About this file

Amendment 0004, questions and answers, bid opening will be in room 155 not 167.

View the file

Other files

File Type Posted
W912P818B0031_Abstract_ALT_1_and_ALT_2.pdf PDF
W912P818B0031_Original_Abstract.pdf PDF
A21_-_Am-0003.pdf PDF
A21_-_Am-0002.pdf PDF
A21_-_Amendment_0001.pdf PDF
Solicitation_Number_W912P8-18-B-0031.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE

PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

W912P8

The above numbered solicitation for Houma Navigation Canal, Terrebonne Bay and Cat Island Pass, Maintenance Dredging, 18-1, Terrebonne Parish, Louisiana is amended as follows:

1. Question and answer are included.

2. Bid Opening Date remains the same Tuesday, 18 Sept 2018 at 2:00 P.M., room 155 (Small Business) instead of conference room 167.

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT-W, ROOM 326

7400 LEAKE AVENUE

NEW ORLEANS, LA 70118-3651

SEE ITEM 6

J

W912P8-18-B-0031

1 3

09/14/2018

Questions and Answers

Question 1: As according to the Contract Plans the dig depths are -18MLG and -20MLG in varying sections.

a) Are there any vertical tolerances above the required depths that will be accepted?

b) Are there any allowable over dredge tolerances?

Response 1:

a) No vertical tolerances above the required depths will be accepted. -18MLG and -20MLG define minimum required dredging depths.

Over dredging is allowed and the extent of over depth dredging is the responsibility of the Contractor as he/ she deems necessary to complete the work required. However, no separate payment will be provided for over dredging.

Question 2: In reference to Section 35 20 23.00 12 Page 11 it is stated that the Contractor shall provide transportation, meals, and/or lodging for any pipeline/utility representatives who are deemed necessary to remain aboard the dredge while working in the vicinity of these crossings.

a) Has this been necessary on any of the past dredging events? If so, how many people should the Contractor expect to accommodate and for how long?

Response 2: Each pipeline monitoring event is unique to representatives, and an exact estimate of accommodations needed cannot be provided by the Government. However, in general, one representative for each company appears on board the dredge. The duration of their stay may vary with weather conditions, including sea conditions, as well as the progress of the dredge itself as it approaches and crosses each pipeline crossing. The alignment of the pipeline crossings will also have a bearing on the time it takes to safely pass and dredge over each crossing. (i.e. a skewed crossing versus one that is normal to the channel centerline)

Question 3: The Contractor request the Government provide any information from past dredging events in reference to dredge material encountered, and/or debris in the dredge cuts.

Response 3: Most dredge material previously encountered has been clay and silt in Terrebonne Bay, and hard-packed sand, along with some shell, in Cat Island Pass. As stated in Amendment 0001, crab traps were previously encountered during the November 2017 dredging event.

Solicitation Number W912P8-18-B-0031

Amendment 0004

Question 4: As according to the Block 1 Change- Standard Form 1442 issued with amendment 001. The Contractor shall have 115 calendar days to complete the dredging associated with Alternate 001 (1,310,000 CY’s) of material and then 80 calendar days to complete the dredging associated with Alternate 002 (600,000 CY’s). With that being, said the Contractor will have to maintain a production rate of just over 11,000 CY’s per day for the alternate 001 works while only 7,500 CY’s per day for alternate 002 works.

a) The Contractor request the Government change the allowable calendar days to complete works in Alternate 001 from 115 to 175, this would be more representative in matching production rates for Alternate 002.

Response 4: Alternate 001 includes the dredging of Terrebonne bay which contains lighter dredge material than that found in Cat Island Pass, which lends to a “walking” mode versus a “production” mode which is more characteristic of Cat Island Pass. Thus, the Government will not increase the allowable calendar days in Alternate 001.

Question 5: The Contractor request the Government announces available funding for the works (available alternates) prior to opening bids at the bid opening?

Response 5: The government will not disclose available funding prior to bid opening.

Question 6: When does the Government anticipate issuance of Award?

Response 6: The plan is for this work to be awarded this current FY.

Question 7: There are multiple Single Point Discharge locations listed in the Contract Plans but only locations at mile 7.9, (-)1.9, and (-)2.6 are listed in the Contract specifications to be pre/post surveyed after discharge.

a) Is it the Government’s intent that the Contractor only use the SPD locations 7.9, (-) 1.9 and (-) 2.6 for discharging the dredged material? Or will all of the SPD locations listed in the plans be available for Contractor use?

Response 7: All SPD locations listed in the plans will be available for Contractor use. SPD locations 7.9, - 1.9, and -2.6 are the only locations that shall be surveyed pre and post discharge of dredged material.

Solicitation Number W912P8-18-B-0031