B01. Bid Abstract, 25B0045_signed.pdf
PDF 927 KB Posted
- Solicitation number
- W912P8-25-B-0045
About this file
This document is a Bid Abstract for a federal contract opportunity for the Comite River Diversion Channel Reach 3 project in East Baton Rouge Parish, Louisiana. The project is a 100% Total Small Business Set-Aside with an estimated value between $25 million and $100 million, involving flood control infrastructure for the Amite River and its tributaries. The work includes excavation, embankment placement, stockpiling earthen materials, placement of bedding and riprap, geotextile surfacing, clearing and grubbing, utility relocation, installation of flap gates, access road and drainage construction, and turf establishment.
The bid abstract details 12 bidders who submitted offers, with total bid amounts ranging from approximately $19.9 million to $39.6 million. The government estimate was $30.8 million. Bidders included companies such as Genesis 360, LLC; AAA Valley Gravel, LLC; Anderson Contracting, LLC; and Onshore Materials, LLC. The solicitation (W912P8-25-B-0045) was issued by the US Army Corps of Engineers, New Orleans District, with the bid opening held on July 18, 2025. The contract specialist was Angela Day, and bidders were required to be registered in the System for Award Management (SAM) database to be eligible for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Bidder Name Genesis 360, LLC Bidder Address 8352 Bluebonnet Blvd, Baton Rouge, LA 70810
2. Bidder Name AAA Valley Gravel, LLC Bidder Address 110 W 38th Avenue, Suite 200K, Anchorage, AK 99503
Flood Control, Amite River and Tributaries, Comite River Basin, Comite River Diversion Project, Comite River Diversion Channel Reach 3, East Baton Rouge Parish, Louisiana (ED 20-005)
Solicitation Number: W912P825B0045
3. Bidder Name Anderson Contracting, LLC Bidder Address 222 Anderson Lane, Yazoo City, MS 39194
4. Bidder Name Red Bison Services, LLC Bidder Address 2232 Fayette St., Kenner, LA 70062
5. Bidder Name Five-S Group, LLC Bidder Address 4750 Sherwood Common Blvd, Baton Rouge, LA 70816
6. Bidder Name Command Construction Industries, LLC Bidder Address 68445 James Street, Mandevilla, LA 70471
7. Bidder Name Lil Man-Phylway JV, LLC Bidder Address P.O. Box 1492, Hammond, LA 70404
8. Bidder Name Moore Industries, LLC Bidder Address 10037 Baringer Foreman Rd., Baton Rouge, LA 70809
9. Bidder Name Onshore Materials, LLC Bidder Address 127 Lincoln Lane, Thibodaux, LA 70301
10. Bidder Name Low Land Construction Co., Inc.
Bidder Address 206 Industrial Avenue C, Houma, LA 70363
11. Bidder Name Siema Construction, LLC Bidder Address 408 Sunbeam Ln., Scott, LA 70583
2. DATE ISSUED 3. DATE OPENED
12-Jun-25
DATE SIGNED
18-Jul-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 1,253,000.00 $ 1,253,000.00 $ 2,067,000.00 $ 2,067,000.00 1,925,000.00$ $ 1,925,000.00 500,000.00$ $ 500,000.00
0002 Safety Fence 1 JOB $ 160,000.00 $ 160,000.00 $ 446,925.00 $ 446,925.00 350,000.00$ $ 350,000.00 75,000.00$ $ 75,000.00
Video and Photographic Documentation
1 JOB $ 56,500.00 $ 56,500.00 $ 22,000.00 $ 22,000.00 10,000.00$ $ 10,000.00 25,000.00$ $ 25,000.00
Traffic Control
1 JOB $ 115,000.00 $ 115,000.00 $ 88,000.00 $ 88,000.00 100,000.00$ $ 100,000.00 20,000.00$ $ 20,000.00
Silt Fences 8,400
LF $ 8.00 $ 67,200.00 $ 3.30 $ 27,720.00 30.00$ $ 252,000.00 6.00$ $ 50,400.00
Straw Bales
1,500 LF $ 18.00 $ 27,000.00 $ 9.90 $ 14,850.00 200.00$ $ 300,000.00 6.00$ $ 9,000.00
Truck Wash-Down Rack
1 JOB $ 151,000.00 $ 151,000.00 $ 121,000.00 $ 121,000.00 350,000.00$ $ 350,000.00 75,000.00$ $ 75,000.00
0008 Channel Excavation
1,187,000 CY $ 6.00 $ 7,122,000.00 $ 3.42 $ 4,059,540.00 4.00$ $ 4,748,000.00 3.80$ $ 4,510,600.00
Drainage Ditch Excavation
11,000 CY $ 12.00 $ 132,000.00 $ 3.42 $ 37,620.00 4.00$ $ 44,000.00 6.00$ $ 66,000.00
Compacted Fill
116,000 CY $ 8.00 $ 928,000.00 $ 3.79 $ 439,640.00 2.00$ $ 232,000.00 2.50$ $ 290,000.00
Separator Geotextile
188,500 SY $ 6.00 $ 1,131,000.00 $ 3.85 $ 725,725.00 5.00$ $ 942,500.00 3.80$ $ 716,300.00
Clearing and Grubbing
1 JOB $ 938,800.00 $ 938,800.00 $ 1,102,350.00 $ 1,102,350.00 300,000.00$ $ 300,000.00 350,000.00$ $ 350,000.00
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
A. HIRED LABOR Genesis 360, LLC AAA Valley Gravel, LLC Anderson Contracting LLC
B. REASONABLE CONTRACT
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist New Orleans, LA 70118
Christopher Nuccio
DATE SIGNED
18-Jul-25
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3
A. HIRED LABOR Genesis 360, LLC AAA Valley Gravel, LLC Anderson Contracting LLC
B. REASONABLE CONTRACT
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist New Orleans, LA 70118
Christopher Nuccio
Construction Unwatering
1 JOB $ 549,000.00 $ 549,000.00 $ 565,555.00 $ 565,555.00 658,000.00$ $ 658,000.00 200,000.00$ $ 200,000.00
Grouted Riprap
12,400 CY $ 378.00 $ 4,687,200.00 $ 176.55 $ 2,189,220.00 235.00$ $ 2,914,000.00 240.00$ $ 2,976,000.00
Access Roads/Staging Areas
1 JOB $ 867,000.00 $ 867,000.00 $ 467,181.00 $ 467,181.00 600,000.00$ $ 600,000.00 481,700.00$ $ 481,700.00
0016 Turf Establishment and Maintenance
91 AC $ 6,900.00 $ 627,900.00 $ 3,988.00 $ 362,908.00 12,500.00$ $ 1,137,500.00 5,000.00$ $ 455,000.00
0017 42" Reinforced Concrete Pipes
400 LF $ 405.00 $ 162,000.00 $ 209.00 $ 83,600.00 300.00$ $ 120,000.00 250.00$ $ 100,000.00
0018 42" Concrete Headwall
3 EA $ 22,000.00 $ 66,000.00 $ 54,450.00 $ 163,350.00 40,000.00$ $ 120,000.00 25,000.00$ $ 75,000.00
0019 42" Aluminum Flap Gate
3 EA $ 14,400.00 $ 43,200.00 $ 17,860.00 $ 53,580.00 32,000.00$ $ 96,000.00 30,000.00$ $ 90,000.00
0020 Bedding Material 48,000 TON $ 80.00 $ 3,840,000.00 $ 63.80 $ 3,062,400.00 68.00$ $ 3,264,000.00 71.00$ $ 3,408,000.00
0021 Channel Riprap R-
92,000 TON $ 86.00 $ 7,912,000.00 $ 72.60 $ 6,679,200.00 75.00$ $ 6,900,000.00 78.00$ $ 7,176,000.00
$30,835,800.00 $22,779,364.00 $25,363,000.00 $21,649,000.00TOTAL
DATE SIGNED
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 1,253,000.00 $ 1,253,000.00 $ 1,606,300.00 $ 1,606,300.00 400,000.00$ $ 400,000.00 3,000,000.00$ $ 3,000,000.00
0002 Safety Fence 1 JOB $ 160,000.00 $ 160,000.00 $ 75,500.00 $ 75,500.00 151,000.00$ $ 151,000.00 100,000.00$ $ 100,000.00
Video and Photographic Documentation
1 JOB $ 56,500.00 $ 56,500.00 $ 28,700.00 $ 28,700.00 5,000.00$ $ 5,000.00 50,000.00$ $ 50,000.00
Traffic Control
1 JOB $ 115,000.00 $ 115,000.00 $ 28,750.00 $ 28,750.00 189,000.00$ $ 189,000.00 25,000.00$ $ 25,000.00
Silt Fences 8,400
LF $ 8.00 $ 67,200.00 $ 4.00 $ 33,600.00 3.23$ $ 27,132.00 3.00$ $ 25,200.00
Straw Bales
1,500 LF $ 18.00 $ 27,000.00 $ 9.00 $ 13,500.00 6.46$ $ 9,690.00 15.00$ $ 22,500.00
Truck Wash-Down Rack
1 JOB $ 151,000.00 $ 151,000.00 $ 68,000.00 $ 68,000.00 70,000.00$ $ 70,000.00 161,000.00$ $ 161,000.00
0008 Channel Excavation
1,187,000 CY $ 6.00 $ 7,122,000.00 $ 3.00 $ 3,561,000.00 2.75$ $ 3,264,250.00 6.00$ $ 7,122,000.00
Drainage Ditch Excavation
11,000 CY $ 12.00 $ 132,000.00 $ 3.00 $ 33,000.00 6.53$ $ 71,830.00 6.00$ $ 66,000.00
Compacted Fill
116,000 CY $ 8.00 $ 928,000.00 $ 1.25 $ 145,000.00 1.42$ $ 164,720.00 6.00$ $ 696,000.00
Separator Geotextile
188,500 SY $ 6.00 $ 1,131,000.00 $ 4.00 $ 754,000.00 5.08$ $ 957,580.00 3.00$ $ 565,500.00
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6
A. HIRED LABOR Red Bison Services, LLC Five-S Group, LLC Command Construction Industries, LLC
B. REASONABLE CONTRACT
Christopher Nuccio
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist
18-Jul-2025
DATE SIGNED
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 4 NO. 5 NO. 6
A. HIRED LABOR Red Bison Services, LLC Five-S Group, LLC Command Construction Industries, LLC
B. REASONABLE CONTRACT
Christopher Nuccio
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist New Orleans, LA 70118
Clearing and Grubbing
1 JOB $ 938,800.00 $ 938,800.00 $ 198,000.00 $ 198,000.00 485,000.00$ $ 485,000.00 1,500,000.00$ $ 1,500,000.00
Construction Unwatering
1 JOB $ 549,000.00 $ 549,000.00 $ 550,000.00 $ 550,000.00 130,000.00$ $ 130,000.00 1,300,000.00$ $ 1,300,000.00
Grouted Riprap
12,400 CY $ 378.00 $ 4,687,200.00 $ 215.00 $ 2,666,000.00 202.00$ $ 2,504,800.00 225.00$ $ 2,790,000.00
Access Roads/Staging Areas
1 JOB $ 867,000.00 $ 867,000.00 $ 450,000.00 $ 450,000.00 422,000.00$ $ 422,000.00 1,500,000.00$ $ 1,500,000.00
0016 Turf Establishment and Maintenance
91 AC $ 6,900.00 $ 627,900.00 $ 6,900.00 $ 627,900.00 5,763.00$ $ 524,433.00 4,500.00$ $ 409,500.00
0017 42" Reinforced Concrete Pipes
400 LF $ 405.00 $ 162,000.00 $ 253.00 $ 101,200.00 228.55$ $ 91,420.00 400.00$ $ 160,000.00
0018 42" Concrete Headwall
3 EA $ 22,000.00 $ 66,000.00 $ 28,750.00 $ 86,250.00 39,000.00$ $ 117,000.00 40,000.00$ $ 120,000.00
0019 42" Aluminum Flap Gate
3 EA $ 14,400.00 $ 43,200.00 $ 25,100.00 $ 75,300.00 39,000.00$ $ 117,000.00 15,000.00$ $ 45,000.00
0020 Bedding Material 48,000 TON $ 80.00 $ 3,840,000.00 $ 61.00 $ 2,928,000.00 68.55$ $ 3,290,400.00 80.00$ $ 3,840,000.00
0021 Channel Riprap R-
92,000 TON $ 86.00 $ 7,912,000.00 $ 66.00 $ 6,072,000.00 75.90$ $ 6,982,800.00 90.00$ $ 8,280,000.00
$30,835,800.00 $20,102,000.00 $19,975,055.00 $31,777,700.00TOTAL
DATE SIGNED
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 1,253,000.00 $ 1,253,000.00 $ 1,000,000.00 $ 1,000,000.00 3,433,148.00$ $ 3,433,148.00 1,300,000.00$ $ 1,300,000.00
0002 Safety Fence 1 JOB $ 160,000.00 $ 160,000.00 $ 225,000.00 $ 225,000.00 76,870.00$ $ 76,870.00 116,000.00$ $ 116,000.00
Video and Photographic Documentation
1 JOB $ 56,500.00 $ 56,500.00 $ 25,000.00 $ 25,000.00 21,000.00$ $ 21,000.00 57,000.00$ $ 57,000.00
Traffic Control
1 JOB $ 115,000.00 $ 115,000.00 $ 52,500.00 $ 52,500.00 489,807.07$ $ 489,807.07 30,500.00$ $ 30,500.00
Silt Fences 8,400
LF $ 8.00 $ 67,200.00 $ 4.00 $ 33,600.00 5.27$ $ 44,268.00 4.40$ $ 36,960.00
Straw Bales
1,500 LF $ 18.00 $ 27,000.00 $ 5.50 $ 8,250.00 7.97$ $ 11,955.00 11.00$ $ 16,500.00
Truck Wash-Down Rack
1 JOB $ 151,000.00 $ 151,000.00 $ 50,000.00 $ 50,000.00 62,000.00$ $ 62,000.00 47,500.00$ $ 47,500.00
0008 Channel Excavation
1,187,000 CY $ 6.00 $ 7,122,000.00 $ 3.15 $ 3,739,050.00 3.27$ $ 3,881,490.00 4.95$ $ 5,875,650.00
Drainage Ditch Excavation
11,000 CY $ 12.00 $ 132,000.00 $ 4.75 $ 52,250.00 7.65$ $ 84,150.00 4.85$ $ 53,350.00
Compacted Fill
116,000 CY $ 8.00 $ 928,000.00 $ 3.50 $ 406,000.00 1.63$ $ 189,080.00 1.00$ $ 116,000.00
Separator Geotextile
188,500 SY $ 6.00 $ 1,131,000.00 $ 6.00 $ 1,131,000.00 5.05$ $ 951,925.00 4.10$ $ 772,850.00
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 7 NO. 8 NO. 9
A. HIRED LABOR Lil Man-Phylway JV, LLC Moore Industries Onshore Materials, LLC
B. REASONABLE CONTRACT
Christopher Nuccio
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist
DATE SIGNED
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 7 NO. 8 NO. 9
A. HIRED LABOR Lil Man-Phylway JV, LLC Moore Industries Onshore Materials, LLC
B. REASONABLE CONTRACT
Christopher Nuccio
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist New Orleans, LA 70118
Clearing and Grubbing
1 JOB $ 938,800.00 $ 938,800.00 $ 2,000,000.00 $ 2,000,000.00 52,000.00$ $ 52,000.00 210,000.00$ $ 210,000.00
Construction Unwatering
1 JOB $ 549,000.00 $ 549,000.00 $ 550,000.00 $ 550,000.00 777,247.07$ $ 777,247.07 670,000.00$ $ 670,000.00
Grouted Riprap
12,400 CY $ 378.00 $ 4,687,200.00 $ 230.00 $ 2,852,000.00 227.90$ $ 2,825,960.00 250.00$ $ 3,100,000.00
Access Roads/Staging Areas
1 JOB $ 867,000.00 $ 867,000.00 $ 1,200,000.00 $ 1,200,000.00 377,327.07$ $ 377,327.07 850,000.00$ $ 850,000.00
0016 Turf Establishment and Maintenance
91 AC $ 6,900.00 $ 627,900.00 $ 5,000.00 $ 455,000.00 14,856.43$ $ 1,351,935.13 8,050.00$ $ 732,550.00
0017 42" Reinforced Concrete Pipes
400 LF $ 405.00 $ 162,000.00 $ 375.00 $ 150,000.00 208.65$ $ 83,460.00 265.00$ $ 106,000.00
0018 42" Concrete Headwall
3 EA $ 22,000.00 $ 66,000.00 $ 70,000.00 $ 210,000.00 163,109.37$ $ 489,328.11 32,000.00$ $ 96,000.00
0019 42" Aluminum Flap Gate
3 EA $ 14,400.00 $ 43,200.00 $ 50,000.00 $ 150,000.00 29,500.00$ $ 88,500.00 35,000.00$ $ 105,000.00
0020 Bedding Material 48,000 TON $ 80.00 $ 3,840,000.00 $ 66.50 $ 3,192,000.00 72.91$ $ 3,499,680.00 67.50$ $ 3,240,000.00
0021 Channel Riprap R-
92,000 TON $ 86.00 $ 7,912,000.00 $ 74.50 $ 6,854,000.00 70.65$ $ 6,499,800.00 77.00$ $ 7,084,000.00
$30,835,800.00 $24,335,650.00 $25,290,930.45 $24,615,860.00TOTAL
DATE SIGNED
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
Mobilization and Demobilization
1 JOB $ 1,253,000.00 $ 1,253,000.00 $ 3,259,817.05 $ 3,259,817.05 2,300,000.00$ $ 2,300,000.00 $ -
0002 Safety Fence 1 JOB $ 160,000.00 $ 160,000.00 $ 15,000.00 $ 15,000.00 120,000.00$ $ 120,000.00 $ -
Video and Photographic Documentation
1 JOB $ 56,500.00 $ 56,500.00 $ 18,000.00 $ 18,000.00 75,000.00$ $ 75,000.00 $ -
Traffic Control
1 JOB $ 115,000.00 $ 115,000.00 $ 20,000.00 $ 20,000.00 54,000.00$ $ 54,000.00 $ -
Silt Fences 8,400
LF $ 8.00 $ 67,200.00 $ 6.93 $ 58,212.00 5.50$ $ 46,200.00 $ -
Straw Bales
1,500 LF $ 18.00 $ 27,000.00 $ 22.87 $ 34,305.00 11.75$ $ 17,625.00 $ -
Truck Wash-Down Rack
1 JOB $ 151,000.00 $ 151,000.00 $ 36,000.00 $ 36,000.00 200,000.00$ $ 200,000.00 $ -
0008 Channel Excavation
1,187,000 CY $ 6.00 $ 7,122,000.00 $ 12.25 $ 14,540,750.00 3.85$ $ 4,569,950.00 $ -
Drainage Ditch Excavation
11,000 CY $ 12.00 $ 132,000.00 $ 22.62 $ 248,820.00 7.50$ $ 82,500.00 $ -
Compacted Fill
116,000 CY $ 8.00 $ 928,000.00 $ 10.95 $ 1,270,200.00 4.50$ $ 522,000.00 $ -
Separator Geotextile
188,500 SY $ 6.00 $ 1,131,000.00 $ 10.23 $ 1,928,355.00 3.50$ $ 659,750.00 $ -
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 10 NO. 11 NO. 12
A. HIRED LABOR Low Land Construction Co. Inc. Siema Construction, LLC
B. REASONABLE CONTRACT
Christopher Nuccio
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist
DATE SIGNED
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES C. AMENDMENTS ACKNOWLEDGED - YES
(Including Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
(Without Profit)
7B. DESCRIPTION OF
OFFERED ITEM
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Flood Control, Amite River Tributaries, Louisiana, Comite River Basin
Comite River Diversion Project Comite River Diversion Channel Reach 3
East Baton Rouge Parish, Louisiana (ED 20-005)
(Check A, B or C and complete D, E, and F) NO. 10 NO. 11 NO. 12
A. HIRED LABOR Low Land Construction Co. Inc. Siema Construction, LLC
B. REASONABLE CONTRACT
Christopher Nuccio
SIGNATURE
100% Total Small Business Set-Aside Contracting Officer
ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P825B0045
18-Jul-25
4. ISSUING OFFICE
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
US ARMY CORPS OF ENGINEERS, NOD DISTRICT Angela Day 7400 Leake Avenue Contract Specialist New Orleans, LA 70118
Clearing and Grubbing
1 JOB $ 938,800.00 $ 938,800.00 $ 816,870.00 $ 816,870.00 135,000.00$ $ 135,000.00 $ -
Construction Unwatering
1 JOB $ 549,000.00 $ 549,000.00 $ 527,585.35 $ 527,585.35 755,000.00$ $ 755,000.00 $ -
Grouted Riprap
12,400 CY $ 378.00 $ 4,687,200.00 $ 390.28 $ 4,839,472.00 160.00$ $ 1,984,000.00 $ -
Access Roads/Staging Areas
1 JOB $ 867,000.00 $ 867,000.00 $ 253,068.75 $ 253,068.75 950,000.00$ $ 950,000.00 $ -
0016 Turf Establishment and Maintenance
91 AC $ 6,900.00 $ 627,900.00 $ 10,935.00 $ 995,085.00 4,000.00$ $ 364,000.00 $ -
0017 42" Reinforced Concrete Pipes
400 LF $ 405.00 $ 162,000.00 $ 432.23 $ 172,892.00 220.00$ $ 88,000.00 $ -
0018 42" Concrete Headwall
3 EA $ 22,000.00 $ 66,000.00 $ 45,679.65 $ 137,038.95 30,000.00$ $ 90,000.00 $ -
0019 42" Aluminum Flap Gate
3 EA $ 14,400.00 $ 43,200.00 $ 65,653.61 $ 196,960.83 24,500.00$ $ 73,500.00 $ -
0020 Bedding Material 48,000 TON $ 80.00 $ 3,840,000.00 $ 67.39 $ 3,234,720.00 65.00$ $ 3,120,000.00 $ -
0021 Channel Riprap R-
92,000 TON $ 86.00 $ 7,912,000.00 $ 76.02 $ 6,993,840.00 74.00$ $ 6,808,000.00 $ -
$30,835,800.00 $39,596,991.93 $23,014,525.00 $0.00TOTAL
| 1: | |
| 0002: | |
| 1_2: | |
| 1_3: | |
| 1500: | |
| 1_4: | |
| CY: | |
| CY_2: | |
| CY_3: | |
| 188500: | |
| 1_5: | |
| SIGNATURE: | |
| DATE SIGNED 18Jul25: | |
| B BID SECURITY Type and amount: | |
| B BID SECURITY Type and amount_2: | |
| C AMENDMENTS ACKNOWLEDGED YES: | |
| C AMENDMENTS ACKNOWLEDGED YES_2: | |
| 3083580000: | |
| 2277936400: | |
| 2536300000: | |
| E ESTIMATED AMOUNT_3: | |
| C AMENDMENTS ACKNOWLEDGED YES B BID SECURITY Type and amount NO 5 FiveS Group LLC: | |
| D UNIT PRICE_3: | |
| E ESTIMATED AMOUNT_4: | |
| D UNIT PRICE_4: | |
| 1_6: | |
| 0002_2: | |
| 1_7: | |
| 1_8: | |
| 1500_2: | |
| 1_9: | |
| CY_4: | |
| CY_5: | |
| CY_6: | |
| 188500_2: | |
| SIGNATURE_2: | |
| DATE SIGNED: 18-Jul-2025 | |
| B BID SECURITY Type and amount_3: | |
| B BID SECURITY Type and amount_4: | |
| C AMENDMENTS ACKNOWLEDGED YES_3: | |
| C AMENDMENTS ACKNOWLEDGED YES_4: | |
| 3083580000_2: | |
| 2010200000: | |
| 1997505500: | |
| E ESTIMATED AMOUNT_5: | |
| C AMENDMENTS ACKNOWLEDGED YES B BID SECURITY Type and amount NO 8 Moore Industries: | |
| D UNIT PRICE_5: | |
| E ESTIMATED AMOUNT_6: | |
| D UNIT PRICE_6: | |
| 1_10: | |
| 0002_3: | |
| 1_11: | |
| 1_12: | |
| 1500_3: | |
| 1_13: | |
| CY_7: | |
| CY_8: | |
| CY_9: | |
| 188500_3: | |
| SIGNATURE_3: | |
| DATE SIGNED_2: 18-Jul-2025 | |
| B BID SECURITY Type and amount_5: | |
| B BID SECURITY Type and amount_6: | |
| C AMENDMENTS ACKNOWLEDGED YES_5: | |
| C AMENDMENTS ACKNOWLEDGED YES_6: | |
| 3083580000_3: | |
| 2433565000: | |
| 2529093045: | |
| E ESTIMATED AMOUNT_7: | |
| D UNIT PRICE_7: | |
| E ESTIMATED AMOUNT_8: | |
| D UNIT PRICE_8: | |
| 1_14: | |
| 0002_4: | |
| 1_15: | |
| 1_16: | |
| 1500_4: | |
| 1_17: | |
| CY_10: | |
| CY_11: | |
| CY_12: | |
| 188500_4: | |
| SIGNATURE_4: | |
| DATE SIGNED_3: 18-Jul-2025 | |
| B BID SECURITY Type and amount_7: | |
| B BID SECURITY Type and amount_8: | |
| C AMENDMENTS ACKNOWLEDGED YES_7: | |
| C AMENDMENTS ACKNOWLEDGED YES_8: | |
| 3083580000_4: | |
| 3959699193: | |
| 2301452500: | |
| 2025-07-18T14:27:11-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
| 2025-07-18T14:27:38-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
| 2025-07-18T14:27:58-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
| 2025-07-18T14:28:16-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
| 2025-07-18T14:28:31-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
| 2025-07-18T14:28:48-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
| 2025-07-18T14:29:02-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
| 2025-07-18T14:29:19-0500 | |
| NUCCIO.CHRISTOPHER.1296631457 |
File details come from the government source that posted it. Updated .