This amendment to the solicitation provides responses to questions from interested vendors regarding requirements for the West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP 110 Levee in St. John the Baptist Parish, Louisiana. The United States Army Corps of Engineers, New Orleans District is seeking a firm fixed-price contract for clearing, grubbing, placing sand fill, separator fabric, compacted clay embankment, constructing access roads, excavating drainage canals, placing culverts, fertilizing, turf establishment and other incidental work. The estimated value of the contract is between $10 million and $25 million. Questions were answered clarifying that global navigation satellite systems or static GPS will not be accepted for surveys, grass hay cannot be used for mulch, the access road included in Optional Work Area 2 will be executed at award, and base work such as clearing and grubbing may be performed concurrently with but not prior to the optional work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered Solicitation for West Shore Lake Pontchartrain, Hurricane and Storm Damage Risk Reduction Project, WSLP-110 Levee, St. John the Baptist Parish, Louisiana has been amended to:
1. Provide Responses to Questions
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Dec-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P822B0072
X 9B. DATED (SEE ITEM 11)
21-Oct-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Dec-2022
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P822B0072
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT 0006
Questions & Respones – WSLP 110 30 Nov 2022
1. Specification Section 01100- General Provisions Part 15 Project Benchmarks
Would the USACE consider allowing us to use RTK GNSS or static GPS control surveys methods for the every six (6) month survey?
Response: no
2. Specification 32 92 19.04 12 paragraph 2.1.4 depicts wood fiber mulch only which is typically used for the hydrologically placed mulch. Can grass hay be utilized for the dry broadcast type depicted in paragraph 3.5?
Response: no
3. General Provision 01100, paragraph 25 ORDER OF WORK was revised in Amendment 0005 stating that Optional Work Area 2 access may be constructed by the adjacent contractor working on the WSLP-109 project. If this work is performed by others, what is the time frame that the work will be performed in relation to the NTP for this contract?
Response: The government will execute option 2 at award.
W912P822B0072
4. Note 4 of page 00010-5 of the Solicitation states that, if implemented, the Government will exercise OPTIONAL WORK 2 no later than 90 calendar days after issuance of the NTP. This would allow clearing, grubbing and channel excavation during the wait period and while optional work (if exercised) if performed. Amendment 0005 revised General Provision 01100, paragraph 25 ORDER OF WORK stating, “Once access is constructed, base work will begin with clearing, grubbing, channel excavations, and sand placement.” Can Base Work clearing, grubbing, channel excavations begin prior to and during optional work being performed.?
Response: It may be performed concurrent with option work 2, but not prior.
Additional Note:
In amendment 5, response to question 8 is revised as follows:
Should the contractor consider the existing access road acceptable for 2-way traffic in its existing condition and configuration?
Response: The contractor may elect to widen the road or to add pull-offs, but the construction and maintenance of additional road width will be at the contractor’s expense. The access road right-of-way is 40 feet wide and the road shall not extend past the ROW. The road maintenance bid item will be used to maintain the width and elevation of the existing access road at the time of award.
(End of Summary of Changes)