This document is an Amendment to a federal solicitation for the Calcasieu River and Pass, LA, Channelside Stone Foreshore Protection, Confined Disposal Facilities 7, 10, & 11 project (ED 20-060). The amendment provides an updated list of acceptable stone sources. The bid submission deadline of September 3, 2024 and bid opening date of September 3, 2024 remain unchanged. The work consists of dredging and construction of stone foreshore dikes along the Calcasieu River, with an estimated value between $10-25 million. The solicitation is an Invitation for Bid for a firm fixed-price contract. The procurement is unrestricted, but large businesses must submit a subcontracting plan. The Contract Specialist is Anedra Baldwin and Christopher Nuccio.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 20-060
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject solicitation for Calcasieu River and Pass, LA, Channelside Stone Foreshore Protection, Confined Disposal Facilities 7, 10, & 11, Calcasieu Parish, Louisiana (ED 20-060) is hereby amended as follows:
1) Provides an updated version of the Stone Sources list.
The bid submission deadline of 3 September 2024, 10:00AM, local time, as w ell as the virtual bid opening date and time of 3 September 2024, 1:00PM, local time, remains unchanged.
***PLEASE ACKNOWLEDGE THIS AMENDMENT AND SUBMIT WITH YOUR BID***
1. CONTRACT ID CODE PAGE OF PAGES
1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P822B0051
X 9B. DATED (SEE ITEM 11)
15-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2024
CODE
CONTRACTING DIV- CHIEF
7400 LEAKE AVENUE, ROOM 172
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
CATEGORY I – ACCEPTABLE SOURCES
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
May 2024
MVD Master List Stone Protection Sources
On the basis of information and data available, stone meeting the quality requirements in paragraph EVALUATION TESTING OF STONE of UFGS Section 35 31 19, STONE, CHANNEL, SHORELINE/COASTAL PROTECTION
FOR STRUCTURES, has been produced from the sources listed. Acceptance of a source of stone is not to be construed as acceptance of all material from that source. The right is reserved to reject materials from certain localized areas, zones, strata, or channels, when such materials are unsuitable for stone as determined by the Contracting Officer. The Contracting Officer also reserves the right to reject individual units of produced specified materials in stockpiles at the quarry, all transfer points, and at the project construction site when such materials are determined to be unsuitable.
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
ALABAMA
34º 26’ 52”N
86º 15’ 33”W
Update d
Guntersville Quarry - from the intersection of US Hwy 431 and AL Hwy 79, north of Guntersville, AL, travel north 0.7 miles on US HWY 431 to Convict Camp Road.
Turn right onto Convict Camp Rd and travel 0.5 miles. Mine scale house will be on the right.
TEL:256.582.2130
Madison Materials 692 Convict Camp Rd Guntersville, AL 35976
POC: Joe McConnell
TEL: 256.298.3918
joemcconnell@madisonmaterial.com
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
34º 11’ 35”N
86º 29’ 21”W Updated 2021
Summit Quarry - from the intersection of US Hwy 278 and US Hwy 231, near Brooksville, AL, travel north
2.8 miles on US Hwy 231N to Blount County Road 25.
Turn right onto Blount County Road 25 and travel
1.5 miles to Hinds Road.
Turn right onto Hinds Road and Travel 1.8 miles to quarry entrance. Quarry entrance will be on the right.
TEL: 205.429.3807
Madison Materials 2335 Hinds Rd.
Blountsville, AL 35031
POC: Joe McConnell
TEL: 256.298.3918
joemcconnell@madisonmaterial.com
33º 18’ 17”N
86º 59’ 23”W
Updated 2021
Flat Top Quarry – from the intersection of interstate I- 22W and US Hwy 78, near Graysville, AL, take exit 85 toward Birmingham and travel south 0.53 miles on US Hwy 78. Turn right onto first exit ramp (2nd
Ave. NW). Travel 0.4 miles on 2nd Ave NW and merge onto Flat Top Road. Travel north on Flat Top Road 0.85 miles to quarry entrance on left.
TEL:256.673.6360
Madison Materials 2335 Hinds Rd.
Blountville, AL 35031
POC: Tom Bass
TEL: 256.582.2656
tombass@whitaker-contracting.com
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
34º 33’ 29.89”N 86º 34’ 31.37”W
Updated
Lacey Spring Quarry – From Lacey Spring AL, go 1.7 miles north of intersection of US Hwy 231/AL Hwy 53 with AL Hwy 36 and turn right onto the southern end of 149 Parks Chapel Rd and go to quarry entrance on right.
Lacey Spring Quarry 149 Parks Chapel Rd.
Lacey Spring, AL 35754
Rogers Group Inc.
Corporate Headquarters 421 Great Circle Rd.
Nashville, TN 37228 615.242.0585
Rogers Group Inc.
Administrative Office 520 Three Mile Lane Tuscumbia, AL 35674 256.383.1645
POC: Mr. Michael Wilkes - Quarry Manager
34º 39’ 51.82”N 87º 37’ 31.33”W
Updated
Tuscumbia Quarry – from the intersection of US Hwys 72 and 43, in Tuscumbia, take US Hwy72/AL Hwy 20 east approximately 2 miles and then turn south on to Three Mile Road (County Rd 57) and go 2.3 miles to Quarry entrance on left.
LEDGES 1,2 AND 3*
*Ledge 3 – Randomly oriented fractures are present in the material. Failure can occur along existing fractures under F&T.
Tuscumbia Quarry 520 Three Mile Lane Tuscumbia, AL 35674
Roger Group Inc.
Corporate Headquarters 421 Great Circle Rd.
Nashville, TN 37228 615.242.0585
Roger Group Inc.
Administrative Office 520 Three Mile Lane Tuscumbia, AL 35674 256.383.1645
POC: Mr. Michael Wilkes - Quarry Manager
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
34º 43’ 33.46”N 87º 48’ 28.66”W
Data update submitted
Pride Quarry located on N side of US Hwy 72, Pride, AL.
approx.8.2 miles west of intersection of US-72 and US- 43 in Tuscumbia, AL
Vulcan Materials, Pride Quarry P.O. 740250 18055 Hwy 72 Tuscumbia, AL 35674 205.310.6853-cell
Vulcan Materials Co.
Southern and GLF CST DVSN P.O. Box 385016 Birmingham, AL 35238-5016 Tim Wyatt – Area Manager wyattt@vmcmail.com 205.668.6001-office 205.310.6853-cell
34º 44’ 40” N 87º 56’ 0”W
Cherokee Quarry- 3 miles east of Cherokee, AL on old Hwy 72.
Vulcan Materials Co., Cherokee Quarry P.O. Box 459 Cherokee, AL 35616 POC: Tim Wyatt 205.310.6853 wyattt@vmcmail.com
Vulcan Materials Co.
Southern and GLF CST DVSN P.O. Box 385016 Birmingham, AL 35238-5016 POC: Tim Wyatt 205.310.6853 wyattt@vmcmail.com
33° 07.34532’, - 86° 46.95146’
Calera Quarry - Calera Alabama
Tim Wyatt P.O. Box 996 Calera, AL. 35040 wyatt@vmcmail.com ph#205-310-6853
Vulcan Materials Co.
Southern and GLF CST DVSN P.O. Box 385016 Birmingham, AL 35238-5016 POC: Tim Wyatt 205.310.6853 wyattt@vmcmail.com
ARKANSAS
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address
36º 17’
51.468”N 90º 58’ 55.70”W
Updated Sep 2023
Pocahontas Quarry - Take Hwy 67 north or south to the Hwy 90/115 junction west. Follow Hwy 90/115 until the two highways split, bear right to stay on Hwy 115. Stay on Hwy 115 approx two miles and turn left on Hwy 251. Proceed .1 miles and turn left onto Johnson Church Rd. The quarry is .5 miles ahead on left.
Div. Capital Quarries Co. Inc, 632 Johnson Church Rd Pocahontas AR 72455
Capital Quarries Co. Inc, PO Box 105050 Jefferson City, Mo 65110
Chris W. Pitts Phone (870) 248-1212 Fax (870) 248-0532 Cell (573) 694-0797
34º 40’ 38”N 92º 15’ 38”W
(2020)
Granite Mountain Quarry #1 is located on east side of AR I-530 and just north of Dixon Road, AR Hwy 338
Granite Mountain Quarries P.O. Box 138 Sweet Home, AR 72164
(501) 490-1535
McGeorge Corporation P.O. Box 408 1425 Shamburger Lane
(501) 490-1456
34º 40’ 38” N 92º 15’ 38”W
Granite Mountain Quarry #2 is located on west side of AR I- 530 and just north of Dixon Road, AR Hwy 338
Granite Mountain Quarries P.O. Box 138
(501) 490-1535
1425 Shamburger Lane
(501) 490-1456
34º 34’ 48”N 92º 27’ 59”W
Granite Mountain Quarry #3 is located 3 miles south of intersection of I-30 and AR Hwy 183 and south of Bryant, AR and 1 mile east on County Rd. #2 Granite Mountain Quarries P.O. Box 886 Bryant, AR 72089
1425 Shamburger Lane Sweet Home, AR 72164
(501) 490-1456
34° 8'46.58"N, 93°15'34.80"W
(Sep 2019)
Hollywood Quarry located off Highway 53, 3 miles north of Hollywood, Arkansas, AR in Ouachita Mountain Range.
McGeorge Contracting Co. Inc.
P.O Box 408 1425 Shamburger Lane Sweet Home AR 72164 Pine Bluff, Arkansas POC: Anthony Jones anthony.jones@mcgeorgecontracting.c om office: 501.490.6079 Cell: 501.353.4515
35.33146;- 93.34504
35.32713;- 93.34599 Aug 2022
River Mountain Quarry is operated by Pine Bluff Sand and Gravel Company of Pine Bluff Arkansas. The operation is on the south bank of the Arkansas River at mile 218.5 with a physical address of 3979 River Mountain Road, Delaware, AR 72835. From Delaware, AR turn off AR Hwy 22 and go north on AR Hwy 393 one mile to River Mountain Rd. Proceed West four miles to the quarry entrance road on the right (north).
“Berryhill Pit”-35º 32’76.36”North/ Upper East Pit 93º 34’61.23” West
“Lower East Pit”- 36º 33’15.17”North/
93º 34’48.66” West
Pine Bluff Sand and Gravel
Attn: Christopher David Abadie chris.abadie@pbsgc.com
Delaware, Arkansas
GEORGIA
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
ILLINOIS
37º 28.645’North/
88º 07.917’ West
June 2022
Cave-In-Rock Quarry is located approximately 5 miles east of Cave in Rock, IL. From the flashing light on Illinois Highway 1, from the ferry across the Ohio River, head east past Cave-in-Rock State Park to intersection with next road and turn south toward river. Quarry is on right 0.25 miles from intersection.
Genevieve’s Ledge
Lafarge Holcim Attn: Jodie Shepperd 1-jodi.shepperdA@lafargeholcim.com 1-ernest.walder@lafargeholcim.com 830 Three Rivers Quarry Smithland, KY 42081
37º 28.645’North/
88º 07.917’ West
June 2022
Cave-In-Rock Quarry is located approximately 5 miles east of Cave in Rock, IL. From the flashing light on Illinois Highway 1, from the ferry across the Ohio River, head east past Cave-in-Rock State Park to intersection with next road and turn south toward river. Quarry is on right 0.25 miles from intersection.
Downey’s Bluff Ledge
Lafarge Holcim Attn: Jodie Shepperd 1-jodi.shepperdA@lafargeholcim.com 1-ernest.walder@lafargeholcim.com 830 Three Rivers Quarry Smithland, KY 42081
370 28' 47.72" N 880 7' 32.89" W
Updated (2021)
Cave-In-Rock Quarry is located approximately 5 miles east of Cave in Rock, IL. From the flashing light on Illinois Highway 1, from the ferry across the Ohio River, head east past Cave-in-Rock State Park to intersection with next road and turn south toward river. Quarry is on right 0.25 miles from intersection.
10 Dravo Drive Cave-in-Rock, Illinois, 62919
(618) 289-3404
Lafarge Holcim One Deerfield Center 13560 Morris Road, Suite 3350 Alpharetta, GA 30004
TEL: 678.867.1309
Ken Coats 205.492.7934
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
37° 19’ 07.42”N 89° 01’ 12.36”W
Updated (Sep 2019)
Shawnee Stone, LLC- Cypress Plant From Cairo IL, go to north on I- 57 to exit 18, Ullin and take ramp right. At the end of ramp turn right on Co. Rd. 7 (East), Ullin Rd. (Shawnee College Rd.), and proceed 7 mi. to St.
Rt. 37. Turn left on St. Rt. 37 (North) and proceed north for
3.2 mi. and the quarry is on the right hand side of the road.
Bottom Ledge Ledge 20 Ledge 70
NOTE: The Cypress plant quarry should provide rock from bottom of the Lower Ledge (Mammoth Cave Group. Ste.
Genevieve Formation) which should produce riprap and stone protection meeting the required requirements.
Shakespeare Aggregates, Inc.
202 West Main Street Salem, IL 62881 Tel. No. 618.548.1585 www.shakespeare-oil.com
Feb 2023 Fredonia Quarry Fredonia, KY
Lafarge Holcim Attn: Jodie Shepperd 1-jodi.shepperdA@lafargeholcim.com 1-ernest.walder@lafargeholcim.com
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
KENTUCKY
37° 11’ 30.62”N 88° 13' 32.64”W
37° 11’ 39.58”N 88° 13' 26.63”W
Updated June (2021)
Slats Lucas Quarry - is located in Livingston County, KY, From Paducah, KY take US Hwy 60N through Smithland, KY to Salem, KY. Turn South on KY Hwy 723 for 5.4 mi to Pinkneyville, KY and turn left onto Lee Rd Quarry.
Bench D, Ledge 10 Bench D, Ledge 7
712 Lee Road Pinkneyville, KY Mr. Daniel Adams Quarry Manager Mr. Colby Croft Assurance Technician (270)988.2647
Warren Paving Co.
562 Elks Lake Road P.O. Box 572 Hattiesburg, MS 39403 Chris Noble 601.544.7811
(228) 697-9005
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
N 37º11’36” / W 88º15’59”
(2005)
Updated 2021
Cumberland (Smith) Quarry is located approximately 6 miles south of Salem, KY, at Cumberland River Mile 14.5.
From the intersection of US Hwy 60 and KY Hwy 723 in Salem, KY go south approximately 3.5 miles and then turn right onto Maddox Road and go approximately 2.5 miles
Actively mining on 4 benches B/C bench N37 1.918’, W88 15.910’ D bench N37 11.889’m W88 15.827’ E bench N37 11.838’ W88 15.783’ F bench N37 11.688 W88 15.889;
Note: 11 Apr 12, Ledge 2 is gone, They are mining on Benches B C, D,E,and F.
Pine Bluff Sand and Gravel P.O. Box 7008 Pine Bluff, AR 71611-7008
(870) 534-7120
(800) 850-2300
POC:
Chris Abadie Technical Advisor 318.308.5670=cell 225.922.7864 Email: chris.abadie@pbsgc.com
MISSOURI
37°59'29.10"N 90° 2'39.15"W
Added Aug 2023
Tower Rock Stone Company Ledge 3T, 4, and 8
Tower Rock Stone Company 19829 Lower Frenchman Road Ste. Genevieve, Missouri 63670 (651)-659-9001
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
39° 04’ 06.15”N 90° 44’ 42.44”W
Updated (2020)
Foley Quarry is located approximately 1.4miles north of Foley, Missouri on the west side of Old State route 79 (presently known as Lincoln County Road 925).
POC: Jake Fortner 636.266.8714 jfortner@magrudercompanies.c om
Ledge 1 and Ledge 2
Magruder Limestone Co., Inc 255 Watson Rd.
Troy, MO 63379
POC: Harold Bono Harold_bono@magrudercompanies.co m
37°30.685' North, 89°30.578' West
Approved Feb.
Neely’s Landing Quarry is located in Cape Girardeau County, Missouri, eighteen miles north of Cape Girardeau, MO along the Mississippi River.
Take Highway 177 north (MO- 177 N) for 7.5 miles. Turn right to remain on MO-177 N. Stay straight onto State Highway J for 1.1 miles and continue onto County Road 525 for 1.5 miles.
Turn right onto Northeast Quarry Drive.
Ledge 10A, 11, and 12
The Southern Stone Company,LLC
Jim Provine 207-832-9628 jprovine@aggprollc.com 3861 Ambassador Caffery, Suite 175 Lafayette, LA 70503
Nick Horbenko 618-407-3753 Nick@southernstoneco.com
37º 26’ 04.17”N 89º 38’ 02.39”W
Updated Oct
Fruitland Quarry – Cape Girarddeau County, Missouri, On I-55 starting from Cape Girardeau go North to Mile Marker 105. Get off of I-55 at the 105/Furitland exit and trun right on Hwy 61. Go northeast on Hwy 61 towards Fruitland for ¼ mile. The quarry is on the right between Rhodes 101 Convenience Store and Purcell Tire.
POC: Kerry Bauman Quarry Manager Tel (cell): 573.880.0885 kerry@baserockminerals.com
Base Rock Minerals (New owner) 5154 US Highway 61 Jackson, MO 63755 POC: Dwayne Holst Aggregates Sales Tel (cell): 573.579.1074 dwayneh@baserockminerals.com
37º 54’ 05.76”N 90º 31’ 29.38”W
Updated Oct
Bonne Terre Quarry – St.
Francois Country, MO Starting in Farmington MO at the intersection of Hwy 67 and Hwy 32. Take Hwy 67 north about 8.0 miles to Desloge.
Take the Desloge exit onto Bus 67/North Desloge Rd. Go about ¼ mile to first stop light and turn north onto State Drive/Votech Rd. The quarry extrance is on the west side of Votech Rd. just past the cemetery.
Base Rock Minerals (New owner) 6801 Votech Road Bonne Terre, Mo 63628 POC: Dwayne Holst Aggregates Sales Tel (cell): 573.579.1074 dwayneh@baserockminerals.com
POC: Kerry Bauman Quarry Manager Tel (cell): 573.880.0885 kerry@baserockminerals.com
Lat/Long (Tested)
Quarry Location, Address and Telephone Number
Main Office Address and Telephone Number
37º 15’ 57.96”N 89º 33’ 24.00”W
Updated March 2019
Cape Girardeau Quarry – is located on the Northeast corner of MO-72 and South Sprigg St.
East of I-55, exit no. 93.
LEDGE 3-4 ONLY
Southeast Missouri Stone Co.
3155 Sprigg St.
Cape Girardeau, MO 63702
(573) 986-9516
Delta Companies, Inc. - Corporate Office 114 S Silver Springs Rd Cape Girardeau, MO 63701 Phone: 573-334-5261 Fax: 573-986-9511
37.853634o N
89.990964 o W
Added 2020
FISCHER QUARRY AND
HAULING
25501 STATE ROUTE Z
ST. MARY, MISSOURI
(573) 543-5366
38.333 -90.3778
Added Feb 2023
Simpson Barnhart Quarry 750 Sulphur Springs Road Barnhart, MO
J.C. Webb JCWebb@simpsonmaterials.com 314-565-3420
Added August
Brickeys Quarry Kimmswick, Plattin, and Burlington Bloomsdale, MO
Mike Pingel
OHIO
HONDURAS, CENTRAL AMERICA
MEXICO, STATE OF VERACRUZ
19.524296 N,
96.426432 W
Added September 2019
The quarry is located at 19.524296o N, 96.426432 o W, in the State of Veracruz, Mexico approximately 61 kilometers north and west of the Veracruz International Airport.
Wayne LeBaron, Alamo Construction 15088 Rufus White Road, Prairieville, LA 70769
Telephone 225.362.8997 wlebaron83@gmail.com
W912P822B0051
(End of Summary of Changes)
File details come from the government source that posted it. Updated .