B01_Official_Abstract_W912P8180038.pdf
PDF 126 KB Posted
- Solicitation number
- W912P818B0038
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_Unofficial_Abstract_W912P818B0038.pdf | ||
| A22_Amendment_0002_W912P818B0038.pdf | ||
| A22_Amendment_0001_W912P818B0038.pdf | ||
| A22_Solicitation_W912P818B0038_.pdf | ||
| 385-1-1.pdf | ||
| 18b0038.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ABSTRACT
LINE
ITEM
NO. DESCRIPTION EST QTY UM
UNIT
PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $2,960,000.00 0002 Traffic Control and Coordination 1 JOB FOR $59,900.00 0003 Silt Fences
0003A First 25,000 LF 25,000 LF $ 1.54 $38,500.00 0003B Over 25,000 LF 7,500 LF $ 1.50 $11,250.00
0004 Truck Wash-Down Racks 1 JOB FOR $741,200.00 0005 Demolition 1 JOB FOR $1,025,000.00 0006 Separator Geotextile 18,052 SY $ 4.60 $83,039.20 0007 Clearing and Grubbing 1 JOB FOR $171,000.00 0008 Excavation, New Drainage Ditch 2,200 CY $ 6.70 $14,740.00 0009 Degrading Existing Levees 1,900 CY $ 11.45 $21,755.00 0010 Embankment, Compacted Fill 460,000 CY $ 56.25 $25,875,000.00 0011 Ground Improvement 1 JOB FOR $11,582,000.00 0012 Granular Base Course 900 SY $ 14.60 $13,140.00 0013 Asphaltic Pavement 900 SY $ 50.15 $45,135.00 0014 Temporary Access Road 1 JOB FOR $52,400.00 0015 Surfacing 3,300 CY $ 93.55 $308,715.00 0016 Seeding and Mulching 72 AC $ 3,075.00 $221,400.00 0017 Fertilizer
0017A First 21,600 LBS 21,600 LBS $ 1.70 $36,720.00 0017B Over 21,600 LBS 3,300 LBS $ 1.70 $5,610.00
0018 Lime Soil Amendment 72 TON $ 1,140.00 $82,080.00 0019 Sulfur Soil Amendment 36 TON $ 855.00 $30,780.00 0020 Concrete Slope Pavement 6,800 SQ $ 637.20 $4,332,960.00
$47,712,324.20
For Bids Under Solicitation, W912P818B0038 West Bank Mississippi River Levee, New Orleans to Venice, NOV-09, St. Jude To City Price, Plaquemines
Parish, Louisiana
Randy Kinder Excavating, Inc., 12965 Carrier Lane, Dexter, MO 63841
TOTAL
ITEM
NO. DESCRIPTION EST QTY UM
UNIT
PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $2,900,000.00 0002 Traffic Control and Coordination 1 JOB FOR $52,000.00 0003 Silt Fences
0003A First 25,000 LF 25,000 LF $ 4.00 $100,000.00 0003B Over 25,000 LF 7,500 LF $ 1.50 $11,250.00
0004 Truck Wash-Down Racks 1 JOB FOR $92,000.00 0005 Demolition 1 JOB FOR $500,000.00 0006 Separator Geotextile 18,052 SY $ 2.00 $36,104.00 0007 Clearing and Grubbing 1 JOB FOR $680,000.00 0008 Excavation, New Drainage Ditch 2,200 CY $ 11.00 $24,200.00 0009 Degrading Existing Levees 1,900 CY $ 6.50 $12,350.00 0010 Embankment, Compacted Fill 460,000 CY $ 23.00 $10,580,000.00 0011 Ground Improvement 1 JOB FOR $11,641,727.00 0012 Granular Base Course 900 SY $ 23.00 $20,700.00 0013 Asphaltic Pavement 900 SY $ 70.00 $63,000.00 0014 Temporary Access Road 1 JOB FOR $84,000.00 0015 Surfacing 3,300 CY $ 70.00 $231,000.00 0016 Seeding and Mulching 72 AC $ 3,000.00 $216,000.00 0017 Fertilizer
0017A First 21,600 LBS 21,600 LBS $ 2.04 $44,064.00 0017B Over 21,600 LBS 3,300 LBS $ 1.88 $6,204.00
0018 Lime Soil Amendment 72 TON $ 210.00 $15,120.00 0019 Sulfur Soil Amendment 36 TON $ 750.00 $27,000.00 0020 Concrete Slope Pavement 6,800 SQ $ 577.00 $3,923,600.00
$31,260,319.00
B&K Construction Co., LLC, 1905 Highway 59, Mandeville, LA 70448
NO. DESCRIPTION EST QTY UM
UNIT
PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $2,100,000.00 0002 Traffic Control and Coordination 1 JOB FOR $50,000.00 0003 Silt Fences
0003A First 25,000 LF 25,000 LF $ 5.50 $137,500.00 0003B Over 25,000 LF 7,500 LF $ 5.50 $41,250.00
0004 Truck Wash-Down Racks 1 JOB FOR $225,000.00 0005 Demolition 1 JOB FOR $500,000.00 0006 Separator Geotextile 18,052 SY $ 3.00 $54,156.00 0007 Clearing and Grubbing 1 JOB FOR $650,000.00 0008 Excavation, New Drainage Ditch 2,200 CY $ 19.00 $41,800.00 0009 Degrading Existing Levees 1,900 CY $ 23.00 $43,700.00 0010 Embankment, Compacted Fill 460,000 CY $ 34.00 $15,640,000.00 0011 Ground Improvement 1 JOB FOR $9,650,000.00 0012 Granular Base Course 900 SY $ 33.00 $29,700.00 0013 Asphaltic Pavement 900 SY $ 44.00 $39,600.00 0014 Temporary Access Road 1 JOB FOR $400,000.00 0015 Surfacing 3,300 CY $ 116.00 $382,800.00 0016 Seeding and Mulching 72 AC $ 4,000.00 $288,000.00 0017 Fertilizer
0017A First 21,600 LBS 21,600 LBS $ 1.00 $21,600.00 0017B Over 21,600 LBS 3,300 LBS $ 1.00 $3,300.00
0018 Lime Soil Amendment 72 TON $ 150.00 $10,800.00 0019 Sulfur Soil Amendment 36 TON $ 900.00 $32,400.00 0020 Concrete Slope Pavement 6,800 SQ $ 675.00 $4,590,000.00
$34,931,606.00
Cycle Construction Company, LLC, 6 East Third St., Kenner, LA 70062
NO. DESCRIPTION EST QTY UM
UNIT
PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $2,075,000.00 0002 Traffic Control and Coordination 1 JOB FOR $40,000.00 0003 Silt Fences
0003A First 25,000 LF 25,000 LF $ 3.00 $75,000.00 0003B Over 25,000 LF 7,500 LF $ 3.00 $22,500.00
0004 Truck Wash-Down Racks 1 JOB FOR $110,000.00 0005 Demolition 1 JOB FOR $175,000.00 0006 Separator Geotextile 18,052 SY $ 2.50 $45,130.00 0007 Clearing and Grubbing 1 JOB FOR $800,000.00 0008 Excavation, New Drainage Ditch 2,200 CY $ 6.00 $13,200.00 0009 Degrading Existing Levees 1,900 CY $ 6.00 $11,400.00 0010 Embankment, Compacted Fill 460,000 CY $ 29.00 $13,340,000.00 0011 Ground Improvement 1 JOB FOR $10,000,000.00 0012 Granular Base Course 900 SY $ 33.00 $29,700.00 0013 Asphaltic Pavement 900 SY $ 60.00 $54,000.00 0014 Temporary Access Road 1 JOB FOR $150,000.00 0015 Surfacing 3,300 CY $ 90.00 $297,000.00 0016 Seeding and Mulching 72 AC $ 3,600.00 $259,200.00 0017 Fertilizer
0017A First 21,600 LBS 21,600 LBS $ 1.25 $27,000.00 0017B Over 21,600 LBS 3,300 LBS $ 1.25 $4,125.00
0018 Lime Soil Amendment 72 TON $ 225.00 $16,200.00 0019 Sulfur Soil Amendment 36 TON $ 300.00 $10,800.00 0020 Concrete Slope Pavement 6,800 SQ $ 650.00 $4,420,000.00
$31,975,255.00
Phylway Construction, LLC, 1074A Hwy 1, Thibodaux, LA 70301
NO. DESCRIPTION EST QTY UM
UNIT
PRICE AMOUNT
0001 Mobilization and Demobilization 1 JOB FOR $1,053,000.00 0002 Traffic Control and Coordination 1 JOB FOR $14,970.00 0003 Silt Fences
0003A First 25,000 LF 25,000 LF $ 5.25 $131,250.00 0003B Over 25,000 LF 7,500 LF $ 5.25 $39,375.00
0004 Truck Wash-Down Racks 1 JOB FOR $54,870.00 0005 Demolition 1 JOB FOR $326,820.00 0006 Separator Geotextile 18,052 SY $ 2.70 $48,740.40 0007 Clearing and Grubbing 1 JOB FOR $1,226,600.00 0008 Excavation, New Drainage Ditch 2,200 CY $ 9.55 $21,010.00 0009 Degrading Existing Levees 1,900 CY $ 7.65 $14,535.00 0010 Embankment, Compacted Fill 460,000 CY $ 37.00 $17,020,000.00 0011 Ground Improvement 1 JOB FOR $12,906,450.00 0012 Granular Base Course 900 SY $ 18.65 $16,785.00 0013 Asphaltic Pavement 900 SY $ 85.20 $76,680.00 0014 Temporary Access Road 1 JOB FOR $39,650.00 0015 Surfacing 3,300 CY $ 70.30 $231,990.00 0016 Seeding and Mulching 72 AC $ 4,915.00 $353,880.00 0017 Fertilizer
0017A First 21,600 LBS 21,600 LBS $ 1.12 $24,192.00 0017B Over 21,600 LBS 3,300 LBS $ 1.12 $3,696.00
0018 Lime Soil Amendment 72 TON $ 117.00 $8,424.00 0019 Sulfur Soil Amendment 36 TON $ 877.00 $31,572.00 0020 Concrete Slope Pavement 6,800 SQ $ 697.00 $4,739,600.00
$38,384,089.40
I CERTIFY THAT I HAVE OPENED, READ AND RECORDED ON THIS ABSTRACT,
ALL OFFERS RECEIVED IN RESPONSE TO THE SOLICITATION.
SIGNATURE AND DATE
Independent Government Estimate
Sheet1
| 2018-10-15T11:23:55-0500 | |
| CARLOCK.JASON.M.1384151228 |
File details come from the government source that posted it.