About this file

This abstract of bids document summarizes bids received in response to solicitation number W912P820B0050 from the U.S. Army Corps of Engineers Engineering District New Orleans. The solicitation sought bids for the Mississippi River and Tributaries Project (MR&T), Mississippi River Levee (MRL), Atchafalaya Basin Levee District, Point Pleasant Seepage Relief Well Project Phase III, located in Iberville Parish, Louisiana. The project involves installing 42 passive relief wells along the west bank of the Mississippi River to collect seepage during high water stages, excavating and grading an existing drainage ditch to collect outflow, and utilizing six pairs of electric pumps stationed at discharge locations to return up to 11,000 gallons per minute of seepage water back over the levee and into the river. Three bids were received for the set-aside contract from Coactint, LLC, Genesis 360 LLC, and SDC Group, Inc. The government estimate for the work was between $5-10 million. The bids ranged from $5.8-8.4 million. The apparent low bid was submitted by Coactint, LLC at $5.8 million.

View the file

Other files

File Type Posted
A21- 20B0050 AM_0004.pdf PDF
A21- 20B0050 AM_0003.pdf PDF
A21- 20B0050 AM_0002.pdf PDF
A21- 20B0050 AM_0001.pdf PDF
A21- Plans.pdf PDF
A21- 20B0050 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED

17-Aug-2018

3. DATE OPENED

9-Jul-20

DATE SIGNED

18-Aug-20

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Mobilization and Demobilization

1 JOB $ 160,497.00 $ 160,497.00 $ 741,176.57 $ 741,176.57 300,000.00 $ 300,000.00 1,169,441.00 $ 1,169,441.00

Traffic Control and

Coordination 1 JOB $ 78,782.00 $ 78,782.00 $ 55,095.71 $ 55,095.71 15,867.00$ $ 15,867.00 24,644.00$ $ 24,644.00

Blocked Out Guard

Rail 1,100 LF $ 196.00 $ 215,600.00 $ 34.89 $ 38,379.00 36.74$ $ 40,414.00 31.63$ $ 34,793.00

Guard Rail End

Treatment Tangent 10 EA $ 4,017.00 $ 40,170.00 $ 3,917.92 $ 39,179.20 4,301.42$ $ 43,014.20 4,270.00$ $ 42,700.00

0005 Silt Fences 12,000 LF $ 5.80 $ 69,600.00 $ 3.06 $ 36,720.00 1.50$ $ 18,000.00 3.30$ $ 39,600.00

Truck Wash-Down

Rack 1 JOB $ 54,769.00 $ 54,769.00 $ 42,852.22 $ 42,852.22 8,200.00$ $ 8,200.00 35,933.00$ $ 35,933.00

0007 Submersible Pumps 1 JOB $ 1,841,643.00 $ 1,841,643.00 $ 1,140,358.69 $ 1,140,358.69 924,518.00$ $ 924,518.00 ########### $ 1,201,691.00

0008 Discharge Piping 1 JOB $ 440,770.00 $ 440,770.00 $ 613,521.30 $ 613,521.30 366,629.00$ $ 366,629.00 514,989.00$ $ 514,989.00

0009 Electrical Work 1 JOB $ 689,549.00 $ 689,549.00 $ 328,125.54 $ 328,125.54 434,500.00$ $ 434,500.00 394,515.00$ $ 394,515.00

0010 Clearing and Grubbing 1 JOB $ 697,294.00 $ 697,294.00 $ 244,869.81 $ 244,869.81 165,000.00$ $ 165,000.00 92,375.00$ $ 92,375.00

17--AUG-2020

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

6. NUMBER OF AMENDMENTS ISSUED

7400 Leake Avenue

New Orleans, LA 70118

A. HIRED LABOR A. OFFEROR: Coactint, LLC Mandeville, LA B. OFFEROR: Genesis 360 LLC Baton Rouge, LA

Nakiea B. Butler

Contract Specialist

Christopher Nuccio

Contracting Officer

Mississippi River and Tributaries Atchafalaya Basin Levvee Sistrict, Point

Pleasnt Seepage Relief Well Project Phase III, Iberville, Parish, LA

7B. DESCRIPTION OF

OFFERED ITEM

B. BID SECURITY (Type and amount)

C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

ABSTRACT OF OFFERS

1. SOLICITATION NUMBER W912P820B0050

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

SIGNATURE

4. ISSUING OFFICE

US ARMY ENGINEER DISTRICT, NOD

B. OFFEROR: SDC Group, INC Nofolk, VA

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

2. DATE ISSUED

17-Aug-2018

3. DATE OPENED

9-Jul-20

DATE SIGNED

18-Aug-20

7A. ITEM 7C. EST. D. UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

17--AUG-2020

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

6. NUMBER OF AMENDMENTS ISSUED

7400 Leake Avenue

New Orleans, LA 70118

A. HIRED LABOR A. OFFEROR: Coactint, LLC Mandeville, LA B. OFFEROR: Genesis 360 LLC Baton Rouge, LA

Nakiea B. Butler

Contract Specialist

Christopher Nuccio

Contracting Officer

Mississippi River and Tributaries Atchafalaya Basin Levvee Sistrict, Point

Pleasnt Seepage Relief Well Project Phase III, Iberville, Parish, LA

7B. DESCRIPTION OF

OFFERED ITEM

B. BID SECURITY (Type and amount)

C. REASONABLE CONTRACT

(Including Profit)

C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES C. AMENDMENTS ACKNOWLEDGED: YES

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

(Check A, B or C and complete D, E, and F) NO. 1 NO. 2 NO. 3

ABSTRACT OF OFFERS

1. SOLICITATION NUMBER W912P820B0050

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

SIGNATURE

4. ISSUING OFFICE

US ARMY ENGINEER DISTRICT, NOD

B. OFFEROR: SDC Group, INC Nofolk, VA

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

0011 Seeding and Mulching 40 AC $ 7,883.00 $ 315,320.00 $ 2,571.13 $ 102,845.20 2,000.00$ $ 80,000.00 3,363.00$ $ 134,520.00

0012 Fertilizer 8,000 LBS $ 1.50 $ 12,000.00 $ 1.53 $ 12,240.00 1.00$ $ 8,000.00 1.80$ $ 14,400.00

0013++ Lime Soil Amendment 40 TON $ 137.00 $ 5,480.00 $ 306.09 $ 12,243.60 50.00$ $ 2,000.00 1,572.00$ $ 62,880.00

0014++ Sulfur Soil Amendment 40 TON $ 1,227.00 $ 49,080.00 $ 306.09 $ 12,243.60 50.00$ $ 2,000.00 1,914.00$ $ 76,560.00

0015 Relief Wells 5,500 LF $ 533.00 $ 2,931,500.00 $ 557.08 $ 3,063,940.00 530.00$ $ 2,915,000.00 752.04$ $ 4,136,220.00

0016 Concrete Pavement 65 CY $ 1,063.00 $ 69,095.00 $ 1,958.96 $ 127,332.40 7,800.00$ $ 507,000.00 7,259.00$ $ 471,835.00

$ 7,671,149.00 $ 6,611,122.84 $ 5,830,142.20 $ 8,447,096.00 TOTAL: