About this file

AMENDMENT 0001

View the file

Other files

File Type Posted
B01_Official_Abstract_W912P8180038.pdf PDF
B01_Unofficial_Abstract_W912P818B0038.pdf PDF
A22_Amendment_0002_W912P818B0038.pdf PDF
A22_Solicitation_W912P818B0038_.pdf PDF
385-1-1.pdf PDF
18b0038.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912P818B0038, for West Bank Mississippi River Levee, New Orleans To Venice, NOV-09, St. Jude To City Price, Plaquemines Parish, Louisiana, is amended as follow s:

Please see continuation pages for changes.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P818B0038

X 9B. DATED (SEE ITEM 11)

29-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Sep-2018

CODE

VICKSBURG DISTRICT CONTRACTING OFFICE

4155 CLAY ST.

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P818B0038

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

A new Bid Opening date and time of Thursday, 04 October 2018 at 02:00 p.m. is hereby established.

SPECIFICATIONS: Section 01100, Section 31 24 00.00 12, Section 31 32 13.00 12, and

Section 35 42 38.00 12 are revised and replaced.

DRAWINGS: Drawings B-101, C-101, C-201, C-202, C-203, C-204, C-205, C-206, C-502, CU-101, CU-102, CU-103, RR-102, RR-103, and RR-104 are revised and replaced.

Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.

Drawings revised by this amendment have the notation “Revised by Amendment 0001” in the title block.

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Jeff Falati

New Orleans Area Office

Email: Jeffrey.J.Falati@usace.army.mil

Telephone: 504-862-2980 or 504-628-5078

(End of provision)

(End of Summary of Changes)

01100-a Ed 18-037

Section Table of Contents

SECTION 01100 - GENERAL PROVISIONS

1. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 1

2. DAMAGE TO WORK 2

3. SAFETY PROVISIONS 2

4. INSPECTOR'S FIELD OFFICE 7

5. PROJECT SIGN 8

6. RIGHTS-OF-WAY 9

7. CERTIFICATES OF COMPLIANCE 10

8. ENVIRONMENTAL LITIGATION 10

9. UTILITIES AND IMPROVEMENTS 11

10. PERMISSIBLE HOURS OF WORK 13

11. STONE SOURCES 13

12. CLAY SOURCES 14

13. AGGREGATE SOURCES 16

14. FORMAT OF SURVEYS 18

15. PROJECT BENCHMARKS 19

16. BASELINE RE-ESTABLISHMENT 20

17. ACCESS PLAN 21

18. ACCESS ROADS 21

19. EMERGENCY FLOOD PROTECTION PLAN 21

20. FIELD VERIFICATION OF UTILITY LOCATIONS 22

21. SECURITY 22

22. COORDINATION WITH LOCAL INTERESTS 23

23. TEMPORARY NO WORK AREAS 24

Rivised By Amendment 0001

01100-1 Ed 18-037

SECTION 01100 - GENERAL PROVISIONS

1. TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

(a) This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract Clause in Section 00700, entitled Default (Fixed Price Construction) (FAR 52.249-10). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.

(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

(b) The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) for temperature, precipitation and wet ground conditions or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities. Also considered in the chart below was wind, fog, high or low tides, etc.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS

BASED ON (5) DAY WORK WEEK

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

(c) Upon receipt of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.

(d) The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), and shall be calculated chronologically from the first to the last day of each month, and shall be recorded as full days. If the number of actual

01100-2 Ed 18-037 adverse weather delay days exceeds the number of days anticipated in paragraph b, above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Contract Clause in Section 00700, entitled Default (Fixed Price Construction) (FAR 52.249-10).

2. DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in the Contract Clause in Section 00700, entitled Permits and Responsibilities (FAR 52.236-7). However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit price or job prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there is no contract unit or job prices applicable to any part of such work, an equitable adjustment shall be made pursuant to the Contract Clause in Section 00700, entitled Changes (FAR 52.243-4). Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

3. SAFETY PROVISIONS

The safety provisions as specified herein refer to the November 2014 edition of EM 385-1-1. The current document can be found at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM _385-1-1.pdf

(a) Accident Reporting and Recordkeeping. Refer to EM 385- 1-1, Section 01.D.

Reports shall be submitted on ENG Form 3394. Accidents shall be investigated and reports completed by the immediate supervisor of the employee(s) involved and reported to the Contracting Officer or his/her representative within one working day after the accident occurs. All data reported must be complete, timely and accurate. A follow-up report shall be submitted when the estimated lost time days differs from the actual lost time days.

(b) Accident Prevention Plan (APP). (See the Contract Clause in Section 00700, entitled ACCIDENT PREVENTION (FAR 52.236-13).) Within 15 days after receipt of Notice of Award of the contract, and at least 7 days prior to the prework conference, four copies of the Accident Prevention Plan shall be submitted to the Contracting Officer for review and acceptance. The plan shall be prepared in the following format:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

01100-3 Ed 18-037

(1) Executed CESO Form A-02), Accident Prevention Plan Checklist (the “fillable form” can be obtained from:

http://www.usace.army.mil/Portals/2/docs/Safety/EM%20385-1- 1,%202014%20Sections/Checklists/CESO%20Checklist%20A- 02%20Accident%20Prevention%20Plan.pdf) The Contractor shall address each of the elements/sub-elements in the outline contained in Appendix A of EM 385-1-1 in the order that they are provided in the manual. If an item is not applicable because of the nature of the work to be performed, the Contractor shall state this exception and provide a justification.

(2) Activity Hazard Analysis (AHA) Form, Figure 1-2 in Section 1 “Program Management” of EM 385-1-1 (Nov 2014) (Attached at the end of this section).

(3) A copy of company policy statement regarding accident prevention.

(4) When marine plant and equipment are in use under a contract, the method of fuel oil transfer shall be included on MVN Form 385-10 (Latest Edition), Fuel Oil Transfer (attached at the end of this section), (Refer to

33 CFR 156).

(5) EM-385-1-1 01.A.14 (a) requires a hazard analysis for all features of work. For this contract, these hazard analyses shall be submitted with the rest of the APP for review before work begins. Hazard analysis may be refined and resubmitted at a later date if the Contractor chooses.

The Contractor shall have on the construction site during working hours a trained Site Safety and Health Officer (SSHO) in accordance with paragraph 01.A.17 of EM 385-1-1. The Contractor shall not commence physical work at the site until the Contracting Officer, or his/her authorized representative has accepted the plan. The Contractor may submit its Accident Prevention Plan only for the first phase of construction provided that it is accompanied by an outline of the remaining phases of construction. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase. Also refer to Section 1 of

EM 385-1-1.

(c) Comprehensive Hazard Communication Program. The Contractor shall develop, implement, and maintain at the workplace a written, Comprehensive Hazard Communication Program (see Section 06.B.01 of EM 385-1-1) that includes identification of potential hazards as prescribed in 29 CFR Part

1910.1200 and/or 1926.59, effects of exposure and control measures to be used for chemical products and physical agents that may be encountered during the performance of work on this contract, provisions for container labeling, Safety Data Sheets, and employee training program, and other criteria in accordance with 29 CFR Part 1910.1200 and/or 1926.59. Training shall include http://www.usace.army.mil/Portals/2/docs/Safety/EM%20385-1-1,%202014%20Sections/Checklists/CESO%20Checklist%20A-02%20Accident%20Prevention%20Plan.pdf http://www.usace.army.mil/Portals/2/docs/Safety/EM%20385-1-1,%202014%20Sections/Checklists/CESO%20Checklist%20A-02%20Accident%20Prevention%20Plan.pdf http://www.usace.army.mil/Portals/2/docs/Safety/EM%20385-1-1,%202014%20Sections/Checklists/CESO%20Checklist%20A-02%20Accident%20Prevention%20Plan.pdf

01100-4 Ed 18-037 communication methods and systems to be used (i.e., voice, hand signals, radios or other means), and training in the use and understanding of safety data sheets and chemical product hazard warning labels. Prior to bringing hazardous substances, as defined in 29 CFR 1910.1200 and/or 1926.59, onto the job site, a copy of the Hazard Communication Program and the Safety Data Sheets of each substance shall be submitted to the Contracting Officer and made available to the Contractor's employees as part of its Accident Prevention Plan. A site map shall be attached to the inventory showing where the inventoried hazardous substances are stored. The inventory list and site map shall be updated monthly to assure accuracy. The Contractor shall note that “Safety Data Sheets (SDS) has replaced Material Safety Data Sheets (MSDS)” referenced in Section 06.B.01 of EM 385-1-1 meeting the criteria of the new OSHA globally harmonized system.

(d) Daily Inspections. The Contractor shall perform daily safety inspections and record them on the forms approved by the Contracting Officer. Reports of daily inspections shall be maintained at the jobsite in accordance with Section 01 45

04.00 10, "CONTRACTOR QUALITY CONTROL". The reports shall be records of the daily inspections and resulting actions. Each report shall include, as a minimum, the following:

(1) Phase(s) of construction underway during the inspection.

(2) Locations of areas where inspections were made.

(3) Results of inspections, including nature of deficiencies observed and corrective actions taken, or to be taken, date, and signature of the person responsible for its contents.

(e) Safety Sign. The Contractor shall furnish, erect, and maintain a safety sign at the site where indicated by the Contracting Officer. The sign shall conform to the requirements of this paragraph and the drawing included at the end of this section. The lettering shall be black, the safety circle and cross green, and the background white. When placed on a floating plant, the sign may be half size.

The sign shall be erected as soon as practicable, but not later than 15 calendar days after the date established for commencement of work. The data required shall be current. The sign coordinator is Mary H. Ferry@ 504.862.2000.

(f) Ground Fault Protection. Electrical equipment used on this contract shall be equipped with ground fault circuit interrupters in accordance with EM 385-1-1, Section 11.D.05.

(g) Haul Roads. Whenever practical, one-way haul roads shall be used on this contract. Haul roads built and maintained for this work shall comply with the following:

01100-5 Ed 18-037

(1) One-way haul roads for off-the-road equipment; e.g., belly dumps, scrapers, and off-the-road trucks shall have a minimum usable width of 25-feet. One-way haul roads for over-the- road haulage equipment only (e.g., dump trucks, etc.) may be reduced to a usable width of 15-feet.

When the Contracting Officer determines that it is impractical to obtain the required width for one-way haul roads (e.g., a road on top of a levee), a usable width of not less than 10-feet may be approved by the Contracting Officer, provided a positive means of traffic control is implemented. Such positive means shall be signs, signals, and/or signalmen and an effective means of speed control.

(2) Two-way haul roads for off-the-road haulage equipment shall have a usable width of 60-feet. Two-way haul roads for over-the-road haulage equipment only may be reduced to a usable width of 30-feet.

(3) Haul roads shall be graded and otherwise maintained to keep the surface free from potholes, ruts, and similar conditions that could result in unsafe operation.

(4) Grades and curves shall allow a minimum sight distance of 200-feet for one-way roads and 300-feet for two-way roads. Sight distance is defined as the centerline distance an equipment operator (4.5-feet above the road surface) can see an object 4.5-feet above the road surface.

When conditions make it impractical to obtain the required sight distance (e.g., ramps over levees), a positive means of traffic control shall be implemented.

(5) Dust abatement shall permit observation of objects on the roadway at a minimum distance of 300-feet.

(6) Haul roads shall have the edges of the usable portion marked with posts at intervals of 50-feet on curves and 200-feet maximum elsewhere.

Such markers shall extend 6-feet above the road surface and, for nighttime haulage, be provided with reflectors in both directions.

(i) Hurricane Plan. A detailed plan for protection and evacuation of personnel and the construction site, in the event of an impending hurricane or storm, is required as an enclosure to the Contractor's Accident Prevention Plan. This plan shall be submitted to the Contracting Officer, or his/her representative, for review prior to the preconstruction conference. No separate measurement or payment will be made for the Hurricane Plan. Payment shall be distributed amongst the existing bid items. The Hurricane Plan shall include at least the following:

(1) The time each phase of the plan will be put in effect. The time shall be the number of hours remaining for the storm to reach the worksite if it continues at the predicted speed and direction.

01100-6 Ed 18-037

(2) The estimated time necessary to secure and evacuate the site including any emergency flood protection.

(3) The safe harbor for personnel and plant specifically identified.

(4) Sealing Operation. The Contractor shall submit a method for sealing any de-grassed area(s) prior to evacuation from the construction site.

Sealing must be performed with equipment exerting a ground force of not less than 6.0 psi. If a dozer is used to seal the embankment, it shall not weigh less than 20,000 lbs. Initial passes shall be parallel to the levee centerline, and the final pass shall be perpendicular to the levee centerline. Sealing equipment shall remain on site at all times between 01 June and 30 November.

(j) Hazardous Energy Protection. The Contractor shall develop, implement and maintain at the workplace, a written Control of Hazardous Energy (Lockout/Tagout) System. Refer to Section 12 of EM 385-1-1.

(k) Cranes. The Contractor (including subcontractors) shall have cage boom guards, insulating links, or proximity warning devices on cranes that will be working adjacent to power lines. These devices shall not alter the requirements of any other regulation of this part - even if such device is required by law or other regulation. Insulating links shall be capable of withstanding a 1-minute dry low frequency dielectric test of 50,000 volts, alternating current (EM 385-1-1, Section 11.F.08). Calibration records or stamped date of required manufacturer inspection of proximity warning devices shall be kept on the crane. Additionally, prior to any work commencing an Activity Hazard Analysis (EM 385-1-1, Fig.1-2) identifying and satisfying EM 385-1-1, Section 11.A.02, 11.F.03, 11.F.04, 11.F.05, and Table 11-1 requirements shall be submitted and accepted by the Contracting Officer.

(l) Site Safety and Health Office (SSHO). Contractor shall employ a competent person at each project to function as the Site Safety and Health Officer (SSHO).

The SSHO will manage the Contractor’s APP. (This may be a collateral duty responsibility unless specified differently in the contract.) See EM 385-1-1 Appendix A. The person(s), as a minimum, must have completed the 30-hour OSHA Construction Industry safety class (may be web-based training if the student is able to directly ask questions of the instructor by chat/phone), or an equivalent course (See Appendix A, paragraph 3.d.(3)) applicable to the work to be performed and given by qualified instructors. Such training shall have been within the last four (4) years. An SSHO shall be on-duty at all times when work is being performed and shall be responsible for enforcing and implementing the Contractor’s Safety and Health Program in accordance with the accepted APP.

01100-7 Ed 18-037

4. INSPECTOR'S FIELD OFFICE

(a) The Contractor shall furnish, throughout the contract period, for the exclusive use of the Government employees, a temporary waterproof building, or trailer, to be utilized as a field office. It shall be conveniently located at the site of construction and shall be independent of any building, or trailer, used by the Contractor. Toilet facilities and potable water, including bottled water with water cooler, shall be provided within the Inspector's office. It shall be equipped with approved electrical wiring, private telephone service, a telephone answering machine, a fax / copier / printer machine. It shall be equipped with ceiling lamps, double convenience outlets, and the required switches and fuses, to provide 110-volt power for lighting and operating a laptop computer and printer. It shall be equipped with an air conditioning unit to provide cooling in warm or hot weather, and a heater, properly installed and vented in accordance with the National Fire Protection Association Code, for heating in cold weather, as required. The Contractor shall make the necessary arrangements to obtain or to generate the power required to operate the air conditioning unit, lights, and laptop computer and printer, and the power or fuel required for the heater, and shall bear the cost thereof. A drafting table providing a working surface having dimensions of at least 4-feet by 6-feet (which may consist of a piece of plywood, at least 3/4-inch thick, hinged to a wall of the building with hinged legs) shall be installed in the building. The building shall have a built-in locker, extending from the floor to the ceiling, having dimensions of at least 2- feet by 5-feet, with a shelf 12-inch from the top, and one door equipped with two hinges, a hasp and a padlock. All exterior doors and window frames of the building shall be equipped with iron security guards. The door shall also be equipped with butt hinges and a cylinder lock. One draftsman's stool, two strong chairs and two desks shall be provided.

The building or trailer shall conform to the following minimum requirements:

Ceiling height, not less than 6-feet 9-inches Floor space, no less than 240 square feet

Windows, not less than 2

Doors, outside 3

Rooms 2

Ceiling lamp receptacles 3

Double convenience outlets 3

Screens over windows; walls and ceilings shall be insulated; and interior walls finished.

(b) The building, or trailer, shall be removed by the Contractor after completion of all work under this contract and before final acceptance thereof. No separate

01100-8 Ed 18-037 payment will be made for furnishing, maintaining, providing the prescribed utilities, and removing the inspector's field office, but the cost of the same shall be distributed throughout the existing bid items. In the event the Contractor fails to furnish the required facilities, the Government may elect to procure the required facilities and deduct all costs from amounts due or to become due under this contract.

(c) The Contractor shall provide daily janitorial services for this and other buildings at the site throughout the life of the contract. The cost of this service shall be distributed throughout the existing bid items and there shall be no separate payment.

(d) The Contractor shall provide the inspector’s field office with a hard line broadband high speed internet service and associated equipment for the exclusive use of the Government. If this service is not practical at the jobsite, the Contractor shall provide the Inspector's Field Office with access to a wireless network or mobile hotspot. This service must be capable of providing adequate connection to allow the inspectors to import/export files through RMS. The Contractor must field verify that the service provider chosen has adequate continuous coverage at the construction site. This service shall provide a minimum download speed of 20 Mbps and a minimum upload speed of 5 Mbps.

The Contractor shall be responsible for the installation, the maintenance of, and the monthly service fees necessary to provide continuous high speed internet service for the duration of the contract.

(e) The Government and Contractor’s field offices shall be placed within the location and limits of the Government environmentally cleared right of way (ROW) or Limits of Construction (LOC).

5. PROJECT SIGN

Prior to commencement of work, the Contractor shall construct a project sign at the site of the work at a location directed by the Contracting Officer. The sign, which will identify the work with the Corps of Engineers shall be 4 feet by 6 feet in size and shall conform to the requirements of the PROJECT SIGN drawing and installation instructions attached at the end of this section. The lettering for the 2 feet by 4 feet section of the sign with the Corps logo shall be white; all other lettering shall be black.

Lettering for the project name shall be Helvetica Bold, all other lettering shall be Helvetica Regular. The sign coordinator is Mary H. Ferry @ 504.862.2000. No separate payment will be made for construction and erection of the project sign and all costs in connection therewith will be considered an incidental obligation of the Contractor. Upon completion of the work, the sign shall become the property of the Contractor and shall be removed from the job site.

01100-9 Ed 18-037

6. RIGHTS-OF-WAY

a. The rights of entry required for the work to be constructed under this contract, within the rights-of-way limits indicated on the drawings, have been obtained by the Government and are provided without cost to the Contractor. The Contractor shall make its own investigations to determine the conditions, restrictions, and difficulties that may be encountered in the transportation of equipment and material to and from the work site. The proposed work, including rights-of-way, as defined by these specifications and as shown on the drawings, is in compliance with all applicable Federal and state environmental laws and regulations. Upon completion of the Contractor’s work, rights-of-way furnished by the Government shall be returned to its original condition prior to construction unless otherwise noted.

b. If the Contractor proposes a deviation from the Government furnished rights-of-way for his convenience, the Contractor shall notify the Contracting Officer or its representative in writing. Contractor shall not provide any permanent rights-of-way for the project. The Contractor is cautioned that any deviation to the Government furnished rights-of-way is subject to all applicable Federal and state environmental laws and regulations. Compliance with these environmental laws and regulations may require additional National Environmental Policy Act (NEPA) documents, cultural resources surveys, coordination with the Louisiana State Historical Preservation Officer, water quality certification, modification of the Federal consistency determination, etc. The Government is ultimately responsible for environmental compliance; therefore, the Government will determine the additional environmental coordination and documentation necessary for a proposed deviation to the Government furnished rights-of-way.

For any environmental investigations the Government is to perform on areas outside of Government furnished rights-of-way, the Contractor shall provide sufficient rights of entry to the Government. The Contracting Officer will advise the Contractor of the additional environmental coordination and documentation that must be completed. The Government shall be responsible for any additional environmental compliance; however, the Contractor may conduct specific tasks identified by the Government. The Government will offer advice and assistance to the Contractor in conducting these tasks. Depending on the environmental impact of the proposed deviation, obtaining the coordination and documentation may not be approved or could take as much as 180 days for approval by the Government. The Government must review, approve and ensure distribution of all environmental compliance documentation and ensure all comments on the same have been resolved before any utilization of any areas outside of the Government furnished rights-of-way. The Contractor shall reimburse the Government for actual expenses incurred for assistance in completing or attempting to complete additional environmental coordination and documentation, which expenses will not exceed one hundred thousand ($100,000.) dollars. There is no guarantee that environmental compliance will be obtained; therefore, the Contractor shall assume all risks and liabilities

01100-10 Ed 18-037 associated with pursuing a deviation. Any delays resulting from the deviation and/or the environmental coordination and documentation shall not be made the basis of any Contractor claim for increase in the contract cost and/or increase in contract time. Deviations will be at Contractor’s sole risk and liability, including, but not limited to, such liabilities associated with items such as hazardous substances regulated under the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C. 9601 et. seq.), and at no cost to the Government. Government assistance in obtaining additional environmental clearances does not relieve the Contractor of responsibility for complying with other Federal, state or local licenses and permits.

7. CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in three (3) copies. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet specified requirements.

8. ENVIRONMENTAL LITIGATION

(a) The term "environmental litigation", as used herein, means a lawsuit alleging that the work has an adverse effect on the environment or that the Government has not duly considered, either substantively or procedurally, the effect of the work on the environment.

(b) If the performance of all or any part of the work is suspended, delayed, or interrupted due to an order of a court of competent jurisdiction as a result of environmental litigation, as defined below, the Contracting Officer, at the request of the Contractor, shall determine whether the order is due in any part to the acts or omissions of the Contractor or a Subcontractor at any tier not required by the terms of this contract. If the order is not due in any part to acts or omissions of the Contractor (or a Subcontractor at any tier) other than as required by this contract, such suspension, delay, or interruption shall be as if ordered by the Contracting Officer under the Contract Clause in Section 00700, entitled Suspension of Work (FAR 52.242-14). The period of such suspension, delay or interruption shall be considered unreasonable, and an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) as provided in that clause, subject to all the provisions thereof.

01100-11 Ed 18-037

9. UTILITIES AND IMPROVEMENTS

(a) All known utilities within the limits of the work, such as pipes, communication lines, power lines, etc., that would interfere with construction work will be removed, modified or relocated by local interests or utility companies at no cost to the Contractor unless otherwise noted in the plans and/or specifications. The Contractor, however, shall cooperate with the authorities or company representatives and shall conduct his/her operations in such manner as to result in a minimum of inconveniences to the owners of said utilities. The Contractor shall notify each utility owner by certified mail 45 days, 15 days, and again 72 hours prior to the date utilities must be moved and provide a copy of these notifications to the Contracting Officer.

(b) Any unidentified pipes or structures which may be found within the limits of the work during the course of construction shall not be disturbed nor shall construction or excavation be performed at these locations unless and until approved by the Contracting Officer.

(c) The Contractor shall assume full responsibility for the protection of all structures and utilities, public or private including poles, signs, services building utilities, in the street, gas pipes, water pipes, hydrants, sewers, drains, and electric and telephone cables, whether or not they are shown on the drawings.

The Contractor shall carefully support and protect all such structures and utilities from injury of any kind. Any damage resulting from the Contractor's negligence shall be repaired by him at his expense. The Contractor shall bear full responsibility for locating all underground structures and utilities (including existing water services, drain lines, and sewers) as indicated on the plan drawings. Services to buildings shall be maintained, and all costs or changes resulting from damage thereto shall be paid by the Contractor. If, in the opinion of the Contracting Officer, permanent relocation of a utility owned by the Parish is required and is not indicated on the plans, he may direct the Contractor in writing, to perform the work. If relocation of a privately owned utility is required, the Contractor shall notify utility owner and shall have no claim for delay due to such relocation.

(d) Electric Transmission and Distribution Lines (Entergy). While constructing the project, the Contractor will be working near, and under Entergy overhead power lines. The Contractor shall contact Entergy prior to start of construction to coordinate all construction work with Entergy in order to insure safety.

(1) All Entergy Electric relocation and de-energizing shall be closely coordinated between Entergy Electric and the Contractor.

(2) The Contractor shall maintain a minimum distance from all power lines as required by NEC, Entergy and EM 385-1-1. Contractor shall be responsible for determining the maximum height and reach attainable by

01100-12 Ed 18-037 any part of any piece of equipment, and after coordinating with Entergy to determine the height and location of the power line, shall determine if the required clearance will be violated. The Contractor shall not work within the required clearance of the lines unless the lines are de-energized. If the clearance will be violated, prior to beginning any operations in the area, the Contractor shall coordinate with Entergy to de-energize the line.

If the line is to be de-energized but is to remain in place, rather than being removed, the Contractor shall establish a procedure with Entergy to ensure that the Contractor shall have sufficient notice to allow removal of all equipment which may violate the required clearance from the area prior to the line being re-energized. These procedures and requirements shall also apply to any buried power lines.

(3) It shall be the Contractor's sole duty and responsibility to provide for the safety of his/her workers, equipment, Sub-Contractors and the general public during operations in the vicinity of overhead and underground power lines; and to assure that all of his/her operations and those of his/her workers and Sub-Contractors comply with OSHA, EM 385-1-1, the National Electric Safety Code, and all applicable Parish, State and Federal codes and regulations.

(e) For the EXISTING UTILITY DISPOSITION TABLE, see the contract drawings. The followings are Facility Owners’ contact information:

ENTERGY DISTRIBUTION

Ms. Ana Gale-Orellana 413 Paul Mallard Rd.

Mail Unit L-LUL-490 Luling, LA 70070(985) 785-4319 Email: agale@entergy.com

ENTERGY DISTRIBUTION – Relocations Michael Kenney 1001 Virgil St.

Gretna, LA 70053 Mail Unit: L-VIR-680 mkenney@entergy.com 504-365-2984

AT&T

Barry Barrilleaux Manager, OSP Plng and Engineering Design 1010 Hancock Street Gretna, LA 70053(504) 364-6807 Email: bb0533@att.com

PLAQUEMINES PARISH GOVERNMENT (Water and sewer lines) Ken Dugas 333 F. Edward Hebert Blvd, Bldg. 500 mailto:agale@entergy.com mailto:bb0533@att.com

01100-13 Ed 18-037

Belle Chase, LA 70037

(504) 934-6115 kdugas@ppgov.net

ATMOS ENERGY (Gas Pipeline) Brian Blum, Project Specialist 5241 Taravella Road Marrero, LA 70072(504) 362-5258 Brian.blum@atmosenergy.com

10. PERMISSIBLE HOURS OF WORK

When the Contractor elects to work weekends and holidays, notice shall be given to the Contracting Officer, in writing, 36 hours in advance of commencement of such operations to permit suitable arrangements for inspections to be made. Adequate lighting for thorough inspection of night operations shall be provided by the Contractor at his/her own expense. No work shall be performed between the hours of 9:00 p.m.

and 6:00 a.m..

11. STONE SOURCES

(a) On the basis of information and data available to the Contracting Officer, stone meeting the quality requirements of these specifications has been produced from the listed in STONE SOURCES attached at the end of this section.

(b) Stone may be furnished from any of the above listed sources, or at the option of the Contractor may be furnished from any other source designated by the Contractor and accepted by the Contracting Officer, subject to the conditions hereinafter stated.

(c) The Contractor shall determine that the stone source or combination of sources selected is capable of supplying the quantities and gradation needed and at the rate needed to maintain the scheduled progress of the work.

(d) After the award of the contract, the Contractor shall designate in writing only one source or one combination of sources from which he/she proposes to furnish stone. If the Contractor proposes to furnish stone from a source not listed above, he/she may designate only a single additional source for stone. Samples for acceptance testing shall be provided as required by Section 32 15 00.00 12 "Surfacing (Granular)”. If a source for stone so designated by the Contractor is not accepted for use by the Contracting Officer, the Contractor may not propose other sources but shall furnish the stone from a source listed above at no additional cost to the Government.

(e) The listings of the names of the stone suppliers does not constitute an endorsement of such companies. Acceptance of a source of stone is not to be construed as acceptance of all material from the source. The right is reserved to mailto:kdugas@ppgov.net mailto:Brian.blum@atmosenergy.com

01100-14 Ed 18-037 reject materials from certain localized areas, zones, strata, or channels, when such materials are unsuitable for stone as determined by the Contracting Officer.

Materials produced from a listed or unlisted source shall meet all requirements of Section 32 15 00.00 12 Surfacing (Granular).

12. CLAY SOURCES

(a) On the basis of information and data available to the Contracting Officer, the lands containing the clay sources from the sites designated below have been studied by the Government for environmental concerns and soil suitability. The designated sites, below, may be capable of producing the quality of clay material meeting the requirements set forth in Section 31 24 00.00 12, paragraph entitled “MATERIALS”, including the salinity requirements set forth in Section 31 23

00.00 12, paragraph entitled “Borrow Area Agronomy Report”, and are subject to the subparagraphs (b) through (e) below. However, some documentation relating to the below sites may need to be updated prior to their use. The Contractor is responsible for submitting a complete Borrow Submittal for Corps review and approval with all applicable updated documentation. See Section 31 23 00.00 12, paragraph entitled "Submittal Package Requirements in Detail".

March 2014

Site Name Point of Contact Contact Information Location

River Birch, Phase 1 Vic Culpepper Office: 504-436-1288 Cell: 504-915-6006 Avondale, LA

River Birch, Phase 2 Vic Culpepper Office: 504-436-1288 Cell: 504-915-6006 Avondale, LA

Pearlington Dirt Johnny Dollar Cell: 318-366-8218 jdollar.chapel.hill@gmail.com Pearlington, MS

Diaz Property (DK Aggregates) Philip Callahan

504-450-6702 philcallahan@cox.net St. Bernard Parish, LA

Eastover Jerry Howell Cell: 504-559-1606 jerryhowell992@hotmail.com New Orleans, LA

St. Gabriel Michael Daigle Office: 225-216-7483 mdaigle@trcsolutions.com Carville, LA

*1025 Florissant Michael Palmer Cell: 504-812-8016 palmertruckin@yahoo.com St. Bernard Parish, LA

Acosta Amanda Phillips Office: 985-626-5204 gsdi@bellsouth.net St. Bernard Parish, LA

3C Riverside Properties H. Ray Coleman Office: 901-309-5844 raycoleman@earthlink.net St. Charles Parish, LA

*Myrtle Grove Kenneth Payne Office: 504-615-1076 Cell: 504-382-5866 gcdr1@hotmail.com Plaquemines Parish, LA

Frierson M. Matt Durand Office: 337-394-6574 Hancock County, MS

Meyer Robert Najor Office: 866-998-6400 Cell: 805-393-9994 bnajor@fortressgroupusa.com Plaquemines Parish, LA

River Birch-Willswood Vic Culpepper Office: 504-436-1288 Cell: 504-915-6006 Avondale, LA mailto:jdollar.chapel.hill@gmail.com mailto:philcallahan@cox.net mailto:jerryhowell992@hotmail.com mailto:mdaigle@trcsolutions.com mailto:palmertruckin@yahoo.com mailto:gsdi@bellsouth.net mailto:raycoleman@earthlink.net mailto:gcdr1@hotmail.com mailto:bnajor@fortressgroupusa.com

01100-15 Ed 18-037

Contact Contact Information Location vculpepper@riverbirchlandfill.com

Willow Bend Hensley Lee Office: 601-799-1335 Cell: 601-273-0404 hrlee81@hotmail.com

St. John the Baptist Parish, LA

Pearlington Dirt, Phase 2 Johnny Dollar Cell: 318-366-8218 jdollar.chapel.hill@gmail.com Pearlington, MS

*Gathien – Navy Ship Paul Loupe Office: 985-535-0148 Paul.Loupe@loupegroup.com St. Bernard Parish

River Birch-South Kenner Rd. Vic Culpepper

Office: 504-436-1288 Cell: 504-915-6006 vculpepper@riverbirchlandfill.com Avondale, LA

Guillot Paul Loupe Office: 985-535-0148 Paul.Loupe@loupegroup.com St. Bernard Parish

Eastover, Phase 2 Jerry Howell Cell: 504-559-1606 jerryhowell992@hotmail.com New Orleans, LA

Willow Bend, Phase 2 Hensley Lee Office: 601-799-1335 Cell: 601-273-0404 hrlee81@hotmail.com

St. John the Baptist Parish, LA

Tammany Holding Company Robert Torres Office: 985-641-0089 St. Tammany Parish, LA

Henley Robert Najor Office: 866-998-6400 Cell: 850-393-9994 najorr@bellsouth.net Hancock County, MS

Big Shake Jay Thomas Office: 225-769-8615 laearthcorps@cox.net St. James Parish, LA

Contreras Cells E, F, & Z Philip Callahan Cell: 504-450-6702 philcallahan@cox.net St. Bernard Parish, LA

3C Riverside Properties, Phase 3 H. Ray Coleman Office: 901-309-5844 raycoleman@earthlink.net St. Charles Parish, LA

Bocage Plantation Marion Rundell Cell: 713-253-1700 mrundell@gmail.com Ascension Parish, LA

Idlewild, Stage 1 Jerry Howel. Cell: 504-559-1606 jerryhowell992@hotmail.com Plaquemines Parish, LA

Plaquemines Dirt & Clay Karen Boudrie Office: 504-912-5696 boudriekaren@yahoo.com Plaquemines Parish, LA

Citrus Lands Shirley T. Hall Office: 504-754-6881 Plaquemines Parish, LA

Phillips 66 Emily Campbell Office: 504-656-3103 Cell: 504-415-3568 Plaquemines Parish, LA

Nairn Jerry Howell Cell: 504-559-1606 jerryhowell992@hotmail.com Plaquemines Parish, LA

King Mine Richie Santiago Cell: 228-216-5403 kinglandfill@att.net Hancock County, MS

Idlewild, Stage 2 Jerry Howell Cell: 504-559-1606 jerryhowell992@hotmail.com Plaquemines Parish, LA

Spoil Area Michael Pugh Office: 504-309-4129 Cell: 504-905-6387 mpugh@royalengineering.net St. Bernard Parish, LA

Lilly Bayou Thomas Hymel Office: 985-446-9644, Ext. 117

Cell: 985-665-8344 thymel@phylway.com

East Baton Rouge Parish, LA

Raceland Raw Sugars Dan Duplantis Office: 985-537-3533 rrsdanjr@aol.com Lafourche Parish, LA mailto:vculpepper@riverbirchlandfill.com mailto:hrlee81@hotmial.com mailto:Paul.Loupe@loupegroup.com mailto:vculpepper@riverbirchlandfill.com mailto:Paul.Loupe@loupegroup.com mailto:jerryhowell992@hotmail.com mailto:hrlee81@hotmial.com mailto:najorr@bellsouth.net mailto:laearthcorps@cox.net mailto:philcallahan@cox.net mailto:raycoleman@earthlink.net mailto:mrundell@gmail.com mailto:jerryhowell992@hotmail.com mailto:boudriekaren@yahoo.com mailto:jerryhowell992@hotmail.com mailto:kinglandfill@att.net mailto:jerryhowell992@hotmail.com mailto:mpugh@royalengineering.net mailto:thymel@phylway.com mailto:rrsdanjr@aol.com

01100-16 Ed 18-037

Contact Contact Information Location

Acosta, Phase 2 Amanda Phillips Office: 985-626-5204 Cell: 985-264-2425 gsdi@bellsouth.net

St. Bernard Parish, LA

Scarsdale Michael Pugh Office: 504-309-4129 Cell: 504-905-6387 mpugh@royalengineering.net Plaquemines Parish, LA

River Birch-Landfill Expansion Vic Culpepper

Office: 504-436-1288 Cell: 504-915-6006 vculpepper@riverbirchlandfill.com Avondale, LA

Levis Robert Levis Cell: 985-643-1800 rlevis@levischevycadillac.com St. Tammany Parish, LA

Port Bienville M. Matt Durand Office: 337-394-6574 Hancock County, MS

RBEND II Warren Treme Cell: 504-458-9055 tremebuilders528@bellsouth.net

St. John the Baptist Parish, LA

Robert Brothers Farm Pete Graffagnino Office: 225-473-7778 Cell: 225-715-5525

St. John the Baptist Parish, LA

Assumption Land Company

Richard Robichaux

985-526-6457 985-209-8338 rgr23@bellsouth.net Jefferson Parish, LA

Houma Excavation Renee Sabella 504-739-9551 ext. 1091 renees@orleansshoring.com Terrebonne Parish, LA

*No salinity data obtained as Right of Entry not provided

(b) Clay may be furnished from any of the above listed sources, or at the option of the Contractor may be furnished from any other source designated by the Contractor and accepted by the Contracting Officer, subject to the conditions in 31 23 00.00 12, paragraph entitled CONTRACTOR-FURNISHED BORROW

AREAS.

(c) The Government is not responsible for any agreements or breach of agreements nor the resulting impacts of any breach of agreements between the Contractor and the listed owners and/or agents and or any other persons.

(d) Contact the Point of Contact for the above sources for information regarding the location of the sites and geotechnical boring logs of the material.

(e) Usage of any of the above listed clay sources shall neither relieve the Contractor from its obligation to furnish satisfactory material to the project nor commit the Government to the acceptance of the character, quantity or availability of material from these sources. Verification of the material should be performed by the Contractor to assure that the material meets the contract specifications for embankment construction material.

13. AGGREGATE SOURCES

mailto:gsdi@bellsouth.net mailto:mpugh@royalengineering.net mailto:vculpepper@riverbirchlandfill.com mailto:rlevis@levischevycadillac.com mailto:tremebuilders528@bellsouth.net mailto:rgr23@bellsouth.net mailto:renees@orleansshoring.com

01100-17 Ed 18-037

(a) Concrete aggregates meeting the quality requirements of these specifications have been produced from the sources listed below:

July 2014

PRODUCER NEAREST TOWN TO PIT* TYPE PIT DESIGNATION

B. & M. B., Inc. Jackson, LA S, G Dudley Pit B. & M. B., Inc. Wakefield, LA S, G Island Pit B. & M. B., Inc. Jackson, LA S, G Thompson Pit Barriere’s Construction Co., LLC Arcola, LA S, G Ponder Pit Bayou Sand and Gravel, LLC Amite, LA S, G Bayou Sand and Gravel Blain Sand & Gravel, Inc. Georgetown, MS S, G Bailey Pit Bunch Gravel Co. Clinton, LA G Bunch Gravel Plant #1 Bunch Gravel Co. Darlington, LA S, G Bunch Gravel Plant #2 DK Aggregates, LLC Nicholson, MS S, G DK Aggregates Pit Fleniken Sand & Gravel Co. Grangeville, LA S, G Flen-Rock Pit (Spears Lease) Irv Daniel Wakefield, LA S, G Island Pit Lafarge North America Pearl River, LA S, G Honey Island Operation Lafarge North America Sun, LA S, G Isabel Plant Martin Marietta Aggregates Smithland, KY LS Three Rivers Quarry Mears Sand & Gravel Co.