AMEND_0002.pdf
PDF 608 KB Posted
- Solicitation number
- W912P820B0044
About this file
This document contains an amendment to a solicitation for dredging services along the Mississippi River in Plaquemines Parish, Louisiana. The U.S. Army Corps of Engineers, New Orleans District is seeking to dredge shoal material from South Pass to a depth of -20.0 feet MLG over a 300-foot bottom width and dispose of dredged materials at designated disposal sites. The estimated value of the work is between $25 million and $100 million. The response due date is September 15, 2020 and the period of performance is 460 calendar days from notice to proceed. The amendment provides responses to contractor questions, modifying access channel dimensions and material disposal locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912P820B0044 Revised Abstract.pdf | ||
| B01 - W912P820B0044 Abstract signed.pdf | ||
| AMEND_0003.pdf | ||
| AMEND_0001.pdf | ||
| W912P820B0044 Solicitation Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED-20-027
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation, W912P820B0044 for Passes of the Mississippi River, South Pass Maintenance Dredging #20-1, Plaquemines Parish, Louisiana (ED-20-027), hereby amended as follow s:
1. Provided responses to contractors questions. Please see the follow ing Q&A section.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0044
X 9B. DATED (SEE ITEM 11)
13-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0044
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
SECTION SPECIFICATIONS - SPECIFICATIONS
The following have been added by full text:
Q&A AMEND 0002
Contractor questions (Q) and Corps of Engineers response (R) for solicitation W912P820B0044 are provided below;
Q23: Concerning the access channels to Leblanc Disposal Area and Windham Disposal Area, please allow the channel to be excavated to 60’ wide and -6’ MLG, while still maintaining a top width of 150’.
R23: Access notes for both LeBlanc and Windham Disposal Areas as defined in the general notes on Sheet G-03 are modified by this response to allow 60 foot wide and (-) 6.0 feet MLG. The Contractor, however, shall ensure the additional cut does not jeopardize the stability of the banks on Corridor 10.0E.
Q24: Section 35 20 23.00 12 Page 17 Paragraph 3.3.1.4 (1) states material dredged between C/L Stations 385+30 and 488+64 shall be placed within Leblanc Disposal Area. Due to shallow water depths near the access channel corridor, please consider changing mandatory disposal into Leblanc Disposal Area to begin at or after station 420+00.
R24: Channel limits placed in LeBlanc Disposal Area can be field adjusted to accommodate conditions observed on site at the time of construction.
Q25: Please consider postponing the bid date by one week.
R25: No extension of bid opening date will be made.
Q26: How many days are the time of completion for the project? In some areas of the specs, the time of completion stated is 280 calendar days after NTP and in other areas it is 460 calendar days after NTP.
R26: Note 8 of the Bid Schedule reflects the original 280 calendar days anticipated to complete the work before a 6 month window was added to accommodate current dredge demand in the Gulf Coast area. The duration in Note 8 is revised to 460 calendar days with this response. Section 10 of SF-1442 reflects the original 280 calendar days anticipated to complete the work before a 6 month window was added to accommodate current dredge demand in the Gulf Coast area. The duration is revised to 460 calendar days with this response.
Q27: What is the height of the Entergy Powerline that runs above the access corridor to Leblanc Disposal Area?
R27: No current data is available for sag that runs across the access corridor to LeBlanc Disposal Area. Contractor shall make determination during site visit when preparing its estimate.
(End of Amendment)