULATIONSG-004

INDEX OF DRAWINGS, BENCHMARKS AND LEGENDSG-003

LOCATION & VICINITY MAPSG-002

COVER SHEETG-001

INDEX OF DRAWINGSNO.

LEVEE

NEW ORLEANS DISTRICT

CROSS REFERENCE SYMBOL LEGEND

X

SCALE:

TITLE

X

(SHOWN ON SAME SHEET)

DETAIL

(SHOWN ON ANOTHER SHEET)

DETAIL

X

SHT #

(SHOWN ON SAME SHEET)

OR SECTION TITLE

PLAN, ELEVATION, DETAIL

(SHOWN ON SAME SHEET)

SECTION CUT

(SHOWN ON ANOTHER SHEET)

SECTION CUT

X

SHT #

X

GENERAL LEGEND

BENCHMARK

EXISTING GROUND

AERIAL POWER LINE

NATURAL GAS LINE

WATER MAIN

RIGHT OF WAY

PROJECT BASELINE

LEVEE CROWN (PLAN VIEW)

LEVEE TOE (PLAN VIEW)

LEVEE CENTERLINE

EARTHWORK - SAND FILL

EARTHWORK - CRUSHED STONE

BREAK LINE

EARTHWORK - COMPACTED FILL

EXISTING GROUND

STAGING AREA

CONSTRUCTION LIMIT/

CPT CONE PENETROMETER TEST

ABBREVIATIONS

* UNLESS OTHERWISE NOTED ON EACH SHEET

BASELINE

BENCHMARK

CENTERLINE

CONSTRUCTIONCONST.

C/L

BM

B/L

NOT TO SCALEN.T.S.

LAND SIDEL/S

R/W RIGHT OF WAY

STATIONSTA.

ELEVATIONEL.

FOOT OR FEETFT.

HWY. HIGHWAY

CONSTRUCTION EASEMENTC/E

TYP. TYPICAL

LIMIT OF CONSTRUCTIONLOC

COR

REPRESENTATIVE

CONTRACTING OFFICER

FCM FRACTURE CRITICAL MEMBER

MT MAGNETIC PARTICLE TESTING

USACE

OF ENGINEERS

UNITED STATES ARMY CORPS

UT ULTRASONIC TESTING

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

A M

E N

D M

E N

T

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

X X

X X

X X

X X

X X

X

W

P

B A

F E

B R

U A

R Y

A N

S I

D

H A

C H

O R

D

D

M

IC

H E

L L

I

B B

A R

C E

L O

N A

B

B A

R C

E L

O N

A H

-4 -4

W E

S T

S H

O R

E L

A K

E P

O N

T C

H A

R T

R A

IN

L

O U

IS

IA

N A

H U

R R

IC

A

N E

A N

D S

T O

R M

D A

M A

G E

R

IS

K R

E D

U C

T

IO

N P

R O

J E

C T

W S

L P

-1 A

L E

V E

E F

L O

O D

W A

L L

A N

D G

A T

E

S T

A

B /L

T O

S T

A

B /L

S T

J O

H N

T H

E B

A P

T

IS

T

L O

U

IS

IA

N

A

G-003

IN

D

E X

O F

D R

A W

IN

G

S

B E

N C

H M

A R

K S

A N

D L

E G

E N

D S

H

-0

-G

-0

.d g n

A

M E

N D

M E

N T

R

E V

IS

E

D T

IT

L

E O

F C

-0

A D

D E

D C

-0

A

/2

/2

NEW ORLEANS DISTRICT

COMPACTED FILL

SEPARATOR GEOTEXTILE

TO PROVIDE A LEVEL ROAD BASE

SOME SAND FILL MAY BE REQUIRED

12" SAND

LEVEL ROAD ELEVATION

INCREASE THICKNESS TO 9" BUT MAINTAIN

INTERSECTION OF AGGREGATE ROAD

FOR LAST 18" OF ASPHALT ROAD AT

2" ASPHALT BINDER COURSE.

2" ASPHALT SURFACE COURSE

12" STONE (R90 GRADATION) 12" CRUSHED STONE BASE

12" CRUSHED STONE BASE (UP TO HAUNCHES)

EL. -2.83', AT DITCH INVERT

EL. -1.83', AT CULVERT INVERT

24" PIPE CULVERT 2' (MIN.) COVER OVER PIPE

2" ASPHALT SURFACE COURSE

FABRIC SHALL BE CUT BACK TO EDGE OF STONE.

TO SAND CONTINUOUS OVER PIPES. EXPOSED

SEPARATOR GEOTEXTILE TO BE PLACED PRIOR

5' 5'

OVER TOP OF CULVERT AND ON SIDES.

THE R90 STONE SHALL EXTEND 1-FOOT

(COMPACTED CRUSHED STONE)

12" BASE COURSE

1V:1H

15' (BYPASS RAMP)

10' (ACCESS ROAD)

2" ASPHALT BINDER COURSE

(COMPACTED CRUSHED STONE)

12" BASE COURSE

SEPARATOR GEOTEXTILE

15'

GROUND

EXISTING

ANGLE OF REPOSE

LEVEE SLOPE

ANGLE OF REPOSE

9" CRUSHED STONE COMPACTED

10' WIDE

8' WIDE

9" COMPACTED

SEPARATOR FABRIC

H

C -0

.d g n

B Y

P A

S S

R A

M P

A

N D

T E

M P

O R

A R

Y B

Y P

A S

S D

E T

A

IL

S A

L L

W E

A T

H E

R A

C C

E S

S R

O A

D

E M

E R

G E

N C

Y

C-006

A

M E

N D

M E

N T

A

D D

E D

T E

M P

O R

A R

Y B

Y P

A S

S R

O A

D D

E T

A

IL

/2

/2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S W

E S

T S

H O

R E

L A

K E

P O

N T

C H

A R

T R

A

IN

L

O U

IS

IA

N A

H U

R R

IC

A

N E

A N

D S

T O

R M

D A

M A

G E

R

IS

K R

E D

U C

T

IO

N P

R O

J E

C T

W S

L P

-1 A

L E

V E

E F

L O

O D

W A

L L

A N

D G

A T

E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

A

F E

B R

U A

R Y

A N

S I

D S

T

J O

H N

T H

E B

A P

T

IS

T

L O

U

IS

IA

N

A

P

W

IL

T Z

H U

E T

E

M C

C A

R T

Y

L H

A T

T E

N

D B

E C

K H

-4 -4

S T

A

B /L

T O

S T

A

B /L

A M

E N

D M

E N

T

1V O N 3H

1V ON 3H

NOTE: ASPHALT ROAD WILL TRANSITION TO CRUSHED STONE ROAD AFTER 50'.

15'

2%

LEVEE SECTION

(LEVEE GRADE MATERIAL)

CONSTRUCT COMPACTED FILL

1V:3H

1V:3H

SURFACING DETAIL

SEE TYPICAL RAMP

ASPHALT ROAD TYPICAL SECTION

SCALE: N.T.S.

RAMP SECTION DETAIL 1

MIRROR RAMP SECTION DETAIL 1 AS NEEDED

SCALE: N.T.S.

15'

LEVEE EMABNKMENT

1V O N 3H

7.5' 7.5'

RAMP

C/L

2%

GEOTEXTILE

SEPARATOR

INSTALL

7" CRUSHED STONE

SURFACING MATERIAL

INSTALL

(LEVEE GRADE MATERIAL)

CONSTRUCT COMPACTED FILL

RAMP CROWN EL.

1V:3H1 V :1

H

1V:1H

ROAD

ASPHALT

TO DRAIN

MIN 2% SLOPE

TO DRAIN

MIN. 2% SLOPE

C L

10'

GROUND

EXISTING

1V O N 3H

5' 5'

ROAD

C/L

2%

GEOTEXTILE

SEPARATOR

INSTALL

7" CRUSHED STONE

SURFACING MATERIAL

INSTALL

CONSTRUCT COMPACTED FILL

EL. 3.5'

1V:3H

V :1

H

2%

1V:3 H

1V:3H

LENGTH OF PIPE

CROSSING WIDTH

15' (BYPASS RAMP)

10' (ACCESS ROAD)

48' (BYPASS RAMP)

43' (ACCESS ROAD)

ROAD

C/L

CULVERT DETAILS - SECTION

C/L STA. 3+46.44 (ACCESS ROAD); C/L STA. 0+40.96, 0+44.96, 8+27.92 AND 8+31.92 (BYPASS RAMP)

SCALE: N.T.S.

TYPICAL RAMP SURFACING DETAIL

SCALE: N.T.S.

SLOPE TO DRAIN

TYPICAL ROAD AND SURFACING DETAIL

SCALE: N.T.S.

TYPICAL ALL WEATHER ACCESS ROAD DETAIL

SCALE: N.T.S.

TEMPORARY BYPASS ROAD DETAIL

SCALE: N.T.S.

CONTRACTOR

INSTRUMENTATION

INSTALLED BY

PIEZOMETER TO BE

DATA LOGGER

STRIP DRAINS AND WILL BE APPROX 2 FT W X 1 FT D.

CONTRACTOR. TRENCH WILL BE EXCAVATED BETWEEN ROWS OF

IN TRENCH WHICH IS TO BE EXCAVATED BY THE INSTRUMENTATION

DATA CABLES AND HORIZONTAL DATA PROFILERS INSTRUMENT LAID

SAND BASE

HORIZONTAL STRIP DRAINS

AT EDGE OF PRELOAD

INCLINOMETER INSTALLED

DATA LOGGER

CONTINUOUS ACROSS SAND BASE

VERTICAL WICK DRAINS

TO DATA LOGGER FOR INSTRUMENTATION CONTRACTOR'S USE

CONTRACTOR SHALL PLACE COMPACTED FILL (15' WIDE AT EL. +3.5) OUT

15'30'

BRIDGE EL. +3.5

START OF LAND

15'30'

SLOPE

7.5' +/-

A T

E L

.5

L

A N

D B

R

ID

G E

S L

O P

E .5

INSTRUMENTATION CONTRACTOR

SETTLEMENT GAGE INSTALLED BY

DATA LOGGER

DATA LOGGER

GPS MONUMENT &

VW PIEZOMETER NEST

INCLINOMETER

VERTICAL IN-PLACE

SETTLEMENT GAGE

SYMBOLINSTRUMENTATION

577312.2113506070.512WSLP-110-PL-D3

577335.6713505949.577WSLP-110-PL-P2C

577349.7303506009.955WSLP-110-PL-P2B

577372.7713505972.764WSLP-110-PL-P2A

151+73

577277.5043505913.173WSLP-110-PL-D2

577252.0703505897.263WSLP-110-PL-I2

577115.9623505950.812WSLP-110-PL-D1

577131.7613505925.310WSLP-110-PL-I1

577214.9783505874.062WSLP-110-PL-P1C/SG1C

577154.8453505888.051WSLP-110-PL-P1B/SG1B

577177.8873505850.860WSLP-110-PL-P1A/SG1A

149+43

YX

COORDINATES

STATE PLANE

LABELSTATION

PRELOAD INSTRUMENTATION

G-027

LEVEE TOE

EXISTING

C/L EXISTING LEVEE

ACCESS ROAD

EXISTING LEVEE

ACCESS ROAD

EXISTING LEVEE C/L EXISTING LEVEE

LEVEE TOE

EXISTING

WSLP-110-PL-D3

WSLP-110-PL-P1A/SG1A

WSLP-110-PL-P1B/SG1B

WSLP-110-PL-I1

WSLP-110-PL-P1C/SG1C

WSLP-110-PL-D1

WSLP-110-PL-I2

WSLP-110-PL-D2 WSLP-110-PL-P2A

WSLP-110-PL-P2B

WSLP-110-PL-P2C

N O

R T

H P L A

N

FLOOD SIDE

LAND SIDE

SCALE: 1" = 50'

ST. JOHN THE BAPTIST PARISH, LA

C-019A

,5 ,5

,0

,0

,5

,0

,5

,0

0° '1 5"

0° '1 5"

°0

' 0

B /L S

T A

B /L S

T A

50' 100'0

,5

CL EXISTING DITCH

EXISTING DITCH TOP

CL EXISTING DITCH

EXISTING DITCH TOP

SEE SHEET C-020

TEMPORARY STOCKPILE FOR LEVEE DEGRADE MATERIAL

SEE SHEET C-020

TEMPORARY STOCKPILE FOR LEVEE DEGRADE MATERIAL

W S

L P

L

IM

IT

O

F C

O N

S T

R U

C T

IO

N

W S

L P

L

IM

IT

O

F C

O N

S T

R U

C T

IO

N

B /L S

T A

B /L S

T A

B /L S

T A

B /L S

T A

SCALE: 1" = 50'

W S

L P

-1 P

R E

L O

A D

I N

S T

R U

M E

N T

A T

IO

N

H -4

-4 C

-0 A

.D G

N

A M

E N

D M

E N

T

BASELINE

BASELINE

A

M E

N D

M E

N T

A D

D E

D S

H E

E T

C -0

A

/2

/2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

N E

W O

R L

E A

N S

L A

L

E A

K E

A V

E N

E W

O R

L E

A N

S D

IS

T

R

IC

T U

.S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S W

E S

T S

H O

R E

L A

K E

P O

N T

C H

A R

T R

A

IN

H U

R R

IC

A

N E

A N

D S

T O

R M

D A

M A

G E

R

IS

K R

E D

U C

T

IO

N P

R O

J E

C T

W S

L P

L

E V

E E

F

IL

E N

A M

E

F

IL

E N

U M

B E

R

Z X

X X

X X

X X

X X

X X

W P

B

A

F E

B R

U A

R Y

A N

S I

D S

T

J O

H N

T H

E B

A P

T

IS

T P

A R

IS

H

A

B R

O O

K S

H U

E T

E

M C

C A

R T

Y

L H

A T

T E

N

D B

E C

K H

-4 -4

AT EACH LOCATION OF INSTRUMENTATION

COMPLETION OF SAND AND BERM FILL PLACEMENT

INSTRUMENTATION TO BE INSTALLED BY OTHERS AFTER

INSTRUMENTATION SECTION

LAND BRIDGE PLAN

SCALE: NTS

SCALE: NTS

OF THE INSTALLED DEVICES SHALL BE DISTRIBUTED THROUGHOUT EXISTING BID ITEMS.

ASSISTING WITH THE INSTALLATION OF THE GEOTECHNICAL INSTRUMENTATION AND PROTECTION

11. THE COST FOR ALL REQUIRED WORK FOR INSTALLING LAND BRIDGES BY THE CONTRACTOR FOR

FOR SETTLMENT ARE FOUND IN SPECIFICATION SECTION 31 24 00.00 12.

ADDITIONAL PAYMENT DUE TO SETTLEMENT. MEASUREMENT AND PAYMENT CONSIDERATIONS

AND MAY NOT BE USED BY THE CONTRACTOR FOR ANY USE, INCLUDING THE CALCULATION OF

10. DATA OBTAINED FROM THIS INSTRUMENTATION IS FOR THE SOLE USE OF THE GOVERNMENT

CONTRACTOR TO RE-ESTABLISH THE INSTRUMENTS AND OBTAIN NEW BASELINE READINGS.

OF EQUIPMENT, SUPPLIES, AND LABOR REQUIRED BY THE THIRD PARTY

INSTRUMENTATION DAMAGED BY THE CONTRACTOR. THIS INCLUDES THE COST

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT COST OF

INSTRUMENTATION FROM DAMAGE.

GOVERNMENT. TAKE ALL MEASURES NECESSARY TO PROTECT THE GEOTECHNICAL

8. PROVIDE ACCESS AT ALL TIMES TO THE INSTRUMENTATION LOCATIONS SELECTED BY THE

TO THE CABLES WHEN BACKFILLING.

APPROXIMATELY 2-FT WIDE BY 1-FT DEEP. CARE SHALL BE TAKEN TO BE TAKEN TO AVOID DAMAGE

WILL CONNECT TO DATA LOGGERS SET UP ON THE L/S OF THE WORK SITE. TRENCHES WILL BE

THE WORK SITE FROM THE C/L OF THE LEVEE SECTION TO THE L/S SO THAT ALL INSTRUMENTS

CABLING THAT WILL CONNECT INSTRUMENTS TO DATA LOGGERS. CABLING WILL TRAVERSE

7. TRENCHES WILL BE EXCAVATED BY THE THIRD PARTY CONTRACTOR FOR INSTALLING DATA

6. RATE OF FILL PLACEMENT SHALL NOT EXCEED 2 VERTICAL FEET PER WEEK.

CONSTRUCTION IN THE AFFECTED AREA.

TO BE READING SATISFACTORILY, THE CONTRACTING OFFICER WILL AUTHORIZE RESUMPTION OF

LOGGER. ONCE THE INSTRUMENTS ARE DETERMINED BY THE THIRD PARTY CONTRACTOR

ACROSS THE CORRIDOR BETWEEN THE INSTRUMENTS AND THE ADJACENT DATA

5. COORDINATE WITH THE THIRD PARTY CONTRACTOR FOR ANY WORK PERFORMED

INSTRUMENTS SHALL BE OBSERVED.

DURING THIS 17-DAY PERIOD, A NO WORK ZONE OF A 25-FT RADIUS AROUND THE

INSTRUMENT SITE IS GRANTED, PLUS AN ADDITIONAL 7 DAYS TO INITIALIZE THE EQUIPMENT.

4. INSTRUMENTATION INSTALLATION IS EXPECTED TO TAKE 10 DAYS ONCE ACCESS TO

PRIMARY CONTRACTOR.

LAND BRIDGES PROVIDING ACCESS TO THE DATA LOGGERS SHALL BE INSTALLED BY THE

INCLUDING EXTENDING THE BERM FILL TO PROVIDE ACCESS TO THE DATA LOGGER. THE

TO INDICATE WHEN THE SAND BASE, BERM FILL AND WICK/STRIP DRAINS ARE COMPLETE

3. PROVIDE TEN DAYS ADVANCE NOTICE TO THE CONTRACTING OFFICER REPRESENTATIVE

2. THIS IS SCHEMATIC ONLY. REFER TO TYPICAL SECTIONS FOR SECTION DIMENSIONS.

1. GEOTECHNICAL INSTRUMENTATION WILL BE INSTALLED BY A THIRD PARTY CONTRACTOR.

NOTES:

Questions and Answers:

W912P826BA041

West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP-103A Levee, Floodwall and Gate, Sta. 819+87 B/L to Sta. 827+95 B/L, St.

John the Baptist Parish, Louisiana

Question: Please provided qtys for bid items with a unit of measure of "JOB"

Response: See attached job item quantities.

Question: Please provide bidders with estimated quantities on items of work for which bids are being solicited on a JOB basis.

Question: Does the government anticipate a deficit in material available to construct the proposed levee and preloads? Will the contractor be responsible for import of any material should a deficit in onsite material be encountered?

Response: The Government does not anticipate a deficit in material available to construct the proposed levee and preloads.

Question: What is the status of the current WSLP 110 project? Can the contractor assume unimpeded access?

Response: The contractor for WSLP 110 is working towards turf established. Access will be unimpeded.

Question: Please clarify the expectation of the removal of existing wick drains

Response: Vertical wick drains are spaced 3 ft O.C. in a triangular pattern over an area of roughly 7,124 SY within the base of each preload. Horizontal strip drains spaced at approximately 5.2 feet extend across the vertical wick drain field and are connected to the vertical wick drains. All visible horizontal strip and vertical wick drains are to be cut at visible grade within the footprint of the T-Wall foundation and TRS excavations;

however, no removal other than cutting of visible wick drains is required.

Question: please provide estimated quantities

Question: Does the government intend to issue a tax exemption form to the awardee of this project or should the contractor include all federal, state, and local tax costs in his bid for this project?

Response: No the Government does not issue a tax exemption form.

Question: Can the field seams be lapped and if so, how wide?

Response: 2 feet

Question: 1. Can preloads be built to full height. 2. Is settlement for preload to be monitored under this contract?

Response: 1. Per Specification Section 31 24 00.00 12, paragraph 3.2.1 "The rate of compacted fill placement shall not exceed 2-feet in elevation over a 7-day time frame."

2. No

Question: Please clarify the maximum width of 22" for substitute sheet piling.

Response: Substitute sheet piling with larger widths will be considered as long as they meet the minimum section modulus.

Question: Is asphalt paving a single 4" wearing course layer or 2" binder and 2" wearing?

Response: The asphalt paving consists of a 2" binder course and 2" wearing course.

Reference C-006.

Question: Please clarify the extent of horizontal and vertical wick drain removal required in the vicinity of floodwall construction between C/L Sta. 50+80.37 & 52+12 and between C/L Sta.

54+03 & 55+37.04.

approximately 5.2 feet extend across the vertical wick drain field and are connected to the vertical wick drains. All visible horizontal strip and vertical wick drains are to be cut at

Question: Can access to the WSLP 110 westerly preload be considered from Access Road "A"?

Response: No.

Question: Considering the limits of asphalt paving shown on C003 & C004 (215' x 210'), please review your quantity for Item 0022.

Response: This inquiry was withdrawn by inquiry 11840220.

Question: Is sand and/or embankment fill to develop PDA, temporary stockpile and staging areas measured under Items 0013 or 0014?

Question: Inquiry 11840140 is withdrawn.

Response: Noted.

Question: The Pipeline and Valve Removal (G-060 and V-001 Enlink) appear to be in a very swampy environment on the east side of the contstruction limits, the removal of this pipeline and valve will require alot of matting, site work, and prep work to perform which will increase pricing.

Response: The Government acknowledges the statement.

Question: Please clarrify Bid Item 0025AA "First 280 LBS" and Bid Item 0025AB "All Over

280 LBS"

Response: The Government acknowledges the statement.

Question: Please provide the Government's estimated quantities for "Job" items.

Question: The contractor is required to access the WSLP-110 site from Access Road B. This will require heavy truck traffic, large earth moving equipment, wick drain installation rigs, etc. to travel along the previously completed levee section including established turf and in place surfacing.

Response: Any damage will be repaid with applicable CLINS under the Changes Clause.

Question: Please confirm that the existing preload and levee material the contractor is to degrade and stockpile for reuse has been previously tested and will be deemed suitable for use in the features required on this project as well as for turf establishment.

Response: The Government confirms the bidder statement.

Question: Is the intent for the Contractor to not import any "outside" fill for this project as no pre-approved borrow sources have been provided in section 01 00 00 and no excavation for borrow specifications are included in the solicitation? What if the contractor determines additional material is required outside of what is available?

Response: The Government does not anticipate the need for any "outside" fill for this project.

Question: Is the geotextile fabric required for the grouted riprap measured and paid under the Separator Geotextile CLIN or is it incidental to the riprap?

Response: The geotextile fabric required for the grouted riprap is incidental to the riprap.

Question: Will payment be made for stored materials, either onsite or offsite, for sheet piles, pipe piles, and the floodgate?

Response: Yes, payment will be made for onsite materials only.

Question: Please confirm that the PDA pipe piles are not measured for payment and are to be included in the PDA Testing item.

Response: Confirmed.

Question: Please confirm that static load tests are not being performed on this project and that only dynamic testing is being performed.

Question: Specification section 31 62 17.00 12, paragraph 1.8 states "The contractor shall obtain the services of an independent, registered professional geotechnical engineer (Geotechnical Consultant) licensed in the state of Louisiana, experienced in soil mechanics and pile dynamic analysis, to observe test pile installation and production pile installation as specified herein."

Response: The intention is for the Geotechnical Consultant to observe the test pile installations and Dynamic testing as well as the evaluation of the Dynamic testing results.

The Consultant is required to observe the first 3 production piles to confirm uniformity in pile driving and driving stresses.

Question: Will an additional and separate Superintendent, SSHO, and QC all be required when work is performed at the WSLP-110 site?

Response: No, a separate team will not be required at the WSLP-110 site.

Question: Please confirm that base, subbase, and geotextile material for the asphaltic pavement are not measured and paid under respective CLINS and are to be included under the "Asphaltic Paving" item.

Question: What material is the existing Enlink G-060 line to be removed so we can accurately determine what will be required to cap the ends to remain and what will be necessary for disposal?

Response: Steel.

Question: Are the test piles required to be removed or can they be cut off below grade and abandoned in place?

Response: The test piles shall be removed.

Question: Will temporary access be required for Frenier Road traffic to the flood side of the levee system during floodwall construction? Construction will require complete closure of the road. If temporary access is required, is there a typical section of road construction that is required? Where would the temporary access road be located? If a temporary access road is required during construction, how would it be paid?

Response: Temporary access for Frenier Road traffic to the flood side will be required.

See revised sheet C-006 for detail.

Question: Will a truck wash down rack be required at the WSLP-110 site?

Question: Will steel faced forms be allowed on wall stems requiring a Class A finish?

Response: Steel faced forms will be allowed as long as the finish meets the spec requirements.

Question: Is the contractor required to maintain/cut grass along the WSLP-110 levee during the life of this contract?

Question: Drawing C-009, note 2 requires the existing wick drains to be removed. Please provide the extent or limits that the existing wick drains are to be removed to. Is the intent to individually cut each tail off at a certain elevation?

approximately 5.2 feet extend across the vertical wick drain field and are connected to the vertical wick drains. All visible horizontal strip and vertical wick drains are to be cut at

Question: Is the contractor limited to a vertical height of stockpiled material that can be placed in a certain period of time?

Response: The stockpile height is limited to 6' as per the typical section on sheet C-017.

There is no limit on the rate of placement as long as the maximum height is not exceeded.

Question: Is the contractor limited to a vertical height of preload material that can be placed in a certain period of time?

Response: Per Specification Section 31 24 00.00 12, paragraph 3.2.1 "The rate of compacted fill placement shall not exceed 2-feet in elevation over a 7-day time frame."

Question: As there is no section L provided with instructions to offerors, will the government provide a checklist of requirements bidders are to provide?

Response: No section L. This acquisition is Invitation for Bid . No, the Government will not provide a checklist.

Question: Please provide the Government's estimated quantities for the Lump Sum/Job CLIN items.

Question: The contract drawings state that the contractor is to maintain access to the flood side throughout the contract. We are assuming this is for the railroad to have access. Is there a minimum design for temporary access road to the flood side (width, material, etc.)? If the access road is to be installed over the existing gas lines, are there any additional provisions that need to be accounted for? Please clarify..

Response: See revised sheet C-006 for detail.

Question: DWG G-004, Utility Tabulation, E-008 notes that the existing line will be relocated by owner prior to construction. DWG C-001 notes that E-008 Is to be relocated during construction.

Which is correct?

Response: E-008 will be relocated prior to construction. The callout on sheet C-001 that states "RELOCATED E-008 LOCATION DURING CONSTRUCTION" is intended to show the temporary location of the E-008 line during construction. The line will be relocated back to the original location after construction is complete.

Question: Sheet C-019 depicts the WSLP-110 Preloads. Is there a required hold period for the preloads? Additionally, there are no geotechnical devices depicted for the preloads. Will the preloads be monitored with inclinometers, piezometers, and settlement gauges? If so, who is responsible, the Contractor or the Government? Please clarify.

Response: There is no hold required for the WSLP-110 preloads. The preloads will be monitored by a separate contractor.

Question: DWG C-021 shows detail K11, where the wick drain installation elevation is EL. 2.5 with an approximate sand fill base of 12" in thickness. This would put the cut to EL. 1.5. Please confirm.

Question: Please clarify whether utility owner coordination, support personnel, operational restrictions, vibration monitoring, shutdown requirements, inspections, and associated costs for work adjacent to the Uniti fiber optic line (C-009), Energy Transfer gas line (G-058), and Enlink facilities (G-060/V-001) are Contractor-responsible and incidental to the contract.

Response: Utility owner coordination will be contractor responsibility. Reference 01 00 00 paragraph 9 Utility and Improvements.

Question: Please clarify whether utility elevations and horizontal locations shown for C-009, G- 058, and G-060 were field verified or are based solely on record/as-built information.

Response: Exact location shall be field verified by the contractor. Utility locations are based on surveys and or owner provided locations.

Question: Please clarify how wick drain refusal, obstruction, or unsuccessful installations requiring relocation or reinstallation will be measured and compensated.

Response: Per Specification Section 31 26 00.00 12, paragraph 3.1.2, "Where obstructions or stiff soils are present that prevent the installation of wick drains, the Contractor shall make two attempts to install a wick drain within 18 inches of the original location. If a drain can still not be installed, the lat/long location shall be marked on the asbuilt drawings and submitted as per the "Wick Survey" requirements and the Contractor shall proceed with wick drain installation." Per Specification Section 31 26 00.00 12, paragraph 1.2, "No payment will be made for the Contractor making two additional attempts to install the wick drains when the first attempt fails to reach tip elevation."

Question: Please clarify whether restrike testing, WEAP analyses, redriving, or additional dynamic testing beyond Bid Item 0021 "PDA Testing" are anticipated or incidental to the contract requirements.

Response: The Contractor will be required to submit WEAP and CAPWAP analyses and perform initial and restrike PDA dynamic testing on 2, non-production piles. The PDA dynamic testing shall be conducted outside the footprint of the permanent T-walls, but inside the authorized limits of construction. No additional dynamic testing is anticipated and all of these tests are covered by Bid Item 0021 "PDA Testing".

Question: Please clarify anticipated Government review duration for temporary retaining structure submittals and whether review periods will count against the contract performance period.

Response: Yes, the Government has 30 days to review submittals.

Question: I do not see anything regarding Insurance to be carried for this project. Where can I find this information?

Response: We usually do not tell the contractors what type of Insurance they should carry while they're working on the project.

Question: Please clarify whether disposal areas for unsuitable or excess excavated/preload materials will be Government-furnished or Contractor-responsible.

Response: Disposal areas for unsuitable excavated/preload material will be Contractor-responsible.

Question: Please clarify whether treatment, testing, filtration, permitting, or other special requirements apply to construction dewatering discharge beyond standard SWPPP/BMP compliance.

Response: The bidders must follow the standards of the LDEQ Strom Water General Permit LAR100000 regarding dewatering discharge. Specifically see Part III. SPECIAL

CONDITIONS, MANAGEMENT PRACTICES, AND OTHER NON-NUMERIC

LIMITATIONS “Section A.3.m” and “Section A.4.d”.

Question: Please confirm whether all gate hardware, anchorage components, guides, stops, locking devices, operational appurtenances, and testing requirements necessary for a fully operational swing gate are fully depicted in the plans and included within Bid Item 0034.

Response: Bid Item 0034 includes all gate components except for anything covered under Section 05 50 04.01 12 which is paid under Bid Item 0006.

Question: There is an existing overhead powerline running parallel to Frenier Road on the north side of the roadway. Please confirm whether this line will be de-energized, relocated, or otherwise modified prior to commencement of construction activities. If not, please clarify the Contractor’s required means and methods restrictions, minimum clearance requirements, and responsibility for coordination related to pile driving operations in proximity to the energized line.

Response: The overhead powerline will be relocated prior to construction. The temporary line will route around the construction site as shown on sheet C-001 (see line with callout

"RELOCATED E-008 LOCATION DURING CONSTRUCTION".

Question: There appears to be existing utility equipment located on the north side of Frenier Road near the proposed floodgate structure. Please confirm whether the utility equipment will be removed or relocated by others prior to construction, or if the Contractor shall be responsible for protecting the equipment and sequencing work around the existing utilities.

Response: The Utility Tabulations table on sheet G-004 lists the known utilities and their dispositions. The overhead lines will be relocated prior to construction. One underground gas line and valve are to be removed by the Contractor. The other underground gas line and fiber optic line will require utility sleeves be constructed and installed where the lines pass through the sheet pile under the floodwall (see sheets S-401 - S-407).

Question: Specification Section 03 31 00.00 12, Paragraph 1.5, “Thermal Analysis and Thermal Control Plan,” identifies the wall stem as mass concrete. However, the base slab appears to have a greater minimum thickness (3’) than the wall stem (2.5’). Please clarify whether the Thermal Analysis and Thermal Control Plan requirements apply to both the base slab and wall stem, or only to the wall stem.

Response: The Thermal Analysis and Thermal Control Plan requirements only apply to the wall stem.

Question: Specification Section 01 57 20.00 12 states that construction activities must cease if wading birds or bald eagles are found nesting within 1,000 feet and 1,500 feet, respectively, of the work area. Please clarify how the Contractor will be compensated for impacts to the critical path schedule and/or standby costs resulting from environmental work restrictions beyond the Contractor’s control.

Response: Impact would be covered under the Changes clause.

Question: Specification Section 31 11 00.00 12, Paragraph 3.4.1, indicates that a burn permit will be required. Please clarify whether the burn permit is to be obtained through the Parish or USACE. If the permit is to be obtained through the Parish, note that local requirements prohibit burning within 1,000 feet of existing structures. The cell tower located at 326 Frenier Road appears to be within approximately 600–800 feet of the project site. Please confirm whether open burning will be permitted or if the Contractor should assume all vegetation/debris will require off-site disposal.

Response: In accordance with the Permits and Responsibility clause: Contractor is responsible for any and all permits and conforming to requirements of the permits.

Question: Page 6 of the solicitation states: “The contractor shall begin performance within 10 calendar days and complete performance within 465 calendar days after receiving Notice to Proceed (NTP).” However, Page 50 states: “The total duration of this contract, including the exercise of any options under this clause, shall not exceed 6 months.” Please clarify the intended contract duration and identify which duration requirement governs.

Response: Yes, 465 days is the contract duration. Please see amendment.

Question: Please provide Lump Sum item quantity breakdowns

Question: Will separate SSHO / QCM / Superintendent be required for each site when working concurrently?

Response: No, a separate team will not be required at the WSLP-110 site.

Question: Please provide soil reports / proctors for Preload embankment areas.

Response: A new proctor sample will be required to be taken from the preload material that is stockpiled on site.

Question: Does CLIN 0009 include Clearing & Grubbing at both sites?

Response: Yes.

Question: During site visit, it was noticed the levee section called out to be degraded & ties in near STA 56+00 has been removed. Please confirm.

Response: This levee is still under construction.

Question: What ground elevation shall…

This is the start of the file's text. The full file is on GovTribe.