AMEND_0001.pdf

PDF 2 MB Posted

Attached to
Passes of the Mississippi River, South Pass, Maintenance Dredging #20-1
Solicitation number
W912P820B0044
Issued by

About this file

This federal contract solicitation seeks dredging services for maintenance of South Pass in Plaquemines Parish, Louisiana. The work consists of dredging shoal material above elevation -20.0 feet MLG over a 300-foot bottom width from the project limits and disposing of material at designated disposal sites. The estimated value of the work is between $25 million and $100 million. The solicitation will issue on or about August 13, 2020, with a bid opening scheduled for September 15, 2020 at 11:30 AM via teleconference. This is an unrestricted procurement for NAICS code 237990. Interested vendors should register at Beta SAM and SAM.gov. Offerors may also post subcontracting opportunities at the SBA Subnet. The point of contact for the solicitation is Bianca James Gaddison or Karen Hargrave at the USACE New Orleans District.

View the file

Other files

File Type Posted
W912P820B0044 Revised Abstract.pdf PDF
B01 - W912P820B0044 Abstract signed.pdf PDF
AMEND_0003.pdf PDF
AMEND_0002.pdf PDF
W912P820B0044 Solicitation Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912P820B0044

ED-20-027

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation, W912P820B0044 for Passes of the Mississippi River, South Pass Maintenance Dredging #20-1, Plaquemines Parish, Louisiana (ED-20-027), is hereby amended as follow s:

1. Adding Questions and Responses from Contractor's regarding solicitation W912P820B0044.

2. Inform bidders of audio teleconference number for bid opening being held on Tuesday, 15 September 2020 11:30AM: Toll-Free:

844-291-5495, Access Code: 9411816.

3. Deadline to submit any additional questions w ill be 10 September 2020 at 5pm.

1. CONTRACT ID CODE PAGE OF PAGES

1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0044

X 9B. DATED (SEE ITEM 11)

13-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2020

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - SF 30 CONTINUATION

The Issued By organization below has been added:

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

SECTION SPECIFICATIONS - SPECIFICATIONS

The following have been added by full text:

Q&A Contractor questions (Q) and Corps of Engineers response (R) for solicitation W912P820B0044 are provided below;

Q1: Contract duration is 460 days according to SF 1442. However, Note 8 on the Bid Schedule states “the time required for completion of the contract shall be the original contract duration of 280 calendar days established for the BASE WORK items specified in Section 00700, CONTRACT CLAUSES, paragraph entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK”. The time required for completion of the Optional Work on this contract will not be adjusted but shall be performed concurrent with the original base contract duration.” Can the Owner please revise Note 8 on the Bid Schedule to show the correct Contract duration?

R1: Note 8 of the Bid Schedule reflects the original 280 calendar days anticipated to complete the work before a 6 month window was added to accommodate current dredge demand in the Gulf Coast area. The duration in Note 8 is revised to 460 calendar days with this response.

Q2: The W912P8-17-B-0001 Solicitation for South Pass provided a disposal area on the north end of the project area: Lambert Disposal Area. This disposal area was removed for the 2020 solicitation. The 2020 solicitation also moved the start of dredging back almost 3,500 ft. Due to these changes, startup dredge pipeline lengths have increased from approximately 15,000 ft to over 32,000 ft. Pipeline lengths this long will likely require the addition of a booster plant for most dredges, which will dramatically increase the mobilization / demobilization and dredging costs for this project. Further, there is an approximately 3,500 ft long stretch around Station 165+51 south that has less than 3 ft of water on the red toe, where subline is likely to be laid. There are many safety concerns with laying subline in less than 3 ft of water. Is there any way that the Lambert Disposal Area, or any disposal area to the north of Castille Disposal Area, can be added back in to this Contract so that Contractors will have more manageable pipeline lengths and safer subline laying operations?

R2: No. Lambert Disposal Area was filled to maximum capacity during previous HDDA contract and is no longer available.

Q3: Section 35 20 23.00 Paragraph 3.3.1.2 mentions that disposal at Castille Disposal Area shall begin in the northeast corner of the Castille Disposal Area, filling westerly. Will the Owner please consider allowing the Contractor to begin disposal in the southwest corner of the disposal area and fill west, to minimize line lengths and reduce dredging costs?

R3: Variation in fill direction and starting point is acceptable if the contactor's intent is to utilize the majority of the capacity in the Castille Disposal area.

Q4: With the exception of material dredged between STA 365+30 and 488+64 to be placed within Leblanc Disposal Area, is the Contractor allowed to choose which disposal areas to use for each dredging area?

R4: Yes, this is the only mandated reach.

Q5: Section 35 20 23.00, Paragraph 3.3.1.8 states “Scott Island is first priority.”

a. Is Scott Island first priority between Scott and Ed Island, or between all disposal areas?

b. Can the Owner please clarify what is meant by first priority?

R5: Scott Island takes priority over Ed Island only. This prioritization does not relate to other disposal areas.

Q6: Section 35 20 23.00, Paragraph 3.3.1.8 states, “Dredge material is limited to a maximum initial elevation of +8.0' NAVD88. The islands footprint shall be no larger than 24 acres at elevation +1.0' NAVD88.”

a. Is the max fill height for this island to +8.0 or +1.0’ NAVD88?

b. Please confirm if the entire 24 acres can be filled to +8.0 or +1.0’ NAVD88?

c. Please address both questions above for both Scott Island and Ed Island.

R6: Max height on both islands is +8.0 feet NAVD88. The 24 acre maximum is based on all created lands at each disposal area that are +1.0' NAVD88 or more, and that would be expected to occur at that +1.0' elevation along the perimeter of the island.

Q7: For access corridors where excavation is not allowed, the Plans and Specifications state that the access corridors are required to be backfilled with disposal material to a maximum of 2 feet above existing adjacent marsh.

a. Would the Owner please consider removing this requirement or only requiring Contractor to return the access corridors to pre-dredging conditions?

b. The access corridors provided are 150 ft wide. Is it the Owner’s intention to have a 150 ft x 1,000 ft berm that is 2 ft above existing marsh for the Castille Disposal Area access corridor, a 150 ft x 450 ft berm and a 150 ft x 150 ft berm that is 2 ft above existing marsh for the Leblanc Disposal Area access corridor, a 150 ft x 650 ft berm that is 2 ft above existing marsh for the Windham Disposal Area access corridor 1, and a 150 ft x 1000 ft berm that is 2 ft above existing marsh for the Windham Disposal Area access corridor 2?

c. How does the Owner plan to measure and pay for the backfilling of the access corridors?

R7: The intent is to return the access corridors to pre-existing conditions. Any backfilling of damaged wetlands within the access corridors should not exceed 2' above adjacent wetlands. Payment will be made at contract job price for CLIN 0003, “Flotation Access Channel/Access Corridor.” Contractor shall bid accordingly.

Q8: Can the Owner please provide existing depths for Cadro Pass surrounding Castille Disposal Area?

R8: No survey is available. Contractor shall conduct site visit to determine current conditions and bid accordingly.

Q9: Can the Owner please provide existing depths for Outlet 10E and 11.8E?

R9: No survey is available. Contractor shall conduct site visit to determine current conditions and bid accordingly.

Q10: According to Section 02 21 10.00, Paragraph 3.1.8, Contractor is supposed to submit a survey of the Castille Disposal Area perimeter dike to verify the retaining dikes have been constructed to meet minimum specifications.

What are the minimum specifications for the Castille Disposal Area perimeter dikes?

R10: No minimum specification is provided. The Contractor, however, shall prevent excessive runoff of dredge slurry into adjacent lands and waters during fill operations at the Castile Pass disposal area. Survey is intended to document the condition of the site's perimeter dike. Various mechanisms and practices to prevent excessive runoff across observed gaps may be employed by the contractor.

Q11: Can the Owner confirm that if access corridors are excavated, no back-filling is required?

R11: Backfilling is not required. The Contractor, however, shall control the height of spoil mounds to prevent spoil from the access corridors to exceed 2' above existing wetlands.

Q12: According to Section 35 20 23.00 Paragraph 3.3.1.3, waterfowl season includes the months of September, November, December and January. Is October supposed to be included in this list?

R12: No. October was intentionally left off of this listing for waterfowl season.

Q13: When the specifications state “During peak campground usage, nighttime usage will be restricted to personnel access only,” can the Owner please clarify what this means?

a. Does this mean that no off-loading of equipment will be allowed during nighttime, or that no equipment will be allowed to be used during night time?

b. Will marshbuggies, dozers, and other shore equipment, assuming it is already onsite, be allowed to be used in disposal areas during night time?

R13: Peak campground usage coincides with waterfowl season, and can be expected on certain weekends where hunting conditions are extraordinary. Duration of peak campground usage would be short and on the order of days.

During these brief time periods, the use of marsh buggies and bulldozers at night should be limited to the least practical extent necessary for the control of dredged material. Equipment staging and preparation should be scheduled for daytime operations.

Q14: Are airboats expected to be permitted for this Project?

R14: Airboat use requires a special use permit granted to CEMVN by LDWF on behalf of the contractor. Such special use permits allow airboat use, with limitations, during waterfowl season to daytime operation where no other type of equipment could practicably be used and with restrictions on run time. There are no instances where a special use permit has not been granted by LDWF to CEMVN for airboat operation on the PALWMA. It is LDWF's intent to regulate/monitor airboat use during prime hunting season.

Q15: Due to the complexity of the job, and the flexible time allotted for show-up, will the Owner please consider a 2 week extension in bid date?

R15: No extension of bid opening date will be made.

Q16: The SF-1442 Form Section 11 states that the contract performance period is to be 460 days, while Section 10 makes reference to a 280 day contract performance period. Please clarify the correct contract performance period for this project.

R16: Section 10 of SF-1442 reflects the original 280 calendar days anticipated to complete the work before a 6 month window was added to accommodate current dredge demand in the Gulf Coast area. The duration in Note 8 is revised to 460 calendar days with this response.

Q17: SECTION 35 20 23.00 12 Page 11, Paragraph 3.1.6 Character of materials states: “Dredging history of South Pass is available on request.” Please make available the dredging history documents of South Pass as referenced above.

R17: Copy of production logs for DACW29-99-C-0027 are attached.

Q18: Please provide any and all relevant geotechnical data in regard to the material to be dredged under this contract.

R18: No geotechnical exploration was performed on material to be dredged under this contract.

Q19: Please provide all Federal, State, and local permits associated with this project.

R19: The project is in full compliance with state and Federal environmental regulations, and Right-of-Entry has been granted to perform work. All work activities described in the project's Plans and Specs are consistent with Federal, state, and local requirements identified during the environmental permitting phase. Certain work activities if proposed by the contractor after award, such as limited airboat use during waterfowl season, would require CEMVN to obtain a Special Use Permit from the LA Department of Wildlife and Fisheries.

Q20: Must all of the disposal areas available for this project be utilized?

R20: Material dredged between STA 365+30 and 488+64 shall be placed within Leblanc Disposal Area. This is the only required disposal area.

Q21: SECTION 35 20 23.00 12 Page 15, Paragraph 3.3.1.1 Disposal Area Capacity states the following: “The Contracting Officer's Representative will determine when an area has been utilized to the optimum capacity, prior to the Contractor utilizing another area.” Please provide an estimated fill amount at each of the planned disposal areas so that contractors may accurately estimate the required pipeline lengths to reach each disposal area and correlative production rates.

R21: No disposal areas have surveys to allow calculation of capacity. Contractor can assume existing elevations with maximum allowed fill elevations to calculate capacity with the following areas;

North Cell = 145 acres Castille = 380 acres LeBlanc = 608 acres Windham = 250 acres East Bird Island (unlimited)

South Pass Split (unlimited)

Scott = 26 acres Ed = 26 acres

Q22: Plan Drawing C-17, Note 2 states: “Existing ground elevations are reflective of conditions taken in October 2019. Surveys will be updated prior to bid opening.” Please advise if updated surveys are available for Contractor use.

R22: Due to extreme shoal condition, no surveys were taken prior to bid opening.

Contractor questions (Q) and Corps of Engineers response (R) for solicitation W912P820B0044 are provided below;

Q1: Contract duration is 460 days according to SF 1442. However, Note 8 on the Bid Schedule states “the time required for completion of the contract shall be the original contract duration of 280 calendar days established for the BASE WORK items specified in Section 00700, CONTRACT CLAUSES, paragraph entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK”. The time required for completion of the Optional Work on this contract will not be adjusted but shall be performed concurrent with the original base contract duration.” Can the Owner please revise Note 8 on the Bid Schedule to show the correct Contract duration?

R1: Note 8 of the Bid Schedule reflects the original 280 calendar days anticipated to complete the work before a 6 month window was added to accommodate current dredge demand in the Gulf Coast area. The duration in Note 8 is revised to 460 calendar days with this response.

Q2: The W912P8-17-B-0001 Solicitation for South Pass provided a disposal area on the north end of the project area: Lambert Disposal Area. This disposal area was removed for the 2020 solicitation. The 2020 solicitation also moved the start of dredging back almost 3,500 ft. Due to these changes, startup dredge pipeline lengths have increased from approximately 15,000 ft to over 32,000 ft. Pipeline lengths this long will likely require the addition of a booster plant for most dredges, which will dramatically increase the mobilization / demobilization and dredging costs for this project. Further, there is an approximately 3,500 ft long stretch around Station 165+51 south that has less than 3 ft of water on the red toe, where subline is likely to be laid. There are many safety concerns with laying subline in less than 3 ft of water. Is there any way that the Lambert Disposal Area, or any disposal area to the north of Castille Disposal Area, can be added back in to this Contract so that Contractors will have more manageable pipeline lengths and safer subline laying operations?

R2: No. Lambert Disposal Area was filled to maximum capacity during previous HDDA contract and is no longer available.

Q3: Section 35 20 23.00 Paragraph 3.3.1.2 mentions that disposal at Castille Disposal Area shall begin in the northeast corner of the Castille Disposal Area, filling westerly. Will the Owner please consider allowing the Contractor to begin disposal in the southwest corner of the disposal area and fill west, to minimize line lengths and reduce dredging costs?

R3: Variation in fill direction and starting point is acceptable if the contactor's intent is to utilize the majority of the capacity in the Castille Disposal area.

Q4: With the exception of material dredged between STA 365+30 and 488+64 to be placed within Leblanc Disposal Area, is the Contractor allowed to choose which disposal areas to use for each dredging area?

R4: Yes, this is the only mandated reach.

Q5: Section 35 20 23.00, Paragraph 3.3.1.8 states “Scott Island is first priority.”

a. Is Scott Island first priority between Scott and Ed Island, or between all disposal areas?

b. Can the Owner please clarify what is meant by first priority?

R5: Scott Island takes priority over Ed Island only. This prioritization does not relate to other disposal areas.

Q6: Section 35 20 23.00, Paragraph 3.3.1.8 states, “Dredge material is limited to a maximum initial elevation of +8.0' NAVD88. The islands footprint shall be no larger than 24 acres at elevation +1.0' NAVD88.”

a. Is the max fill height for this island to +8.0 or +1.0’ NAVD88?

b. Please confirm if the entire 24 acres can be filled to +8.0 or +1.0’ NAVD88?

c. Please address both questions above for both Scott Island and Ed Island.

R6: Max height on both islands is +8.0 feet NAVD88. The 24 acre maximum is based on all created lands at each disposal area that are +1.0' NAVD88 or more, and that would be expected to occur at that +1.0' elevation along the perimeter of the island.

Q7: For access corridors where excavation is not allowed, the Plans and Specifications state that the access corridors are required to be backfilled with disposal material to a maximum of 2 feet above existing adjacent marsh.

a. Would the Owner please consider removing this requirement or only requiring Contractor to return the access corridors to pre-dredging conditions?

b. The access corridors provided are 150 ft wide. Is it the Owner’s intention to have a 150 ft x 1,000 ft berm that is 2 ft above existing marsh for the Castille Disposal Area access corridor, a 150 ft x 450 ft berm and a 150 ft x 150 ft berm that is 2 ft above existing marsh for the Leblanc Disposal Area access corridor, a 150 ft x 650 ft berm that is 2 ft above existing marsh for the Windham Disposal Area access corridor 1, and a 150 ft x 1000 ft berm that is 2 ft above existing marsh for the Windham Disposal Area access corridor 2?

c. How does the Owner plan to measure and pay for the backfilling of the access corridors?

R7: The intent is to return the access corridors to pre-existing conditions. Any backfilling of damaged wetlands within the access corridors should not exceed 2' above adjacent wetlands. Payment will be made at contract job price for CLIN 0003, “Flotation Access Channel/Access Corridor.” Contractor shall bid accordingly.

Q8: Can the Owner please provide existing depths for Cadro Pass surrounding Castille Disposal Area?

R8: No survey is available. Contractor shall conduct site visit to determine current conditions and bid accordingly.

Q9: Can the Owner please provide existing depths for Outlet 10E and 11.8E?

R9: No survey is available. Contractor shall conduct site visit to determine current conditions and bid accordingly.

Q10: According to Section 02 21 10.00, Paragraph 3.1.8, Contractor is supposed to submit a survey of the Castille Disposal Area perimeter dike to verify the retaining dikes have been constructed to meet minimum specifications.

What are the minimum specifications for the Castille Disposal Area perimeter dikes?

R10: No minimum specification is provided. The Contractor, however, shall prevent excessive runoff of dredge slurry into adjacent lands and waters during fill operations at the Castile Pass disposal area.

Survey is intended to document the condition of the site's perimeter dike. Various mechanisms and practices to prevent excessive runoff across observed gaps may be employed by the contractor.

Q11: Can the Owner confirm that if access corridors are excavated, no back-filling is required?

R11: Backfilling is not required. The Contractor, however, shall control the height of spoil mounds to prevent spoil from the access corridors to exceed 2' above existing wetlands.

Q12: According to Section 35 20 23.00 Paragraph 3.3.1.3, waterfowl season includes the months of September, November, December and January. Is October supposed to be included in this list?

R12: No. October was intentionally left off of this listing for waterfowl season.

Q13: When the specifications state “During peak campground usage, nighttime usage will be restricted to personnel access only,” can the Owner please clarify what this means?

a. Does this mean that no off-loading of equipment will be allowed during nighttime, or that no equipment will be allowed to be used during night time?

b. Will marshbuggies, dozers, and other shore equipment, assuming it is already onsite, be allowed to be used in disposal areas during night time?

R13: Peak campground usage coincides with waterfowl season, and can be expected on certain weekends where hunting conditions are extraordinary. Duration of peak campground usage would be short and on the order of days. During these brief time periods, the use of marsh buggies and bulldozers at night should be limited to the least practical extent necessary for the control of dredged material. Equipment staging and preparation should be scheduled for daytime operations.

Q14: Are airboats expected to be permitted for this Project?

R14: Airboat use requires a special use permit granted to CEMVN by LDWF on behalf of the contractor. Such special use permits allow airboat use, with limitations, during waterfowl season to daytime operation where no other type of equipment could practicably be used and with restrictions on run time. There are no instances where a special use permit has not been granted by LDWF to CEMVN for airboat operation on the PALWMA. It is LDWF's intent to regulate/monitor airboat use during prime hunting season.

Q15: Due to the complexity of the job, and the flexible time allotted for show-up, will the Owner please consider a 2 week extension in bid date?

R15: No extension of bid opening date will be made.

Q16: The SF-1442 Form Section 11 states that the contract performance period is to be 460 days, while Section 10 makes reference to a 280 day contract performance period. Please clarify the correct contract performance period for this project.

R16: Section 10 of SF-1442 reflects the original 280 calendar days anticipated to complete the work before a 6 month window was added to accommodate current dredge demand in the Gulf Coast area. The duration in Note 8 is revised to 460 calendar days with this response.

Q17: SECTION 35 20 23.00 12 Page 11, Paragraph 3.1.6 Character of materials states: “Dredging history of South Pass is available on request.” Please make available the dredging history documents of South Pass as referenced above.

R17: See Petitbon for submission.

Q18: Please provide any and all relevant geotechnical data in regard to the material to be dredged under this contract.

R18: Need grad sample information.

Q19: Please provide all Federal, State, and local permits associated with this project.

R19: The project is in full compliance with state and Federal environmental regulations, and Right-of- Entry has been granted to perform work. All work activities described in the project's Plans and Specs are consistent with Federal, state, and local requirements identified during the environmental permitting phase. Certain work activities if proposed by the contractor after award, such as limited airboat use during waterfowl season, would require CEMVN to obtain a Special Use Permit from the LA Department of Wildlife and Fisheries.

Q20: Must all of the disposal areas available for this project be utilized?

R20: Material dredged between STA 365+30 and 488+64 shall be placed within Leblanc Disposal Area. This is the only required disposal area.

Q21: SECTION 35 20 23.00 12 Page 15, Paragraph 3.3.1.1 Disposal Area Capacity states the following: “The Contracting Officer's Representative will determine when an area has been utilized to the optimum capacity, prior to the Contractor utilizing another area.” Please provide an estimated fill amount at each of the planned disposal areas so that contractors may accurately estimate the required pipeline lengths to reach each disposal area and correlative production rates.

R21: No disposal areas have surveys to allow calculation of capacity. Contractor can assume existing elevations with maximum allowed fill elevations to calculate capacity with the following areas;

List of areas from Clement

Q22: Plan Drawing C-17, Note 2 states: “Existing ground elevations are reflective of conditions taken in October 2019. Surveys will be updated prior to bid opening.” Please advise if updated surveys are available for Contractor use.

R22: Due to extreme shoal condition, no surveys were taken prior to bid opening.

(End of Summary of Changes)

CONTRACT/SOLICITATION NUMBER: DACW29-99-C-0027 DACW29-98-B-0033 PROJECT: Passes Of The Mississippi River, South Pass, CY Cutterhead, Maintenance Dredging, C/L Sta's 280+00 To 760+00, Plaquemines Parish, Louisiana PAGE 5 OF 5 DREDGE: Katrina DISCHARGE DIAMETER: 24 in. CHANNEL DIMENSIONS: Form effective since - 7 Jan 2000

LOCATION/REMARKS SWING ADVANCE DEPTH Stand/ Gross Credit GROSS CREDITED CUMULATIVE CUMULATIVE Gross Credit EFF.

DATE Nov-99 ft ft ft Non-stand CY/ CY/ CY CY GROSS CY CREDITED CY FT/ CY/ CY/ DISPOSAL PUMP TOTAL TIME NON-EFFECTIVE TIME PIPELINE - FT

Previous cumulative totals = 16,132 Reach FT FT 77,485 368,666 HR HR HR LOCATION RPM TIME 845.33 HPL HSL CPPL CCSH CLPJ LDNE WVP MOR MISC PONT SHORE SUB TOTAL 1 519+80 to 522+87 160 307 15.5 N/A 39 12,087 89,572 368,666 16 642 - Mounds Area-04 800 24.00 18.50 1.20 0.40 0.50 2.20 2,200 3,700 2,000 7,900 2 to 524+50 160 163 15.5 N/A 40 6,506 96,078 368,666 11 436 - Mounds Area-04 800 24.00 14.55 9.05 2,200 3,700 2,000 7,900 3 to 527+97 160 347 15.5 N/A 37 12,952 109,030 368,666 18 664 - Mounds Area-04 800 24.00 19.30 1.15 1.50 1.25 2,200 3,700 2,000 7,900 4 to 530+00 160 203 15.5 N/A 31 6,312 115,342 368,666 19 578 - Mounds Area-04 800 24.00 10.55 0.25 0.30 12.10 2,200 3,700 2,000 7,900 5 520+00 to 523+90 160 390 15.5 N/A 37 14,335 129,677 368,666 19 699 - Mounds Area-04 800 24.00 20.30 0.20 0.40 2.30 2,200 3,700 2,000 7,900 6 to 528+08 160 418 15.5 N/A 33 13,652 143,329 368,666 19 616 - Mounds Area-04 800 24.00 22.10 0.35 0.50 0.25 2,200 3,700 2,000 7,900 7 528+08 to 530+58 & 520+00 to 520+77 160 327 15.5 N/A 32 10,471 153,800 368,666 19 607 - Mounds Area-04 800 24.00 17.15 1.30 1.00 0.30 3.45 2,200 3,700 2,000 7,900 8 to 525+10 160 433 20.0 N/A 24 10,344 164,144 368,666 24 580 - Mounds Area-04 800 24.00 17.50 1.25 0.40 4.05 2,200 3,700 2,000 7,900 9 to 528+25 160 315 20.0 N/A 22 7,075 171,219 368,666 19 429 - Barrier Island-03 800 24.00 16.30 0.40 6.50 2,200 3,700 2,000 7,900 10 528+25 to 531+28 & 520+00 to 521+20 160 423 20.0 N/A 17 7,015 178,234 368,666 24 392 - Barrier Island-03 800 24.00 17.55 1.05 0.35 2.25 2.00 2,200 3,700 2,000 7,900 11 521+00 160 - 20.0 N/A 178,234 368,666 - - Barrier Island-03 800 24.00 24.00 2,200 3,700 2,000 7,900 12 521+00 to 521+40 160 140 20.0 N/A 5 659 178,893 368,666 15 73 - Barrier Island-03 800 24.00 9.05 0.55 14.00 2,200 3,700 2,000 7,900 13 521+40 160 - 20.0 N/A 178,893 368,666 - - Barrier Island-03 800 24.00 24.00 2,200 3,700 2,000 7,900 14 521+40 160 - 20.0 N/A 178,893 368,666 - - Barrier Island-03 800 24.00 24.00 2,200 3,700 2,000 7,900 15 521+40 160 493 20.0 N/A 42 20,484 199,377 368,666 23 975 - Barrier Island-03 800 24.00 21.00 1.30 0.30 1.00 2,200 3,700 2,000 7,900 16 526+33 to 531+21 160 557 20.0 N/A 21 11,662 211,039 368,666 27 562 - Barrier Island-03 800 24.00 20.45 1.10 1.05 1.00 500 3,700 2,000 6,200 17 531+90 to 537+60 160 570 20.0 N/A 3 1,737 212,776 368,666 28 85 - Barrier Island-03 800 24.00 20.20 1.15 1.15 1.10 500 3,700 2,000 6,200 18 to 538+31 160 646 20.0 N/A 1 525 213,301 368,666 39 32 - Barrier Island-03 800 24.00 16.35 0.30 1.00 3.55 2.00 500 3,700 2,000 6,200 19 526+75 to 531+60 & 290+00 to 291+22 160 607 19.5 N/A 4 2,636 215,937 368,666 38 164 - Barrier Island-03 800 24.00 16.05 0.50 0.45 3.40 2.40 500 12,000 - 12,500 20 to 294+00 160 278 20.5 N/A 34 9,361 225,298 368,666 19 631 - Barrier Island-03 800 24.00 14.50 0.15 8.55 500 12,000 - 12,500 21 294+00 160 - 20.5 N/A 225,298 368,666 - - Barrier Island-03 800 24.00 24.00 500 12,000 - 12,500 22 294+00 160 - 20.5 N/A 225,298 368,666 - - Barrier Island-03 800 16.67 16.40 500 12,000 - 12,500 23 225,298 368,666 - - - 24 225,298 368,666 - - - 25 Katrina shut down at 1640 hours on 225,298 368,666 - - - 26 22nd of November 1999 due to repairs 225,298 368,666 - - - 27 on main pump shaft bearing. 225,298 368,666 - - - 28 225,298 368,666 - - - 29 225,298 368,666 - - - 30 225,298 368,666 - - - 31 225,298 368,666 - - -

7th: Repair hydraulic leak on spud winch. Add packing of main pump. 225,298 368,666 - - - 13th, 14th: Clutch and main bearing. Repairs to fuel system on EMD. Repairs to main generator. 225,298 368,666 - - - 19th: Repaired leaks at flange connections on discharge line. 225,298 368,666 - - -

OD-T Prepared by OD-T, David Mayeaux 225,298 368,666 - - - NOTE: (Time Input - Hrs.Minutes) TOTAL: 6,617 147,813 - 21 474 520.67 311.67 12.75 13.08 11.33 117.42 54.42 Pipeline Length (Based (Time Calculations - Hrs.Decimal Hrs) AVG. 305 FT/DY 6,813 - CY/DAY % TIME: 59.86% 2.45% 2.51% 2.18% 22.6% 10.45% on eff. time) 8,288

Cumulative Advance = 22,749 FT Cum. CY = 225,298 368,666 CY Cumulative EFF. Time = 1157.00 Hrs.

CONTRACT/SOLICITION NUMBER: DACW29-99-C-0027 DACW29-98-B-0033 PROJECT: Passes Of The Mississippi River, South Pass, CY Cutterhead, Maintenance Dredging, C/L Sta's 280+00 to 760+00, Plaquemines Parish, Louisiana PAGE 2 OF 2 DREDGE: North Carolina DISCHARGE DIAMETER: 20 in. CHANNEL DIMENSIONS: Form effective since - 7 Jan 2000

LOCATION/REMARKS SWING ADVANCE DEPTH Stand/ Gross Credit GROSS CREDITED CUMULATIVE CUMULATIVE Gross Credit EFF.

DATE Oct-99 ft ft ft Non-stand CY/ CY/ CY CY GROSS CY CREDITED CY FT/ CY/ CY/ DISPOSAL PUMP TOTAL TIME NON-EFFECTIVE TIME PIPELINE - FT

Previous cumulative totals = 1,097 Reach FT FT 32,046 HR HR HR LOCATION RPM TIME 93.33 HPL HSL CPPL CCSH CLPJ LDNE WVP MOR MISC PONT SHORE SUB TOTAL 1 610+52 to 611+62 & 600+00 to 601+23 160 233 16.0 N/A 20 4,625 - 36,671 12 - 231 Mounds Area-04 800 24.00 20.00 1.00 0.40 2.20 1,250 900 - 2,150 2 to 605+80 160 457 16.0 N/A 25 11,391 - 48,062 24 - 600 Mounds Area-04 800 24.00 19.00 3.20 0.50 0.50 1,250 900 - 2,150 3 to 610+31 160 451 16.0 N/A 24 10,957 - 59,019 21 - 522 Mounds Area-04 800 24.00 21.00 0.30 0.30 1.00 1.00 1,250 900 - 2,150 4 599+84 to 604+51 160 467 20.0 N/A 15 6,893 - 65,912 22 - 319 Mounds Area-04 800 24.00 21.35 1.55 0.30 1,250 900 - 2,150 5 to 608+40 160 389 20.0 N/A 15 5,945 - 71,857 19 - 290 Mounds Area-04 800 24.00 20.30 0.15 0.25 0.20 2.30 1,550 900 - 2,450 6 608+40 to 610+17 & 599+47 to 601+01 160 331 20.0 N/A 13 4,238 - 76,095 16 - 200 Mounds Area-04 800 24.00 21.10 0.50 0.05 1.55 600 900 - 1,500 7 to 602+78 160 177 20.0 N/A 14 2,540 - 78,635 20 - 293 Mounds Area-04 800 9.33 8.40 0.20 0.20 600 900 - 1,500 8 - 78,635 - - - 9 - 78,635 - - - 10 North Carolina sunk in vicinity of - 78,635 - - - 11 C/L Sta 601+35 ( West Half of Channel) - 78,635 - - - 12 at 0920 hours on October 7, 1999. - 78,635 - - - 13 - 78,635 - - - 14 - 78,635 - - - 15 - 78,635 - - - 16 - 78,635 - - - 17 - 78,635 - - - 18 - 78,635 - - - 19 - 78,635 - - - 20 - 78,635 - - - 21 - 78,635 - - - 22 - 78,635 - - - 23 - 78,635 - - - 24 - 78,635 - - - 25 - 78,635 - - - 26 - 78,635 - - - 27 - 78,635 - - - 28 - 78,635 - - - 29 - 78,635 - - - 30 - 78,635 - - - 31 - 78,635 - - -

1st, 3rd: Broke stbd swing sheave. - 78,635 - - - 5th: Change swing sheave. - 78,635 - - -

- 78,635 - - - OD-T Prepared by OD-T, David Mayeaux - 78,635 - - - NOTE: (Time Input - Hrs.Minutes) TOTAL: 2,505 46,589 19 353 153.33 131.92 5.42 5.50 0.08 0.50 1.92 1.33 6.67 Pipeline Length (Based (Time Calculations - Hrs.Decimal Hrs) AVG. 392 FT/DY 7,292 CY/DAY % TIME: 86.03% 3.53% 3.59% 0.05% 0.33% 1.25% 0.9% 4.35% on eff. time) 2,050

Cumulative Advance = 3,602 FT Cum. CY = - 78,635 CY Cumulative EFF. Time = 225.25 Hrs.

CONTRACT/SOLICITION NUMBER: DACW29-99-C-0027 DACW29-98-B-0033 PROJECT: Passes Of The Mississippi River, South Pass, CY Cutterhead, Maintenance Dredging, C/L Sta's 280+00 to 760+00, Plaquemines Parish, Louisiana PAGE 1 OF 2 DREDGE: North Carolina DISCHARGE DIAMETER: 20 in. CHANNEL DIMENSIONS: Form effective since - 7 Jan 2000

LOCATION/REMARKS SWING ADVANCE DEPTH Stand/ Gross Credit GROSS CREDITED CUMULATIVE CUMULATIVE Gross Credit EFF.

DATE Sep-99 ft ft ft Non-stand CY/ CY/ CY CY GROSS CY CREDITED CY FT/ CY/ CY/ DISPOSAL PUMP TOTAL TIME NON-EFFECTIVE TIME PIPELINE - FT

Previous cumulative totals = - Reach FT FT HR HR HR LOCATION RPM TIME HPL HSL CPPL CCSH CLPJ LDNE WVP MOR MISC PONT SHORE SUB TOTAL 1 - - - - - 2 - - - - - 3 - - - - - 4 - - - - - 5 - - - - - 6 - - - - - 7 - - - - - 8 - - - - - 9 - - - - - 10 - - - - - 11 - - - - - 12 - - - - - 13 - - - - - 14 - - - - - 15 - - - - - 16 - - - - - 17 - - - - - 18 - - - - - 19 North Carolina commenced dredging at - - - - - 20 2035 hours on September 24, 1999. - - - - - 21 - - - - - 22 - - - - - 23 450+84 160 - 19.5 N/A - - - - - Mounds Area-04 785 24.00 24.00 1,450 2,000 10,000 13,450 24 599+55 to 599+80 160 25 16.0 N/A 18 444 - 444 7.3 - 130 Mounds Area-04 785 3.42 3.25 500 500 - 1,000 25 to 600+15 160 35 16.0 N/A 17 583 - 1,027 8.2 - 137 Mounds Area-04 900 24.00 4.15 0.10 19.35 500 500 - 1,000 26 to 601+41 160 126 16.0 N/A 25 3,114 - 4,141 15 - 374 Mounds Area-04 785 24.00 8.20 0.15 0.25 15.00 500 500 - 1,000 27 to 603+60 160 219 16.0 N/A 30 6,634 - 10,775 10 - 309 Mounds Area-04 785 24.00 21.30 0.50 1.40 500 500 - 1,000 28 to 605+82 160 222 18.0 N/A 33 7,262 - 18,037 11 - 344 Mounds Area-04 800 24.00 21.05 0.20 2.35 500 500 - 1,000 29 to 608+61 160 279 16.0 N/A 30 8,452 - 26,489 14 - 432 Mounds Area-04 800 24.00 19.35 1.20 0.45 2.20 800 900 - 1,700 30 to 610+52 160 191 18.0 N/A 29 5,557 - 32,046 13 - 366 Mounds Area-04 800 24.00 15.10 1.20 0.10 7.20 1,250 900 - 2,150

- 32,046 - - -

26th: Starter on main engine. Fuel filter on generator. - 32,046 - - - Ladder cable broke. - 32,046 - - - 30th: Check cutter and pump. - 32,046 - - -

OD-T Prepared by OD-T, David Mayeaux - 32,046 - - - NOTE: (Time Input - Hrs.Minutes) TOTAL: 1,097 32,046 12 343 171.42 93.33 3.00 4.75 48.00 22.33 Pipeline Length (Based (Time Calculations - Hrs.Decimal Hrs) AVG. 154 FT/DY 4,487 CY/DAY % TIME: 54.45% 1.75% 2.77% 28.0% 13.03% on eff. time) 1,334

Cumulative Advance = 1,097 FT Cum. CY = - 32,046 CY Cumulative EFF. Time = 93.33 Hrs.

CONTRACT/SOLICITATION NUMBER: DACW29-99-C-0027 DACW29-98-B-0033 PROJECT: Passes Of The Mississippi River, South Pass, CY Cutterhead, Maintenance Dredging, C/L Sta's 280+00 to 760+00, Plaquemines Parish, Louisiana PAGE 3 OF 5 DREDGE: Texas DISCHARGE DIAMETER: 30 in. CHANNEL DIMENSIONS: Form effective since - 7 Jan 2000

LOCATION/REMARKS SWING ADVANCE DEPTH Stand/ Gross Credit GROSS CREDITED CUMULATIVE CUMULATIVE Gross Credit EFF.

DATE Apr-00 ft ft ft Non-stand CY/ CY/ CY CY GROSS CY CREDITED CY FT/ CY/ CY/ DISPOSAL PUMP TOTAL TIME NON-EFFECTIVE TIME PIPELINE - FT

Previous cumulative totals = 19,046 Reach FT FT 1,955,236 1,711,751 HR HR HR LOCATION RPM TIME 959.83 HPL HSL CPPL CCSH CLPJ LDNE WVP MOR MISC PONT SHORE SUB TOTAL 1 655+67 - 21.0 N/A - 1,955,236 1,711,751 - - Barrier Island-03 24.00 24.00 2,330 6,305 9,500 18,135 2 655+67 - 21.0 N/A - 1,955,236 1,711,751 - - Barrier Island-03 24.00 24.00 2,330 6,305 9,500 18,135 3 655+67 - 21.0 N/A - 1,955,236 1,711,751 - - Barrier Island-03 24.00 24.00 2,330 6,305 9,500 18,135 4 655+67 - 21.0 N/A - 1,955,236 1,711,751 - - Barrier Island-03 24.00 24.00 2,330 6,305 9,500 18,135 5 655+67 - 21.0 N/A - 1,955,236 1,711,751 - - Barrier Island-03 24.00 24.00 2,330 6,305 9,500 18,135 6 655+67 to 658+90 325 323 21.0 N/A 170 158 54,788 50,900 2,010,024 1,762,651 14 2,453 2,279 Barrier Island-03 353 24.00 22.20 0.30 1.10 2,330 6,305 9,500 18,135 7 658+90 to 660+00 & 660+00 to 661+00 325 210 21.0 N/A 164 152 34,528 32,000 2,044,552 1,794,651 15 2,409 2,233 Barrier Island-03 352 24.00 14.20 1.45 0.20 7.35 2,730 6,305 9,500 18,535 8 to 664+40 325 340 21.0 N/A 168 156 57,093 53,000 2,101,645 1,847,651 17 2,831 2,628 Barrier Island-03 349 24.00 20.10 0.30 2.30 0.50 2,730 6,305 9,500 18,535 9 to 667+50 325 310 21.0 N/A 180 168 55,731 52,000 2,157,376 1,899,651 16 2,858 2,667 Barrier Island-03 347 24.00 19.30 0.20 4.10 2,930 6,305 9,500 18,735 10 to 669+90 325 240 21.0 N/A 180 168 43,309 40,420 2,200,685 1,940,071 16 2,809 2,622 Barrier Island-03 346 24.00 15.25 0.20 8.15 2,330 6,305 9,500 18,135 11 to 673+40 325 350 21.0 N/A 179 167 62,813 58,600 2,263,498 1,998,671 16 2,844 2,654 Barrier Island-03 346 24.00 22.05 0.30 0.30 0.55 2,330 6,305 9,500 18,135 12 to 677+50 325 410 21.0 N/A 185 160 75,650 65,780 2,339,148 2,064,451 17 3,219 2,799 Barrier Island-03 850 24.00 23.30 0.30 2,330 6,305 9,500 18,135 13 677+50 to 680+00 & 680+00 to 681+05 325 355 21.0 N/A 200 170 71,000 60,375 2,410,148 2,124,826 16 3,156 2,683 Barrier Island-03 838 24.00 22.30 0.30 0.30 0.30 2,730 6,305 9,500 18,535 14 to 684+06 325 301 21.0 N/A 196 181 59,100 54,529 2,469,248 2,179,355 15 2,883 2,660 Barrier Island-03 838 24.00 20.30 1.10 0.20 0.30 0.10 1.20 2,330 3,655 10,480 16,465 15 to 686+92 325 286 21.0 N/A 175 169 50,000 48,230 2,519,248 2,227,585 14 2,381 2,297 Barrier Island-03 840 24.00 21.00 0.30 0.20 2.10 2,330 3,655 10,480 16,465 16 to 689+81 325 289 21.0 N/A 194 184 56,000 53,211 2,575,248 2,280,796 14 2,625 2,494 Barrier Island-03 840 24.00 21.20 0.40 1.45 0.15 3,030 3,655 10,480 17,165 17 to 692+90 325 309 21.0 N/A 204 180 63,000 55,587 2,638,248 2,336,383 13 2,662 2,349 Barrier Island-03 840 24.00 23.40 0.20 2,030 3,655 10,480 16,165 18 692+90 to 694+92 & 680+90 to 683+27 325 439 21.0 N/A 150 118 65,893 51,684 2,704,141 2,388,067 21 3,089 2,423 Barrier Island-03 840 24.00 21.20 0.40 2.00 2,030 3,655 10,480 16,165 19 683+77 to 686+75 & 694+92 to 696+05 325 411 21.0 N/A 94 73 38,465 29,808 2,742,606 2,417,875 24 2,285 1,771 Barrier Island-03 341 24.00 16.50 4.25 0.30 2.15 1,330 3,805 12,420 17,555 20 to 698+50 335 245 21.0 N/A 210 197 51,385 48,345 2,793,991 2,466,220 11 2,234 2,102 Barrier Island-03 340 24.00 23.00 1.00 1,330 3,805 12,420 17,555 21 to 700+70 335 220 21.0 N/A 194 182 42,690 39,960 2,836,681 2,506,180 11 2,227 2,085 Barrier Island-03 340 24.00 19.10 0.25 2.00 2.25 1,330 3,805 12,420 17,555 22 to 703+40 335 270 21.0 N/A 215 185 58,030 49,830 2,894,711 2,556,010 12 2,541 2,182 Barrier Island-03 340 24.00 22.50 0.40 0.30 1,330 3,805 12,420 17,555 23 to 706+00 335 260 21.0 N/A 208 186 54,060 48,360 2,948,771 2,604,370 11 2,385 2,134 Barrier Island-03 340 24.00 22.40 0.35 0.40 0.05 1,330 3,805 12,420 17,555 24 to 708+85 335 285 21.0 N/A 200 176 57,000 50,295 3,005,771 2,654,665 12 2,443 2,156 Barrier Island-03 353 24.00 23.20 0.40 1,330 3,805 12,420 17,555 25 to 711+15 335 230 21.0 N/A 192 171 44,056 39,240 3,049,827 2,693,905 13 2,506 2,232 Barrier Island-03 353 24.00 17.35 1.00 0.25 1.10 3.20 0.30 2,030 3,855 12,420 18,305 26 to 713+50 335 235 21.0 N/A 213 191 50,000 44,889 3,099,827 2,738,794 11 2,381 2,138 Barrier Island-03 353 24.00 21.00 1.30 0.30 1.00 1,630 3,855 13,380 18,865 27 to 715+75 335 225 21.0 N/A 219 197 49,255 44,250 3,149,082 2,783,044 11 2,383 2,141 Barrier Island-03 353 24.00 20.40 0.40 2.40 1,630 3,855 13,380 18,865 28 to 718+10 335 235 21.0 N/A 219 194 51,550 45,610 3,200,632 2,828,654 11 2,308 2,042 Barrier Island-03 353 24.00 22.20 0.20 1.20 1,630 3,855 13,380 18,865 29 718+10 to 720+00 & 720+00 to 720+40 335 230 21.0 N/A 187 174 43,000 40,100 3,243,632 2,868,754 12 2,234 2,083 Barrier Island-03 348 24.00 19.15 0.30 4.15 1,630 3,855 13,380 18,865 30 720+40 to 721+26 & 709+40 to 715+15 335 661 21.0 N/A 69 56 45,314 37,114 3,288,946 2,905,868 35 2,385 1,953 Barrier Island-03 343 24.00 19.00 0.40 0.15 1.45 2.20 1,630 3,855 13,380 18,865 3,288,946 2,905,868 - - -

15th: Changed gromet gasket on back door liner of main pump, and fix leak on lid to main pump. 3,288,946 2,905,868 - - - 14th: Lost main pump pressure to problem with service water pump. 3,288,946 2,905,868 - - -

3,288,946 2,905,868 - - - OD-T Prepared by OD-T, David Mayeaux, Rev JBP{ 3,288,946 2,905,868 - - - NOTE: (Time Input - Hrs.Minutes) TOTAL: 7,669 1,333,710 1,194,117 15 2588 2317 720.00 515.33 11.58 14.08 4.17 1.00 6.00 162.75 5.08 Pipeline Length (Based (Time Calculations - Hrs.Decimal Hrs) AVG. 256 FT/DY 44,457 39,804 CY/DAY % TIME: 71.57% 1.61% 1.96% 0.58% 0.14% 0.83% 22.6% 0.71% on eff. time) 17,862

Cumulative Advance = 26,715 FT Cum. CY = 3,288,946 2,905,868 CY Cumulative EFF. Time = 1475.17 Hrs.

CONTRACT/SOLICITATION NUMBER: DACW29-99-C-0027 DACW29-98-B-0033 PROJECT: Passes Of The Mississippi River, South Pass, CY Cutterhead, Maintenance Dredging, C/L Sta's 280+00 to 760+00, Plaquemines Parish, Louisiana PAGE 4 OF 5

LOCATION/REMARKS SWING ADVANCE DEPTH Stand/ Gross Credit GROSS CREDITED CUMULATIVE CUMULATIVE Gross Credit EFF.

DATE May-00 ft ft ft Non-stand CY/ CY/ CY CY GROSS CY CREDITED CY FT/ CY/ CY/ DISPOSAL PUMP TOTAL TIME NON-EFFECTIVE TIME PIPELINE - FT

Previous cumulative totals = 26,715 Reach FT FT 3,288,946 2,905,868 HR HR HR LOCATION RPM TIME 1,475.17 HPL HSL CPPL CCSH CLPJ LDNE WVP MOR MISC PONT SHORE SUB TOTAL 1 715+15 to 718+55 335 340 21.0 N/A 57 44 19,218 15,000 3,308,164 2,920,868 44 2,507 1,957 Barrier Island-03 343 24.00 7.40 0.20 16.00 1,630 3,855 14,340 19,825 2 718+55 to 720+00 & 720+00 to 721+00 335 245 21.0 N/A 61 49 15,040 12,000 3,323,204 2,932,868 40 2,439 1,946 Barrier Island-03 343 24.00 6.10 0.55 0.35 16.20 1,630 3,855 14,340 19,825 3 to 723+20 335 220 21.0 N/A 209 191 46,000 41,950 3,369,204 2,974,818 10 2,140 1,951 Barrier Island-03 343 24.00 21.30 0.05 0.15 2.10 1,630 3,855 14,340 19,825 4 to 725+40 335 220 21.0 N/A 171 159 37,700 35,000 3,406,904 3,009,818 9.7 1,663 1,544 Barrier Island-03 343 24.00 22.40 0.25 0.55 1,630 4,005 14,340 19,975 5 to 727+70 335 230 21.0 N/A 159 141 36,514 32,460 3,443,418 3,042,278 10 1,660 1,475 Barrier Island-03 343 24.00 22.00 1.00 0.40 0.20 1,630 4,155 14,340 20,125 6 to 730+02 335 232 21.0 N/A 172 153 40,000 35,414 3,483,418 3,077,692 12 2,034 1,801 Barrier Island-03 343 24.00 19.40 0.10 4.10 1,630 4,155 14,340 20,125 7 to 731+80 335 178 21.0 N/A 169 156 30,036 27,826 3,513,454 3,105,518 13 2,133 1,976 Barrier Island-03 343 24.00 14.05 0.10 8.30 1.15 1,930 4,155 14,340 20,425 8 to 734+27 335 247 21.0 N/A 179 158 44,200 39,080 3,557,654 3,144,598 12 2,105 1,861 Barrier Island-03 343 24.00 21.00 1.00 2.00 2,330 4,155 14,340 20,825 9 734+27 to 736+10 & 719+50 to 723+39 335 572 21.0 N/A 70 55 39,884 31,226 3,597,538 3,175,824 30 2,090 1,636 Barrier Island-03 343 24.00 19.05 0.10 1.10 2.15 1.20 2,330 4,155 14,340 20,825 10 to 735+00 295 572 21.0 N/A 31 25 18,000 14,364 3,615,538 3,190,188 26 809 646 Barrier Island-03 343 24.00 22.15 1.00 0.20 0.25 2,330 4,475 14,340 21,145 11 to 737+90 335 290 21.0 N/A 127 109 36,927 31,530 3,652,465 3,221,718 17 2,194 1,873 Barrier Island-03 353 24.00 16.50 4.50 2.20 1,630 4,675 15,800 22,105 12 to 741+00 335 310 21.0 N/A 126 107 38,939 33,170 3,691,404 3,254,888 13 1,645 1,402 Barrier Island-03 353 24.00 23.40 0.20 1,630 4,675 15,800 22,105 13 to 744+50 335 350 21.0 N/A 89 64 31,085 22,400 3,722,489 3,277,288 16 1,463 1,054 Barrier Island-03 363 24.00 21.15 1.20 0.45 0.40 2,330 4,675 15,800 22,805 14 to 749+12 335 462 21.0 N/A 38 19 17,496 8,748 3,739,985 3,286,036 37 1,390 695 Barrier Island-03 363 24.00 12.35 0.35 0.40 3.00 7.10 2,330 4,675 15,800 22,805 15 Repairs to dredge ladder - 21.0 N/A - 3,739,985 3,286,036 - - Barrier Island-03 24.00 24.00 - - - - 16 Repairs to dredge ladder - 21.0 N/A - 3,739,985 3,286,036 - - Barrier Island-03 24.00 24.00 - - - - 17 Repairs to dredge ladder - 21.0 N/A - 3,739,985 3,286,036 - - Disposal Area-05 24.00 24.00 - - - - 18 Repairs to dredge ladder - 21.0 N/A - 3,739,985 3,286,036 - - Disposal Area-05 24.00 24.00 - - - - 19 Repairs to dredge ladder - 21.5 N/A - 3,739,985 3,286,036 - - Disposal Area-05 24.00 24.00 - - - - 20 303+50 to 302+90 335 60 21.5 N/A 102 89 6,104 5,360 3,746,089 3,291,396 14 1,465 1,286 Disposal Area-05 283 24.00 4.10 1.50 18.00 1,280 120 4,370 5,770 21 302+90 to 300+00 & 300+00 to 299+10 320 380 21.5 N/A 120 97 45,730 36,730 3,791,819 3,328,126 17 2,103 1,689 Disposal Area-05 290 24.00 21.45 0.40 0.25 1.10 1,430 50 4,320 5,800 22 to 293+80 320 530 21.5 N/A 90 66 47,590 35,090 3,839,409 3,363,216 27 2,380 1,755 Disposal Area-05 280 24.00 20.00 1.10 2.50 1,430 150 4,320 5,900 23 to 286+60 320 720 21.5 N/A 63 45 45,420 32,620 3,884,829 3,395,836 36 2,271 1,631 Disposal Area-05 283 24.00 20.00 0.50 3.10 2,130 150 4,320 6,600 24 to 279+60 320 815 21.5 N/A 51 37 41,560 30,415 3,926,389 3,426,251 39 1,995 1,460 Disposal Area-05 281 24.00 20.50 0.05 0.50 0.40 1.35 2,130 150 4,320 6,600 25 303+10 to 306+45 320 335 21.5 N/A 115 103 38,465 34,495 3,964,854 3,460,746 18 2,051 1,840 Disposal Area-05 283 24.00 18.45 0.40 4.05 0.30 2,130 270 4,320 6,720 26 to 309+40 320 295 21.5 N/A 128 120 37,901 35,405 4,002,755 3,496,151 15 1,960 1,831 Disposal Area-05 283 24.00 19.20 0.40 0.15 3.45 2,130 350 4,320 6,800 27 to 313+44 320 404 21.5 N/A 122 100 49,166 40,344 4,051,921 3,536,495 17 2,122 1,741 Disposal Area-05 283 24.00 23.10 0.20 0.30 2,130 550 4,320 7,000 28 to 317+80 320 436 21.5 N/A 97 78 42,431 33,876 4,094,352 3,570,371 19 1,845 1,473 Disposal Area-05 283 24.00 23.00 0.30 0.30 2,130 750 4,320 7,200 29 to 322+71 320 491 21.5 N/A 83 65 40,681 31,693 4,135,033 3,602,064 21 1,775 1,383 Disposal Area-05 304 24.00 22.55 0.45 0.20 2,730 870 4,320 7,920 30 to 326+92 320 421 21.5 N/A 83 64 34,808 27,107 4,169,841 3,629,171 22 1,793 1,396 Disposal Area-05 324 24.00 19.25 0.30 1.25 2.40 2,330 1,030 6,320 9,680 31 to 332+30 320 538 21.5 N/A 76 64 41,024 34,648 4,210,865 3,663,819 24 1,844 1,557 Disposal Area-05 323 24.00 22.15 0.40 0.30 0.35 2,330 1,190 6,320 9,840

7th:Changed main generator fuel filter and repaired leak in service wtr line. 26th: Changed broken port swing cable. 4,210,865 3,663,819 - - - 1st, 2nd: Tighten packing on main pump, repair leak in engine room of dredge, replace broken bolts on main pump. 4,210,865 3,663,819 - - - 3rd: Changed starboard swing cable and relug port swing cable. 20th, 22nd: Underwater pump tripped off, low oil pressure. 4,210,865 3,663,819 - - -

OD-T Prepared by OD-T, David Mayeaux, Rev JBP{14th: Picked up swing anchors and disconnect discharge line from dredge. 4,210,865 3,663,819 - - - NOTE: (Time Input - Hrs.Minutes) TOTAL: 9,893 921,919 757,951 20 1897 1560 744.00 486.00 10.33 17.08 6.92 0.33 6.83 12.67 47.08 156.75 Pipeline Length (Based (Time Calculations - Hrs.Decimal Hrs) AVG. 319 FT/DY 29,739 24,450 CY/DAY % TIME: 65.32% 1.39% 2.30% 0.93% 0.04% 0.92% 1.70% 6.3% 21.07% on eff. time) 14,327

Cumulative Advance = 36,608 FT Cum. CY = 4,210,865 3,663,819 CY Cumulative EFF. Time = 1961.17 Hrs.

CONTRACT/SOLICITATION NUMBER: DACW29-99-C-0027 DACW29-98-B-0033 PROJECT: Passes Of The Mississippi River, South Pass, CY Cutterhead, Maintenance Dredging, C/L Sta's 280+00 to 760+00, Plaquemines Parish, Louisiana PAGE 5 OF 5

LOCATION/REMARKS SWING ADVANCE DEPTH Stand/ Gross Credit GROSS CREDITED CUMULATIVE CUMULATIVE Gross Credit EFF.

DATE Jun-00 ft ft ft Non-stand CY/ CY/ CY CY GROSS CY CREDITED CY FT/ CY/ CY/ DISPOSAL PUMP TOTAL TIME NON-EFFECTIVE TIME PIPELINE - FT

Previous cumulative totals = 36,608 Reach FT FT 4,210,865 3,663,819 HR HR HR LOCATION…

This is the start of the file's text. The full file is on GovTribe.