A21_W912P818B0056_Am_0005.pdf

PDF 2 MB Posted

Attached to
WBV_MRL Nine Mile Point Seepage Control (ED 18-045) Federal contract opportunity
Solicitation number
W912P818B0056
Issued by
Department of the Army Corps of Engineers Engineering District New Orleans

About this file

W912P818B0056_Am_0005

View the file

Other files for this federal contract opportunity

Other files attached to WBV_MRL Nine Mile Point Seepage Control (ED 18-045), newest first.
File Type Posted
W912P818B0056_Signed_Abstract.pdf PDF
W912P818B0056_Original_Abstract.pdf PDF
A21_W912P818B0056_Am_0004.pdf PDF
A21_W912P818B0056_Am_0003.pdf PDF
A21_W912P818B0056_Am_0002.pdf PDF
A21_W912P818B0056_Am_0001.pdf PDF
H01_W912P818B0056_Plans.pdf PDF
A21-W912P818B0056.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for Mississippi River and Tributaries Project (MR&T), Mississippi River Westbank Levee, West Jef ferson Levee District, Nine Mile Point Seepage Control, B/L Sta. 481+50 to B/L Sta. 524+70, Jefferson Parish, Louisiana (ED 18-045), is hereby amended to incorporate changes to the Plans and Specifications, revise response to number 19. of contractor's questions, delete bid schedule in it's entirety and replace it w ith the attached, and incorporate quantity take off for contractors:

SEE ATTACHED CONTINUATION PAGES

BID OPENING DATE/TIME OF 25 SEPTEMBER 2018 AT 2:00 PM CST REMAINS THE SAME.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P818B0056

X 9B. DATED (SEE ITEM 11)

24-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Sep-2018

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

19-Sep-2018

W912P818B0056

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

SECTION 01100

1. Page 10, paragraph 7. Delete this paragraph in its entirety and substitute the following therefore.

“7. STAGING AREAS

(a) The area identified on the drawings as Temporary Work Area Easement “Staging Area” is available for the Contractors to utilize through the duration of this contract.

Access to the staging area is restricted to the use of and through GATE 2 only. (See drawings, Temporary Access Easement @ GATE 2). The Contractor shall maintain the staging area through the duration of the contract. With the exception of stored sheetpile, the area shall not be used for stockpiles. When construction is complete, the Contractor shall remove any debris, grade any disturbed areas and perform any turf establishment or add surfacing material to restore the area to its pre-construction condition.

(b) Measurement and Payment. No separate measurement or payment will be made for utilizing staging area. All costs incurred for the utilization, maintenance and post-construction restoration shall be included in the items to which the work is incidental.”

2. Page 11, UTILITIES WITHIN THE LIMITS OF WORK. Delete subparagraph (4) listing in its entirety and substitute the following therefore:

(4) West Jefferson Levee District John R. Monzon, P.E.

Regional Director 7001 River Road P.O. Box 608 Marrero, La. 70073 Telephone: 504-371-6900 Cell Phone: 504-432-7741 Email: jmonzon@slfpaw.org

3. Page 12, subparagraph 10(c). Delete this subparagraph in its entirety and substitute the following therefore:

“(c) Important Notice Regarding Pipelines. Notification of Pipeline Company/Facility Owner is required immediately after Notice to Proceed. The Contractor shall not track heavy equipment or truck loads of sheetpile or other material across any pipeline without prior coordination with the facility owner. Atmos Energy will install protection over their pipeline crossing. The Contractor will not be allowed to cross the Gulf South pipeline with heavy loads as described above. The Contractor shall relocate Ramp B at approximate station 524+00 as necessary to facilitate construction.”

Amendment 0005

SECTION 31 41 16.00 12

Page 6, paragraph 2.1.2. In the 3rd line, delete “, a maximum overall width of 22 inches”.

DRAWINGS

SHEET IDENTIFICATION Nos. G-04 and CG-05. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. G-04 and C-05 therefore.

REVISED CONTRACTOR QUESTION / USACE RESPONSE

As presented in Amendment 0004, delete USACE RESPONSE given and replace with the revised response as follows:

19. Response: By Amendment 0005, the verbiage “a maximum overall width of 22 inches” is hereby deleted from Section 31 41 16.00 12, paragraph. 2.1.2, therefore, NZ-14 and PZC-13 are acceptable alternatives for PZ-22.

00010-3 Ed 18-045

SECTION 00010 – BIDDING SCHEDULE

Mississippi River and Tributaries Project (MR&T), Mississippi River Westbank Levee, West Jefferson Levee District, Nine Mile Point Seepage Control, B/L Sta. 481+50 to B/L Sta. 524+70, Jefferson Parish, Louisiana

Item DESCRIPTION Estimated Quantity Unit Unit

Price Estimated Amount

0001 Mobilization and Demobilization 1 JOB

0002 Traffic Control and Coordination 1 JOB

0003 Silt Fences

0003AA First 4,000 LF 4,000 LF

0003AB All Over 4,000 LF 1,300 LF

0004 Clearing and Grubbing 1 JOB

0005 Degrading Existing Levee 1 JOB

0006 Embankment, Compacted Fill 1 JOB

0007 Temporary Access Ramps 1 JOB

0008 Piling, Steel Sheet, Type PZ-22 165,440 SF

0009 Asphaltic Pavement 1 JOB

*0010 Seeding and Mulching 2.2 AC

*0011++ Lime Soil Amendment 2.2 TON

*0012++ Sulfur Soil Amendment 1.1 TON

0013 Fertilizer

*0013AA First 660 LBS 660 LBS

*0013AB All Over 660 LBS 115 LBS

Total $ *Denotes a change from the previous Bidding Schedule.

++Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

Award will be made as a whole to one bidder.

*CLIN 0008 - Refer to Amendment 0005, Revised response to Question 19

00010-4 Ed 18-045

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE

UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY

ITEM, ITS BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE

INELIGIBLE FOR AWARD.

NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2), Rejection of Individual Bids).

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

00010-5 Ed 18-045

EVALUATION OF SUBDIVIDED ITEMS (UAI 5152.211-9000 Mar 1995).

Item Nos. 0003 and 0013 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS (UAI 5152.211-

9001 Mar 1995).

The Variation in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. 0003 and 0013.

a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

b. Where the actual quantity of work performed for Item Nos. 0003 and 0013 is less than 85% of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity .

c. If the quantity of work performed under Item Nos. 0003 and 0013 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.

(End of Clause)

Nine Mile Point

Quantity Take offs

ITEM # UNIT Quantity

0004 AC 2.2

0005 Degrading Existing Levee CY 3500

0006 CY 6300

0007 EA 2

LF 152'

LF 118'

CY 500

CY 82

CY 5.2

CY 2.2

CY 22.2

0009 JOB 1

CY 477

CY 376

SY 4288

Geogrid (10'x10')

DESCRIPTION

Clearing and Grubbing

Embankment, Compacted Fill

Temporary access road

Ramp A

Ramp B

Compacted Fill

7" Surfacing

Asphalt Apron

6" Wearing Course (10'x 14')

3" Base Course (10'x12')

4"Asphaltic Pavement

4" wearing Superpave (4"x10'x3859')

3" Base Course (3"x10'x3859')

Geogrid (10'x3859')

18B0056_Am_0005-DRAFT
Binder1
ED%2018-045_Am_0005_Nine%20Mile%20Point%20Seepage%20Control
Bid Schedule for_W912P818B0056_Am_0005
Quantity Take off for Contractors

File details come from the government source that posted it.