Text version
NO-15-16
SOLICITATION# W912P819B0019
US Army Corps of Engineers New Orleans District
West Bank Mississippi River Levee, New Orleans to Venice
NOV-10
Happy Jack to Nairn
Plaquemines Parish, Louisiana
Construction Solicitation and Specifications
December 2018
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
7400 LEAKE AVENUE
NEW ORLEANS, LOUISIANA 70118
NO-15-16
REPLY TO
ATTENTION OF
20 December 2018
SOLICITATION: W912P819B0019
FOR: New Orleans to Venice, NOV-10, Happy Jack to Nairn, Plaquemines Parish, Louisiana (NO-15-16)
TO OPEN:
I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY
CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.
Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.
III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) B-U-N-S number. If you do not already have a D&B B-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS
SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS
IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of clearing, grubbing, excavation for new drainage ditches, new levee/ramp crossing embankments, degrading of the existing levee, deep material mixing, buttress riprap placement, geotextile and surfacing, turf establishment and all other related incidental work.
CAUTION TO BIDDERS: In delivery of hand-carried bids, bidders are cautioned to allow sufficient time for delays which may be encountered as a result of frequent trains which are subject to block all access roads to place of bid opening for various lengths of time. Such delays DO NOT permit acceptance or consideration of late bids.
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH
THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL", DATED NOVEMBER 2014.
https://www.sam.gov/
SOLICITATION NUMBER: W912P819B0019
TECHNICAL INQUIRIES AND QUESTIONS
ALL QUESTIONS MUST BE SUBMITTED VIA PROJNET.
TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THIS SOLICITATION ARE TO BE
SUBMITTED VIA BIDDER INQUIRY IN PROJNET AT (HTTPS://WWW.PROJNET.ORG) .
BIDDERS ARE ENCOURAGED TO SUBMIT QUESTIONS 5 DAYS PRIOR TO BID OPENING
IN ORDER TO ENSURE ADEQUATE TIME IS ALLOTTED TO FORM AN APPROPRIATE
RESPONSE AND AMEND THE SOLICITATION, IF NECESSARY. TO SUBMIT AND REVIEW
INQUIRY ITEMS, PROSPECTIVE VENDORS WILL NEED TO USE THE BIDDER INQUIRY
KEY PRESENTED BELOW AND FOLLOW THE INSTRUCTIONS LISTED BELOW THE KEY
FOR ACCESS. A PROSPECTIVE VENDOR WHO SUBMITS A COMMENT /QUESTION WILL
RECEIVE AN ACKNOWLEDGEMENT OF THEIR COMMENT/QUESTION VIA EMAIL,
FOLLOWED BY AN ANSWER TO THE COMMENT/QUESTION AFTER IT HAS BEEN
PROCESSED BY OUR TECHNICAL TEAM.
ALL TIMELY QUESTIONS AND APPROVED ANSWERS WILL BE MADE AVAILABLE
THROUGH PROJNET. APPROVED ANSWERS TO ALL TIMELY QUESTIONS WILL ALSO BE
POSTED ON THE FEDBIZOPS IN THE FORM OF A REPORT GENERATED FROM PROJNET
AS SOON AS THE COMMENT/QUESTION ENTERING PERIOD IS OVER AND ALL
ANSWERS ARE ALL FINALIZED.
THE SOLICITATION NUMBER IS: W912P819B0019
THE BIDDER INQUIRY KEY IS: 8T55YI-86F9JB
SPECIFIC INSTRUCTIONS FOR PROJNET BID INQUIRY ACCESS:
1. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
2. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
3. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
4. EMAIL. ENTER THE EMAIL ADDRESS YOU WOULD LIKE TO USE FOR
COMMUNICATION.
5. CLICK CONTINUE. A PAGE WILL THEN OPEN SAYING THAT A USER ACCOUNT
WAS NOT FOUND AND WILL ASK YOU TO CREATE ONE USING THE PROVIDED
FORM.
6. ENTER YOUR FIRST NAME, LAST NAME, COMPANY, CITY, STATE, PHONE,
EMAIL, SECRET QUESTION, SECRET ANSWER, AND TIME ZONE. MAKE SURE TO
REMEMBER YOUR SECRET QUESTION AND ANSWER AS THEY WILL BE USED
FROM THIS POINT ON TO ACCESS THE PROJNET SYSTEM.
7. CLICK ADD USER. ONCE THIS IS COMPLETED YOU ARE NOW REGISTERED
WITHIN PROJNET AND ARE CURRENTLY LOGGED INTO THE SYSTEM.
SPECIFIC INSTRUCTIONS FOR FUTURE PROJNET BID INQUIRY ACCESS:
1. FOR FUTURE ACCESS TO PROJNET, YOU WILL NOT BE EMAILED ANY TYPE OF
PASSWORD. YOU WILL UTILIZE YOUR SECRET QUESTION AND SECRET ANSWER
TO LOG IN.
2. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
3. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
4. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
5. EMAIL. ENTER THE EMAIL ADDRESS YOU USED TO REGISTER PREVIOUSLY IN
PROJNET.
6. CLICK CONTINUE. A PAGE WILL THEN OPEN ASKING YOU TO ENTER THE
ANSWER TO YOUR SECRET QUESTION.
7. ENTER YOUR SECRET ANSWER AND CLICK LOGIN. ONCE THIS IS COMPLETED
YOU ARE NOW LOGGED INTO THE SYSTEM.
NOV-10 SPECIFICATIONS
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
PAGES 1-79
DIVISION 01 - GENERAL REQUIREMENTS
01 32 17.00 20 01 33 00 01 42 00 01 45 0 . 10 01 45 04.00 10 01 55 26.00 12 01 57 20.00 12 01 57 23.00 12 01 57 23.01 12 01 78 02.00 10
NETWORK ANALYSIS SCHEDULES (NAS)
SUBMITTAL PROCEDURES
SOURCES FOR REFERENCE PUBLICATIONS
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
CONTRACTOR QUALITY CONTROL
TRAFFIC CONTROL AND COORDINATION
ENVIRONMENTAL PROTECTION
STORM WATER POLLUTION PREVENTION PLAN
TRUCK WASH-DOWN RACKS
CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 31 - EARTHWORK
31 05 19.04 12 SEPARATOR GEOTEXTILE
31 11 00.00 12 CLEARING AND GRUBBING
31 23 00.00 12 EXCAVATION
31 24 00.00 12 EMBANKMENT
31 32 13.00 12 GROUND IMPROVEMENT
31 32 13.03 12 SOIL MIXING (WET METHOD)
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23.00 09 GRANULAR COURSES
32 12 16.00 12 ASPHALTIC PAVEMENT
32 15 00.00 12 SURFACING (GRANULAR)
32 92 19.04 12 TURF ESTABLISHMENT AND MAINTENANCE
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19.04 12 STONE AND BEDDING CONSTRUCTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS
01100
SOLICITATION
GENERAL PROVISIONS
W42HEM83454941
WEST BANK MISSISSIPPI RIVER LEVEE, NEW ORLEANS TO VENICE, NOV-10, HAPPY JACK TO NAIRN, PLAQUEMINES PARISH, LOUISIANA
The work consists of clearing, grubbing, excavation for new drainage ditches, new levee/ramp crossing embankments, degrading of the existing levee, deep material mixing, buttress riprap placement, geotextile and surfacing, turf establishment and all other related incidental work.
The estimated value of the proposed work is between $25,000,000 and $100,000,000.
X
DUSTIN G. CANNADA (601)631-7546
NOTE: In this request for proposal, "bid" and "bidder" mean "offer" and "offeror".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20 DECEMBER 2018
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SEE SPECIAL NOTICES TO BIDDERS
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by
GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within 10 calendar days and complete it within (730 calendar days)after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 0700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 BY 24 January 2019 @ 1400.
. If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
VICKSBURG CONTRACTING OFC
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE
PAGE
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(601)631-7261 FAX: TEL: TEL: FAX:
W912P819B0019
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 964145
US ARMY CORPS OF ENGRS FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
26. ADMINISTERED BY
U.S. ARMY CORPS OF ENGINEERS
NEW ORLEANS AREA OFFICE
7400 LEAKE AVENUE,
RM 186 NEW ORLEANS, LA 70118
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
Section 00010 - Solicitation Contract Form
NEW ORLEANS TO VENICE NOV-10,HAPPY JACK TO NAIRN, PLAQUEMINES
PARISH, LOUISIANA
This contract will be awarded as one job with unit prices required for specifically selected work. A schedule of the unit price work is contained in Standard Form SF 1442, "Solicitation, Offer and Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys," "DFARS 52.236-7008, Contract Prices."
LINE
ITEM
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
MOBILIZATION AND
DEMOBILIZATION
1 JOB FOR
TRAFFIC CONTROL AND
COORDINATION
1 JOB FOR
TRUCK WASH-DOWN RACKS 1 JOB FOR
DEMOLITION 1 JOB FOR
CLEARING AND GRUBBING 1 JOB FOR
GROUND IMPROVEMENT 1 JOB FOR
EMBANKMENT, COMPACTED FILL 336,480 CY $
SILT FENCE
0008AA
FIRST 16,860 LF 16,860 LF
0008AB
ALL OVER 16,860 LF 3,380 LF
SURFACING 3,810 CY
SEPARATOR GEOTAXTILE 22,950 SY
SEEDING AND MULCHING 80 AC $
0012 ++
LIME SOIL AMENDMENT 80 TN
0013 ++
SULFUR SOIL AMENDMENT 40 TN
W912P819B0019 0010-1 NO-15-16
LINE
ITEM
NO. DESCRIPTION EST QTY UM UNIT PRICE AMOUNT
FERTILIZER
0014AA
FIRST 24,000 LBS 24,000 LBS
0014AB
ALL OVER 24,000 LBS 3,600 LBS
ASPHALTIC PAVEMENT
(6" THICK PG 70-22M) 100 SY
GRANULAR BASE COURSE (7"
THICK) 100 SY
RIVER CHANNEL BUTRESS
RIPRAP
630,660 TN
0018 DEGRADING EXISTING LEVEES
48,320 CY
EXCAVATION, NEW DRAINAGE
DITCH
280 CY
0020 ++
PROCUREMENT OF HESCO
BARRIERS,
OR APPROVED EQUIVALENT
0020AA
FIRST 3,000 LF 3,000 LF
0020AB
ALL OVER 3,000 LF 2,000 LF
0021 ++
INSTALLATION OF HESCO
BARRIERS, OR APPROVED
EQUIVALENT
0021AA
FIRST 3,000 LF 3,000 LF
0021AB
ALL OVER 3,000 LF 2,000 LF
TOTAL $
W912P819B0019 0010-2 NO-15-16
NOTES
++ Items not subject to the requirements of FAR 52.211-18 VARIATION IN
ESTIMATED QUANTITY.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE
AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPaym ent.aspx
EVALUATION OF SUBDIVIDED ITEMS.
Item Nos. 0008, 0014, 0020 and 0021 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS.
The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. 0008 and 0014.
a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
W912P819B0019 0010-3 NO-15-16
b. Where the actual quantity of work performed for Item Nos. 0008 and 0014 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
c. If the quantity of work performed under Item Nos. 0008 and 0014 exceeds 115% or is less than 85% of the total estimated quantity of the subitems under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
Award will be made as a whole to one bidder.
AC = Acre CF = Cubic Feet CY = Cubic Yard DH = Miles EA = Each FC = 1000 Cubic Feet FT = Foot HF = 100 Feet HH = 100 Cubic Feet HL = 100 Linear Feet HR = Hours HS = 100 Square Feet HY = 100 Yards LB = Pound LF = Linear Foot LH = Labor Hour JA = Job LY = Linear Yard MO = Months SB = Square Mile SF = Square Foot SQ = Square SY = Square Yard TL = 1000 Linear Feet TN = Net Ton UN = Unit YD = Yard YL = 100 Linear Yards YM = Cubic Yards Per Mile SQ = Square
All quantities are estimated except where unit is given as "JA" or "EA".
-- End of Document --
W912P819B0019 0010-4 NO-15-16
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf
W912P819B0019 0010-5 NO-15-16
***Analysis for application of PLAs apply to construction solicitations (including task order request for proposals (RFPs)), with performance in the United States, with an anticipated contract value of $25M or greater, and issued after 15 October 2010. Further, with respect to solicitations to establish new MATOCs and Single Award Task Order Contracts (SATOC) issued after 15 October 2010, the following language shall be included at an appropriate location in the solicitation: “Pursuant to FAR 22.503, a PLA may be considered for certain projects under Task Orders meeting the criteria set forth in Executive Order 13502. Each Task Order may be evaluated on a project by project basis for possible application of a PLA.*** http://www.fedshirevets.gov/index.aspx http://www.dol.gov/vets/ http://benefits.va.gov/vow/ http://wtc.army.mil/modules/employers/index.html http://www.hiringourheroes.org/ http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-
Section 00100 - Bidding Schedule/Instructions to Bidders
SPECIAL NOTICES
1. INVITATION FOR BIDS (IFB) NO. W912P819B0019
FOR: WEST BANK MISSISSIPPI RIVER LEVEE, NEW ORLEANS TO VENICE,
NOV-10, HAPPY JACK TO NAIRN, PLAQUEMINES PARISH, LOUISIANA
BID OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE AT
https://www.youtube.com/channel/UC8aGwLzGsYAHHISJg31RFOw/live
2. SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE
RECEIVED UNTIL DATE AND TIME OF BID OPENING.
3. THIS PROCUREMENT IS TOTAL SMALL BUSINESS SET-ASIDE.
4. YOUR ATTENTION IS DIRECTED TO SECTION 00100-BID
SCHEDULE/INSTRUCTIONS TO BIDDERS CLAUSE ENTITLED “SUBMISSION
OF BIDS”. IT IS THE BIDDER’S RESPONSIBILITY TO ENSURE THAT
BIDS SENT BY COMMERCIAL CARRIER ARE CLEARLY IDENTIFIED AS
CONTAINING A SEALED BID ON THE OUTERMOST ENVELOPE. THIS
INCLUDES, BUT IS NOT LIMITED TO, BIDS SENT VIA: FEDERAL
EXPRESS, AIRBORNE EXPRESS, EXPRESS COURIER SERVICES, INC.,
EXPRESS MAIL - U.S. POSTAL SERVICE, UNITED PARCEL SERVICE AND
PUROLATOR.
5. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL
OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
6. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT
CLAUSE ENTITLED, “AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS
FOR CONSTRUCTION”, WHICH WILL APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
7. SEE SECTION 01 00 00.00 09, GENERAL CONTRACT REQUIREMENTS
CLAUSE, ENTITLED, “PAYMENT INVOICES” WHICH WILL APPLY TO THE
CONTRACT RESULTING FROM THIS SOLICITATION.THE FEDERAL
ACQUISITION REGULATION REQUIRES THAT THE “REMIT TO” ADDRESS OF
THE INVOICE MATCH THE “REMIT TO” ADDRESS ON THE CONTRACT OR A
PROPER NOTICE OF ASSIGNMENT.
8. MAIL BIDS TO THE VICKSBURG DISTRICT HEADQUARTERS
BUILDING, PLANS AND SPECIFICATIONS ROOM, ROOM 120, 4155 CLAY
STREET, VICKSBURG, MISSISSIPPI 39183-3435. BIDS SENT BY
COMMERCIAL CARRIER SHALL BE CLEARLY MARKED ON THE OUTER
W912P819B0019 00100-1W912P819B0019 00100-1 NO-15-16
https://www.youtube.com/channel/UC8aGwLzGsYAHHISJg31RFOw/live
ENVELOPE AS CONTAINING A “SEALED BID”. BIDS MUST BE RECEIVED
PRIOR TO THE EXACT TIME SET FOR BID OPENING.
9. HAND CARRIED BIDS MUST BE DELIVERED TO THE PLANS AND
SPECIFICATIONS ROOM, ROOM 120, IN THE VICKSBURG DISTRICT
HEADQUARTERS BUILDING, 4155 CLAY STREET, VICKSBURG,
MISSISSIPPI 39183-3435. ALL BIDS MUST BE RECEIVED PRIOR TO
THE EXACT TIME SET FOR BID OPENING. NOTE: BIDS DELIVERED
LATER THAN 15 MINUTES PRIOR TO THE TIME SET FOR THE BID
OPENING SHALL BE DELIVERED DIRECTLY TO ROOM 103, BID OPENING
ROOM, RATHER THAN ROOM 120, THE PLANS AND SPECIFICATIONS ROOM.
10. BIDS WILL NOT BE ACCEPTED NOR SHALL BIDS BE WITHDRAWN
TELEGRAPHICALLY OR BY ELECTRONIC COMMERCE.
11. VENDORS CAN BE FOUND ON THE WEB SITE:
http://www.cpars.navy.mil/. IF THE CONTRACTOR WISHES TO
PARTICIPATE IN THE PERFORMANCE EVALUATION PROCESS, ACCESS TO
CCASS AND PKI CERTIFICATION IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
12. P RIOR TO BID OPENING, IN ACCORDANCE WITH FEDERAL
ACQUISITION REGULATION PART 14.303 (b) MODIFICATION OR
WITHDRAWAL OF BIDS, “A BID MAY BE WITHDRAWN IN PERSON BY A
BIDDER OR ITS AUTHORIZED REPRESENTATIVE IF, BEFORE THE EXACT
TIME SET FOR OPENING OF BIDS, THE IDENTITY OF THE PERSONS
REQUESTING WITHDRAWAL IS ESTABLISHED AND THAT PERSON SIGNS A
RECEIPT FOR THE BID."
THE FOLLOWING STEPS WILL BE REQUIRED BY THE VICKSBURG
CONTRACTING OFFICE:
1) CONTRACTOR MUST PRESENT A LETTER VERIFYING THEY ARE A
REPRESENTATIVE OF THE COMPANY.
2) CONTRACTOR MUST SHOW VALID PICTURE ID.
3) VICKSBURG DISTRICT CONTRACTING OFFICE WILL HAVE THE
REPRESENTATIVE SIGN A RECEIPT FOR BID.
W912P819B0019 00100-2W912P819B0019 00100-2 NO-15-16
http://www.cpars.navy.mil/
GENERAL NOTICES
1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA
AUTHORITY:
(a) Original Authorization: Section 203 of the Flood Control Act of 1962, Public Law 87-874 (76 Stat. 1173)
(b) Supplemental Authorization: New Orleans to Venice, LA— Under the Flood Control and Coastal Emergencies (FC&CE) heading, Chapter 3, Title I, Division B of Public Law 109 148 (119 Stat.
2762 – 2763) (3rd FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title II of Public Law 109-234 (120 Stat. 454-455) (4th FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title III of Public Law 110-252 (122 Stat. 2349-2350) (6th FC&CE Supplemental); and under the FC&CE heading, Chapter 3, Title I, Division B of Public Law 110-329 (122 Stat. 3590) (7th FC&CE Supplemental)
APPROPRIATION:
4th and 6th Supplemental appropriations for the Non-Federal Levees. 3rd, 4th, and 6th Supplemental appropriations for New Orleans to Venice, LA
FUNDING CITATION: 96x3125
2. NEGOTIATIONS AFTER SEALED BIDDING.
The Government has the option to reject all bids received in response to the sealed bid advertisement and initiate negotiation. Negotiations will include soliciting offers from each responsible bidder that submits a bid in response to the Invitation for Bids. If, after bid opening, the Contracting Officer determines that negotiations are in the best interest of the Government, the following steps will be followed:
(a) An amendment to the sealed bid advertisement will be issued to each responsible bidder changing the Invitation for Bids Number to Request for Proposals Number. The amendment will also make any necessary changes to the scope of the work.
(b) A cover letter signed by the negotiator will accompany the amendment explaining the
W912P819B0019 00100-3W912P819B0019 00100-3 NO-15-16
procedures to be followed during negotiations.
3. BID, PERFORMANCE AND PAYMENT BONDS.
A bid bond is required with the bid package and is to be executed on Standard Form SF24. Performance and payment bonds with be required after award. See Section 00700, Contract Clauses 52.228-1, BID GUARANTEE and 52.228-15, PERFORMANCE AND
PAYMENT BONDS -- CONSTRUCTION
4. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS.
The right is reserved, as the interest of the Government may require, to revise or amend the specifications and/or drawings prior to the date set for opening bids. Such revisions or amendments, if any, will be announced by amendment or amendments to this Invitation for Bids. Copies of such amendments as may be issued will be furnished to all prospective bidders. If the revision or amendments are of a nature which require material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the District Engineer will enable bidders to revise their bids. In such case, the amendments will include an announcement of the new date for opening bids.
5. BUSINESS INTEGRITY.
The apparent successful bidder as a condition for award of any contract resulting from this solicitation may be required to execute a certificate related to Business Integrity.
6. CONDITIONS AFFECTING THE WORK.
Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications, W912P819B0019 00100-4W912P819B0019 00100-4 NO-15-16 or related documents.
7. BIDDER'S QUALIFICATIONS.
A determination of contractor responsibility will be made. A determination of non-responsibility may be cause for the rejection of a prospective contractor's bid. In accordance with FAR 9.104-1 - General Standards, before a bid is considered for award, the bidder shall be requested by the Government to submit a statement regarding their previous experience in performing comparable work, their business and technical organization, financial resources, the plant available to be used in performing the work and/or other information necessary to make the determination of contractor responsibility.
8. SITE OF THE WORK.
Bidders are advised that for purpose of applicability of the Davis-Bacon Act and other contract labor standard provisions, "the site of the work" under the contract to be awarded pursuant to this Invitation may not be limited to the physical place(s) where the construction called for in the contract will remain when work on it has been completed. The "site of the work" may include other adjacent or nearby property used by the Contractor or Subcontractors during such construction. For example, fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., will be considered part of the site of the work provided they are dedicated exclusively or nearly so to performance on the contract and are so located in proximity to the actual construction location that it would be reasonable to include them.
9. INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE,
AND BONDS.
a. Specifications, Invitation No. W912P819B0019, Bidding Schedule, Pre-award Information/Description of Work/Bid Evaluation, Equipment Schedule, Construction Contract Clauses, and Wage Determination Decisions No. LA180007 02/09/2018 LA7 of the Secretary of Labor, are parts of this Invitation.
b. (1) An offeror (bidder) electing to use individual sureties for either bid guarantees or performance and payment
W912P819B0019 00100-5W912P819B0019 00100-5 NO-15-16
bonds must submit, concurrently with the bonds and required affidavits, a statement of both the business and personal names of the persons and/or brokerages firms through whom the bonds or the guarantees were obtained, together with the address and telephone number of the persons and/or brokerage firms.
(2) Offerors or bidders should note that some individual sureties and brokers of individual sureties have been debarred or suspended from offering themselves or others as sureties to the Government. Offerors or bidders are responsible for ascertaining the current status of their sureties and brokers.
(3) Failure to provide the required information or the submission of bid guarantees obtained from debarred or suspended sureties or brokers may cause rejection of the offer (bid).
10. DEFINITIONS
(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.
(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
(c) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of l978 is the Armed Services Board of Contract Appeals, addressed as follows: Recorder, Armed Services Board of Contract Appeals, Skyline 6, 7th Floor, 5109 Leesburg Pike, Falls Church, Virginia 22041-3208.
(d) "Small business concern" means a concern including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in 13 CFR 121.
W912P819B0019 00100-6W912P819B0019 00100-6 NO-15-16
(1) Size Standards for Construction and Special Trades.
(a) Construction. A concern is small if its average annual receipts for its preceding 3 fiscal years did not exceed $36.5 million.
(b) Dredging. A concern is small if (1) its average annual receipts for its preceding 3 fiscal years did not exceed $27.5 million, and (2) at least 40 percent of the yardage in the contract's plans and specifications is dredged with equipment owned by the concern or obtained from another small business dredging concern.
CLAUSES INCORPORATED BY REFERENCE
52.203-7 Anti-Kickback Procedures MAY 2014 52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
52.232-13 Notice Of Progress Payments APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
W912P819B0019 00100-7W912P819B0019 00100-7 NO-15-16
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
(End of provision)
52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATION (JUN 2018)
(a) This provision does not apply to acquisitions below the simplified acquisition threshold or to acquisitions of commercial items as defined at FAR 2.101.
(b) Certification. [Offeror shall check either (1) or (2).]
____ (1) The Offeror certifies that--
W912P819B0019 00100-8W912P819B0019 00100-8 NO-15-16
https://www.sam.gov/
(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available via the internet at https://www.state.gov/t/avc/rls/rpt/; and
(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President's or Secretary of State's determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C. 2593a). The report is available via the internet at https://www.state.gov/t/avc/rls/rpt/; or
____ (2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.
(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.
(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there. Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.
(2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of non-compliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation:
(i) An inability to certify compliance.
(ii) An inability to conclude compliance.
(iii) A statement about compliance concerns.
(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns.
(4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days.
(d) Do not submit an offer unless--
W912P819B0019 00100-9W912P819B0019 00100-9 NO-15-16
https://www.state.gov/t/avc/rls/rpt/ https://www.state.gov/t/avc/rls/rpt/ mailto:NDAA1290Cert@state.gov
(1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer; or
(2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has--
(i) Waived application under U.S.C. 2593e(d) or (e); or
(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).
(e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly submitted a false certification, in addition to other remedies available to the Government, such as suspension or debarment, the Contracting Officer may terminate any contract resulting from the false certification.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
52.219-2 EQUAL LOW BIDS. (OCT 1995)
(a) This provision applies to small business concerns only.
(b) The bidder's status as a labor surplus area (LSA) concern may affect entitlement to award in case of tie bids. If the bidder wishes to be considered for this priority, the bidder must identify, in the following space, the LSA in which the costs to be incurred on account of manufacturing or production (by the bidder or the first-tier subcontractors) amount to more than 50 percent of the contract price.
(c) Failure to identify the labor surplus area as specified in paragraph (b) of this provision will preclude the bidder from receiving priority consideration. If the bidder is awarded a contract as a result of receiving priority consideration under this provision and would not have otherwise received award, the bidder shall perform the contract or cause the contract to be performed in accordance with the obligations of an LSA concern.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
W912P819B0019 00100-10W912P819B0019 00100-10 NO-15-16
Goals for minority participation for each trade
Goals for female participation for each trade
See Attached See Attached
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Economic Area 113 New Orleans, LA as follows:
Bayou Sauvage, Turtle Bayou, Orleans Parish, Louisiana
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
W912P819B0019 00100-11W912P819B0019 00100-11 NO-15-16
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be ________ percent of the bid price or twenty percent (20%) of the bid price or $3,000,000 , (d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S Army Corps of Engineers Ellis Screws
CEMVK-CT-C
4155 Clay Street Vicksburg, MS 39183
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Jeff Falati New Orleans Area Office Email: Jeffrey.J.Falati@usace.army.mil Telephone: 504-862-2980 or 504-628-5078
W912P819B0019 00100-12W912P819B0019 00100-12 NO-15-16
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any (48 CFR Chapter) provision with an authorized deviation is indicated by the…