W912P821R0042 Professional Dive Solicitation.pdf

PDF 14 MB Posted

Attached to
Professional Diving Services
Solicitation number
W912P8R0042
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912P821R0042 30-Jul-2021

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

10:00 AM 30 Aug 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912P89. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

BIANCA M GADDISON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIV- CHIEF

7400 LEAKE AVENUE, ROOM 172

NEW ORLEANS LA 70118-3651

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$12,000,000

NAICS:

561990

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF73

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

CLIN MINIMUM/MAXIMUM QUANTITY

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

MINIMUM MINIMUM MAXIMUM MAXIMUM

CLIN QUANTITY AMOUNT QUANTITY AMOUNT

0001 $10,000.00 $5,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM MINIMUM MAXIMUM MAXIMUM

CLIN QUANTITY AMOUNT QUANTITY AMOUNT

0001 $10,000.00 $5,000,000.00

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 UNDEFINED

Professional Diving Services

FFP

Provide Professional Diving Services in accordance with the attached Performance Work Statement and the terms and conditions of this contract.

Period of Performance - 20 SEP 2021 - 19 SEP 2026 (Base Period plus 4 Option Periods. May change depending on contract award date.)

Contract ceiling amount is $5,000,000.00 or five (5) years in duration, whichever is exhausted first.

Minimum Guarantee Amount: The minimum guaranteed amount is $10,000.00 which consists of a base period plus four option periods aand 6 months if exercised.

FOB: Destination

PSC CD: R499

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED

OPTION Option Year One

FFP

Indefinite Delivery / Indefinite Quantity. Contractor shall provide professional diving services in support of navigation, flood control, environmental projects, and other Corps of Engineers related missions, to include: diving services and equipment to investigate, survey and/or remove designated obstructions and sunken vessels. Contractor shall provide all labor, fuel, transportation, tools, equipment, insurance, and supplies (not identified elsewhere as government furnished) necessary for the performance of diving services, on a task order basis, in accordance with the attached performance work statement, the requirements of each individual task order, and the terms and conditions of this contract (including price schedule).

Period of Performance 19 Sep 2021 - 18 Sep 2026

FOB: Destination

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0003 UNDEFINED

OPTION Option Year Two

FFP

Indefinite Delivery / Indefinite Quantity. Contractor shall provide professional diving services in support of navigation, flood control, environmental projects, and other Corps of Engineers related missions, to include: diving services and equipment to investigate, survey and/or remove designated obstructions and sunken vessels. Contractor shall provide all labor, fuel, transportation, tools, equipment, insurance, and supplies (not identified elsewhere as government furnished) necessary for the performance of diving services, on a task order basis, in accordance with the attached performance work statement, the requirements of each individual task order, and the terms and conditions of this contract (including price schedule).

Period of Performance 19 Sep 2021 - 18 Sep 2026

FOB: Destination

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0004 UNDEFINED

OPTION Option Year Three

FFP

Indefinite Delivery / Indefinite Quantity. Contractor shall provide professional diving services in support of navigation, flood control, environmental projects, and other Corps of Engineers related missions, to include: diving services and equipment to investigate, survey and/or remove designated obstructions and sunken vessels. Contractor shall provide all labor, fuel, transportation, tools, equipment, insurance, and supplies (not identified elsewhere as government furnished) necessary for the performance of diving services, on a task order basis, in accordance with the attached performance work statement, the requirements of each individual task order, and the terms and conditions of this contract (including price schedule).

Period of Performance 19 Sep 2021 - 18 Sep 2026 FOB: Destination

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0005 UNDEFINED

OPTION Option Year Four

FFP

Indefinite Delivery / Indefinite Quantity. Contractor shall provide professional diving services in support of navigation, flood control, environmental projects, and other Corps of Engineers related missions, to include: diving services and equipment to investigate, survey and/or remove designated obstructions and sunken vessels. Contractor shall provide all labor, fuel, transportation, tools, equipment, insurance, and supplies (not identified elsewhere as government furnished) necessary for the performance of diving services, on a task order basis, in accordance with the attached performance work statement, the requirements of each individual task order, and the terms and conditions of this contract (including price schedule).

Period of Performance 19 Sep 2021 - 18 Sep 2026 FOB: Destination

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0006 UNDEFINED

OPTION Additional 6 Months Option

FFP

Indefinite Delivery / Indefinite Quantity. Contractor shall provide professional diving services in support of navigation, flood control, environmental projects, and other Corps of Engineers related missions, to include: diving services and equipment to investigate, survey and/or remove designated obstructions and sunken vessels. Contractor shall provide all labor, fuel, transportation, tools, equipment, insurance, and supplies (not identified elsewhere as government furnished) necessary for the performance of diving services, on a task order basis, in accordance with the attached performance work statement, the requirements of each individual task order, and the terms and conditions of this contract (including price schedule).

Period of Performance 19 Sep 2026 - 18 Mar 2027 FOB: Destination

BASE YEAR

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT

INCREMENT

UNIT

PRICE AMOUNT

0001AA

Mobilization and Demobilization

4 Man Dive Team 1,440 Miles

0001AB

Mobilization and Demobilization 5 Man Dive Team

2,420 Miles

0001AC

Mobilization and Demobilization

6 Man Dive Team 460 Miles

0001AD

4 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

96 Hours

0001AE

4 Man Dive Team Include Consu ma b les In Excess of 8 Hr/Day

40 Hours

0001AF

5 Man Dive Team

Include Consu mab les

First 8 Hr/Day

224 Hours

0001AG

5 Man Dive Team

Include Consumables

In Excess of 8 Hr/Day

160 Hours

0001AH

6 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

56 Hours

0001AI

6 Man Dive Team

Include Consumables

In Excess of 8 Hr/Day

35 Hours

0001AJ Per Diem 4 Man Dive Team 10 Days 0001AK Per Diem 5 Man Dive Team 35 Days

0001AL Per Diem 6 Man Dive Team 8 Days

0001AM Hot Water Unit 265 Hours

0001AN 3x2 Water Jet Pump and Associated Equipment 330 Hours

0001AP 4x3 Water Jet Pump and Associated Equipment

50 Hours

0001AQ Underw ater Cutting and Welding Equipment

75 Hours

0001AR

Dive Boat at a Minimum of 30' in Length 50 Hours

0001AS Underw ater Video and Still Came r a and Associated Equipment 45 Hours

0001AT

Mobilization and Demobilization Preliminary Inspection/Meeting 140 Miles

0001AU

Preliminary Inspection/Meeting

3 Hours

0001AV Other Equipment & Costs not otherwise identif ied in this Schedule N/A Job TO BE NEGO TIA TE D PER TASK

ORDER

Total

OPTION YEAR 1

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT

INCREMENT

UNIT

PRICE AMOUNT

0002AA

Mobilization and Demobilization

4 Man Dive Team 1,440 Miles

0002AB

Mobilization and Demobilization5 Man Dive Team

2,420 Miles

0002AC

Mobilization and Demobilization

6 Man Dive Team 460 Miles

0002AD

4 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

96 Hours

0002AE

4 Man Dive Team Include Consu ma b les In Excess of 8 Hr/Day

40 Hours

0002AF

5 Man Dive Team

Include Consu mab les

First 8 Hr/Day

224 Hours

0002AG

5 Man Dive Team

Include Consu ma ble s In Excess of 8 Hr/Day

160 Hours

0002AH

6 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

56 Hours

0002AI

6 Man Dive Team

Include Consu ma ble s In

Excess of 8 Hr/Day

35 Hours

0002AJ Per Diem 4 Man Dive Team 10 Days

0002AK Per Diem 5 Man Dive Team 35 Days

0002AL Per Diem 6 Man Dive Team 8 Days

0002AM Hot Water Unit 265 Hours

0002AN 3x2 Water Jet Pump and Associated Equipment 330 Hours

0002AP 4x3 Water Jet Pump and Associated Equipment

50 Hours

0002AQ Underw ater Cutting and Welding Equipment

75 Hours

0002AR

Dive Boat at a Minimum of 30' in Length 50 Hours

0002AS Underw ater Video and Still Came ra and Associated Equipment

45 Hours

0002AT

Mobilization and Demobilization Preliminary Inspection/Meeting 140 Miles

0002AU Preliminary Inspection/Meeting 3 Hours

0002AV

Other Equipment & Costs not otherwise identif ied in this Schedule N/A Job

TO BE NEGO TIA TE D PER TASK

OPTION YEAR 2

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT

INCREMENT

UNIT

PRICE AMOUNT

0003AA

Mobilization and Demobilization

4 Man Dive Team 1,440 Miles

0003AB

Mobilization and Demobilization 5 Man Dive Team

2,420 Miles

0003AC

Mobilization and Demobilization

6 Man Dive Team 460 Miles

0003AD

4 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

96 Hours

0003AE

4 Man Dive Team Include Consu ma bles In Excess of 8 Hr/Day

40 Hours

0003AF

5 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

224 Hours

0003AG

5 Man Dive Team

Include Consu ma ble s In Excess of 8 Hr/Day

160 Hours

0003AH

6 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

56 Hours

0003AI

6 Man Dive Team

Include Consu ma ble s In

Excess of 8 Hr/Day

35 Hours

0003AJ Per Diem 4 Man Dive Team 10 Days

0003AK Per Diem 5 Man Dive Team 35 Days

0003AL Per Diem 6 Man Dive Team 8 Days

0003AM Hot Water Unit 265 Hours

0003AN 3x2 Water Jet Pump and Associated Equipment 330 Hours

0003AP 4x3 Water Jet Pump and Associated Equipment

50 Hours

0003AQ Underw ater Cutting and Welding Equipment

75 Hours

0003AR

Dive Boat at a Minimum of 30' in Length 50 Hours

0003AS Underw ater Video and Still Came ra and Associated Equipment

45 Hours

0003AT

Mobilization and Demobilization Preliminary Inspection/Meeting 140 Miles

0003AU Preliminary Inspection/Meeting 3 Hours

0003AV

Other Equipment & Costs not otherwise identif ied in this Schedule N/A Job

TO BE NEGO TIA TE D PER TASK

OPTION YEAR 3

ITEM

NO. DESCRIPTION

ESTIMATED

QUANTITY

UNIT

INCREMENT

UNIT

PRICE AMOUNT

0004AA

Mobilization and Demobilization

4 Man Dive Team 1,440 Miles

0004AB

Mobilization and Demobilization 5 Man Dive Team

2,420 Miles

0004AC

Mobilization and Demobilization

6 Man Dive Team 460 Miles

0004AD

4 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

96 Hours

0004AE

4 Man Dive Team Include Consu ma b les In Excess of 8 Hr/Day

40 Hours

0004AF

5 Man Dive Team

Include Consu mab les

First 8 Hr/Day

224 Hours

0004AG

5 Man Dive Team

Include Consu ma ble s In Excess of 8 Hr/Day

160 Hours

0004AH

6 Man Dive Team

Include Consu ma bles First 8 Hr/Day

56 Hours

0004AI

6 Man Dive Team

Include Consu ma ble s In

Excess of 8 Hr/Day

35 Hours

0004AJ Per Diem 4 Man Dive Team 10 Days 0004AK Per Diem 5 Man Dive Team 35 Days

0004AL Per Diem 6 Man Dive Team 8 Days

0004AM Hot Water Unit 265 Hours

0004AN 3x2 Water Jet Pump and Associated Equipment 330 Hours

0004AP 4x3 Water Jet Pump and Associated Equipment

50 Hours

0004AQ Underw ater Cutting and Welding Equipment

75 Hours

0004AR

Dive Boat at a Minimum of 30' in Length 50 Hours

0004AS Underw ater Video and Still Camer a a n d Associated Equipment 45 Hours

0004AT

Mobilization and Demobilization Preliminary Inspection/Meeting 140 Miles

0004AU Preliminary Inspection/Meeting 3 Hours

0004AV

Other Equipment & Costs not otherwise identif ied in this Schedule N/A Job

TO BE NEGO TIA TE D PER TASK

OPTION YEAR 4

ITEM

NO.

DESCRIPTION ESTIMATED

QUANTITY

UNIT

INCREMENT

UNIT

PRICE

AMOUNT

0005AA

Mobilization and Demobilization

4 Man Dive Team 1,440 Miles

0005AB

Mobilization and Demobilization 5 Man Dive Team

2,420 Miles

0005AC

Mobilization and Demobilization

6 Man Dive Team 460 Miles

0005AD

4 Man Dive Team

Include Consu ma bles First 8 Hr/Day

96 Hours

0005AE

4 Man Dive Team Include Consu ma b les In Excess of 8 Hr/Day

40 Hours

0005AF

5 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

224 Hours

0005AG

5 Man Dive Team Include Consu mab les

In Excess of 8 Hr/Day

160 Hours

0005AH

6 Man Dive Team

Include Consu ma bles

First 8 Hr/Day

56 Hours

0005AI

6 Man Dive Team

Include Consu ma b les In Excess of 8 Hr/Day

35 Hours

0005AJ Per Diem 4 Man Dive Team 10 Days

0005AK Per Diem 5 Man Dive Team 35 Days

0005AL Per Diem 6 Man Dive Team 8 Days

0005AM Hot Water Unit 265 Hours

0005AN 3x2 Water Jet Pump and Associated Equipment 330 Hours

0005AP 4x3 Water Jet Pump and Associated Equipment

50 Hours

0005AQ Underw ater Cutting and Welding Equipment

75 Hours

0005AR

Dive Boat at a Minimum of 30' in Length

50 Hours

0005AS Underw ater Video and Still Camer a and Associated Equipment 45 Hours

0005AT

Mobilization and Demobilization Preliminary Inspection/Meeting

140 Miles

0005AU Preliminary Inspection/Meeting 3 Hours

0005AV

Other Equipment & Costs not otherwise identif ied in this Schedule N/A Job

TO BE NEGO TIA TE D PER TASK

ORDER

Total

OPTION - 6 MONTHS

ITEM

NO.

DESCRIPTION

ESTIMATED

QUANTITY

UNIT

INCREMENT

UNIT

PRICE

AMOUNT

0006AA

Mobilization and Demobilization

4 Man Dive Team 1,440 Miles

0006AB

Mobilization and Demobilization 5 Man Dive Team

2,420 Miles

0006AC

Mobilization and Demobilization

6 Man Dive Team 460 Miles

0006AD

4 Man Dive Team

Include Consumables

First 8 Hr/Day

96 Hours

0006AE

4 Man Dive Team

Include Consumables

In Excess of 8 Hr/Day

40 Hours

0006AF

5 Man Dive Team

Include Consumables

First 8 Hr/Day

224 Hours

0006AG

5 Man Dive Team Include Consumables In Excess of 8 Hr/Day

160 Hours

0006AH

6 Man Dive Team

Include Consumables

First 8 Hr/Day

56 Hours

0006AI

6 Man Dive Team

Include Consumables In Excess of 8 Hr/Day

35 Hours

0006AJ Per Diem 4 Man Dive Team 10 Days

0006AK Per Diem 5 Man Dive Team 35 Days

0006AL Per Diem 6 Man Dive Team 8 Days

0006AM Hot Water Unit 265 Hours

0006AN

3x2 Water Jet Pump and Associated Equipment 330 Hours

0006AP 4x3 Water Jet Pump and 50 Hours

Associated Equipment

0006AQ Underwater Cutting and Welding Equipment

75 Hours

0006AR

Dive Boat at a Minimum of 30' in Length 50 Hours

0006AS Underwater Video and Still Camera and Associated Equipment

45 Hours

0006AT Mobilization and Demobilization Preliminary Inspection/Meeting

140 Miles

0006AU Preliminary Inspection/Meeting 3 Hours

0006AV Other Equipment & Costs not otherwise identified in this Schedule

N/A Job TO BE NEGOTIATED PER TASK

SECTION C - PERFORMANCE WORK STATEMENT

FOR PROFESSIONAL DIVING SERVICES

1. Scope of Work / Description of Services

The work to be performed under this contract consists of furnishing all labor, fuel, transportation, equipment, and supplies (not identified elsewhere as government furnished) necessary for the performance of the services in accordance with this performance work statement (PWS). The work to be performed under this contract shall be in support of navigation, flood control, environmental projects, and other Corps of Engineers related missions, to include: diving services and equipment to investigate, assist in the repair of Corps structures, and/or remove designated obstructions and sunken vessels from navigable waterways.

2. Area of Coverage

a. This contract covers diving services in all navigable waterways of the New

Orleans District, including the offshore bar channels that extend into the Gulf of

Mexico, and including but not limited to, the navigation locks/structures listed below:

Algiers Lock Ellerslie Pumping Station

Bayou Darbonne Drainage Structure Freshwater Bayou Lock

Bayou Boeuf Lock Harvey Lock

Bayou Sorrel Lock Harvey Sector Gate

Berwick Lock Industrial Lock (IHNC)

Caernarvon Sector Gate Keystone Lock

Calcasieu Lock Leland Bowman Lock

Calcasieu Saltwater Barrier Old River Lock & Control Structure

Catfish Point Control Structure* Pointe Coupee Pumping Station

Charenton Floodgate Port Allen Lock

East & West Calumet Floodgate Schooner Bayou Control Structure*

* These structures are accessible by boat only.

b. At the sole option of the Government, same or similar diving services at other locations or other locks/structures serviced by the New Orleans District may utilize this contract on a non-competitive basis. The place of performance will be specified under each task order. Location maps for the locks and control structures are attached at the end of this solicitation.

c. This contract also covers diving services to inspect the New Orleans

District’s hopper dredge Wheeler in the event a problem should occur with the dredge. On rare occasions, the dredge may be located at a site that is further than 5 hours from the approved mobilization location (see paragraph d below concerning the 5-hour requirement). For payment guidelines concerning this occurrence, see paragraph 16 “Payments”, sub-paragraph n.

d. The Contractor’s mobilization location must be in a location that will allow any of the sites listed in paragraph a above to be reached within 5 hours, as required in paragraph 4-c “Emergency Verbal Task Orders”. This location will remain constant throughout the contract unless otherwise approved by the

Contracting Officer to change. This location will be used to calculate the mobilization/demobilization mileage for the dive team under contract line item numbers (CLINs) 0001AA “Mobilization and Demobilization 4 Man

Dive Team”, 0001AB “Mobilization and Demobilization 5 Man Dive Team”, 0001AC “Mobilization and Demobilization 6 Man Dive Team”, 0001AT

“Mobilization and Demobilization Preliminary Inspection/Meeting”, and to determine if per diem will be allowed.

3. Description of Diving Services

All dives will be initiated by individual task orders with specific work to be accomplished set forth therein. The Contractor shall determine the methods with full regard for safety and efficiency.

The diving services to be performed at the navigation locks include, but are not limited to, the following:

• Inspecting and/or assisting in the repair of cracks in the concrete walls or floor of the lock structures.

• Inspecting gates or components of gates for wear or damages caused by marine accidents.

• Inspecting and/or assisting in the repair of rubber seals on the sides or bottom of lock gates.

• Removing silt deposits by means of water-jetting.

• Removing debris such as rocks, scrap iron, rubber tires, ropes, cables, wood, etc. from around and/or under gates.

• Assisting in the removal, replacement, and/or adjustment of lock gates or valves.

• Placement of packing material in valves or around steel cofferdams, emergency stop-log bulkheads, or concrete dewatering needles.

• Preparing reports describing the f indings and condition of structures, including measurements and sketches.

The diving services to be performed at the site of wrecks and obstructions include, but are not limited to, the following:

a. Locating and identifying wrecks and obstructions.

b. Determining the cause of sinking and the amount and type of work necessary to remove wrecks and obstructions.

c. Preparing reports outlining the condition and placement of wrecks and obstructions, including measurements, sketches, and Global Positioning System

(GPS) coordinates with recommendations for removal.

d. Assisting in the removal operation.

4. Task Orders

Once the New Orleans District has determined that a dive is required, the

Contracting Officer’s Representative (COR) will notify the Contractor of the impending dive. The COR will provide the Contractor with a technical POC who the Contractor is required to contact in order to receive the required scope of work and specific details of the dive. The Contractor must not commence and perform work until a task order has been issued by the Contracting Officer. The

Contractor is to arrive at the scheduled time and place stated in the written task order or given verbally under an emergency task order. The task order issued by the Contracting Officer can be written or verbal as described below.

a. Written Task Orders

Written task orders are required prior to all jobs when time is not a determining factor. The task order will specify the scope of work and contain other particulars of the job such as location, reporting time, special equipment requirements, etc. The reporting time shall be the time at which the Contractor is directed to report to the specified location with all dive team members and all required equipment. It is the Contractor’s responsibility to review the scope of work prior to the dive team mobilizing to the dive site. The Contractor must notify the Corps of Engineers if the required equipment is inadequate, the scope is unclear, suggests unsafe practices or impractical requirements, etc.

b. Verbal Task Orders

Verbal task orders may be issued by the Contracting Officer when time is a determining factor or when determined to be in the best interest of the

Government.

c. Emergency Verbal Task Orders

Authority to issue an emergency task order is limited to the Contracting

Officer or an Authorized Government Representative Emergency task orders are verbal task orders issued during or after MVN business hours for dives deemed an emergency by the Government. In such cases, the

Contractor must mobilize and be at the specified location within 5 hours of notification by an Authorized Government Representative. The emergency callout limitation is $40,000. A numbered task order will be issued by the

Contracting Officer on the first business day after appropriate funds are made available, and the emergency callout will be converted to the appropriate project for contractual, invoicing, and payment purposes.

5. Diving Conditions

Divers may be expected to encounter conditions that affect the ease or safety of operations. Some conditions that may be encountered are reduced or zero visibility, cold water, night dives, dangerous animals (such as poisonous snakes), unpredictable currents, and confined spaces which are considered penetration dives (such as diving in valve tunnels or the girder systems of gates). Generally, water depths for dives vary from 6 feet to 60 feet. Occasionally, dives may be to depths in excess of 60 feet, and any special requirements for these dives will be addressed in the task order. See paragraph 16 “Payments”, sub-paragraph i, for payment guidelines.

6. Diving Equipment

All diving equipment shall be provided and used by the Contractor, including any special equipment, which may be required for a given dive. All maintenance to be performed on diving equipment must be performed during non-duty hours. All diving equipment must be delivered to the job site in a ready-to-operate condition, with the exception of loading fuel in the compressors. Any loss of time on a job due to the Contractor’s equipment failure shall be omitted from the invoice. See paragraph 16 “Payments”, sub-paragraph d, for payment guidelines.

a. Normal Equipment

Consumables and normal equipment, which are usually required for each dive, shall be provided at no additional cost to the Government and shall be in the Contractor’s own inventory, or belong to the individual diver, as appropriate. Examples include, but are not limited to, acetylene, oxygen, two-way communications between supervisor and divers, GPS, air compressors and ancillary equipment providing 4.5 cubic feet per minute at all depths, bailout bottles or other secondary air supplies, diving harnesses, helmets, wet or dry suits, hoses, fuel, knives, hand and/or power tools, tool boxes, boarding ladders, duct tape, rope, etc. Despite the provision of bailout bottles as normal equipment, the use of SCUBA for normal operations or emergencies shall not be allowed without the prior approval of the New Orleans District Diving Coordinator. Divers using direct source surface-supplied air (SSA) shall be provided with a primary air supply of at least 4.5 cubic feet per minute to each diver at the maximum depths and a backup air supply in compliance with Section 30.D.05 of EM

385-1-1.

Direct source air compressors shall be used and equipped specifically for their intended use. They shall have a suitable approved means to regulate the pressure and a low air pressure alarm in the system. In addition, they shall have a Carbon Monoxide (CO) monitor with alarm in the following situations:

(1) The compressor is powered by an internal combustion engine.

(2) Compressors used in close proximity to internal combustion engines that may/will be running during dive operations (boat motors, generators, cranes, etc.). Air intake pipes shall be placed away from/upwind of the exhaust source.

(3) Fueling a compressor during operation shall not be allowed.

b. Special Equipment

Special pieces of diving equipment may be required on individual task orders as specified by the Contracting Officer. Special equipment is that equipment which is identified separately in the Bidding Schedule under

CLINs 0001AN “3x2 Water Jet Pump and Associated Equipment”, 0001AP “4x3 Water Jet Pump and Associated Equipment”, 0001AQ

“Underwater Cutting and Welding Equipment”, 0001AR “Dive Boat at a

Minimum of 30’ in Length”, and 0001AS “Underwater Video and Still

Camera and Associated Equipment”, which shall be provided by the

Contractor as indicated in the task order, at the cost set forth in the Bidding

Schedule. The Contractor will get paid for this equipment at the rates set forth in the Bidding Schedule whether the equipment is in the Contractor’s own inventory or is being rented. This equipment includes a 3x2 water jet pump and all associated equipment (hoses, connectors, nozzles, etc.), 4x3 water jet pump and all associated equipment (hoses, connectors, nozzles, etc.), underwater cutting and welding equipment, a dive boat measuring a minimum of 30 feet in length including fuel, and underwater video and still camera and associated equipment. Underwater welding and burning must be limited to SSA mode only, and equipment configuration and procedures must be in accordance with Section 30.B.08 of EM 385-1-1 and the US

Navy Underwater Cutting & Welding Manual, S0300-BB-MAN-010. The dive boat must meet U.S. Coast Guard regulations for passenger and equipment load and must have enough space to accommodate a

Government Dive Inspector. The boat operator must be a member of the dive team and must have a boat operator license. Special equipment does not have to be in the Contractor’s own inventory, but it must be able to be at the dive location in good operating condition within 5 hours of notification. If the Contractor purchases any equipment for use in which the Contractor seeks full reimbursement, the Contractor must receive approval by the Contracting Officer in writing prior to the purchase. Upon completion of the task order, the purchased equipment will be transferred to the Government.

c. Other Equipment and Costs

Other equipment may be required to accomplish the work and not otherwise be identified in the Bidding Schedule. This equipment would be paid for under CLIN 0001AV “Other Equipment & Costs not otherwise identified in this Schedule”. This equipment includes, but is not limited to, an underwater thickness gauge, air wrench, air lift, diving barge, tug/tender boat, support vessel, crane, and a decompression chamber. The

Contractor must provide the equipment’s brand/model # and a cost estimate for the equipment within 2 hours of notification for an emergency dive and within 48 hours of notification for a non-emergency dive.

Equipment and costs under this line item require the Contracting Officer’s approval in writing prior to the dive team mobilizing to the dive site. If the equipment is being rented, the Contractor must provide a receipt from the rental company.

7. Government Inspection

a. Pre-Dive Inspection

An equipment inspection will be held jointly by the dive supervisor and the Government Dive Inspector at the beginning of the dive. The form entitled “Contract Surface-Supplied Air (SSA) Diving Operation Quality

Assurance Checklist” shall be used for this inspection (see Enclosure 1).

Inspection reports shall include, as a minimum, the following:

1. The phase of work underway during the inspection. If others are performing other work in conjunction with the diving services, the phase work for these other activities shall be included.

2. The locations or areas where the safety inspections were performed.

3. The results of the safety inspections, including the nature of deficiencies observed and corrective actions taken.

4. The date and time of the inspection.

5. The signatures of the personnel responsible for the contents of the inspection report.

b. Pre and Post Dive Safety Meetings

The dive supervisor is responsible for holding a daily pre and post dive safety meeting (see Sections 30.A.19 through 30.A.21 of EM 385-1-1).

The meetings must be documented on the daily time log as being completed. As stated in paragraph 14 “Record Keeping”, the Contractor must submit pre and post dive safety meeting forms within 24 hours after the completion of each day’s dive, and each member of the dive team, the

MVN dive inspector, and the USACE representative on site (if present) must sign attendance for both meetings.

c. Post Dive Survey

Following each dive, the District Dive Coordinator (DDC) or the

Government Dive Inspector will independently complete a post dive survey which rates the Contractor’s job performance. The form entitled

“Post Dive Survey” will be used for this evaluation (see Enclosure 2).

8. Safety

a. Safety Indoctrination

The Contractor shall be responsible for initiating and maintaining a safety and health program that complies with the safety and health references described below. The program shall include initial indoctrination and continuing training for all employees who shall work under this contract.

b. Safety and Health References

Equipment and procedures shall comply with:

1. US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, latest edition.

2. OSHA Regulations, 29 CFR Part 1910, Subpart T.

3. Current US Navy Diving Tables in U.S. Navy Diving Manual Volume

I, NAVSEA 0994-LP-001-9010.

4. Safety resources of the Association of Diving Contractors International

(ADCI).

5. These specifications, whichever is the most stringent for the particular application.

c. Required Safety Equipment for Non-Divers

Except for the diver in the water and the stand-by diver, all personnel on the dive team must wear safety equipment (flotation aids, hard hats, hearing/eye protection, etc.) as required by EM 385-1-1. The stand-by diver is exempt from the requirements but is required to wear a hard hat.

When no divers are in the water, all dive team personnel must wear the required safety equipment without exception.

9. Diver Qualifications

a. Medical Fitness to Dive

The Contractor must ensure that all divers are medically fit to dive (see

Section 30.A.09 of EM 385-1-1). Divers must receive an annual diving physical according to ADCI or similar standards preferably by a hyperbaric physician (MD or DO) or other licensed physician knowledgeable in the physiology of diving. A “Fit to Dive” statement that each diver has been medically examined within the previous 12 months and has been determined fit and approved to dive must be signed and signature stamped by the examining physician. After any serious diving-related injury or illness, such as an over-pressurization injury and/or decompression illness, divers must be re-examined by a hyperbaric physician and be re-certified as “Fit to Dive”. In addition, the dive supervisor must verify the divers’ health and well-being at the dive site before allowing the diver to enter the water.

b. First Aid, CPR, and Emergency Oxygen Systems Certification

Each dive team member must have current certification in first aid and cardiopulmonary resuscitation (CPR) from the American Red Cross

(ARC), the American Heart Association (AHA), or from an organization whose training adheres to the standards of the International Liaison

Committee on Resuscitation, or from a Licensed Physician (LP).

Additionally, each dive team member must have current certification in the use of emergency oxygen systems, and, if provided on the dive site, the use of Automated External Defibrillators (AEDs). All classes must contain a hands-on component and cannot be taken online. Evidence of this will be a photocopy of the certificates. The certificates must state the date of issue and length of validity. Training in the use of emergency oxygen systems shall be specific to underwater diving and shall meet the requirements of a nationally recognized training organization such as

Divers Alert Network (DAN), Professional Association of Diving

Instructors (PADI), National Association of Underwater Instructors

(NAUI), the YMCA, or other recognized sources (see Section 30.A.08 of

EM 385-1-1).

c. Experience and Qualifications

The Contractor must provide evidence that each dive team member has training and experience consistent with the performance requirements of the scope of work (see Sections 30.A.05 through 30.A.07 of EM 385-1-1).

Training documentation must be in compliance with the OSHA Diving

Standards 29 CFR 1910.410 and must show that the dive team members have successfully completed training to the appropriate level. A copy of all dive-related training certificates shall be required. Proof of certification (a diploma and/or official transcript) as a commercial working diver from an accredited commercial dive school and other dive-related training certificates (e.g. chamber operator, saturation diver, etc.)

must be required as proof of a dive team member’s certification and/or experience. An ADCI card may be substituted as proof of training for divers demonstrating more than five (5) years of diving experience within the six (6) years preceding commencement of dive operations. As a minimum, each diver, stand-by diver, and dive team supervisor must have at least one (1) year of commercial experience in the applicable position.

Divers must have completed at least four (4) working dives using the particular diving techniques and equipment to be used under the contract.

Divers must demonstrate that at least one out of the four dives was performed in the last nine months. Dive tenders must have previous experience and training as a dive tender. If divers are required to perform rigging duties, they must be a qualified rigger and meet the personnel qualifications listed in Section 15.B of EM 385-1-1.

10. Dive Teams

See Appendix G of EM 385-1-1 for manning levels of dive teams.

a. Four-Man Dive Team

A four-man dive team may be used whenever a penetration dive is not anticipated. The Contractor may provide additional personnel for his own convenience, at no additional cost to the Government. A four-man dive team consists of one dive supervisor, one diver, one stand-by diver, and one tender. Assignments may be rotated among the certified divers, if desired, in order to limit bottom time for any given diver for safety reasons. If such rotation is to occur, this fact must be stated in the diving operations plan.

b. Five-Man Dive Team

A five-man dive team consists of one dive supervisor, one diver, one stand-by diver, and two tenders and may be used whenever a penetration dive is not anticipated. A five-man dive team may also be used whenever diver bottom time is limited by water depth. The Contractor may provide additional personnel for his own convenience, at no additional cost to the

Government.

c. Six-Man Dive Team

A six-man dive team consists of one dive supervisor, two divers, one stand-by diver, and two tenders and is required whenever a penetration dive is anticipated.

A six-man dive team may also be used whenever diver bottom time is limited by water depth. The Contractor may provide additional personnel for his own convenience, at no additional cost to the Government. However, if the

Government agrees additional personnel are required but not to where two four-man dive teams are required, then the rate for additional individuals will be as stated in paragraph 16 “Payments”, sub-paragraph f.

d. Stand-By Diver

The designated stand-by diver must wear his normal equipment (except helmet) and be prepared to enter the water whenever the primary diver is in the water. Due to the heat conduction properties of a wetsuit and considering south Louisiana’s extreme heat indexes, the Contractor must provide a shade producing apparatus to shield the dressed-out diver from direct sunlight but still allow him to be in an emergency response mode.

The stand-by diver is not allowed to work as a tender or have any other duties while the primary diver is in the water. If the stand-by diver is required to enter the water, the dive supervisor may act as a tender.

11. Required Availability of Dive Teams

The Contractor must be capable of providing up to two full dive teams on the same day, in the event one of the below scenarios occur. Therefore, the

Contractor must always have two six-man dive teams available for use under this contract.

a. There may be instances where two dives are required on the same day, each at a different location.

b. The nature of diving operations under certain task orders may be such that

24-hour operations are required to where shift diving becomes necessary.

The Contractor must provide two dive teams for such operations, each to work a 12-hour shift. No dive team personnel may work two or more consecutive shifts, including the dive supervisor. The second shift may use the same equipment used by the first shift. If separate equipment is used for the second shift, then an additional equipment inspection must be performed.

12. Hurricane Season

The Government will issue task order(s) as necessary for dive teams to conduct emergency preparations prior to a major storm threatening a New Orleans District navigable waterway. Diving operations may be required one to two days prior to a storm event reaching the area. Diving services to be performed for storm preparedness include, but are not limited to, clearing debris from around and/or under gates and ensuring proper closure of gates at navigation locks and hurricane structures.

13. Documentation Required for Work

a. First Aid, CPR, and Emergency Oxygen Systems Certification

All members of the dive team must be certified to administer first aid and

CPR. Dive team members must also have current certification in the use of emergency oxygen systems.

b. Safe Practices Manual

The Contractor must submit one copy of the Contractor's Safe Practices

Manual to the New Orleans District Diving Coordinator for review and acceptance. The manual must include the requirements stated in Section

30.A.15, items a-k, of EM 385-1-1. This manual will be retained by the

District Diving Coordinator and will not be returned.

c. Dive Operations Plan, Activity Hazard Analysis, and Emergency

Management Plan

Following the issuance of the task order, the Contractor must submit a

Dive Operations Plan, Activity Hazard Analysis (AHA), and Emergency

Management Plan to the District Dive Coordinator for review and acceptance (see Sections 30.A.16 through 30.A.18 of EM 385-1-1). These documents must be submitted within two hours of notification for an emergency dive and at least two business days prior to the start of a non-emergency dive. The Dive Operations Plan must include detailed information about the specifics of the dive and at a minimum must include the requirements stated in Section 30.A.16 of EM 385-1-1. The AHA must be detailed to address all of the activities that the Contractor is being requested to perform (see Section 30.A.17 of EM 385-1-1), and the

Emergency Management Plan must include the requirements stated in

Section 30.A.18 of EM 385-1-1. The Contractor must not begin a dive until approval of these documents from the District Dive Coordinator is received in writing. In addition, these documents must be at the dive site while diving operations are being performed. If for any reason the dive mission is altered after approval, the Contractor must revise and resubmit these documents to the District Dive Coordinator for review and acceptance prior to continuing the operation. The revisions may include differences in time, date, dive team members, work methods/tools used, and other changes that do not affect overall risk. This review may be conducted electronically or verbally and confirmed in writing after completion of the dive operation (see Section 30.A.22 of EM 385-1-1).

14. Record Keeping

A record of all dives must be kept. An electronic copy of all dive logs, time logs, Job Hazard Analyses (JHA) or Job Safety Analyses (JSA) forms, a pre-dive safety meeting form, and a post-dive safety meeting form must be submitted to the COR and the District Dive Coordinator within 24 hours after the completion of each day’s dive. The dive logs must be in accordance with Section 30.A.24 of EM-

385-1-1. The daily time logs must include the arrival time at the dive site, the completion time of the dive, the time at which the dive team is leaving the dive site, the time that the pre and post dive safety meetings occurred, and on the bottom of each time log it shall be noted as dive complete and no incidents to record. In addition, a completion report shall be prepared following all inspection dives, which includes a description of the condition of all items surveyed or inspected. Clear, readable sketches shall be prepared to supplement the text descriptions. The reports and sketches must be submitted electronically to the

COR and District Dive Coordinator within 48 hours after the completion of the dive. All documents, reports, and sketches must be submitted electronically and be clearly legible.

15. Per Diem

Per diem is the allowance for lodging and meals. Per diem will only be paid if the

Contractor incurs lodging costs (stays overnight in hotel) and meets one of the triggers listed below. In addition, the Contractor must submit a hotel receipt showing all nights that lodging costs were incurred. Per diem will be paid for under

CLIN 0001AJ “Per Diem 4 Man Dive Team”, CLIN 0001AK “Per Diem 5 Man

Dive Team” or CLIN 0001AL “Per Diem 6 Man Dive Team”, whichever is applicable, and will include costs for lodging and meals in accordance with the Joint

Travel Regulations.

The Contractor must meet one of the triggers listed below and must provide a hotel receipt in order to receive payment for per diem. The days of per diem paid to the

Contractor will match the amount of nights that lodging costs were incurred. The mileage stated in the below triggers is the mileage travelled by vehicle and is the shortest route from the approved mobilization location to the dive location.

a) If the required dive location is greater than 75 miles from the approved mobilization location and the dive team must report to the location at

7:00 a.m. or earlier, then per diem will be allowed for the day prior to the dive.

b) If the dive location is greater than 75 miles from the approved mobilization location and the dive team work time plus commute time is greater than 12 hours, then per diem will be allowed for that day.

c) If the dive location is greater than 50 miles from the approved mobilization location and the dive team is required to perform consecutive day dives at the same location, then per diem will be allowed with the exception of the demobilization day (unless the case in paragraph b above applies).

d) If the Contracting Officer deems it necessary in order to accomplish a particular mission not covered in the above cases, per diem may be paid.

This must be approved by the Contracting Officer in writing prior to the

Contractor incurring lodging costs.

16. Payments

a. Payment will be made at the applicable contract unit price(s) for the services described in each task order.

b. The hours stated on the bid schedule reflect the hours that the entire dive team will work. For example, under CLIN 0001AD “4 Man Dive

Team”, each of the 96 hours is how much the four-man dive team will get paid per hour as a whole team (not per person).

c. Payment for mobilization and demobilization will be made based on the number of round-trip miles between the approved mobilization location and the task order dive site. For a job that takes more than one day, mobilization will only be paid for the first day and demobilization the last day. For jobs requiring a second-shift dive crew, mobilization and demobilization will be paid for each crew. Payments for mobilization and demobilization shall include all work necessary to transport the crew and equipment. Demobilization will begin upon the dive team(s) release by the Government's representative.

d. Payment to the Contractor for hours worked each day will begin when the dive team arrives at the dive location, provided that all dive team members and all required equipment are at the site. Payment will not begin earlier than 15 minutes prior to the reporting time. If any required equipment is brought to the site late, payment will not begin until the equipment arrives at the dive site. If any equipment is determined to not be in good working order, such as bailout bottles not being properly filled, payment will not begin until all equipment is in compliance.

Payment to the Contractor will stop when the dive team departs the dive location. The arrival and departure times will be determined as shown on the Contractor-submitted time logs and through confirmation by a

Government representative. The dive team will be paid a minimum of 8 hours except in the case where the dive team or equipment arrives late to the site or when the Contractor’s equipment failure causes the job to be delayed resulting in idle/lost time on the job site. In such cases, the amount of time lost will be deducted from the invoice. If the lost time occurs during the first 8 hours, that amount of time will be deducted from the first 8 hours line item. If the lost time occurs during overtime, that time shall be omitted from the Contractor’s invoice. If it is determined that the Contractor is negligent during diving operations which causes the dive to last longer than reasonable or causes the divers to come out an additional day to complete the task, the extra time that wouldn’t have been needed if the Contractor was performing at an acceptable level will be at no additional cost to the Government.

e. If the Contractor works more than 8 hours in one day, the Contractor will be paid at the applicable overtime cost set forth in the Bidding

Schedule under CLINs 0001AE, 0001AG, and 0001AI. Payment submitted to the Contractor for overtime will be to the nearest half hour in excess of the…