This document is a summary of changes to a federal solicitation and contract for the Comite River Diversion Channel Reach 1 project. Key details include that the solicitation is issued by the Department of the Army Corps of Engineers Engineering District New Orleans for construction services. The summary outlines revisions to drawings, specifications, a request for information question and answer document, and a final SF30 form. Revisions include updates to drawings for general layout, concrete structures, utility bridge details, and a new wall drain detail. Specification revisions modify paragraphs for suitable fill material and geotextile fabric requirements. The request for information response document answers twenty-eight contractor questions regarding various aspects of the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P823B0064 FINAL Bid Abstract Bids 1-6 crz rev1a.pdf | ||
| W912P823B0064 FINAL Bid Abstract Bids 1-6 crz.pdf | ||
| W912P823B00640003 FINAL Drawings only.pdf | ||
| W912P823B00640002 FINAL SF30 9-6-23.pdf | ||
| W912P823B00640001 FINAL SF30 8-21-23 and Drawings.pdf | ||
| 20230713-W912P823B0064_Plans 3.pdf | ||
| 20230713-W912P823B0064_Plans 1.pdf | ||
| 20230713-W912P823B0064_Plans 4.pdf | ||
| W912P823B0064 FINAL Solicitation w-o Specs - Plans 8-9-23.pdf | ||
| 20230713-W912P823B0064_Plans 5.pdf | ||
| 20230713-W912P823B0064_Plans 2.pdf | ||
| W912P823B0064 Advertisement Specs for Comite River Diversion Channel Reach 1_Ed 20-003.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P823B0064
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is as follow s:
a) RFI responses,
b) Update Draw ing sheets, G-02, C-03, S3, S8, & AD-1,
c) SPEC Section Revisions, 30 00 00 & 32 15 00.01 12 Nothing Follow s.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Sep-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P823B0064
X 9B. DATED (SEE ITEM 11)
09-Aug-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Sep-2023
CODE
CONTRACTING DIV- CHIEF
7400 LEAKE AVENUE, ROOM 172
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X 1
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 4 Updated Drawings G-2,C-
03, S3, S8, & AD-1
07-SEP-2023
SECTION 00 10 00 - SOLICITATION
The following have been added by full text:
RFIS 9-7-2023
Comite River Diversion – Reach 1 W912P823B0064
Requests for Information (RFIs)
Q1. What is the RFI deadline date for the above-named project?
A1. Noon, 12:00 PM, Thursday, 24 AUG 2023.
Q2. Bid item 0049 Clearing and Grubbing Areas – OW. Is this pay item strictly for Clearing and Grubbing or should the OW – Clearing area also be included in this pay item?
A2. The bid item 0049 is stricly for Clearing and Grubbing in the Option Work Area. All other clearing areas shall be completed as Base Work (bid items 0022 and 0023).
*A2 revised. The bid item 0049 is strictly for Clearing and Grubbing in the Option Work Area. All other clearing areas shall be completed as Base Work (Bid item 0022).
Q3. Can you please provide approximate quantities for the bid items listed as “1 Job”?
A3. See below for approximate quantities. Please note these are estimated and no equitable adjustment will be made if quantities differ from actual conditions.
BASE WORK
Line Item Description Unit Approximate Quantity
0002 Safety Fence JOB 15,150 linear feet 0007 Truck Wash Down Rack JOB 3 each 0017 Conduit JOB 314 linear feet 0022 Clearing Areas JOB 102 acres 0023 Clearing and Grubbing Areas JOB 38 acres
0028 Temporary Access Roads/Staging Areas JOB 2,645 linear feet 0033 Barnett Road Security Fencing/Gates JOB 160 linear feet 0035 36‐inch Force Sewer Main Bypass Piping JOB 1,086 linear feet
OPTION
WORK
Line Item Description Quantity Calculation 0049 Clearing and Grubbing Areas - OW JOB 8 acres
Q4. There is no pay item that accounts for the semi compacted fill that is shown on drawings C-10 thru C-13.
Can you please include a pay item with associated quantities?
A4. Per Specification Section 31 00 00 Earthwork Paragraph 1.2.1.2 Payment, placement of excess material in areas designated as semi-compacted embankment shall be included in the price and payment of "Channel Excavation", "Drainage Ditch Excavation", or "Channel Excavation – OW”.
Q5. Can you please provide soil boring information for the proposed base bid area?
A5. All boring information is included in plans and specifications. See Boring CR-28 and CR-27U.
Q6. Does the bedding pay item/quantity include all estimated bedding for the utility work?
A6. No. Bedding Material (Bid Item 0042) and Bedding Material – OW (Bid Item 0052) are the line items associated with the bedding material required for the diversion channel only.
Q7. Is the required new South Gravel Drive included in pay items 29 or 30? A7.
Both. See Sheet C.9.
Q8a. Should we include the demolition of Barnett Road in pay item 0046? A8.
Yes.
Q8b. Or should there be a base bid demolition pay item?
A8b. See Specification Section 02 41 00 Demolition Paragraph 1.1 for the demolition scope for both Base and Option Work.
Q9. Should we include removal of the bypass line in pay item 0035? A9.
Yes.
Q10a. Geotextile fabric is referenced below the aggregate drive on detail 3/C.9? A10a. Yes.
Q10b. Should the geotextile fabric be included in pay item 0030? Q10b.
Yes.
Q11. Are the vaults referenced on sheet M.3 to be paid for by item 0035?
A11. See Section 03 42 13.00 10. No separate measurement or payment will be made for bypass and plug valve vaults including appurtenant items. All costs in connection therewith shall be included in the contract unit or job prices for the items to which the work is incidental thereto.
Q12a. There are concrete steps shown on sheet M.4. Should a pay item be added for the steps, or should the steps be included in an existing pay item?
A12a. Concrete steps should be included in Concrete Transition Structures (0010).
Q12b. If so, which pay item?
A12b. Concrete steps should be included in Concrete Transition Structures (0010).
Q13. Are the fence details shown on sheet S5 referring to the required security fence? A13. Yes.
Q14. There is geotextile fabric required for the temporary access road shown on sheet C-16. Is the referenced geotextile included in the quantity for pay item 0021, or should we include this geotextile in pay item 0028?
A14. Geotextile fabric associated with the temporary access road shall be included in Temporary Access Roads/ Staging Areas (Bid Item 0028).
Q15. Is there any additional geotechnical information available for the project that may have not been included in the bid documents?
A15. No.
Q16. Are the concrete foundations referenced in the drawings part of the bridge scope and pay item? A16. Refer to specification 03 31 00.00 12 Cast-in-Place Concrete, 1.4 Measurement and Payment Paragraphs for what is included in the “Concrete Utility Bridge” and the Concrete Transition Structures” bid items.
Q17. Can you please confirm whether the 60’ wide dimension referenced for the temporary construction access on sheet C-3 is correct? When measured using the drawing scale it is only 30’ wide. A17. The callout on Sheet C- 03 is incorrect. See Amendment for revision.
Q18. CLIN 0035 states 36” bypass but the plans call for 42”. See sheet C.6. [Can USACE] Please clarify. A18.
Specification Section 33 11 00 says that the connection to the bypass line stop equipment is to be made with a 36” pipe at the line stop at each end of the bypass pipe. This is because the specified bypass line stop utilizes a 36” tap and discharge flange. The specification directs the contractor to the plans which show alternatives allowable for bypass piping between the tie-ins. See the entirety of section 33 11 00, bypass details on sheet M- 3, and sheet C-6.
Q19. Regarding the cinder block structures for the sewer force main relocation. If there is no roof to be installed on the structure, will there be weep holes in the block structure or the concrete bridge structure to allow rain water to exit the structure?
A19. A note on sheet S-8 does call for drains. However, that note is deleted and replaced with revised sheet S-8.
The new note on revised sheet S-8 refers to new sheet AD-1, which is a more detailed wall drain. Utilize the detail on new sheet AD-1, including notes, for the wall drain.
Q20. Is there a door schedule for the bullet resistant doors?
A20. Detail 2, Sheet S-8 shows a typical installation of the doors, calls for four pairs of doors, and refers the contractor to the specification. The doors are defined in section 08 34 02 the specification. The locations of the doors are also shown on sheets C-03 and C-05. Sheet C-03, detail 1, shows the doors on the west wall of each transition structure. The same doors are required on the east walls, for a total of four door pairs of double doors.
Q21. Are there any details showing how the frames mount to the block walls?
A21. Specification Section 08 34 02, Bullet Resistant Components, calls for the contractor to provide frame mounting details from the manufacturer along with installation drawings as submittals. It is the responsibility of the contractor to coordinate with the manufacturer of the door system used to provide details. Please read this section in its entirety. Coordinate with specification section 04 20 00, Concrete Masonry Unit Walls, as required, in developing the details.
Q22. Can non-usable excavated material leave the site? If not, where will it go? If so, is there a designated place to take it?
A22. Unsuitable excavated material encountered during channel excavation may be placed in the Semi- Compacted Embankment sections, per Speciation Section 31 00 00. Unsuitable excavated material encountered during excavation associated with the sanitary sewer relocation shall become property of the Contractor and disposed of off-site at an appropriate disposal site, per Specification Section 31 23
16.16 12.
Q23. Pg. C-4 Note 1 states not to stockpile over tributary draining to Bayou Baton Rouge. Existing tributary runs though and takes up a significant portion of the designated stockpile area. May the contractor stockpile over existing tributary in this area and recut tributary once complete?
A23. No.
Q24. Looking at the plans and details for the utility bridge, several details show #6 rebar connecting the 30” pile and the pile cap. Most clearly seen on sheet S3 in Section 4. 30” hollow piles are manufactured with a minimum 2’6” long solid section on each end of the pile, therefore the detail shown is impossible without modification to the piles in the field. There are no details indicating such. Please clarify.
A24. See revised drawing S-3 for detail options.
Q25. Borings CR-28 and to some extent CR-29U show silts and silty sands near the bottom 10 feet of excavation.
Any ground water movement or heavy rainfall will likely cause unravelling of the slope at this exposed surface during construction. The specifications only require unwatering (removing surface water or collected rainwater) with no dewatering (contractor designed well point system) option in the contract. If slopes become unstable, will a well point system be directed by change order?
A25. We will address an unstable slope if it occurs.
Q26. Please clarify all materials that will remain onsite.
A26. All vegetative debris resulting from clearing and grubbing operations at the construction site shall, at the Contractor's option, be disposed of either by burning, grinding of material and/or removal from the site. Dispose of debris, rubbish, scrap, asphaltic pavement and other non-salvageable materials resulting from demolition and removal operations with all applicable federal, state and local regulations. Unsuitable excavated material encountered during excavation associated with the sanitary sewer relocation shall become property of the Contractor and disposed of off-site at an appropriate disposal site. Unsuitable excavated material encountered during channel excavation may be placed in the Semi- Compacted Embankment sections.
Q27. Will channel riprap placement be approved in partial sections?
A27. Yes. The placement of riprap will be approved in partial sections once all contract requirement pertaining thereto have been completed for the section in question. This should not be confused with acceptance, as we do not accept partially completed work. The overall project will be accepted upon successful completion of all contract requirements. Therefore, the contractor will be required to maintain all sections of completed channel until acceptance of the entire project.
Q28. Will the contractor be responsible to control weeds and/or vegetation growth that may grow through the riprap until final project acceptance?
A28. Yes. See Section 35 31 19.04 12 Paragraph 3.1.3.
SPEC REVISIONS 9-7-2023
SECTION 31 00 00
Page 16, paragraph 2.1.2. Delete this paragraph in its entirety and substitute the following revised paragraph therefore:
“2.1.2 Suitability of Compacted Fill Material
All compacted fill materials shall be free from concentrated masses of unsuitable materials (excludes organic matter content as defined in ASTM D2974, Method C) and other non-soil materials including, but not limited to, sticks, branches, and roots. The size of a mass is defined as a 1/3 of a cubic foot of continuous unsuitable material. For purposes of suitability, a mass will be unacceptable if it consists of less than 50% suitable soil. Any excavated material unsuitable for use as compacted fill shall be disposed of as stated in paragraph EXCAVATION.”
SECTION 32 15 00.01 12
1. Page 3, paragraph 1.3.2. Delete this paragraph in its entirety and substitute the following revised paragraph therefore:
“1.3.2 Permanent Access Roads and Parking Areas
The unit of measurement for surfacing material satisfactorily placed for the permanent access road and parking areas will be made by the cubic yard as shown on the contract drawings. Payment for surfacing material will be made at the applicable contract unit price per cubic yard for "Permanent Access Roads/Parking Areas #57 Limestone" or "Permanent Access Roads/Parking Areas #610 Limestone". Price and payment shall constitute full compensation for furnishing all plant, labor, equipment, and materials required, including geotextile fabric; design, placing, spreading, compacting, removal;
and maintenance; for the access roads and parking areas, and all other incidental work;
as shown on the drawings and specified herein.”
2. Page 4. After paragraph 2.1.3 Add the following new paragraph as 2.2:
"2.2 GEOTEXTILE FABRIC
The geotextile shall meet the following requirements:
GEOTEXTILE FOR PERMAMNENT ACCESS ROADS AND
PARKING AREAS
PROPERTY TEST PROCEDURE VALUE
Grab Breaking Load, pounds ASTM D 4632 200 minimum Grab Elongation at Ultimate, percent
ASTM D 4632 15 maximum
Puncture Strength, pounds ASTM D 4833 90 minimum AOS, U.S. Standard Sieve No. ASTM D 4751 40 minimum Permittivity, per second ASTM D 4491 0.05 minimum "
DRAWINGS
1. SHEET IDENTIFICATION Nos. G-02, C-03, S3, and S8. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. G-02, C-03, S3, and S8.
2. Add the attached new drawing SHEET IDENTIFICATION NO. AD-1.
(End of Summary of Changes)
| W912P823B00640003 FINAL SF30 SPS a |
| W912P823B00640003 DRAFT SF30 only |
| SECTION 31 00 00 |
| SECTION 32 15 00.01 12 |
| "2.2 GEOTEXTILE FABRIC |
| GEOTEXTILE FOR PERMAMNENT ACCESS ROADS AND PARKING AREAS |