W912P820R0045 Solicitation.pdf
PDF 1 MB Posted
- Solicitation number
- W912P820R0045
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 3 RESUME REVISED.pdf | ||
| Attachment 3 RESUME.pdf | ||
| Attachment 4 ELIN Schedule.xlsx | XLSX spreadsheet | |
| Attachment 1 PM Support Sample ProjectsProjects.pdf | ||
| Attachment 5 Sample Task Order PWS.docx | DOCX document | |
| Attachment 2 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 6 Sample Task Order Price Proposal.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 01 Feb 2021
A X B X C
D
EX
X G F 61 - 68
69 - 76 X H 77 - 86
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 86
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912P8 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 5
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
6 - 31 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
32 - 33
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 35 - 47 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
48 - 59
PART II - CONTRACT CLAUSES
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
23 Dec 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912P820R0045
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 3,000,000 Job PM Professional Support Services Base YR
FFP
The Contractor shall perform PM Professional Support Services for USACE New Orleans District in accordance with the PWS and using Exhibit A pricing. Job Task orders will be issued on an as-needed basis with a more detailed PWS defining the tasks to be accomplished.
FOB: Destination
PSC CD: R408
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
1001 3,000,000 Job OPTION PM Professional Support Srvc Option YR 1
FFP
The Contractor shall perform PM Professional Support Services for USACE New Orleans District in accordance with the PWS and using Exhibit B pricing. Job Task orders will be issued on an as-needed basis with a more detailed PWS defining the tasks to be accomplished.
UNIT UNIT PRICE MAX AMOUNT
2001 3,000,000 Job OPTION PM Professional Support Srvc Option YR 2
FFP
The Contractor shall perform PM Professional Support Services for USACE New Orleans District in accordance with the PWS and using Exhibit C pricing. Job Task orders will be issued on an as-needed basis with a more detailed PWS defining the tasks to be accomplished.
UNIT UNIT PRICE MAX AMOUNT
3001 3,000,000 Job OPTION PM Professional Support Srvc Option YR 3
FFP
The Contractor shall perform PM Professional Support Services for USACE New Orleans District in accordance with the PWS and using Exhibit D pricing. Job Task orders will be issued on an as-needed basis with a more detailed PWS defining the tasks to be accomplished.
UNIT UNIT PRICE MAX AMOUNT
4001 3,000,000 Job OPTION PM Professional Support Srvc Option YR 4
FFP
The Contractor shall perform PM Professional Support Services for USACE New Orleans District in accordance with the PWS and using Exhibit E pricing. Job Task orders will be issued on an as-needed basis with a more detailed PWS defining the tasks to be accomplished.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
10,000.00 15,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
5,000.00 $5,000.00 3,000,000.00 $3,000,000.00
CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE
The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 $5,000.00 $3,000,000.00 1001 $5,000.00 $3,000,000.00 2001 $5,000.00 $3,000,000.00 3001 $5,000.00 $3,000,000.00 4001 $5,000.00 $3,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$5,000.00
$3,000,000.00
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement Unrestricted MVN Bi-Partisan Budget Act of 2018 and Civil Works Program Project
Management Support Services
PART 1 GENERAL INFORMATION
1. GENERAL:
1.1. Description of Services/Introduction:
1.2. Background:
1.3. Scope:
1.4. General Information
1.4.1. Quality Control
1.4.2. Quality Assurance:
1.4.3. Recognized Holidays:
1.4.4. Hours of Operation:
1.4.5. Place of Performance:
1.4.6. Utilities:
1.4.7. Security Requirements:
1.4.8. Special Qualifications:
1.4.9. Post Award Conference/Periodic Progress Meetings:
1.4.10. Contracting Officer Representative (COR):
1.4.11. Key Personnel:
1.4.12. Identification of Contractor Employees:
1.4.13. Contractor Travel
1.4.14. Other Direct Costs (ODC)
1.4.15. Data Rights
1.4.16. Organizational Conflict of Interest:
1.4.17. Phase In/Phase Out Period
PART 2 DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1. Contractor
2.1.2. Contracting Officer
2.1.3. Contracting Officer's Representative (COR)
2.1.4. Defective Service
2.1.5. Deliverable
2.1.6. Key Personnel. ......................................................... Error! Bookmark not defined.
2.1.7. Physical Security
2.1.8. Quality Assurance
2.1.9. Quality Assurance Surveillance Plan (QASP)
2.1.10. Quality Control
2.1.11. Subcontractor
2.1.12. Work Day
2.1.13. Work Week
2.2. Acronyms:
PART 3 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES 19
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services
3.2. Facilities
3.3. Equipment
3.4. Materials
PART 4 CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1. General
4.2. Secret Facility Clearance
4.3. Materials
4.4. Equipment
PART 5 SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Basic Services
5.2. Task Heading................................................................... Error! Bookmark not defined.
5.3. Contractor Management Reporting (CMR) .................... Error! Bookmark not defined.
PART 6 APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1
PART 7 ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. ATTACHMENT/TECHNICAL EXHIBIT LIST:
7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 1 Performance Requirements Summary TECHNICAL EXHIBIT 2 Deliverables Schedule
ESTIMATED WORKLOAD DATA
PART 1
GENERAL INFORMATION
1. GENERAL:
The Contractor shall provide non-personal services to include project management support services for efforts related to the water resources programs in south Louisiana including the Bi- Partisan Budget Act 2018 (P.L. 115-123) (BBA-18) and other USACE Civil Works programs including but not limited to: Mississippi River and Tributaries (MR&T), Planning Assistance to States (PAS), Continuing Authorities Program (CAP), Flood Plain Management Services (FPMS), Silver Jackets (SJ), International and Interagency Support (IIS), Environmental Infrastructure (EI), Coastal Wetlands Planning Protection and Restoration Act (CWPPRA). The single award task order contract is for a period of one year from date of award, with options to extend for four additional years; not to exceed a total of five years (FAR 52.216-22).
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
Description of Services/Introduction:
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform project management support services for efforts related to the water resources programs in south Louisiana including the BBA-18 and other USACE Civil Works programs as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
Background:
Driving this acquisition approach is the need to ensure sufficient Project Management Support Services for the New Orleans District (MVN) to ensure mission delivery of the Civil Works program, including the Bi-Partisian Budget Act of 2018 (BBA-18). BBA-18 allocated over $1.8 Billion to MVN for the streamlined completion of over 70 short and long term disaster recovery projects. A condition of the BBA18 program is that each project must be completed on an accelerated timeline of less than 5 years. The BBA18 program has been identified as a “no fail mission” by USACE Headquarters. When combined with the existing and future Civil Works funding expectations, MVN management has identified the need for additional support services to ensure the needed resources are readily available.
Scope:
The Contractor shall perform project management support services for efforts related to the water resources programs in south Louisiana including the BBA-18 and other USACE Civil Works programs. Services include: project management/planning support, development of project performance reports, updates to program management plans, project scheduling input, project cost support, presentation development, interagency agreement development/updates, project drawings and maps, other project reports, and monthly status reports. Specific tasks are outlined in Part 5.
General Information
Quality Control The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which it assures itself that its work complies with the requirement of the contract. The Contractor’s quality control plan (QCP) (Deliverable #1) shall be delivered digitally to the contracting officer (KO) and the contracting officer’s representative (COR) within 30 days after contract award and a comprehensive written QCP shall be resubmitted to the KO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
Quality Assurance:
1.4.2.1. The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.2.2. Contracting Officer’s Representative (COR): The COR is charged with implementing this plan to ensure successful contractor performance. The COR will maintain copies of invoices and monthly project status reports. The COR will identify and report contractor non-conformance to the Contracting Officer when the COR is unable to resolve unacceptable performance.
1.4.2.3. Contracting Officer: The Contracting Officer will take appropriate action when non-conformance is evident.
1.4.2.4. Quality Assurance Representative (QAR): The QAR is a designated person responsible for reviewing deliverables and monthly status reports and coordinating with the COR on task order execution and reporting non-compliance of technical submittals/deliverables.
1.4.2.5. For surveillance the the QAR will review deliverables required in the SOW for sufficient quality. The COR will maintain sufficient coordination with the QAR to assure the contractor’s performance is acceptable and deliverables are of sufficient quality and content.
1.4.2.6. In summary the COR and QAR will assure 100% of the preliminary and final deliverables/submittals are reviewed and accepted. The performance requirements for this contract will be based on deliverables outlined in the Scope of Work. Partial payments will be processed monthly upon receipt of contractor certified invoices and a monthly status report.
Payments will not be made until the QAR reviews monthly status report and ensures deliverables are of sufficient quality and content. The Contractor’s performance will be measured and assessed by the Government relative to tasks stated in the SOW. In general, Government oversight will focus, measure and quantify Contractor’s performance based upon: the timeliness, quality of deliverables and flexibility in accomplishing stated Government needs and Contractor’s staffing and management of his work force within the funding constraints of specific task orders.
Recognized Holidays:
The Contractor is not required to perform services on U.S. federal holidays.
Hours of Operation:
PDTs operate on an eight hour schedule, but starting and ending times may varying by the PDT being supported. PDT support may be required between the hours of 6:00 a.m. and 5:30 p.m
Place of Performance:
The work to be performed under this contract will be performed at the MVN District Headquarters, 7400 Leak Avenue, New Orleans LA, 70118, the MVN Baton Rouge Office, 150 Terrace Ave, Baton Rouge, LA, 70802, and the Contractors place of business. BBA-18 and USACE Civil Works projects related to this PWS are located throughout the Mississippi Valley Division and USACE Headquarters Area of Responsibility. Specific place of performance within this ara will be definitized at the task order level.
Utilities:
The Government will provide all utilities for the contractor’s use in performance of the tasks outlined in the PWS for work done on government instalations. If utilities are furnished, the following is required: The Contractor shall instruct employees in utilities conservation practices.
The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment. The Contractor shall be responsible for utilities at their place of business.
Security Requirements:
Physical Security:
The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
Additional Security In some circumstances, in order for the contractor to fully operate as a functional PDT member the approval for and issuance of a Common Access Card (CAC) may be required.
1.4.8.3. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the MVN ATO in presentation form which will be documented via memorandum.
1.4.8.4. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.4.8.5. For contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05 and Homeland Security Presidential Directive-12 (HSPD-12). The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
1.4.8.6. The contractor and all associated sub-contractors shall receive a brief/training (provided by the MVN Security Office) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.4.8.7. Contractor Employees Who Require Access to Government Information Systems: All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems.
1.4.8.8. For Contracts that Require an OPSEC Standing Operating Procedure/Plan: The Contractor shall develop an OPSEC SOP/Plan within 90 days of contract award. The OPSEC
SOP/Plan must be reviewed and approved by the RA OPSEC Officer. The SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator.
1.4.8.9. For Contracts that Require OPSEC Training. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty.
Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https:/lvllww.iad.gov/ ioss/ or http://vllww.cdse.edu/catalog/operations-security.html;
or it can be provided by the MVN OPSEC Officer in presentation form which will be documented via memorandum.
1.4.8.10. For Information assurance (IA)/information technology (IT) training: All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.
1.4.8.11. For information assurance (IA)/information technology (IT) certification: All contractor employees supporting IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01-M, DFARS 252.239-7001 and AR 25-2. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
1.4.8.12. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.4.8.13. Threat Awareness Reporting Program: All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12 . The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized web based TARP training for CAC card holders is available at the following website:
https://www.us.army.mil/suite/page/655474.
Special Qualifications:
NA
Post Award Conference/Periodic Progress Meetings:
The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.
The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
Contracting Officer Representative (COR):
The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
Key Personnel:
The follow personnel are considered key personnel by the government: Senior Project Manager, Project Manager, Senior Program Manager, Program Manager, Scheduler, Planner, Environmental Specialist, and Economist. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
Qualifications for all key personnel are listed below: Senior level disciplines (Project Manager, Program Manager, Civil Engineer) must have 5-10 years experience with water resource related civil works projects. All other disciplines must have 1–5 years experience with water resource related civil works projects. Substitution of key personnel after proposal evaluation requires evaluation of the proposed substitute key personnel’s resume(s) and approval by the Government.
Identification of Contractor Employees:
All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
Contractor Travel
The Government may require the contractor to travel to offsite meetings. The Contractor shall travel as efficiently as possible and not exceed the per diem expenses allowed by the Joint Travel Regulations. The contractor shall submit its bid for travel in its proposal.
Other Direct Costs (ODC) The Contractor’s price shall include the cost of all consultant services, and any other services required to accomplish the work under each task order.
Data Rights The Government has unlimited rights to all documents/material produced under this contract.
All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
Organizational Conflict of Interest:
Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
Phase In/Phase Out Period To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board upon contract award. All other contractor personnel must be on board within 60 days. During the phase-in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
PART 2
DEFINITIONS & ACRONYMS
DEFINITIONS AND ACRONYMS:
Definitions:
Contractor.
A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Officer.
A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Contracting Officer's Representative (COR).
An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Defective Service.
A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable.
Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Physical Security.
Actions that prevent the loss or damage of Government property.
Quality Assurance.
The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP).
An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control.
All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor.
One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Work Day.
The number of hours per day the Contractor provides services in accordance with the contract.
Work Week.
Monday through Friday, unless specified otherwise.
Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation BBA-18 Bipartisian Budget Act of 2018 CAP Continuing Authorities Program CFR Code of Federal Regulations CG Construction General CW Civil Works COR Contracting Officer Representative COTR Contracting Officer's Technical Representative CWE Current Working Estimate CWPPRA Coastal Wetlands Planning, Protection, and Restoration Act DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EI Environmental Infrastructure FAR Federal Acquisition Regulation FPMS Flood Plain Management Services GI General Investigations GIS Geographical Information System HSDRRS Hurricane Storm Damage Risk Reduction System IPR In Progress Review IIS International and Interagency Support KO Contracting Officer MR&T Mississippi River and Tributaries MVN Mississippi Valley New Orleans District OCI Organizational Conflict of Interest ODC Other Direct Costs PAS Planning Assistance to States PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PRB Project Review Board PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SJ Silver Jackets
TE Technical Exhibit USACE United States Army Corps of Engineers
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
GOVERNMENT FURNISHED ITEMS AND SERVICES:
Services The Government will provide personnel to assist with production set-up.
Facilities
The Government will provide the necessary workspace for the contractor staff to provide the support outlined in the PWS to include desk space, utilities, telephones, computers and other items necessary to maintain an office environment.
Equipment
The Government will provide scanners printers, projectors, computers and other items necessary to provide the support outlined in the PWS. This Government property is incidential to the place of performance and is not subject to FAR part 45.
Materials The Government will provide USACE regulations (as listed in Part 6 of the PWS ) and Program/Project Management Plans for projects outlined in the PWS.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
General The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
Secret Facility Clearance Not Applicable
Materials
The Contractor shall furnish all materials required to perform work under this contract that are not listed under Section 3 of this PWS.
Equipment The Contractor shall furnish all equipment required to perform work under this contract that are not listed under Section 3 of this PWS. While the Government will provide equipment at the Government workspace, work at the contractors office will be performed on their own equipment.
PART 5
SPECIFIC TASKS
SPECIFIC TASKS:
Basic Services.
The contractor shall provide services for project management support for efforts related to the water resources programs in south Louisiana including the Bi-Partisan Budget Act 2018 (P.L.
115-123) (BBA-18) and other USACE Civil Works programs The Contractor shall comply with the applicable portions of the most recent U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM385-1-1 and all changes and amendments thereto, and the applicable portions of the latest OSHA standards for the work covered in this contract. The Contractor shall also comply with all Statement of Requirments outlined in Part 5.
During the prosecution of the work under each task order, the Contractor shall maintain liaison with the Contracting Officer's Representative, and/or the Technical Contract Representative. All work shall be in accordance with the planning and engineering criteria, directives, drawings, technical manuals, and other instructions furnished by the Contracting Officer for each individual task order.
5.2 PROJECT MANAGEMENT/PLANNING SUPPORT.
The contractor shall provide programmatic and/or planning support (Deliverable #2) to the USACE Project/Program Manager for the execution of BBA-18 and Civil Works projects including documentation of project scope, schedule, and cost changes, presentation development, inventory and forecast of problems and opportunities, formulation of measures and alternative plans, evaluation and comparison of alternatives, calculation and comparison of monetized and non-monetized benefits, environmental impacts, concept renderings, and site layouts.
5.2.1. The contractor shall provide project management support for the completion of PAS, CAP, FPMS, SJ, IIS, EI, and CWPRRA projects.
5.2.2. The contractor shall formulate flood risk management, navigation, and ecosystem restoration plans supported by quantitative benefits analysis.
5.2.3. The contractor shall conduct studies, inventory and forecast of problems and opportunities, formulation of measures and alternative plans, evaluation and comparison of alternatives, calculation and comparison of monetized and non-monetized benefits.
5.2.4. The contractor shall prepare documents such as federal interest determination, reconnaissance, feasibility, post-authorization and other reports, including cultural resources studies and reports, and hazardous, toxic, and radiological waste (HTRW) investigations, National Environmental Policy Act (NEPA) and/or other environmental quality documents.
5.2.5. The contractor shall document water and waste water issues as necessary to develop master plan level documents for environmental infrastructure, PAS, SJ, CAP, and other programs as required.
5.2.6. The contractor shall develop ecosystem habitat surveys, endangered or threatened species surveys, wetlands assessments using standard State of Louisiana methods in cooperation with other Federal and State agencies, modeling, and mitigation and monitoring plans.
5.2.7. The contractor shall coordinate with Corps, non-Federal partners, and other stakeholders to document existing flood damage problems, historical flood maps, potential ecosystem restoration, and recreation problems and opportunities within the study area.
5.2.8. The contractor shall coordinate with Corps and non-Federal partners to document required excavation permits, utility easements, rights-of-way, and other project-related requirements shortly after exercising this contract.
5.2.9. 5.The contractor shall document all or part of NEPA and/or other environmental documents, including, but not limited to, Biological and HTRW assesments, Environmental Assessments (EA), and Environmental Impact Statements (EIS’s).
5.3 PROJECT PERFORMANCE REPORTS.
The contractor shall document and track metrics (Deliverable #3) developed by USACE to gauge BBA-18 and Civil Works project performance, including earned value and cost percentace index, during all phases of the program. The contractor shall input data to track total project costs and current project schedules, provided by USACE, for the BBA-18 and Civil Works projects. The contractor shall compile all changes into change request forms to ensure changes in project scope, cost, schedule and acquisition are agreed upon and documented by USACE managers.
The contractor shall furnish data to USACE staff for presentations related to program and project management including Project Review Board (PRB) meetings, Business Line meetings, Vertical Team meetings, Executive Board meetings and other related presentations. The contractor shall utilize the existing BBA-18 and HSDRRS dashboards, to collect and organize report information in the specified format.
5.4 DOCUMENT AND MAINTAIN PROGRAM/PROJECT MANAGEMENT PLANS.
The contractor shall document and maintain the BBA-18 and other Civil Works Program Management Plans (Deliverable #4) to include detailed processes for budgeting, scheduling, metric reporting, change control process, cost and quality management, closeout, etc. Revisions will be developed in coordination with the USACE BBA-18 and Civil Works Teams and completed as defined in individual task order PWSs.
5.5 PROJECT SCHEDULING SUPPORT.
The contractor shall provide Programmatic Schedule management support for the BBA-18 and Civil Works Program utilizing the USACE P-2 scheduling system. The contractor shall develop and maintain program, budget (Deliverable #5), and schedule templates (Deliverable #6) for all Construction (CG) and General Investigation (GI) projects. Receiving data from the Senior Project Managers and Project Managers, the contractor shall load P-2 schedules (Deliverable #7) by loading specific activities and resources to produce resourced schedules for all BBA-18 and Civil Works projects. The contractor shall utiliz the existing BBA-18 and HSDRRS dashboards, to transfer schedule updates for review by USACE.
5.6 PROJECT COST SUPPORT.
The contractor shall track current working estimates (Deliverable #8) (CWE), provided by USACE, on a project and programmatic basis for BBA-18 and Civil Works projects. The contractor shall document changes in current project costs and schedules and impacts on programmatic costs and schedules. The contractor shall document Programmatic Cost Estimate, including, escalation & contingency, construction contingencies, and estimated cost to complete.
The Contractor shall compile necessary documents needed for reprogramming requests and Congressional notifications. The Contractor shall review funding requests provided by USACE and provide status reports to USACE on overall project funding status. The contractor shall track financial commitments, obligations, and expenditures of projects through information provided by USACE Program and Project Managers.
5.7 PRESENTATION DEVELOPMENT.
The contractor shall prepare presentations (Deliverable #9) for the District level, Division level, and HQUSACE level IPRs and PRBs, focused on visual and graphic illustrations of current and projected program status based on real time data from the automated information system(s);
including coordinating and compiling the status update presentations prepared by the BBA-18 and Civil Works Teams. The contractor shall develop an upward reporting synchronization matrix (Deliverable #10) to meet all District upward BBA-18 and Civil Works reporting requirements in a timely and accurate manner. The contractor shall utilize the existing BBA-18 and HSDRRS dashboards, to collect and organize report information in the specified format.
5.8 INTERAGENCY AGREEMENT DEVELOPMENT/UPDATES
5.8.1. For ongoing construction projects and new start or resumption projects funded under BBA 2018 (including projects implemented under the Continuing Authorities Program (CAP)) as identified, the contractor shall develop the initial and final draft agreement or amendment to existing agreements, (Deliverable #11) as applicable. To accomplish this effort, the contractor shall review for each project the existing agreement(s) and available supporting documents, and will identify any constraints that may affect development of such agreements or amendments.
After performing the initial project review and coordinating any potential issues with the USACE staff, the contractor shall develop the initial draft agreement or amendment for review by USACE MVN staff. Upon completion of review by USACE staff, the contractor shall finalize the draft agreement or amendment to USACE staff to process with the appropriate Corps’ Division/District for coordination and execution with the non-Federal sponsor.
5.8.2. For the Corps-wide model agreements for studies and projects funded under regular appropriations, the contractor shall update the existing model agreements (Deliverable #12), including CAP model agreements, to reflect model language, including any additional updates as appropriate, and develop new streamlined model agreement for specific purposes and programs, as outlined in individually issued task order PWS.
To accomplish the updates to the existing models, the contractor shall review each existing model and provide a redline markup of the necessary updates. Upon review of this redline markup by USACE Staff, the contractor shall finalize the model agreement in question and update its history and applicability document for USACE posting. To accomplish the development of each new streamlined model agreement, the contractor shall develop an initial draft model agreement for review by USACE Staff. Upon completion of such review, the contractor shall finalize the draft model to provide to USACE to process to the Assistant
Secretary of the Army for Civil Works for review and approval. Upon approval of each model agreement, the contractor shall finalize the model and develop the initial history and applicability document for each model agreement.
5.9 PROJECT DRAWINGS AND MAPS
5.9.1. The Contractor shall prepare drawings and maps (Deliverable #13) as defined by each task order to illustrate details and results of Government investigations and analysis. The Contractor shall have CAD, GIS, and database capability which uses Bentley MicroStation, ESRI ArcGIS, and Oracle software, respectively. Software versions utilized must be ACE-IT approved, in use by the Government, and compatible with operating systems and cybersecurity environments that are in effect any given point during the duration of the contract.
5.9.2. The Contractor shall have expertise in the development and implementation of a comprehensive Geographical Information System (GIS) (Deliverable #14) with spatial data that is logically organized in an Oracle database which is accessed/analyzed in ArcGIS software. Each task order will define field and other database requirements as necessary.
The Contractor must be able to perform such work as digitizing or scanning aerial photographs and maps, georeferencing, attributing key elements and features, and providing documentation on sources of data, methodology used, datum, horizontal/vertical controls, etc. (i.e. metadata development) (Deliverable #15). GIS data products shall implement the U.S. Army Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE) version 3.1 or later unless otherwise specified by the New Orleans District Geospatial Engineering Office.
CAD drawings and maps shall be prepared as specified in the scope of work for each task order.
All drawings shall be prepared to a scale that will provide clear reproduction. All site layouts shall clearly illustrate the location of the alternative plans, drainage, and relationship to existing site conditions and infrastructure. The drawings shall come prepared in accordance with USACE AEC CAD standards. Completed drawings shall be prepared and submitted in Bentley Microstation DGN format.
Products shall be submitted in the manner defined by each task order. Typically products will consist of hard copy formats in additions to digital formats consisting of CD, DVD, USB Hard Drive, and/or electronic transfers over the internet (large data submissions).
5.10 OTHER PROJECT REPORTS.
5.10.1. The Contractor shall…