W912P825R0005 AM_0003.pdf
PDF 15 MB Posted
- Solicitation number
- W912P825R0005
About this file
This document is an Amendment of Solicitation/Modification of Contract for a Roof Replacement project at the New Orleans District Headquarters Building. The amendment provides responses to contractor questions, revises plans and specifications, and establishes a new proposal due date of Friday, April 11, 2025, by 12 PM CST. The solicitation (W912P825R0005) covers comprehensive roof replacement work including demolition of existing roof, installation of concrete roof fill, metal framing, structural steel, roofing systems, insulation, flashing, sheet metal, lightning protection, and associated components.
Key modifications include reducing the installer warranty from 20 years to 2 years, clarifying design and engineering requirements for various system components (such as PV solar array rack, precast concrete, and structural attachments), and addressing technical questions about existing building conditions, material specifications, and installation methods. The amendment also provides details about core sampling, asbestos testing (no asbestos detected), and specific requirements for roofing materials, structural modifications, and technical submittals. The project is fully funded for the Base Work, with Optional Work 1 and 2 submitted as budget items for future fiscal years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P825R0005 AM_0006.pdf | ||
| W912P825R0005 AM_0005.pdf | ||
| W912P825R0005 AM_0004.pdf | ||
| W912P825R0005 AM_0002.pdf | ||
| W912P825R0005 AM_0001.pdf | ||
| W912P825R0005 Plans.pdf | ||
| W912P825R0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation for Roof Replacement New Orleans Headquarters Building is hereby amended to provide responses to
Contractor questions, revised plans and specif ications (as contained herein) and establish a new proposal due date.
Proposals are due NLT Friday, April 11, 2025, by 12PM CST. Additional questions w ill not be accepted, and the proposal due date w ill not be extended.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 45
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Mar-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P825R0005
X 9B. DATED (SEE ITEM 11)
31-Jan-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Mar-2025
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P825R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00700 - CONTRACT CLAUSES
The following have been deleted:
252.219-7011 Notification to Delay Performance JUN 1998
(End of Summary of Changes)
The following items are applicable to this modification:
RESPONSE TO QUESTIONS
Contractor Questions and Government Responses
1) Spec section 075200.0028.1.10.1 states that the installer must warrant the roof for a period of 20 years independent of the membrane manufacturer’s warranty. This is not a typical request. Industry standard is typically a 2-year installer’s warranty. Please confirm that a
2-year installer warranty is acceptable.
Response: Confirmed. Specifications 07 52 00 has been revised as part of this amendment to reduce the Installer Warranty to 2 years.
2) Spec section 075600.1028.1.8.2.2 states that the installer must warrant the PMMA flashings a period of 20 years independent of the membrane manufacturer’s warranty.
This is not a typical request. Industry standard is typically a 2-year installer’s warranty.
Please confirm that a 2-year installer warranty is acceptable.
Response: Confirmed. Specifications 07 56 00 has been revised as part of this amendment to reduce the Installer Warranty to 2 years.
3) Detail F1/S-501 states “CONCRETE REINFORCEMENT TO BE DETERMINED BY THE
CONTRACTOR’S PE.” Will the Contractor be required to provide professional structural engineering services to perform calculations for any new precast concrete planks?
Response: Precast shall be designed, signed and sealed as outlined in SECTION 03 41
16.08 28, paragraph 2.2.1 Precast Concrete Roof Infill.
4) Detail F1/S-501 states “CONCRETE REINFORCEMENT TO BE DETERMINED BY THE
CONTRACTOR’S PE.” If the Contractor is required to determine this reinforcing, will the
Contractor be required to submit professional structural engineer signed and sealed calculations and/or drawings to the Government for review?
Response: A registered professional civil or structural engineer is required to do the concrete design in accordance with SECTION 03 41 16.08 28, Par. 2.2.1.
5) Detail F11/S-501 states “THE ADEQUACY OF THE (8) (E) CHANNEL
CONNECTIONS TO THE (E) WFs ARE NOT ABLE TO BE EVALUATED PRIOR TO
THE EXHAUSTSTACK REMOVAL.” Is the Contractor required to have these connections evaluated by a professional structural engineer or will the Government designer of record evaluate these connections?
Response: No, the contractor does not need to have a licensed engineer evaluate these connections. Per spec section 05 05 13.00 28, paragraph 2.2.1.1, the government will provide a visual inspection of these connections and confirm their adequacy.
6) Detail F11/S-501 states “THE ADEQUACY OF THE (8) (E) CHANNEL
CONNECTIONS TO THE (E) WFs ARE NOT ABLE TO BE EVALUATED PRIOR TO
THE EXHAUST STACK REMOVAL.” These connections are not readily visible due to existing ceilings, insulation, shaft walls, ductwork, and various MEP. If the Contractor is required to evaluate these existing connections will the Government temporarily remove the existing ceilings, insulation, ductwork, and various MEP that currently prevents visual observation or is the Contractor responsible for this?
Response: The Contractor will be responsible for removing ceiling tiles, insulation and ductwork. If ductwork needs to be moved, the Contractor will need to coordinate with the
COR. Work requiring access to the interior of the building shall be arranged to take place outside of regular work hours. See spec SECTION 01100 - GENERAL PROVISIONS, page 9, 21. OCCUPIED BUILDING WORK RESTRICTIONS.
7) Detail K9/A-401 note states “METAL WALL PANEL, INSULATION AND INFILL
STUDSMATCH EXISTING”. Will the Government indicate what the existing metal wall panel, insulation, and infill studs are so that we can price appropriately?
Response: Per spec Section 07 42 13.00 28, the characteristics of the existing metal wall = panels is described under Part 2.1(1). See resource drawing sheet R-022 for additional existing steel stud and wall insulation information.
8) Please confirm that all existing interior roof drain lines are to remain.
Response: Confirmed.
9) Please confirm that the only new interior roof drain lines to be installed by the Contractor are those indicated on sheet M-401.
Response: Confirmed.
10) Detail H13/A-502 indicates that the new PV Rack stanchion anchors are to be “per PV
Rack and stanchion manufacturer to meet wind criteria see specification.” Specification
05 50 13.00 para 1.6.1 indicates the Contractor must procure the services of a PV array rack designer and manufacturer for the design of the system, and the calculations and design drawings must be signed and sealed by the registered professional engineer. Please confirm the Contractor must procure these services and submit professional engineer signed and sealed calculations from qualified PV in accordance with specifications.
Response: PV rack shall be designed, signed and sealed as outlined in SECTION 05 50
13.00 28 paragraph 1.6.1 Photovoltaic (PV) Solar Array Rack System Design.
11) Is there an existing lighting protection system? The drawings and specifications do not indicate.
Response: No.
12) If there is an existing lighting protection system, will the Contractor be allowed to re-use existing downleads?
Response: There is not an existing lightning protection system. This is a new system.
13) If there is an existing lighting protection system, will the Contractor be allowed to re-use existing grounding systems in place?
Response: There is not an existing lightning protection system. This is a new system.
14) If there are no existing Lighting Protection System grounding systems in place, the
Contractor will need to install new. Much of the building perimeter is paved which will require demolition and replacement of paving to install grounding. Is the Contractor required to include in their bid the demo and replacement of existing paving to accommodate new LPS grounding?
Response: Contractor shall try to minimize removing pavement, but where required contractor shall replace pavement. Contractor will have to hand dig portions of the building to avoid existing utilities. Contractor shall field verify.
15) Are there existing interior or exterior downleads we can use for the new lightning protection system? If yes, please provide locations and sizes of existing downleads.
Response: No, this is a new system.
16) If Contractor is required to install new downleads for new lightning protection system, will it be acceptable to install exterior downlead on face of building?
Response: Bid as specified in the plans and specs.
17) Is there an existing surge protection device at the electrical service(s) to the building?
Response: No.
18) In relation to new lightning protection system planning, will the Government provide location of the existing electrical rooms to determine grounding and surge protection scope of work?
Response: Yes.
19) Specification 26 41 00 para 3.3 indicates that Contractor is to “bond metal fencing” within
6 feet of the new LPS to the new LPS system. To determine this can the Government provide a site plan that indicates locations of metal fencing within 6 feet of the building.
Response: Metal fencing that requires bonding surrounds the chill water and generator yard adjacent to the south building. Contractor shall field verify any other locations.
20) Specification 26 41 00 para 3.3 indicates that Contractor is to “bond metal fencing” within
6 feet of the new LPS to the new LPS system. Is the loading dock vehicle barrier (steel bollards with crash cables) considered “metal fencing” that is to be bonded?
Response: Metal fencing that requires bonding surrounds the chill water and generator yard adjacent to the south building. Contractor shall field verify any other locations.
21) Sheet A-401 indicates installing new double door and wall paneling on the West
Elevation. Photo E11/A-901 indicates existing electrical/communications conduit, box, and wiring on the interior of this wall. Is this to be demoed and cut off at concrete deck level?
Response: Conduit, box, and wiring on this wall of Penthouse 2 will be removed by the
Government.
22) Sheet M-401 indicates installing new 4” storm drain line in the plenum space above the ceiling from new roof drains to existing storm drain downleads approximately 50-60 linear feet away. In observing the existing plenum space in these areas during the site walk, and as reflected in the plenum photos provided on Sheet M-901, it appears that there will likely be significant conflicts where the proposed drain line path in the plenum space is completely blocked by ductwork, piping, and structure. In lieu of this proposed routing will the Government allow new drains to daylight through the closest exterior walls with wall-mounted lambs tongue and/or new exterior downspouts?
Response: No. Suggested routing shown was intended to minimize conflicts with existing in-ceiling infrastructure. Should conflicts be unavoidable through reasonable adjustments to recommended routing and require additional work performed modifying existing in-ceiling utilities, this will be addressed through a contract modification.
23) Has the Government performed a hazardous material investigation on any of the materials the Contractor will be disturbing (roofing, insulation/mastic/etc. in plenum space, etc.)?
Response: A roof moisture survey was performed in 2008. 13 core samples were laboratory tested for asbestos containing materials (ACM). ACM was not detected in any of the samples. See copy of asbestos testing report attached to specification
SECTION 07 01 50.10 28 as part of this amendment.
24) If the Government has not performed a hazardous material investigation is the
Contractor required to perform?
Response: No. See spec SECTION 01 35 26 Page 25, 3.1.3 Unforeseen
Hazardous Material.
25) Section 01 35 26 paragraph 1.7.1.1.1 indicates that the SSHO may not serve as the
CQCM or Superintendent. Can Superintendent also serve as the CQCM?
Response: No. The Superintendent and Quality Control Manager need to be 2 separate individuals.
26) Can the Superintendent be a “working” superintendent participating in the project labor requirements?
Response: No.
27) Please confirm that the Government takes no exception and has no special requirements regarding the temporary removal of all roof mounted antennas to accommodate Contractor work.
Response: Confirmed. The Contractor will not be responsible for relocating antennas on the roof.
28) Section 00010 “Bidding Schedule” includes Line Item 0003 “PV Solar Array Support
Structure” under the Base Work.
Response: The Base Work (south building) includes installation of support structure for a future solar array. OW-1 (center building) and OW-2 (north building) do not include a solar array structure.
29) Is this project sales tax exempt?
Response: New Orleans District does not provide nor does the Contracting Officer sign a
Sales Tax Exemption Form
30) Section 01100 paragraph 3.n states that Fall Protection shall be in accordance with EM
385-1-1 Chapter 21 with the exception that fall protection carts shall not be used under this contract. Will the Government confirm that the use of fall protection carts will not be allowed?
Response: Confirmed. See spec 01100-6, (n) Fall Protection. All fall protection shall be in accordance with EM 385-1-1 Chapter 21 Fall Protection with the exception that fall protection carts shall not be used under this contract.
31) Section 01100 paragraph 3 indicates that the Contractor is to follow the 15 March 2024 edition of EM 385-1-1. This edition contains significant changes to the previous 2014 edition. Will the Government confirm that Contractor’s are to follow the 15 March 2024 edition and not the 2014 edition?
Response: Confirmed. ALL WORK UNDER THESE SPECIFICATIONS SHALL BE
PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF EM 385-1-1 "SAFETY
AND OCCUPATIONAL HEALTH REQUIREMENTS” DATED 15 MARCH 2024.”
32) The Contractor is not the designer of record and is not in possession of the ACAD files.
Will the Government confirm that the “Final As-Built Drawings” described in Section 01 78
02.00 10 paragraph 1.3 are not required to be prepared in AutoCAD but can be prepared neatly by hand or with PDF editing software (such as Adobe)?
Response: The Government will accept "red lined" final as-built drawings in accordance with the Construction Solicitation and Specifications. See SECTION 01 78 02.00 10, CLOSEOUT SUBMITTALS.
33) Section 01 33 00 paragraph 1.9 infers that the Contractor is to allow “a minimum of 30 calendar days” for Government review and approval of submittals. This is excessive and would negatively impact project schedule. Can the Government clarify their submittal review duration is 14 or 21 days which aligns more with our past experience with USACE?
Response: A minimum of 30 calendar days is required for Government review and approval of submittals.
34) Our firm exclusively uses Primavera P6 software for project scheduling. Section 01 32
01.00 indicates that the Contractor should prepare and submit schedules using Primavera
P6 but, if using an alternative software, the Contractor should meet the requirements of paragraph 2.1.2.2 and provide the Government two licenses, two computers, and training for two Government employees to use the alternative software. To ensure equal bidding and meet Government expectations, will the Government confirm if they will not entertain exceptions to the requirements noted in 01 32 01.00 paragraph 2.1?
Response: Bid as specified. See spec DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 01.00 12, PROJECT SCHEDULE, Part 2 - Products.
35) Section 00010, NOTE 6 indicates that the Government may exercise award of Option 1 between 10/1/2025 and 12/31/2025 and Option 2 between 10/1/2026 and 12/31/2026.
This infers the Contractor must hold their Option 1 bid price for 303 days after bid date and their Option 2 bid price for 668 days after bid date. This is not reasonable. Please clarify how long the Contractor must hold their bid price for Option 1 and Option 2 after the March 3, 2025, bid date.
Response: Throughout the life of the contract. This is typical practice for much larger, and longer duration, construction projects that are administered by the New Orleans
District. As stated in NOTE 6 in the Bidding Schedule: All prices bid by the Contractor to secure a responsive bid shall be binding throughout the life of the contract.
36) The contract documents do not reference FAR 52.216-4 “Economic Price Adjustment –
Labor and Material.” Given the potential volatility in the market based on potential tariffs and the potential delay in awarding Option 1 and Option 2 as noted in section 00010
NOTE 6, will the Government include this FAR clause in the contract?
Response: No.
37) On Page 20 of the Section:52.228-1 BID GUARANTEE (SEP 1996) (c) The amount of the bid guarantee shall be _twenty_ percent (20%) of the bid price or $_3,000,000.00_, whichever is less.- *** Why is the Bid Bond Amount stipulated Lower (less) than the estimated value amount as listed on Page 6 On form (SF1442) - The estimated value of this work is between $5,000,000 and $10,000,000) ??
Response: The estimated value of $5,000,000.00 - $10,000,000.00 is the magnitude of construction per FAR 36.204. FAR 52.228-1 Is the BID GUARANTEE required in the solicitation.
38) Please confirm that the PMMA coating is only for the canopies on the front of the building.
No PMMA coating on main roof structure.
Response: No. The canopies will have a PMMA fluid-applied roofing system, see sheets A-
102, A-103, and A-104. The main roof structure will have PMMA fluid-applied flashing for the modified bitumen roofing, see details on sheets A-501 through A-514.
39) Please confirm that only 5,605 sq ft of solar array rack area is to be included and that this is part of the base bid only.
Response: Minimum square footage shown on A-104 sheet keynote 16 has been increased.
See amended drawing A-104.
40) Please specify whether a ballasted solar array rack system will be acceptable for this scope of work.
Response: No, a ballasted solar array rack system is not acceptable. See contract specifications section 05 50 13.00 28 Paragraph 1.6.1.
41) Please confirm that the structural concrete on the main roofs for the base bid, OW-1 and
OW-2 are structurally sloped and will not need a taper system except on sheet keynote octagon - Note: I pulled a core sample on the high side main roof of the roof and near the drain.
Response: As part of this amendment, see new S-101 sheet which shows the structural deck type and slope. Additionally, it is recommended that bidders review resource drawings R-
002, R-003, and R-004 for the Structural Roof Level Framing Plans.
42) Please confirm whether or not the metal coping will be required to be a part of the weathertight warranty from the roofing manufacturer. If this is the case the coping will have to be premanufactured by the roofing manufacturer and we will not be able manufacture our own coping metal. Note: (This will be considerably more expensive.)
Response: Per contract specifications Section 07 60 00.00 28, there is no roofing manufacturer required for the sheet metal. However, a warranty for the finish of the sheet metal flashing is specified.
43) Please specify if there is a Preferred Roofing Manufacturer for this project.
Response: There is no preferred roofing manufacturer. The submitted roofing manufacturer and system must meet the technical and warranty requirements as specified.
44) Please specify where the lines are to be run and how many new lines are necessary. -It is unclear where the new drain lines are to be located, drawing sheet M-401 says to reference
A-101 and A-102; but there are no callouts on those pages.
Response: There are 4 new drain locations shown on M-401, the two drain locations between building grid lines 9 and 10, and the two drain locations between building grid lines 18 and
19. Suggested routing of tie in lines to existing storm drain risers is shown on M-401. Neither
M-401, nor A-102 call out the new drain explicitly as new, but the new drains are the ones not shown on the corresponding demolition sheets (e.g. AD-102). Drawings A-102 and A-
104 have been amended to identify the 4 new roof drains with a sheet keynote.
45) Could an onsite manager (QCM, SSHO, or Superintendent) be assigned multiple roles?
Such as one individual being the Superintendent and SSHO.
Response: No. Construction Solicitation and Specifications Section 01 35 26, Page 12,
1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties, states:
“The SSHO may not serve as the Quality Control Manager. The SSHO may not serve as the
Superintendent.” Construction Solicitation and Specifications Section 01 45 04.00 10, Page
3, 3.2.1 (a) states: “The staff shall include a CQC System Manager who shall report to the project superintendent.”
46) Over the years, our company has performed some roof repairs but, in each case, we had to be sub-contracted through the disadvantaged business program. We do not qualify as a disadvantaged business, so would we need to contract with a disadvantaged business? Are we allowed to schedule a site visit in the next week or so?
Response: This solicitation is issued as unrestricted. The opportunity for site visits closed on
2/19/25.
47) It was mentioned at the site visit that a core cut sample has been performed on the existing roof. Can you please share the results of the core sample?
Response: Yes. 4As part of this amendment, see revised contract specification section 07 01
50.10 28 and attached "Core Sampling Report".
48) Will there be a public bid reading for the proposals?
Response: No.
49) Is this project fully funded? Has it been or can it be affected by federal spending freezes?
Response: The Base Work is fully funded. OW1 and OW2 have been submitted as a budget item for the next 2 fiscal years and there is no indication at this time that OW1 and OW2 will not be funded.
50) Given the instability of the marketplace, how long will prices need to be held? Will there be any considerations for material pricing fluctuations due to inflation and/or tariffs?
Response: No. This is typical practice for much larger, and longer duration construction projects that are administered by the New Orleans District. As stated in NOTE 6 in the
Bidding Schedule: All prices bid by the Contractor to secure a responsive bid shall be binding throughout the life of the contract.
51) Does Clause 252.219-7011 - Notification to Delay Performance apply to this project?
Response: No. This amendment will remove Clause 252.219-7011
52) Does Accident Prevention Plan - Fuel Oil Transfer - Floating Plant (EM 385-1-1, Section
19.A.06) apply to this project? It was included in the specifications right before Section
013201.
Response: The "ACCIDENT PREVENTION PLAN (APP) FUEL OIL TRANSFER --
FLOATING PLANT" is not required at this time. The Government Safety Officer reserves the right to require this APP at their discretion after Contract Award.
53) Can schedules produced in Microsoft Project be acceptable in lieu of Primavera P6?
Response: Bid as specified in Construction Solicitation and Specifications DIVISION 01 -
GENERAL REQUIREMENTS SECTION 01 32 01.00 12, PROJECT SCHEDULE, Part 2 -
Products.
54) Section 013526, page 11 - is a confined space entry permit required for this project? There should not be any confined space work on this project.
Response: Yes. Bid as specified in Construction Solicitation and Specifications SECTION
01 35 26, GOVERNMENTAL SAFETY REQUIREMENTS.
55) Section 013526, are the following plans required for this project:
a. Critical Lift Plan
b. Lifts of personnel
c. Barge Mounted Mobile Crane Lift Plan
d. Rescue and Evacuation Plan
e. Hazardous Energy Control Program
f. Lead, Cadmium, and Chromium Compliance Plan
g. Asbestos Hazard Abatement Plan
h. Polychlorinated Biophenyls (PCB) Plan
Response: Government approval is required for submittals with a "G" designation. Other plans may be required during the course of work and will be submitted if necessary.
56) Section 013526, page 22, Item 1.15 Radiation Safety Requirements - is this required for this project?
Response: Government approval is required for submittals with a "G" designation. Other plans may be required during the course of work and will be submitted if necessary.
57) Section 013526, page 23, Item 1.16 Confined Space Entry Requirements - is this required for this project?
Response: Government approval is required for submittals with a "G" designation. Other plans may be required during the course of work and will be submitted if necessary.
58) Section 013526, page 24, Item 1.17 Gas Protection - is this required for this project?
Response: Government approval is required for submittals with a "G" designation. Other plans may be required during the course of work and will be submitted if necessary.
59) Section 013526, page 26, Item 3.4 Control of Hazardous Energy - is this required for this project?
Response: Government approval is required for submittals with a "G" designation. Other plans may be required during the course of work and will be submitted if necessary.
60) Section 013526, page 33, Item 3.8 Excavations - is this required for this project?
Response: Government approval is required for submittals with a "G" designation. Other plans may be required during the course of work and will be submitted if necessary.
61) Section 013526, page 33, Item 3.9 Electrical - is this section required for this project?
Response: Government approval is required for submittals with a "G" designation. Other plans may be required during the course of work and will be submitted if necessary.
62) Section 014500.1510 is there any cost associated with using the Resident Management
System?
Response: No, however you will need to ensure you have the appropriate System
Requirements to run the software. See Construction Solicitation and Specifications, DIVISION 01 - GENERAL REQUIREMENTS, SECTION 01 45 00.15 10, RESIDENT
MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM), 1.4 RMS Software and
1.5 System Requirements.
63) Section 015720.0012, page 4, are the Environmental Protection Plan and the Environmental
Pollution Control Plan required for this project?
Response: Yes. Bid as specified in Construction Solicitation and Specifications SECTION
01 57 20.00 12 ENVIRONMENTAL PROTECTION.
64) Sections 033053.0028, 034116.0828 what testing is required for the infill on the north roof where the exhaust fans are being abandoned and removed?
Concrete testing for infill shall be performed in accordance with specification SECTION 03
41 16.08 28, specifically paragraph 3.2 TESTING AND INSPECTING. Per SECTION 07 52
00.00 28, Part 3.6.1, the contractor must perform test for surface dryness of the concrete roof deck before application of membrane sheets.
65) Section 072200.0028, page 8, Item 2.4 it is not recommended to prime the concrete deck if the insulation is being installed with foam adhesive, is this still a requirement for this project?
Response: Per the Temporary Roof Detail drawing sheets A-501 through A-505, it should be noted that a modified bitumen base ply vapor retarder must be installed directly to the primed concrete roof deck. Insulation will not be installed directly to the concrete roof deck.
66) The Section 075200.00, page 8, Item 1.5.4 Qualifications of Engineer of Record - is this required for this project? the USACE has an engineer record on the project currently is the contractor required to have one on the project as well?
Response: Contractor’s Engineer of Record is required if a non-rated roof system is submitted. Per spec Section 07 52 00.00 28, Part 1.5.6 requires a contractor to "Submit licensed engineer's Wind uplift calculations and substantiating data to validate any non-rated roof system." Additionally, an Engineer of Record is required for the design of the overframing and standing seam metal roofing attachment at each penthouse per spec SECTION
07 61 14.00 28 paragraph 1.6 Design Calculations, the PV rack per SECTION 05 50 13.00
28 paragraph 1.6 Design, and the precast concrete per SECTION 03 41 16.08 28.
67) Section 075200.00, page 14, Item 2.2 if a vapor retarder is not required by the manufacturer to obtain the 30-year warranty, is it still required for this project?
Response: Yes, a vapor retarder is required per the Temporary Roof Detail drawing sheets A-
501 through A-505.
68) Please confirm if the existing concrete roof deck is sloped, or if the tapered insulation panels create the existing slope of the roof. There are conflicting details in the plans; A-510, A11 states "no structural slope" and A-508, H7 states "existing sloped concrete roof deck".
Response: As part of this amendment, see new S-101 sheet which shows the structural deck type and slope. Additionally, it is recommended that bidders review resource drawings R-
002, R-003, and R-004 for the Structural Roof Level Framing Plans. Details cited in the RFI are specific to different roof deck conditions and do not conflict.
69) If the existing roof deck is sloped, please confirm the %.
Response: As part of this amendment, see new S-101 sheet which shows the structural deck type and slope. Additionally, it is recommended that bidders review resource drawings R-
002, R-003, and R-004 for the Structural Roof Level Framing Plans. Details cited in the RFI are specific to different roof deck conditions and do not conflict.
70) Should all tapered insulation be 1/2" slope? Due to conflicts in the plans, it is shown to require 1/8” tapered over the sloped deck but a ¼” tapered over the flat deck.
Response: No. Some roof areas will require tapered insulation with ½” slope and some roof areas will require ¼” slope. Much of the main roof will not require any tapered insulation.
Tapered insulation with 1/8” slope is not required. As part of this amendment, see new S-101 sheet which shows the structural deck type and slope. Per the Sheet Notes on drawing sheets
A-102, A-103, and A-104, the minimum cricket and drain sump slope must be 1/2" (Sheet
Note #3) and the minimum roof slope at SBS modified bitumen and PMMA roofing must be
1/4" (Sheet Note #2).
71) Please confirm if the existing concrete on the roof is structural concrete or light weight concrete?
Response: Assume normal weight concrete, as shown on sheet R-021. Note 2 on R-001 states headed studs with a capacity of 9.55 kips per connector for normal weight concrete.
72) What manufacture are the conceptual PV array racking systems based on? S-501, A10.
Response: The acceptable PV array manufacturer(s) is not stated in the contract. The contractor is responsible to find an array manufacturer that meets the contract performance requirements. Refer to specification section 05 50 13.00 28 for PV array racking system requirements.
73) Please confirm that the contractor will be able to install temporary security fence panels around the ground surface work areas to prevent accidental pedestrian access into the work area(s). A-001, F1.
Response: The Contractor is allowed to install temporary security fence panels subject to approval by the COR and Government Safety Officer. Any method used by the Contractor to ensure a safe working environment for Contractor employees, sub-contractors or
Government employees will be subject to approval by the COR and Government Safety
Officer. The Contractor may be required to limit the square footage of any cordoned area to minimize impacts to the Government employees that occupy the building. See specification
SECTION 07 01 50.10 28 Page 4, Section 1.8.1 Traffic Control Signs.
74) Does the contractor need to account for any special considerations when the emergency exists when the stair/access towers are installed? Obviously, the stair towers will not block the emergency exit doors, but will fencing or dividers be required to separate the emergency exit routes from the contractors work area? The concern being that in the event of an emergency drill or evacuation, pedestrians would be routed into the immediate work area. A-
001, F1.
Response: No. Coordination with the COR and Government Safety Officer will be required prior to placing any equipment on the job site. The Contractor will not be allowed to block the exits or store construction materials in the area near exits.
75) Will USACE close the entrance doors under the canopy, during the contractor's canopy work for the safety of pedestrians? Or do these doors need to remain operational and require temporary overhead debris shielding?
Response: No, the entrance doors will not be closed. The entrance doors may be restricted for use by Government employees during construction for safety reasons. However, the doors will always remain open and operational for Government Employees. Coordination with the COR and Government Safety Officer will be required prior to placing any equipment on the job site. The Contractor will not be allowed to block the exits or store construction materials in the area near exits.
76) 01100-9, Par 10. states that no work can be completed prior to 6:00 AM. In order to meet the contract schedule, work around summer PM showers, and extreme heat, the contractor may need to start earlier than 6:00 AM. Will work prior to 6:00 AM be allowed, if submitted and approved in advance?
Response: No. See specification SECTION 01100 - GENERAL PROVISIONS, page 9, number 10. PERMISSIBLE HOURS OF WORK: “No work shall be done at the jobsite between 9:00 p.m. and 6:00 a.m. Prior to 6:00 a.m. the Contractor shall not start up any equipment nor have any trucks for delivery, service, hauling, etc. arrive at the jobsite. Trucks shall remain on designated truck routes until 6:00 a.m.”
77) Will the contractor be allowed to use a smaller crane in areas outside of the specified crane locations in the plans? A-001, F1.
Response: No.
78) Will the contractor be allowed to use a high reach telehandler in lieu of a crane to transfer materials to/from the roof?
Response: Yes.
79) Will the contractor be allowed to utilize an enclosed trash chute and dumpster(s) on the rear service road behind the building during the project?
Response: No.
80) What is the voltage of the overhead power transmission lines that parallel the roof at the rear of the building?
Response: This is outside of the building footprint and Right of Way. Contractor is responsible for verifying voltage.
81) Is the contractor allowed to request and utilize alternate areas (parking areas near corners of buildings) for dumpsters and telehandlers, instead of the crane staging locations, as they are only "possible"?
Response: Bid according to plans. Coordination with the COR and Government Safety
Officer will be required prior to placing any equipment on the job site. The Contractor will not be allowed to block the exits or store construction materials in the area near exits.
82) Who reviews and provides hot work permits to the contractor? How much time should be anticipated between submission and receipt?
Response: Mr. Todd Jacquet, Contracting Officer Representative. Procedures for submittals will be stipulated by the Contracting Officer or Contracting Officer Representative at the preconstruction conference. Submittal reviews typically take a minimum of 30 days.
83) Please confirm that Lead and/or Asbestos is not anticipated and that any testing or abatement is not required by the contractor.
Response: Lead and asbestos are not anticipated. A roof moisture survey was performed in
2008. 13 core samples were laboratory tested for asbestos containing materials (ACM).
ACM was not detected in any of the samples. See SECTION 07 01 50.10 28 for attached asbestos report. See SECTION 01 35 26 Page 25 3.1.3 Unforeseen Hazardous Material
Contract documents identify materials such as PCB, lead paint, and friable and non-friable asbestos and other OSHA regulated chemicals (i.e. 29 CFR Part 1910.1000). If material(s) that may be hazardous to human health upon disturbance are encountered during construction operations, stop that portion of work and notify the Contracting Officer immediately. Within
14 calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will instruct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.243-4
Changes and FAR 52.236-2 Differing Site Conditions.
84) Will the contractor's employees be allowed to park in the USACE parking lot?
Response: Yes. See specification SECTION 01100 - GENERAL PROVISIONS, Page 15, number 23, COORDINATION OF FACILITY WORK - Temporary Employee Parking.
85) Please confirm the roof core.
Response: As part of this amendment, see revised contract specification section 07 01 50.10
28 and attached "Core Sampling Report".
86) Please confirm if the contractor should account for time and costing to install netting, visqueen, etc. under the expansion joints, prior to demolition. To reduce dust and debris entering the building.
Response: Bid as specified. A Dust and Debris Control Plan, preconstruction submittal is required. See spec SECTION 05 05 20.00 28, Page 9 - 3.4 DUST CONTROL, SECTION 07
01 50.10 28, page 4, 1.7 DUST AND DEBRIS CONTROL, Page 5, 1.8.4 Existing
Construction, SECTION 01100 GENERAL PROVISIONS 01100-8 (c).
87) The specification calls for a three-ply mod bit system but states "Furnish a combination of specified materials that comprise the modified bitumen manufacturer's standard system of the number and type of plies specified." If a manufacturer's standard system is 2-ply, is this acceptable for the base bid? Or is it acceptable to provide an alternate solution to the base bid?
Response: No, bid as specified.
88) The specification calls for a Type 1 mod bit that meets ASTM D6163/D6163M or ASTM
D6164/D6164M. Are Type I, Type II or Type III all acceptable options?
Response: No, bid as specified.
89) Can you share details on the types of solar arrays you intend to install? Are they bifacial?
Response: Conceptual layout shown in the drawings is for a generic 72 cell standard
(nonbifacial) solar PV panels. Specification section 05 50 13.00 28, Par. 1.6.1 indicates: "The PV array rack system shall accommodate various solar panel sizes and types. Submit for
Government review a list of solar panels (three minimum, US made) that are suitable for attachment to the PV array rack system."
90) Do you allow for alternates as long as they meet or exceed the specification standards and fall within the NRCA guidelines?
Response: Bid as specified.
91) If Alternates are allowable, would it be preferred to list this in a table format similar to the bid, and attach a narrative response to the proposed solution?
Response: Bid as specified.
92) Can a drawing be provided and/or notes that show what decks are located on what areas of the roof.
Response: As part of this amendment, see new S-101 sheet which shows the different structural deck types and slopes.
93) It is not fully clear where tapered is required and where there is currently slope in the deck.
Can drawings be provided of where there is Slope in the Deck and where Tapered Insulation is required.
Response: As part of this amendment, see new S-101 sheet which shows the different structural deck types and slopes. All flat structural deck areas, crickets, and drains are required to have tapered insulation.
94) What is the minimum slope required for the roof?
Response: Per the Sheet Notes on drawing sheets A-102, A-103, and A-104, the minimum roof slope at SBS modified bitumen and PMMA roofing must be 1/4" per 12" (2%). Crickets and drains are to be 1/2” per 12” (4%).
95) Are there any penetrations and equipment know to be abandoned? If so, can list be provided?
Response: The demolition plan sheets AD102 - AD104 and AD901 have sufficient information regarding penetrations and abandoned equipment.
96) Are new Sheet Metal and Flashing’s materials required to match the existing Sheet Metal and Flashing? Or will new Galvanized flashings be acceptable?
Response: Per spec Section 07 60 00.00 28, Part 2.2.4, all exposed exterior sheet metal must be provided with a baked-on, factory-applied coil fluoropolymer color coating or approved equal siliconized polyester coating. Bid as specified.
97) Flashing? Or will new Galvanized flashings be acceptable?
Response: Per spec Section 07 60 00.00 28, Part 2.2.4, all exposed exterior sheet metal must be provided with a baked-on, factory-applied coil fluoropolymer color coating or approved equal siliconized polyester coating. Bid as specified.
98) Will stair scaffold be required for accessing the roof?
Response: Bid as specified. Reference Construction Solicitation and Specifications
SECTION 01 35 26 Page 29, 3.6 Work Platforms.
99) Please clarify the specifications regarding flat insulation and 1/4" tapered insulation.
Response: Flat insulation is required to meet minimum r-value requirements. Tapered insulation is to be used to achieve the required roof slope at flat roof areas as well as for crickets and drainage sumps. See new sheet S-101 which shows which structural deck areas have slope and which are flat. See sheets A-102 (keynotes 15 and 17), A-103 (keynote 13), A-104 (keynote 18), A-506, A-507, A-508, A-510 (detail A1), A-511, A-512, and A-514.
100) Has the roof been tested for asbestos?
Response: A roof moisture survey was performed in 2008. 13 core samples were laboratory tested for asbestos containing materials (ACM). ACM was not detected in any of the samples. See copy of asbestos testing report attached to specification SECTION 07 01 50.10
101) Please clarify the solar panel installation. Are we installing stanchions only?
Response: No. Contractor to install the entire racking system for future PV panels. This shall include stanchions, mounting brackets, legs, racking system and all necessary components per manufacturer’s instructions. This shall also include mounting to the existing concrete roof in accordance with SECTION 05 50 13.00 28.
102) Please confirm that the Superintendent, the SSHO, and the QC System Manager must be three different individuals.
Response: Yes, they must be 3 different individuals. Specification Section 01 35 26, Page 12,
1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties, states:
The SSHO may not serve as the Quality Control Manager. The SSHO may not serve as the
Superintendent. Specification Section 01 45 04.00 10, Page 3, 3.2.1 a states: “The staff shall include a CQC System Manager who shall report to the project superintendent.”
103) Please confirm that QC team also has to have structural, environmental, & submittals clerks’ positions.
Response: Not necessarily, as long as they are qualified. Reference Specifications SECTION
01 45 04.00 10 Page 5, 3.4.3 CQC Personnel: A single person may cover more than one area provided that they are qualified to perform QC activities in each designated field of expertise and if their workload allows. Qualifications are listed in SECTION 01 45 04.00 10 Page 6.
104) Please confirm that the QC Environmental position has to be an Environmental Engineer w/ 3 years’ experience.
Response: Confirmed. The Environmental personnel shall have the following qualifications:
Graduate Environmental Engineer with 3 yrs experience.
105) Please confirm that the QC System Manager & alternate has to have taken the
"Construction Quality Management for Contractors" course in the last 3 years.
Response: Yes. See Specifications SECTION 01 45 04.00 10 Page 6, 3.4.4 Additional
Requirement: In addition to the above experience and education requirements the CQC
System Manager, and their alternate, shall have completed the course entitled "Construction
Quality Management for Contractors" within the past 3 years. This course is periodically offered at the New Orleans District and other Corps of Engineers’ districts.
106) The plans show structural slope on the North, Central and South sections. Please confirm that the slope that is present in the deck is 1/4" / 12" to meet the project requirements.
Response: Generally, the North, Central, and South structural decks are at an existing 2% structural slope (1/4:12); however, the north and south Service Area Roofs and Canopy
Roofs have no existing structural slope. See reference sheets R-001, R-002, and R-003 as well as new drawing S-101 sheet as part of this amendment.
107) The plans call for addition of new roof drain lines. Who is responsible for the relocation of the furniture, electronics and other office equipment? Will these areas be accessible during normal hours? Will the Corps have to have someone present during relocation of the offices & equipment?
Response: The Government is responsible for relocating Government property. Work requiring access to the interior of the building shall be arranged to take place outside of regular work hours. See Specifications SECTION 01100 - GENERAL PROVISIONS, page
9, 21. OCCUPIED BUILDING WORK RESTRICTIONS.
108) Are the above-mentioned office areas considered "high security"? Will the Corps have to have someone present while our workers are present during roofing / drain line work?
Response: No, the offices that will need to be entered, are not considered high security areas. Yes, the Government will have someone present when the Contractor will be working in the interior of the building.
109) The new drain lines appear to tie into existing down leads. Are these pipes sized to accommodate the additional water flow?
Response: Yes. The total roof area serviced by downspouts remains unchanged by the addition of new drains.
110) The solicitation states that this is an unrestricted opportunity. There are also several notes concerning SBA and minority participation. Please clarify.
Response: 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business
Concerns; FAR 52.219-8 Utilization of Small Business Concerns;
and FAR 52.219-9 Small Business Subcontracting Plan are included in the solicitation. Both small and large businesses can propose under unrestricted solicitations.
111) The plans call for stanchions to be installed for a future solar system. Spec Section 05 50
13 calls for design of this system. Is there additional time included in the POP for the design, approval, procurement, and manufacturing of this system?
Response: No. Installation of the PV solar array support structure; including design, fabrications; racks, stanchions, and other work incidental thereto as specified and as shown on the drawings must be completed not later than 180 calendar days after the date of receipt of notice to proceed.
112) The plans have the design pressures for the building that the roofing system is to meet. Is the contractor responsible for project specific engineering or will previous testing by qualified manufacturers showing compliance with up lift be accepted?
Response: Per spec Section 07 52 00.00 28, Part 1.5.6, the contractor must provide a complete roof system assembly that is rated and installed to resist wind loads indicated on the drawings and validated by uplift resistance testing in accordance with Factory Mutual FM
4474 test procedures. Engineering is required for non-rated systems. Additionally, Engineer of Record is required for the design of the overframing and standing seam metal roofing attachment at each penthouse per spec SECTION 07 61 14.00 28 paragraph 1.6 Design
Calculations, the PV rack per SECTION 05 50 13.00 28 paragraph 1.6 Design, and the precast concrete per SECTION 03 41 16.08 28.
113) Will night work be permitted if weather conditions hamper production during daylight hours?
Response: Hours of work are listed in the Specifications, SECTION 01100 - GENERAL
PROVISIONS, page 9, number 10. PERMISSIBLE HOURS OF WORK: No work shall be done at the jobsite between 9:00 p.m. and 6:00 a.m. The Contractor will be allowed to work on Saturdays, Sundays and Holidays.
114) 07 52 00 calls for a 20-year installer warranty. Please confirm that this is correct. What are the limitations of said warranty? Are contractors still liable after an Act of God in greater
New Orleans?
Response: Specifications 07 52 00 and 07 56 00 have been changed as part of this amendment to reduce the Installer Warranty to 2 years.
115) Is there enough room between the acoustical ceiling & the concrete deck to allow for fall in the pipe to achieve the connection between the new location and the main trunk line?
Response: Yes, total drop is anticipated at less than 8”, for which plenum space between…