W912P824B0049 Bid Abstract - Signed.pdf

PDF 312 KB Posted

Attached to
Schooner Bayou Control Structure, Guidewall Removal and Replacement, Vermillion Parish, LA
Solicitation number
W912P824B0049
Issued by

About this file

This document is a Bid Abstract for federal contract opportunity W912P824B0049 for the Schooner Bayou Control Structure Guidewall Removal and Replacement project in Vermilion Parish, Louisiana.

The project involves the removal and replacement of the entire timber guidewall system and other related work. The magnitude of construction is between $5-10 million, with a NAICS code of 237990. The contract is a HUBZone set-aside, issued by the U.S. Army Corps of Engineers, New Orleans District. The bid opening date was July 23, 2024. The government estimate for the base work, Optional Work 1, and Optional Work 2 is $16,771,372. Five offerors submitted bids, with the lowest base bid of $4,501,265.85 and the highest of $10,906,088. Pricing details are provided for each bid item including mobilization, demolition, guidewall construction, treated timber piling, and dynamic pile load testing. Optional Work 1 and Optional Work 2 provide additional demolition, guidewall, and piling work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

17-Jun-24 23-Jul-24

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

BASE WORK

0001 Mobilization and Demobilization 1 JOB $391,000.00 $391,000.00 $1,122,194.50 $1,122,194.50 740,000.00$ $740,000.00 $670,340.00 $670,340.00 $1,800,000.00 $1,800,000.00 $188,213.72 $188,213.72 0002 Demolition and Removal 1 JOB $1,567,000.00 $1,567,000.00 $1,300,000.00 $1,300,000.00 725,000.00$ $725,000.00 $375,100.00 $375,100.00 $2,500,000.00 $2,500,000.00 $600,955.62 $600,955.62 0003 Guidewall Construction 1 JOB $1,201,000.00 $1,201,000.00 $2,729,000.00 $2,729,000.00 3,204,000.00$ $3,204,000.00 $1,046,650.00 $1,046,650.00 $3,451,288.00 $3,451,288.00 $1,705,955.97 $1,705,955.97 0004 Treated Timber Piling 10,135 LF $65.00 $658,775.00 $133.50 $1,353,022.50 124.00$ $1,256,740.00 $121.00 $1,226,335.00 $157.00 $1,591,195.00 $151.00 $1,530,385.00

Treated Timber Piling Driven through Riprap

6,515 LF $77.00 $501,655.00 $160.00 $1,042,400.00 129.00$ $840,435.00 $143.39 $934,185.85 $157.00 $1,022,855.00 $164.20 $1,069,763.00

0006 Treated Dolphin Timbers 3 EA $160,000.00 $480,000.00 $214,395.00 $643,185.00 177,000.00$ $531,000.00 $68,365.00 $205,095.00 $140,250.00 $420,750.00 $156,010.24 $468,030.72 0007 Dynamic Pile Load Tests 2 EA $20,400.00 $40,800.00 $5,316.00 $10,632.00 41,000.00$ $82,000.00 $9,982.50 $19,965.00 $30,000.00 $60,000.00 $23,835.84 $47,671.68

0008 Dynamic Pile Load Tests During Restrike 2 EA $20,400.00 $40,800.00 $33,000.00 $66,000.00 41,000.00$ $82,000.00 $11,797.50 $23,595.00 $30,000.00 $60,000.00 $22,766.51 $45,533.02

$4,881,030.00 $8,266,434.00 $7,461,175.00 $4,501,265.85 $10,906,088.00 $5,656,508.73

OPTIONAL WORK 1 (OW1)

0009 Demolition and Removal 1 JOB $848,000.00 $848,000.00 $439,000.00 $439,000.00 187,250.00$ $187,250.00 $61,710.00 $61,710.00 $581,200.00 $581,200.00 $160,734.10 $160,734.10 0010 Guidewall Construction 1 JOB $475,000.00 $475,000.00 $621,500.00 $621,500.00 1,015,000.00$ $1,015,000.00 $390,225.00 $390,225.00 $823,900.00 $823,900.00 $446,929.04 $446,929.04 0011 Treated Timber Piling 2,900 LF $86.00 $249,400.00 $133.50 $387,150.00 121.50$ $352,350.00 $127.05 $368,445.00 $163.00 $472,700.00 $156.75 $454,575.00

Treated Timber Piling Driven through Riprap

580 LF $172.00 $99,760.00 $160.00 $92,800.00 310.00$ $179,800.00 $239.58 $138,956.40 $163.00 $94,540.00 $172.44 $100,015.20

0013 Treated Dolphin Timbers 1 EA $161,000.00 $161,000.00 $214,395.00 $214,395.00 209,000.00$ $209,000.00 $40,837.50 $40,837.50 $165,204.00 $165,204.00 $169,994.00 $169,994.00 0014 Dynamic Pile Load Tests 1 EA $20,400.00 $20,400.00 $5,316.00 $5,316.00 44,750.00$ $44,750.00 $9,982.50 $9,982.50 $25,000.00 $25,000.00 $29,408.15 $29,408.15

0015 Dynamic Pile Load Tests During Restrike 1 EA $20,400.00 $20,400.00 $33,000.00 $33,000.00 44,750.00$ $44,750.00 $11,797.50 $11,797.50 $25,000.00 $25,000.00 $27,223.25 $27,223.25

$1,873,960.00 $1,793,161.00 $2,032,900.00 $1,021,953.90 $2,187,544.00 $1,388,878.74

OPTIONAL WORK 2 (OW2)

0016 Demolition and Removal 1 JOB $1,026,000.00 $1,026,000.00 $470,000.00 $470,000.00 283,000.00$ $283,000.00 $99,099.00 $99,099.00 $1,012,740.00 $1,012,740.00 $207,204.43 $207,204.43 0017 Guidewall Construction 1 JOB $587,000.00 $587,000.00 $955,800.00 $955,800.00 1,570,000.00$ $1,570,000.00 $538,147.50 $538,147.50 $1,325,400.00 $1,325,400.00 $690,435.71 $690,435.71 0018 Treated Timber Piling 2,610 LF $91.00 $237,510.00 $133.50 $348,435.00 125.00$ $326,250.00 $166.98 $435,817.80 $170.00 $443,700.00 $155.68 $406,324.80

Treated Timber Piling Driven through Riprap

3,190 LF $87.00 $277,530.00 $160.00 $510,400.00 120.00$ $382,800.00 $137.94 $440,028.60 $170.00 $542,300.00 $165.62 $528,327.80

0020 Treated Dolphin Timbers 2 EA $159,000.00 $318,000.00 $214,395.00 $428,790.00 210,000.00$ $420,000.00 $42,652.50 $85,305.00 $151,800.00 $303,600.00 $161,086.37 $322,172.74 0021 Dynamic Pile Load Tests 1 EA $20,400.00 $20,400.00 $5,316.00 $5,316.00 44,000.00$ $44,000.00 $9,982.50 $9,982.50 $25,000.00 $25,000.00 $28,794.61 $28,794.61

0022 Dynamic Pile Load Tests During Restrike 1 EA $20,400.00 $20,400.00 $33,000.00 $33,000.00 44,000.00$ $44,000.00 $11,797.50 $11,797.50 $25,000.00 $25,000.00 $26,348.47 $26,348.47

$2,486,840.00 $2,751,741.00 $3,070,050.00 $1,620,177.90 $3,677,740.00 $2,209,608.56 $9,241,830.00 $12,811,336.00 $12,564,125.00 $7,143,397.65 $16,771,372.00 $9,254,996.03

TOTAL OW1:

TOTAL BASE:

TOTAL OW2:

ABSTRACT OF OFFERS 1. SOLICITATION NUMBER W912P824B0049

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

B. BID SECURITY: Yes

C. REASONABLE CONTRACT

(Including Profit)

B. REASONABLE CONTRACT

4. ISSUING OFFICE

(Without Profit)

Mermentau Basin, LA Schooner Bayou Control Structure - Replacement Guide Wall Vermilion Parish, Louisiana - HUBZONE SET-ASIDE

7B. DESCRIPTION OF OFFERED ITEM

6. NUMBER OF AMENDMENTS ISSUED

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. BID SECURITY: Yes B. BID SECURITY: Yes

NO. 04

B. BID SECURITY: Yes

Tarpan Construction, LLC, 6756 Hwy 29, Cottonport, LA 71327

Ack. Amendments: Yes

TKTMJ, Inc., 100 Harbor Circle, New Orleans, LA 70126

Ack. Amendments: Yes

Genesis 360, LLC, 8352 Bluebonnet Blvd., Baton Rouge, LA 70810

Ack. Amendments: Yes

PDSI Contractors, 20 West Huron, Pontiac, MI 48342

NO. 01 NO. 02

Ack. Amendments: Yes

TOTAL BASE + OW1 + OW2:

NO. 03

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

US ARMY ENGINEER DISTRICT, NOD

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

7400 Leake Avenue New Orleans, LA 70118

Lauren Gandolfi, Contract Specialist

Christopher Nuccio Contracting Officer

NO. 05

Justin J. Reeves, LLC, 7836 Park Ave Houma, LA 70364

Ack. Amendments: Yes

B. BID SECURITY: Yes

* CORRECTED BASED UPON LINE ITEM PRICING. - LG

b2ctwlag Highlight

2024-07-23T13:15:50-0500
NUCCIO.CHRISTOPHER.1296631457

File details come from the government source that posted it. Updated .