This document provides details on a federal contract solicitation for maintenance dredging services on the Mississippi River. The U.S. Army Corps of Engineers, New Orleans District is soliciting bids for cutterhead dredge services to maintain the channel from Mile 6.0 to Mile 19.5 of the Southwest Pass area of the Mississippi River. Interested vendors are encouraged to register as interested vendors on beta.sam.gov and post subcontracting opportunities on the SBA Subnet. The solicitation will issue on or around November 14, 2019 and bids will be accepted until a future amendment sets the bid opening date. The work involves providing a fully crewed and equipped cutterhead dredge with a minimum 30-inch discharge pipe to perform dredging in the specified area and potentially other areas in the New Orleans District. The estimated value of the contract is between $5-10 million. The point of contacts for the solicitation are listed as Karen Hargrave and Cori Caimi of the U.S. Army Corps of Engineers, New Orleans District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OM-20-275

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The subject Solicitation Mississippi River, Baton Rouge to Gulf of Mexico, Southw est Pass Maintenance Dredging Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Rental No. 1-2020. Plaquemines Parish, Louisiana. Solicitation No. W912P820B0014 has been modified according to the follow pages.

A second amendment w ill be issued to set the bid opening date.

1. CONTRACT ID CODE PAGE OF PAGES

1 39

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0014

X 9B. DATED (SEE ITEM 11)

14-Nov-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

AM0001

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jun-2020

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P820B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - BIDDING SCHEDULE

SECTION SF 30 - SF 30 CONTINUATION

The following have been added by full text:

AM0001

SUBJECT: Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Rental No. 1-2020. Plaquemines Parish, Louisiana.

Solicitation No. W912P820B0014.

1. Wage rates have been updated.

2. General Comment: This solicitation will be used to dredge the channel for both maintenance and new construction. The new construction dimensions of the channel are -50.0 ft MLLW by 750 ft bottom width from Mile 6.0 AHP to Mile 17.5 BHP, then narrowing to 600 ft wide through the jetty channel and bar channel. The specified elevation in the dredging assignment will not exceed -56.0 ft MLLW. Previously, the specified elevation in dredging assignments did not exceed -54.5 ft MLLW.

3. General Comment: Delete all references within the specifications to Edward Creef and replace with the following point of contact: Jeff Corbino, phone: (504) 862-1958, email: Jeffrey.M.Corbino@usace.army.mil.

4. General Comment: For all project titles, delete the word “rental”.

5. Project Table of Contents: Under Division 35, add Section 35 20 23.33 entitled “National Dredging Quality Management Program Pipeline Hydraulic Dredge”.

6. Section 00010, paragraph 1.1 “Bidding Schedule”: Delete this paragraph in its entirety and replace with the attached paragraph 1.1 entitled “Bidding Schedule”.

7. Section 00010, paragraph 1.3 “Evaluation of Bids”, subparagraph d: In the second sentence, delete “dredge rental” and replace with “contract duration”.

8. Section 00010, paragraph 1.4 “Conditions of Contract Award”, subparagraph c: In the first sentence, delete “of rental time”.

9. Section 00010, paragraph 1.4 “Conditions of Contract Award”, subparagraph c: Delete the “Approximate Cutterhead Dredge Contract Duration (Base Plus Option)” table and replace with the following table:

APPROXIMATE CUTTERHEAD DREDGE

CONTRACT DURATION

(BASE PLUS OPTION)

Pump Discharge ID (Inches)

Submerged Pump

Approximate Number of Contract Days

30 or greater Yes 237

10. Section 00700, FAR Clause 52.211-10 “Commencement, Prosecution, and Completion of Work (Apr 1984)”: In subparagraph c, delete “complete the entire work ready for use not later than the days specified by bid lot in Section 00010-1.4 of the bidding schedule, after the date of receipt by Contractor of notice to proceed” and replace with “complete the entire work ready for use not later than 237 calendar days after issuance of the Notice to Proceed”.

11. Section 00800, paragraph 3.2 “Prosecution, Option and Completion”: In the first sentence, delete “option rental hours” and replace with “option hours”.

12. Section 00800, paragraph 3.4 “Equipment Ownership and Operating Expense Schedule (UAI 5152.231- 9000 –MAR 1995)”: Delete this paragraph in its entirety and replace with the following paragraph:

3.4 CONSTRUCTION AND ARCHITECT-ENGINEER (A-E) CONTRACTS (UAI 5131.105)

(d)(2)(i)(B) For the predetermined schedule of construction equipment use rates, use Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule.

(End of special contract requirement)

Note 1: Reference "Construction and Architect-Engineer Contracts" (FAR 31.105). Costs for repairs or overhauling are not allowed.

Note 2: A copy of the "EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE" (Region III) can be obtained from the following website:

https://www.publications.usace.army.mil/Portals/76/Users/182/86/2486/EP%201110-1- 8%20Vo3%20.pdf?ver=2019-12-02-104221-527.

13. Section 01 30 00, paragraph 1.14 “Suspicious Activity Reporting Training”: Delete this paragraph in its entirety.

14. Section 01 33 00 Attachment: Delete the Submittal Register in its entirety and replace with the attached Submittal Register.

15. Section 35 01 50.73, Part 2 “Products”: In the first sentence, delete “due to the fact that the services of the equipment are leased by the Government,”.

16. Section 35 20 23.23, paragraph 1.2.2 “Dredging and Option Dredging Items”, subparagraph j: Delete “rental rate” and replace with “rate”.

17. Section 35 20 23.23, paragraph 1.2.5 “Work for Others”: Add the following as subparagraph d:

d. If the dredge returns to an assignment in another dredging region and the dredge in tow never enters the route that would have been taken had the dredge not been released, when dredged material starts flowing through the discharge pipeline.

18. Section 35 20 23.23, Part 2 “Products”: In the first sentence, delete “due to the fact that the services of the equipment are leased by the Government,”.

19. Section 35 20 23.23, paragraph 3.2.2 “Government Actions for Failed Production”, item (4): Delete “rental rate” and replace with “rate”.

20. Section 35 20 23.23, paragraph 3.1.3.1 “Dredging in Secondary Regions”: In the last sentence, delete “any additional costs not covered within the specification payment clauses”.

21. Section 35 20 23.23, paragraph 3.5 “Cutterhead Dredge and Attendant Plant Sheet”: Change Item 1.(l) to the following:

(l) Length of digging spud to trunnion:

With an idler barge: ________________, Without an idler barge: ________________

22. Section 35 20 23.23 Attachment: Delete MVN Form 4267 in its entirety and replace with the attached MVN Form 4267 (Version: June 2020).

23. Section 35 20 23.23 12, paragraph 1.3 “Existing Structures or Utilities”: For the 8” Hilcorp/Harvest Pipeline at approx. Station 534+13, change the email address for Mark Bordelon to “mbordelon@harvestmidstream.com”.

24. Section 35 20 23.23 12, Part 2 “Products”: In the first sentence, delete “due to the fact that the services of the equipment are leased by the Government,”.

25. Section 35 20 23.23 12, paragraph 3.1.1.1 “Mississippi River, Southwest Pass”: Delete subparagraph a in its entirety and replace with the following:

a. The new construction dimensions of the channel are -50.0 ft MLLW by 750 ft bottom width from Mile 6.0 AHP to Mile 17.5 BHP, then narrowing to 600 ft wide through the jetty channel and bar channel. The Contracting Officer or his/her authorized representative may issue dredging assignments for all or portions of this dredging region. Each dredging assignment will define the dredging template to be dredged by the contractor. The dredging template will include the swing width, the specified elevation, and the total length. The specified elevation in the dredging assignment will not exceed 6 feet below the new construction elevation. The required side slope is 1V on 3H. Disposal areas are shown on the contract plates (20-1R through 20-10R) attached at the end of this section. Should dike construction be necessary, an equitable adjustment in the contract price will be made.

26. Section 35 20 23.23 12, paragraph 3.1.4 “Location of Dredge Plant and Equipment”: Add the following to the end of this paragraph: “Upon completion of an assignment, the Contractor shall immediately remove all discharge pipeline within the channel and any charted marine vessel anchorage areas.”

27. Section 35 20 23.23 12, paragraph 3.3 “Rights of Way”: In subparagraph b(1), delete “August 31, 2020” and replace with “December 31, 2020”.

28. Section 35 20 23.23 12, paragraph 3.3 “Rights of Way”: Add the following as subparagraph c:

c. Special Permit Conditions – The United States Department of Interior, United States Fish and Wildlife Services has granted Right of Entry, including ingress and egress, to perform dredging, disposal, and dike construction within the Delta National Wildlife Refuge Area (DNWR). All work must be completed in accordance with the contract plates and specifications, including all special permit conditions. The Contractor shall comply with the following special permit conditions:

(1) The Right of Entry is valid through May 1, 2021.

(2) The use of airboats is prohibited from 1 November through 31 January.

(3) USACE will schedule a pre-construction meeting and site visit with DNWR 30 days prior to beginning work in DNWR.

(4) USACE will notify DNWR 48 hours prior to the beginning of work by notifying Barret Fortier at barret_fortier@fws.gov or (985) 882-2011 or Jimmy Laurent at laurent_jimmy@fws.gov.

29. Section 35 20 23.23 12 Attachment: Delete Plates 20-1 thru 20-10 and replaced with the attached plates (Plate 20-1R thru 20-10R).

30. After Section 35 20 23.23 12, add the attached Section 35 20 23.33 entitled “National Dredging Quality Management Program Pipeline Hydraulic Dredge”.

31. A second amendment will be issued to set the bid opening date.

Section 00010, paragraph 1.1 “Bidding Schedule”

1.1 Bidding Schedule

SECTION 00010 – BIDDING SCHEDULE

MISSISSIPPI RIVER, BATON ROUGE TO GULF OF MEXICO

SOUTHWEST PASS MAINTENANCE DREDGING NON-CONTINUOUS

MILE 6.0 AHP TO MILE 19.5 BHP

CUTTERHEAD DREDGE NO. 1-2020

PLAQUEMINES PARISH, LOUISIANA

SOLICITATION NO. W912P820B0014

30 INCHES OR GREATER INSIDE DIAMETER (ID) PUMP DISCHARGE WITH SUBMERGED PUMP

Bid Item DESCRIPTION Estimated Quantity

Unit Unit Price

Total Price

0001 MOBILIZATION AND

DEMOBILIZATION

1 JOB

0002 DREDGING: Operation of one fully operated cutterhead dredge with 30 inches or greater ID pump discharge with a submerged pump, attendant plant and discharge pipeline as specified.

2880 HOUR

Option

OPTION DREDGING - Same plant as listed in Item No. 0002 of this bid lot.

1440 HOUR XXXXXX

0004 DREDGE TOWING SERVICE 15 MILE

Option

OPTION DREDGE TOWING

SERVICE

30 MILE XXXXXX

Option

BIRD NESTING PREVENTION

AND AVOIDANCE MEASURES

100 DAY

TOTAL:

*SEE BID FORM NOTES

"General Decision Number: LA20200007 01/03/2020

Superseded General Decision Number: LA20190007

State: Louisiana

Construction Type: Heavy Dredging

Counties: Louisiana Statewide.

DREDGING PROJECTS ALONG THE GULF COAST AREA INCLUDING THE

MISSISSIPPI RIVER AND ITS TRIBUTARIES TO THE OHIO RIVER

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020

* SULA1994-001 04/01/1994

Rates Fringes

Derrick Operator.................$ 7.25

Dozer Operator...................$ 7.25

Dredge 16"" and Over Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Fireman.....................$ 7.25 First assistant engineer....$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Second assistant engineer...$ 7.25 Shoreman....................$ 7.25 Third assistant engineer....$ 7.25 Truck driver................$ 7.25 Welder......................$ 7.25

Dredge Under 16"" Deckhand....................$ 7.25 Dredge tender operator......$ 7.25 Leverman....................$ 7.25 Oiler.......................$ 7.25 Welder......................$ 7.25

Hydraulic Dredging First cook..................$ 7.25 Handyman....................$ 7.25 Janitor, cabin person.......$ 7.25 Second cook.................$ 7.25

Marsh Buggy Dragline, Oiler......$ 7.25

Marsh Buggy Dragline, Operator...$ 7.25

Self-Propelled Hopper Dredge, Drag Tender......................$ 9.70 3.45+a

FOOTNOTE: Fourteen paid vacation days and eight paid holidays: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day & Christmas Day provided the employee has one year of service.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

SUBMITTAL REGISTER CONTRACT NO.

(ER 415-1-10)

CONTRACTOR SPECIFICATION SECTION

CONTRACTOR

TYPE OF SUBMITTAL ACTION

A C T I V I T Y

N O

TRANS-

MITTAL

NO

I T E M

N O

SPECIFICATION

SECTION

NUMBER

DESCRIPTION OF

ITEM SUBMITTED

D A T A

D R A W I N G S

I N S T R U C T I O N S

S C H E D U L E S

S T A T E M E N T S

R E P O R T S

C E R T I F I C A T E S

S A M P L E S

R E C O R D S

O M

M A N U A L S

I N F O R M A T I O N

O N L Y

G O V E R N M E N T

A P P R O V E D

R E V I E W E R

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

C O D E

DATE

SUBMIT TO

GOVERN-

MENT

C O D E

DATE REMARKS

a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. q. r. s. t. u. v. w. x. y. z. aa.

1 01 30 00 As-Built Drawings X X NOAO

2 01 35 26 Accident Prevention Program X SS

3 01 57 20.00 10 Environmental Protection Plan X X

4 01 57 20.00 10 Bird Nesting Prevention Plan X X

5 35 01 50.73 Calibration of Fathometer X X NOAO

6 35 01 50.73 Calibration of Horizontal Positioning Equipment

X X NOAO

7 35 01 50.73 Disposal Area Surveys X X X NOAO

8 35 01 50.73 Before and After Dredging Cross Sections

X X X NOAO

9 35 20 23.23 Pump curve(s) X X ODT-D

10 35 20 23.23 Plant Data Sheet X X ODT-D

11 35 20 23.23 Plan of Operations for Utility Crossing X X NOAO

12 35 20 23.23 Utility As-builts and Surveys Received from the Owners

X X X ODT-D

13 35 20 23.23 Aerial Photography Documentation X ODT-D

14 35 20 23.33 Letter of National Dredging Quality Management Program Certification

X X ODT-D

ENG FORM 4288-R, JAN 97 EDITION OF MAR 95 IS OBSOLETE. PAGE _1_ OF _1_ PAGES (PROPONENT: CEMP-CE)

NOTE: THIS REGISTER IS NOT NECESSARILY COMPLETE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A COMPREHENSIVE REGISTER.

ACTION

TITLE AND LOCATION

Mississippi River Southwest Pass Cutterhead Dredge No. 1-2020. Solicitation No. W912P820B0014.

CLASSI-

FICATION

GOVERNMENT CONTRACTOR

SCHEDULE DATES

NAME AND TYPE PIPELINE

OTHER TOTAL SHIFTS PER DAY

AUTH.

DIMENSIONS

C/L STATIONS >

GMS/liter GMS/liter

TYPE

TYPE

MM TYPE

AMOUNT

AVERAGE WIDTH OF CUT (SWING) FEET

TOTAL ADVANCE THIS PERIOD FEET

TOTAL ADV. PREVIOUS TO THIS PERIOD FEET BOOSTER (in line) :

TOTAL ADVANCE TO DATE FEET

TOTAL LENGTH OF DISCHARGE PIPE: *SEE REVERSE SIDE HANDLING PIPE LINES HPL

AVERAGE LIFT FEET HANDLING ANCHOR LINES HAL

AVERAGE PUMP SPEED R.P.M. CLEARING PUMP AND PIPE LINE CPPL

AVERAGE GROSS CY'S DREDGED / PER PUMP HRS. CU. YDS. CLEARING CUTTER OR SUCTION HEAD CCSH

SCOWS LOADED NUMBER WAITING FOR SCOWS WFS

CU. YDS. TO AND FROM WHARF OR ANCHORAGE TFWA

CHANGING LOCATION OF PLANT ON JOB CLPJ

CUBIC YARDS REMOVED LOSS DUE TO OPPOSING NATURAL ELEMENTS LDNE

LOSS DUE TO PASSING VESSELS WVP

(1) CREDITED (pay place) SHORE LINE AND SHORE WORK SLSW

(2) GROSS (computed amount) WAITING FOR BOOSTER WFB

MINOR OPER. REPAIRS (explain in remarks) MOR

(1) CREDITED (pay place) WAITING FOR ATTENDANT PLANT WAP

(2) GROSS (computed amount) PREPARATION AND MAKING UP TOW PMUT

TRANSFERRING PLANT BETWEEN WORKS TPBW

(1) CREDITED (pay place) LAY TIME OFF SHIFT AND SATURDAYS LTOSS

(2) GROSS (computed amount) SUNDAYS AND HOLIDAYS SH

FIRE DRILL FD

MISCELLANEOUS (explain in remarks) MISC

TOTAL NON-EFFECTIVE WORKING TIME

DREDGE

TENDER #1

TENDER #2

SKIFF

CREW PCT OF TOTAL TIME IN PERIOD

SURVEY

BARGES

CRANE BARGE MAJOR REPAIRS AND ALTERATIONS

IDLER BARGE CESSATION

CUTTER-TYPE COLLISIONS

SPUD LENGTH MISCELLANEOUS (explain in remarks)

NUMBER OF TOTAL LOST TIME

INSPECTIONS PERCENTAGE OF TOTAL TIME

( ) NO

TOTAL TIME IN PERIOD 00:00

( ) YES

Version: June 2020

SIZE

DREDGE ADVANCE MECHANISM

NO. OF TIMES AMOUNT

THRU: TO:

inch dia.

disch.

PROPULSION

REPORT NO.

SHOREDREDGE

WORK

SCHEDULE

FROM:

DIPPER OR BUCKET

DATE OR

PERIOD

cu. yds. cap.

COMPLETION

PROJECT

AND

BAR

DEPTHWIDTH

SUCTION PIPE JETDREDGE PUMP

RANGES - RT, CL, LT

RANGES - RT, CL, LT

WIDTH OF

SWING:

RANGES - RT, CL, LTLOCATION

(INCLUDE STATIONS

NUMBERS)

CHARACTER

OF

MATERIAL

(chargeable to cost of work)

CONTRACT OR

ORDER NUMBER

WEATHER

CONDITION miles

AVERAGE

DEPTH

RIVER

STAGE

MM

NUMBER

BEFORE DREDGING

GEOLOGICAL

CLASSIFICATION

CHANNEL

CONDITION

ABSOLUTE DENSITY VOIDS RATIOIN PLACE DENSITY

ITEM

MVN FORM 4267

AVERAGE LOAD PER SCOW

CONTRACT USE

ONLY

TOTAL EFFECTIVE AND NON-EFFECTIVE

ITEM

BY DIV & OCE

PERSONNEL

ATTENDANT PLANT

HOURS

(If "YES", explain under remarks on back)

BY DISTRICT

PERSONNEL

HAS ANYTHING DEVELOPED WHICH MIGHT

LEAD TO A CHANGE ORDER OR CLAIM?

TIME

(Signature and Remarks

Required on reverse side)

NAME OR NUMBER

AMOUNT PREVIOUSLY REPORTED:

TOTAL AMOUNT DREDGED TO DATE:

PCT. OF NON-EFFECTIVE TIME

REPORTS CONTROL SYMBOL

ENGCW-0-13

DAYS PER WEEK

CUTTER OR BUCKET

REPORT OF OPERATIONS -- PIPELINE, DIPPER OR BUCKET DREDGES

HORSEPOWER

OF

DAILY[ ] [ ] [ ]NEW

WORK

MAINTE-

NANCE [ ] [ ] ANNUAL

CHARACTER OF

REPORT

DREDGE

OVERDEPTH

EFFECTIVE WORKING TIME

NON-EFFECTIVE WORKING TIME

NUMBER OF

CREWMEMBERS

TIMETIME

(chargeable to cost of work)

HIRED LABOR

TOTAL NUMBER OF DAYS

ON WHICH WORK WAS

DONE:

(clear, cloudy, rain, snow, and fog)

PUMPING OR DREDGING

PCT. OF EFFECTIVE TIME

AFTER DREDGING

VISIBILITY

UNIT QUANTITY

FULL WIDTH

FULL WIDTH

FULL WIDTH

(chargeable to cost of work)

LOST TIME

(not chargeable to cost of work)

AMOUNT DREDGED THIS PERIOD:

DISTRIBUTION OF TIMEWORK PERFORMED

GRAIN SIZE

WIND (maximum velocity & direction)

BEFORE DREDGING

CONTRACTOR

AFTER DREDGING

MINIMUM

GAGE LOCATION

MAXIMUM

MINIMUM

SOUNDING

FLOATING Marsh Trackhoes-30' SKIDDER Barges

PONTOONS Marsh Trackhoes-60'

Metal Metal Metal Marsh Buggies Breast

PVC PVC PVC Dozers Head

Flexifloat Other Other Total FEET in LINE Front End Loaders Line

TOTAL LF Air Boats Other

ATV's

ELBOWS Y-Valves

Stiff Spreaders

Swivel

MATERIAL

SHORE CONNECTION START FINISH TOTAL CY TOTAL ACRES CLASSIFICATION

100% 70% 35% 0% TOTAL

BASE HOURS 00:00

OPTION HRS 00:00

OPERATING SUPPLIES

COMMODITIES UNIT QUANTITY QUANTITY VALUE

FUEL (oil) GAL.

TOTAL COST OF PLANT

LUBRICANT GAL.

(oil)

LUBRICANT LBS.

(grease)

WATER GAL.

NAME: NAME: NAME:

TITLE: TITLE: TITLE:

Version: June 2020

SUMMARY OF DREDGE DISCHARGE PIPELINE, DISPOSAL AREAS and TIME BREAKDOWN

PLANT OWNERSHIP COSTS

(Actual for F.Y. reporting period):

BOOK VALUE

BALANCE IN PLANT ACCOUNT

SUBMITTEDED BY (Name, title, and signature)

REMARKS:

AMOUNT SHORE AMOUNT

RECOMMENDED BY (Name, title, and signature) APPROVED BY (Name, title, and signature)

ATTENDANT PLANT

DREDGE DISCHARGE PIPELINE DISPOSAL AREA EQUIPMENT ANCHORING SYSTEMS

(complete when submitting Annual report)

ANNUAL REPORT DATA

CONSUMED INVENTORY

COSTS PER MINUTE

SUBMERGEAMOUNT

MVN FORM 4267

ANCHORS

DISPOSAL AREA SUMMARY

LOCATION

TIME BREAKDOWN

REMARKS