W912P823B0044 Bid Abstract.pdf
PDF 199 KB Posted
- Solicitation number
- W912P823B0044
About this file
This abstract of offers document is for a construction project solicitation to repair dunes and beaches in Jefferson Parish, Louisiana damaged by Hurricane Ida. The solicitation was issued by the US Army Corps of Engineers New Orleans District and received five offers by the August 16th opening date.
The project involves mobilization, temporary structures, traffic control, silt fencing, truck wash racks, floodwalls, drainage structures, miscellaneous metals, geotextiles, clearing, excavation, embankment, sand and soil filling, pre-loading, wick drains, strip drains, riprap, piling, pile testing, surfacing, fencing, bridges, seeding, fertilizer, lime and sulfur amendments, stoplogs, gates, and other items. Offerors provided unit pricing for all items which the document records along with total proposed prices for base work and two optional work areas. All offerors submitted the required 20% bid bond and acknowledged amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE_1_0F__ PAGES
22-Jun-23
DATE SIGNED
16-Aug-23
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
0001 Mobilization & Demobilization 1 JOB
$ 550,000.00 $ 550,000.00 $ 2,850,000.00 $ 2,850,000.00 $ 2,518,610.00 $ 2,518,610.00 $ 3,075,000.00 $ 3,075,000.00 $ 2,000,000.00 $ 2,000,000.00 $ 2,540,837.53 $ 2,540,837.53
0002 Temporary Retaining Structures 1 JOB
$ 1,398,000.00 $ 1,398,000.00 $ 1,400,000.00 $ 1,400,000.00 $ 809,586.00 $ 809,586.00 $ 756,325.00 $ 756,325.00 $ 2,000,000.00 $ 2,000,000.00 $ 637,769.20 $ 637,769.20
0003 Traffic Control and Coordination 1 JOB
$ 69,000.00 $ 69,000.00 $ 50,000.00 $ 50,000.00 $ 185,791.00 $ 185,791.00 $ 55,000.00 $ 55,000.00 $ 80,000.00 $ 80,000.00 $ 207,000.00 $ 207,000.00
0004 Silt Fence 700 LF
$ 3.70 $ 2,590.00 $ 15.00 $ 10,500.00 $ 7.00 $ 4,900.00 $ 6.25 $ 4,375.00 $ 8.00 $ 5,600.00 $ 3.00 $ 2,100.00
0005 Truck Wash-Down Racks 1 JOB
$ 274,500.00 $ 274,500.00 $ 120,000.00 $ 120,000.00 $ 189,460.00 $ 189,460.00 $ 97,850.00 $ 97,850.00 $ 100,000.00 $ 100,000.00 $ 233,910.00 $ 233,910.00
0006 Reinforced Concrete Floodwall 1 JOB
$ 1,076,000.00 $ 1,076,000.00 $ 1,275,000.00 $ 1,275,000.00 $ 1,164,364.00 $ 1,164,364.00 $ 1,125,000.00 $ 1,125,000.00 $ 1,500,000.00 $ 1,500,000.00 $ 2,085,127.38 $ 2,085,127.38
Reinforced Concrete Drainage
Structures
1 JOB
$ 2,704,500.00 $ 2,704,500.00 $ 2,350,000.00 $ 2,350,000.00 $ 2,344,210.00 $ 2,344,210.00 $ 2,284,000.00 $ 2,284,000.00 $ 2,000,000.00 $ 2,000,000.00 $ 2,884,837.52 $ 2,884,837.52
0008 Miscellaneous Metals 1 JOB
$ 106,000.00 $ 106,000.00 $ 960,000.00 $ 960,000.00 $ 487,410.00 $ 487,410.00 $ 475,000.00 $ 475,000.00 $ 500,000.00 $ 500,000.00 $ 550,000.00 $ 550,000.00
0009 Separator Geotextile 14300 SY
$ 6.30 $ 90,090.00 $ 4.50 $ 64,350.00 $ 6.00 $ 85,800.00 $ 4.00 $ 57,200.00 $ 4.00 $ 57,200.00 $ 5.55 $ 79,365.00
0010 Reinforcement Geotextile 13000 SY
$ 21.40 $ 278,200.00 $ 11.00 $ 143,000.00 $ 9.00 $ 117,000.00 $ 10.00 $ 130,000.00 $ 6.00 $ 78,000.00 $ 8.09 $ 105,170.00
0011 Clearing and Grubbing 1 JOB
$ 2,790,700.00 $ 2,790,700.00 $ 3,900,000.00 $ 3,900,000.00 $ 824,311.00 $ 824,311.00 $ 2,412,500.00 $ 2,412,500.00 $ 2,781,000.00 $ 2,781,000.00 $2,898,139.83 $ 2,898,139.83
ABSTRACT OF OFFERS - CONSTRUCTION Solicitation Number: W912P823B0044
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Contract Specialist
Margaret C. Maine
Contracting Officer
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) 20% 3,000,000 B. BID SECURITY (Type and amount)- 20% 3,000,000
Grand Isle and Vicinity, LA
Hurricane Ida Repairs
Dune and Beach Construction
Jefferson Parish, LA
7B. DESCRIPTION OF OFFERED ITEM
(Check A, B or C and complete D, E, and F)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED-YES
16-Aug-23
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR
CYCLE CONSTRUCTION
A. OFFEROR
EVCO DEVELOPMENT LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calvin Fogle
NO. 1 NO. 2
A. OFFEROR
Onshore Materials, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 4
A. OFFEROR
B&K Construction Company, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 5
A. OFFEROR
Dynamic Group , LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 3
DATE SIGNED
16-Aug-23
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
ABSTRACT OF OFFERS - CONSTRUCTION Solicitation Number: W912P823B0044
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Contract Specialist
Margaret C. Maine
Contracting Officer
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) 20% 3,000,000 B. BID SECURITY (Type and amount)- 20% 3,000,000
Grand Isle and Vicinity, LA
Hurricane Ida Repairs
Dune and Beach Construction
Jefferson Parish, LA
7B. DESCRIPTION OF OFFERED ITEM
(Check A, B or C and complete D, E, and F)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED-YES
16-Aug-23
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR
CYCLE CONSTRUCTION
A. OFFEROR
EVCO DEVELOPMENT LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calvin Fogle
NO. 1 NO. 2
A. OFFEROR
Onshore Materials, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 4
A. OFFEROR
B&K Construction Company, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 5
A. OFFEROR
Dynamic Group , LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 3
0012 Excavation, Drainage Canals 1 JOB
$ 1,796,900.00 $ 1,796,900.00 $ 2,000,000.00 $ 2,000,000.00 $ 784,288.00 $ 784,288.00 $ 837,500.00 $ 837,500.00 $ 1,900,000.00 $ 1,900,000.00 $3,039,132.35 $ 3,039,132.35
0013 Construction Dewatering 1 JOB
$ 504,600.00 $ 504,600.00 $ 100,000.00 $ 100,000.00 $ 174,075.00 $ 174,075.00 $ 170,000.00 $ 170,000.00 $ 200,000.00 $ 200,000.00 $175,000.00 $ 175,000.00
0014 Embankment, Compacted Fill 115000 CY
$ 52.55 $ 6,043,250.00 $ 48.00 $ 5,520,000.00 $ 33.25 $ 3,823,750.00 $ 42.50 $ 4,887,500.00 $ 45.00 $ 5,175,000.00 $ 34.85 $ 4,007,750.00
0015 Sand Fill
0015AA First 74,000 Ton 74000 TON
$ 22.10 $ 1,635,400.00 $ 21.00 $ 1,554,000.00 $ 14.85 $ 1,098,900.00 $ 20.50 $ 1,517,000.00 $ 18.00 $ 1,332,000.00 $ 20.00 $ 1,480,000.00
0015AB All over 74,000 Ton 19000 TON
$ 22.10 $ 419,900.00 $ 21.00 $ 399,000.00 $ 14.85 $ 282,150.00 $ 20.50 $ 389,500.00 $ 18.00 $ 342,000.00 $ 20.00 $ 380,000.00
0016 Soil Pre-Loading 1 JOB
$ 847,700.00 $ 847,700.00 $ 1,100,000.00 $ 1,100,000.00 $ 829,384.00 $ 829,384.00 $ 730,000.00 $ 730,000.00 $ 500,000.00 $ 500,000.00 $ 300,000.00 $ 300,000.00
0017 Vertical Wick Drain Installation 20706 LF
$ 1.00 $ 20,706.00 $ 2.00 $ 41,412.00 $ 2.25 $ 46,588.50 $ 2.00 $ 41,412.00 $ 3.00 $ 62,118.00 $ 1.55 $ 32,094.30
0018 Horizontal Strip Drain Installation 7073 LF
$ 2.00 $ 14,146.00 $ 2.00 $ 14,146.00 $ 3.00 $ 21,219.00 $ 2.00 $ 14,146.00 $ 2.00 $ 14,146.00 $ 1.35 $ 10,399.05
0019 Grouted Rip Rap 495 CY
$ 314.00 $ 155,430.00 $ 375.00 $ 185,625.00 $ 283.00 $ 140,085.00 $ 670.00 $ 331,650.00 $ 465.00 $ 230,175.00 $ 331.50 $ 164,092.50
0020 Piling, Steel Sheet, Type PZ-22 11760 SF
$ 65.50 $ 770,280.00 $ 44.00 $ 517,440.00 $ 63.75 $ 749,700.00 $ 62.20 $ 731,472.00 $ 40.00 $ 470,400.00 $ 55.00 $ 646,800.00
DATE SIGNED
16-Aug-23
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Contract Specialist
Margaret C. Maine
Contracting Officer
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) 20% 3,000,000 B. BID SECURITY (Type and amount)- 20% 3,000,000
Grand Isle and Vicinity, LA
Hurricane Ida Repairs
Dune and Beach Construction
Jefferson Parish, LA
7B. DESCRIPTION OF OFFERED ITEM
(Check A, B or C and complete D, E, and F)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED-YES
16-Aug-23
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR
CYCLE CONSTRUCTION
A. OFFEROR
EVCO DEVELOPMENT LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calvin Fogle
NO. 1 NO. 2
A. OFFEROR
Onshore Materials, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 4
A. OFFEROR
B&K Construction Company, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 5
A. OFFEROR
Dynamic Group , LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 3
Furnish 14" x 14" Square Precast
Concrete Piling
840 LF
$ 97.20 $ 81,648.00 $ 48.00 $ 40,320.00 $ 50.00 $ 42,000.00 $ 48.60 $ 40,824.00 $ 75.00 $ 63,000.00 $ 43.00 $ 36,120.00
Drive 14" x 14" Square Precast
Concrete Piling
840 LF
$ 13.70 $ 11,508.00 $ 57.00 $ 47,880.00 $ 75.50 $ 63,420.00 $ 73.50 $ 61,740.00 $ 75.00 $ 63,000.00 $ 65.00 $ 54,600.00
0023 Furnish HP 14 x 73 Steel Piles 13420 LF
$ 112.50 $ 1,509,750.00 $ 72.00 $ 966,240.00 $ 98.75 $ 1,325,225.00 $ 96.10 $ 1,289,662.00 $ 75.00 $ 1,006,500.00 $ 85.00 $ 1,140,700.00
0024 Drive HP 14 x 73 Steel Piles 13420 LF
$ 44.30 $ 594,506.00 $ 55.00 $ 738,100.00 $ 29.00 $ 389,180.00 $ 28.25 $ 379,115.00 $ 25.00 $ 335,500.00 $ 25.00 $ 335,500.00
0025 Pile Driving Analyzer Testing 1 JOB
$ 95,100.00 $ 95,100.00 $ 154,000.00 $ 154,000.00 $ 324,940.00 $ 324,940.00 $ 316,500.00 $ 316,500.00 $ 200,000.00 $ 200,000.00 $ 280,000.00 $ 280,000.00
0026 Surfacing
0026AA First 4,500 TON 4500 TON
$ 70.00 $ 315,000.00 $ 68.00 $ 306,000.00 $ 65.25 $ 293,625.00 $ 73.60 $ 331,200.00 $ 75.00 $ 337,500.00 $ 52.25 $ 235,125.00
0026AA All Over 4,500 TON 1200 TON
$ 70.00 $ 84,000.00 $ 68.00 $ 81,600.00 $ 65.25 $ 78,300.00 $ 73.60 $ 88,320.00 $ 65.00 $ 78,000.00 $ 52.25 $ 62,700.00
0027 Chain Link Fences and Gates 1 JOB
$ 17,100.00 $ 17,100.00 $ 27,000.00 $ 27,000.00 $ 31,118.00 $ 31,118.00 $ 33,500.00 $ 33,500.00 $ 15,000.00 $ 15,000.00 $ 10,000.00 $ 10,000.00
Drainage Structure Access
Bridge
1 JOB
$ 255,400.00 $ 255,400.00 $ 337,000.00 $ 337,000.00 $ 232,100.00 $ 232,100.00 $ 292,500.00 $ 292,500.00 $ 300,000.00 $ 300,000.00 $ 200,000.00 $ 200,000.00
0029 Seeding and Mulching 14 AC
$ 6,300.00 $ 88,200.00 $ 9,000.00 $ 126,000.00 $ 4,615.00 $ 64,610.00 $ 9,185.00 $ 128,590.00 $ 7,000.00 $ 98,000.00 $ 2,400.00 $ 33,600.00
DATE SIGNED
16-Aug-23
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Contract Specialist
Margaret C. Maine
Contracting Officer
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) 20% 3,000,000 B. BID SECURITY (Type and amount)- 20% 3,000,000
Grand Isle and Vicinity, LA
Hurricane Ida Repairs
Dune and Beach Construction
Jefferson Parish, LA
7B. DESCRIPTION OF OFFERED ITEM
(Check A, B or C and complete D, E, and F)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED-YES
16-Aug-23
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR
CYCLE CONSTRUCTION
A. OFFEROR
EVCO DEVELOPMENT LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calvin Fogle
NO. 1 NO. 2
A. OFFEROR
Onshore Materials, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 4
A. OFFEROR
B&K Construction Company, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 5
A. OFFEROR
Dynamic Group , LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 3
0030 Fertilizer
0030AA First 630 LBS 630 LBS
$ 3.40 $ 2,142.00 $ 3.00 $ 1,890.00 $ 33.50 $ 21,105.00 $ 2.55 $ 1,606.50 $ 7.00 $ 4,410.00 $ 1.15 $ 724.50
0030AB All Over 630 LBS 280 LBS
$ 3.40 $ 952.00 $ 3.00 $ 840.00 $ 33.50 $ 9,380.00 $ 2.55 $ 714.00 $ 7.00 $ 1,960.00 $ 1.15 $ 322.00
0031 Lime Soil Amendment 14 TON
$ 530.00 $ 7,420.00 $ 375.00 $ 5,250.00 $ 1,263.00 $ 17,682.00 $ 1,230.00 $ 17,220.00 $ 100.00 $ 1,400.00 $ 1,950.00 $ 27,300.00
0032 Sulfur Soil Amendment 7 TON
$ 530.00 $ 3,710.00 $ 285.00 $ 1,995.00 $ 3,198.00 $ 22,386.00 $ 3,120.00 $ 21,840.00 $ 100.00 $ 700.00 $ 1,800.00 $ 12,600.00
0033 Stoplogs 1 JOB
$ 613,200.00 $ 613,200.00 $ 375,000.00 $ 375,000.00 $ 870,375.00 $ 870,375.00 $ 679,000.00 $ 679,000.00 $ 750,000.00 $ 750,000.00 $ 600,000.00 $ 600,000.00
0034 Slide Gates and Hoists 1 JOB
$ 846,300.00 $ 846,300.00 $ 1,050,000.00 $ 1,050,000.00 $ 1,102,475.00 $ 1,102,475.00 $ 904,925.00 $ 904,925.00 $ 650,000.00 $ 650,000.00 $ 811,418.00 $ 811,418.00
0035 Rip Rap 550 TON
$ 139.10 $ 76,505.00 $ 120.00 $ 66,000.00 $ 99.50 $ 54,725.00 $ 112.00 $ 61,600.00 $ 120.00 $ 66,000.00 $ 111.00 $ 61,050.00
0036 Rip Rap Bedding 90 TON
$ 70.00 $ 6,300.00 $ 200.00 $ 18,000.00 $ 68.50 $ 6,165.00 $ 112.00 $ 10,080.00 $ 75.00 $ 6,750.00 $ 265.50 $ 23,895.00
0037 Separator Geotextile - (OW1) 2700 SY
$ 7.40 $ 19,980.00 $ 4.50 $ 12,150.00 $ 7.50 $ 20,250.00 $ 4.00 $ 10,800.00 $ 4.00 $ 10,800.00 $ 6.20 $ 16,740.00
0038 Clearing and Grubbing - (OW1) 1 JOB
$ 99,500.00 $ 99,500.00 $ 78,000.00 $ 78,000.00 $ 93,722.00 $ 93,722.00 $ 72,500.00 $ 72,500.00 $ 64,000.00 $ 64,000.00 $ 35,650.00 $ 35,650.00
DATE SIGNED
16-Aug-23
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Contract Specialist
Margaret C. Maine
Contracting Officer
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) 20% 3,000,000 B. BID SECURITY (Type and amount)- 20% 3,000,000
Grand Isle and Vicinity, LA
Hurricane Ida Repairs
Dune and Beach Construction
Jefferson Parish, LA
7B. DESCRIPTION OF OFFERED ITEM
(Check A, B or C and complete D, E, and F)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED-YES
16-Aug-23
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR
CYCLE CONSTRUCTION
A. OFFEROR
EVCO DEVELOPMENT LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calvin Fogle
NO. 1 NO. 2
A. OFFEROR
Onshore Materials, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 4
A. OFFEROR
B&K Construction Company, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 5
A. OFFEROR
Dynamic Group , LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 3
Excavation, Drainage Canals -
(OW1)
1 JOB
$ 53,000.00 $ 53,000.00 $ 74,000.00 $ 74,000.00 $ 45,672.00 $ 45,672.00 $ 78,000.00 $ 78,000.00 $ 40,000.00 $ 40,000.00 $ 71,052.00 $ 71,052.00
Embankment, Compacted Fill -
(OW1)
2100 CY
$ 60.30 $ 126,630.00 $ 54.00 $ 113,400.00 $ 33.00 $ 69,300.00 $ 42.50 $ 89,250.00 $ 45.00 $ 94,500.00 $ 34.85 $ 73,185.00
0041 Sand Fill - (OW1) 1860 TON
$ 25.60 $ 47,616.00 $ 24.00 $ 44,640.00 $ 14.85 $ 27,621.00 $ 20.50 $ 38,130.00 $ 25.00 $ 46,500.00 $ 22.50 $ 41,850.00
0042 Surfacing - (OW1) 600 TON
$ 81.30 $ 48,780.00 $ 68.00 $ 40,800.00 $ 65.25 $ 39,150.00 $ 73.50 $ 44,100.00 $ 75.00 $ 45,000.00 $ 52.25 $ 31,350.00
72-inch CMP Culvert Installation -
(OW1)
1 JOB
$ 306,700.00 $ 306,700.00 $ 462,000.00 $ 462,000.00 $ 428,210.00 $ 428,210.00 $ 430,000.00 $ 430,000.00 $ 250,000.00 $ 250,000.00 $ 325,000.00 $ 325,000.00
0044 R-90 Riprap - (OW1) 420 TON
$ 122.30 $ 51,366.00 $ 120.00 $ 50,400.00 $ 99.50 $ 41,790.00 $ 112.00 $ 47,040.00 $ 90.00 $ 37,800.00 $ 85.50 $ 35,910.00
0045 Separator Geotextile - (OW2) 3600 SY
$ 7.40 $ 26,640.00 $ 4.50 $ 16,200.00 $ 6.65 $ 23,940.00 $ 4.00 $ 14,400.00 $ 4.00 $ 14,400.00 $ 5.20 $ 18,720.00
Reinforcement Geotextile -
(OW2)
5000 SY
$ 21.40 $ 107,000.00 $ 13.00 $ 65,000.00 $ 9.80 $ 49,000.00 $ 10.70 $ 53,500.00 $ 7.00 $ 35,000.00 $ 7.45 $ 37,250.00
0047 Clearing and Grubbing - (OW2) 1 JOB
$ 276,200.00 $ 276,200.00 $ 650,000.00 $ 650,000.00 $ 592,202.00 $ 592,202.00 $ 775,000.00 $ 775,000.00 $ 520,000.00 $ 520,000.00 $ 45,890.00 $ 45,890.00
Excavation, Drainage Canals -
(OW2)
1 JOB
$ 290,500.00 $ 290,500.00 $ 450,000.00 $ 450,000.00 $ 258,805.00 $ 258,805.00 $ 314,500.00 $ 314,500.00 $ 300,000.00 $ 300,000.00 $ 520,284.00 $ 520,284.00
Embankment, Compacted Fill -
(OW2)
34000 CY
$ 59.30 $ 2,016,200.00 $ 48.00 $ 1,632,000.00 $ 35.00 $ 1,190,000.00 $ 42.50 $ 1,445,000.00 $ 45.00 $ 1,530,000.00 $ 34.85 $ 1,184,900.00
DATE SIGNED
16-Aug-23
7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED abstract all offers received in response to this solicitation.
SIGNATURE
4. ISSUING OFFICE
US ARMY ENGINEER DISTRICT, NOD
Contract Specialist
Margaret C. Maine
Contracting Officer
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) 20% 3,000,000 B. BID SECURITY (Type and amount)- 20% 3,000,000
Grand Isle and Vicinity, LA
Hurricane Ida Repairs
Dune and Beach Construction
Jefferson Parish, LA
7B. DESCRIPTION OF OFFERED ITEM
(Check A, B or C and complete D, E, and F)
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED- YES C. AMENDMENTS ACKNOWLEDGED-YES
16-Aug-23
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
6. NUMBER OF AMENDMENTS ISSUED
7400 Leake Avenue
New Orleans, LA 70118
A. HIRED LABOR A. OFFEROR
CYCLE CONSTRUCTION
A. OFFEROR
EVCO DEVELOPMENT LLC
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
Calvin Fogle
NO. 1 NO. 2
A. OFFEROR
Onshore Materials, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 4
A. OFFEROR
B&K Construction Company, LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 5
A. OFFEROR
Dynamic Group , LLC
B. BID SECURITY (Type and amount) 20% 3,000,000
C. AMENDMENTS ACKNOWLEDGED-YES
NO. 3
0050 Surfacing - (OW2) 1200 TON
$ 81.30 $ 97,560.00 $ 68.00 $ 81,600.00 $ 65.25 $ 78,300.00 $ 73.50 $ 88,200.00 $ 75.00 $ 90,000.00 $ 52.25 $ 62,700.00
0051 Seeding and Mulching - (OW2) 5 AC
$ 6,330.00 $ 31,650.00 $ 9,000.00 $ 45,000.00 $ 5,190.00 $ 25,950.00 $ 9,185.00 $ 45,925.00 $ 7,000.00 $ 35,000.00 $ 2,400.00 $ 12,000.00
0052 Fertilizer
0052AA First 225 LBS 225 LBS
$ 3.40 $ 765.00 $ 3.00 $ 675.00 $ 19.40 $ 4,365.00 $ 2.60 $ 585.00 $ 7.00 $ 1,575.00 $ 1.15 $ 258.75
0052AB All Over 225 LBS 100 LBS
$ 3.40 $ 340.00 $ 3.00 $ 300.00 $ 19.40 $ 1,940.00 $ 2.60 $ 260.00 $ 7.00 $ 700.00 $ 1.15 $ 115.00
0053 Lime Soil Amendment 5 TON
$ 530.00 $ 2,650.00 $ 375.00 $ 1,875.00 $ 1,444.00 $ 7,220.00 $ 1,500.00 $ 7,500.00 $ 100.00 $ 500.00 $ 1,950.00 $ 9,750.00
0054 Sulfur Soil Amendment 2.5 TON
$ 530.00 $ 1,325.00 $ 300.00 $ 750.00 $ 3,760.00 $ 9,400.00 $ 3,675.00 $ 9,187.50 $ 100.00 $ 250.00 $ 1,800.00 $ 4,500.00
$ 26,156,633.00 $ 28,897,588.00 $ 21,630,392.50 $ 24,781,366.50 $ 25,305,359.00 $ 26,385,179.16
$ 753,572.00 $ 875,390.00 $ 765,715.00 $ 809,820.00 $ 588,600.00 $ 630,737.00
$ 2,850,830.00 $ 2,943,400.00 $ 2,241,122.00 $ 2,754,057.50 $ 2,527,425.00 $ 1,896,367.75
$ 29,761,035.00 $ 32,716,378.00 $ 24,637,229.50 $ 28,345,244.00 $ 28,421,384.00 $ 28,912,283.91
***CLIN 0018 for Bidder NO. 5 (Dynamic Group, LLC) has a mathematical error. Total CLIN Price utilized.
TOTAL:
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88) Prescribed by GSA - FAR (48 CFR) 53.236-1
OPTIONAL WORK 1 TOTAL:
OPTIONAL WORK 2 TOTAL:
BASE WORK TOTAL:
| 2023-08-16T14:35:24-0500 | |
| MAINE.MARGARET.COOKSEY.1151563550 |
File details come from the government source that posted it. Updated .