specs.pdf
PDF 7 MB Posted
- Solicitation number
- W912P818B0019
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_abstract.pdf | ||
| amendment_03.pdf | ||
| Amendment_02.pdf | ||
| A22_amendment_01.pdf | ||
| 385-1-1.pdf | ||
| 18b0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 00100 - Bidding Schedule/Instructions to Bidders
US Army Corps of Engineers New Orleans District
New Orleans to Venice Hurricane Protection System
NOV-NF-W-06B.5
Magnolia Pump Station
Plaquemines Parish, Louisiana
Construction Specifications
November 2017
REPLY TO
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, VICKSBURG DISTRICT
4155 CLAY STREET
VICKSBURG, MS 39183
Ed 15-014
December 22, 2017
SOLICITATION: W912P818B0018
FOR: New Orleans to Venice, Hurricane Protection System, NOV-NF-W-06B.5, Magnolia Pump Station, Plaquemines Parish, Louisiana
TO OPEN:
I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY
CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.
Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.
III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) D-U-N-S number. If you do not already have a D&B D-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS
SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS
IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of the constructing a pump station, floodwall, levees, channels, and ditches, to include: reinforced concrete walls, reinforced concrete slabs, precast concrete bridge; driving steel sheet piling, steel pipe piling, H-piling, and prestressed precast concrete piling; placing compacted embankment fill,clearing and grubbing, grouted riprap, structural excavation and backfill, painting, turf establishment, excavation, silt fencing, installing vertical pumps, engines, discharge piping, piping supports, electrical systems, mechanical systems, and other incidental work.
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH
THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL", DATED NOVEMBER 2014.
REPLY TO
ATTENTION OF
https://www.sam.gov/ http://fedgov.dnb.com/webform
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00010 Solicitation, Offer and Award (SF 1442) Bidding Schedule
00100 Instructions, To Bidders 00600 Representations and Certifications 00700 Contract Clauses
DIVISION 01 - GENERAL REQUIREMENTS
01100 General Provisions 01 32 17.00 20 Network Analysis Schedules (NAS) 01 33 00 Submittal Procedures 01 42 00 Source for Reference Publications 01 45 02.00 10 Quality Control System (QCS) 01 45 04.00 12 Contractor Quality Control 01 53 00.02 12 Temporary Retaining Structures 01 55 26.00 12 Traffic Control and Coordination 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Plan 01 57 23.01 12 Truck Wash-Down Racks 01 78 02.00 10 Closeout Submittals 01 78 23 Operation and Maintenance Data
DIVISION 03 – CONCRETE
03 11 14.00 12 Formwork for Concrete 03 15 13.00 12 Expansion Joints and Waterstops in Concrete 03 21 00.00 12 Reinforcing Steel 03 31 00.00 12 Cast-In-Place Structural Concrete 03 40 00.00 10 Precast Concrete Construction 03 41 00.01 12 Pre-Engineered Building 03 45 33 Precast Structural Concrete
DIVISION 05 - METALS
05 12 00 Structural Steel 05 50 03.00 12 Metalwork Fabrication, Machine Work, And Miscellaneous Provisions 05 50 04.01 12 Miscellaneous, Standard Articles, Shop Fabricated Items 05 51 00 Metal Stairs 05 51 33 Metal Ladders
05 52 00 Metal Railings
DIVISION 07 – Thermal and Moisture Protection
07 92 00 Joint Sealants
DIVISION 08 – Openings
08 11 13 Steel Doors and Frames 08 33 23 Overhead Coiling Doors 08 51 13 Aluminum Windows 08 71 00 Door Hardware 08 81 00 Glazing 08 91 00 Metal Wall Louvers
DIVISION 09 – FINISHES
09 06 90 Color Schedule 09 22 00 Supports for Plaster and Gypsum Board 09 29 00 Gypsum Board 09 90 00 Paints and Coatings 09 97 02.01 12 Painting: Coal Tar Epoxy System
DIVISION 10 – SPECIALTIES
10 14 02 Interior Signage 10 28 13 Toilet Accessories 10 44 16 Fire Extinguishers 10 71 13.13 Storm Shutters
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems 13 50 01.00 09 Staff Gage
DIVISION 22 – PLUMBING
22 00 00 Plumbing, General Purpose 22 14 01.00 09 Discharge Pipe and Appurtenances
DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems
23 82 02.00 10 Unitary Heating and Cooling Equipment
DIVISION 26 – ELECTRICAL
26 00 00.00 20 Basic Electrical Materials and Methods 26 05 00.00 40 Electrical Work 26 20 00 Interior Distribution System 26 28 01.00 10 Short-Circuit/Coordination Study/Arc-Flash Analysis 26 28 21.00 40 Automatic Transfer Switch 26 32 14.00 10 Diesel Generator Set, Stationary 15-300 KW, Standby Applications 26 41 00 Lightning Protection System 26 51 00 Lighting, Interior and Exterior 28 23 23.00 10 Closed Circuit Television Systems
DIVISION 31 - EARTH WORK
31 05 19.04 12 Separator Geotextile 31 11 00.00 12 Clearing and Grubbing 31 23 00.00 12 Excavation 31 23 16.16 12 Structural Excavation and Backfill 31 23 19.00 12 Dewatering 31 24 00.00 12 Embankment 31 37 00.01 12 Grouted Riprap 31 41 16.00 12 Steel Sheet Piling 31 62 13.20 12 Prestressed Concrete Piles 31 62 14.00 12 Pile Load Tests 31 62 16.00 12 Steel H-Piles 31 62 17.00 12 Steel Pipe Piles
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16.00 12 Asphaltic Pavement 32 15 00.00 12 Surfacing 32 34 00.02 12 Precast Concrete Bridge 32 34 00.02 12 Precast Concrete Bridge Deck Units 32 92 19.04 12 Turf Establishment and Maintenance
DIVISION 33 – UTILITIES
33 05 00.00 12 Modifications to Existing Utilities 33 40 01.00 12 Corrugated Metal Pipe 33 45 00.00 10 Speed Reducers for Storm Water Pumps 33 52 10 Service Piping, Fuel Systems 33 56 10 Factory-Fabricated Fuel Storage Tanks 33 58 00 Leak Detection for Fueling Systems
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 31 19.04 12 Stone and Bedding Construction 35 43 38.00 12 Concrete Scour Protection 35 45 01 Vertical Pumps, Axial-Flow and Mixed Flow Impeller-Type
DIVISION 40 - PROCESS INTEGRATION
40 95 00 Process Control
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 09 Bridge Cranes, Overhead Manual, Under Running Hoist 41 65 10.00 10 Diesel Fueled Engine Pump Drives
TECHNICAL INQUIRIES AND QUESTIONS
ALL QUESTIONS MUST BE SUBMITTED VIA PROJNET.
TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THIS SOLICITATION ARE TO BE
SUBMITTED VIA BIDDER INQUIRY IN PROJNET AT (HTTPS://WWW.PROJNET.ORG) . BIDDERS
ARE ENCOURAGED TO SUBMIT QUESTIONS AT LEAST 5 DAYS PRIOR TO BID OPENING IN
ORDER TO ENSURE ADEQUATE TIME IS ALLOTTED TO FORM AN APPROPRIATE RESPONSE
AND AMEND THE SOLICITATION, IF NECESSARY. TO SUBMIT AND REVIEW INQUIRY ITEMS,
PROSPECTIVE VENDORS WILL NEED TO USE THE BIDDER INQUIRY KEY PRESENTED BELOW
AND FOLLOW THE INSTRUCTIONS LISTED BELOW THE KEY FOR ACCESS. A PROSPECTIVE
VENDOR WHO SUBMITS A COMMENT /QUESTION WILL RECEIVE AN ACKNOWLEDGEMENT
OF THEIR COMMENT/QUESTION VIA EMAIL, FOLLOWED BY AN ANSWER TO THE
COMMENT/QUESTION AFTER IT HAS BEEN PROCESSED BY OUR TECHNICAL TEAM.
ALL TIMELY QUESTIONS AND APPROVED ANSWERS WILL BE MADE AVAILABLE THROUGH
PROJNET. APPROVED ANSWERS TO ALL TIMELY QUESTIONS WILL ALSO BE POSTED ON THE
FEDBIZOPS IN THE FORM OF A REPORT GENERATED FROM PROJNET AS SOON AS THE
COMMENT/QUESTION ENTERING PERIOD IS OVER AND ALL ANSWERS ARE ALL FINALIZED.
THE SOLICITATION NUMBER IS: W912P818B0019
THE BIDDER INQUIRY KEY IS: 9G538E-7RBMQY
SPECIFIC INSTRUCTIONS FOR PROJNET BID INQUIRY ACCESS:
1. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
2. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
3. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
4. EMAIL. ENTER THE EMAIL ADDRESS YOU WOULD LIKE TO USE FOR COMMUNICATION.
5. CLICK CONTINUE. A PAGE WILL THEN OPEN SAYING THAT A USER ACCOUNT WAS
NOT FOUND AND WILL ASK YOU TO CREATE ONE USING THE PROVIDED FORM.
6. ENTER YOUR FIRST NAME, LAST NAME, COMPANY, CITY, STATE, PHONE, EMAIL,
SECRET QUESTION, SECRET ANSWER, AND TIME ZONE. MAKE SURE TO REMEMBER
YOUR SECRET QUESTION AND ANSWER AS THEY WILL BE USED FROM THIS POINT
ON TO ACCESS THE PROJNET SYSTEM.
7. CLICK ADD USER. ONCE THIS IS COMPLETED YOU ARE NOW REGISTERED WITHIN
PROJNET AND ARE CURRENTLY LOGGED INTO THE SYSTEM.
SPECIFIC INSTRUCTIONS FOR FUTURE PROJNET BID INQUIRY ACCESS:
1. FOR FUTURE ACCESS TO PROJNET, YOU WILL NOT BE EMAILED ANY TYPE OF
PASSWORD. YOU WILL UTILIZE YOUR SECRET QUESTION AND SECRET ANSWER TO
LOG IN.
2. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
3. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
4. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
5. EMAIL. ENTER THE EMAIL ADDRESS YOU USED TO REGISTER PREVIOUSLY IN PROJNET.
6. CLICK CONTINUE. A PAGE WILL THEN OPEN ASKING YOU TO ENTER THE ANSWER
TO YOUR SECRET QUESTION.
7. ENTER YOUR SECRET ANSWER AND CLICK LOGIN. ONCE THIS IS COMPLETED YOU ARE
NOW LOGGED INTO THE SYSTEM.
601-631-5793
New Orleans to Venice, Hurricane Protection System, NOV-NF-W-06B.5, Magnolia Pump Station, Plaquemines Parish, Louisiana.
THIS ACQUISITION IS A 100% HUBZone SMALL BUSINESS SET ASIDE
DESCRIPTION OF WORK: The work consists of the constructing a pump station, floodwall, levees, channels, and ditches, to include:
reinforced concrete walls, reinforced concrete slabs, precast concrete bridge; driving steel sheet piling, steel pipe piling, H-piling, and prestressed precast concrete piling; placing compacted embankment fill, clearing and grubbing, grouted riprap, structural excavation and backfill, painting, turf establishment, excavation, silt fencing, installing vertical pumps, engines, discharge piping, piping supports, electrical systems, mechanical systems, and other incidental work..
THE ESTIMATED VALUE OF PROPOSED WORK IS BETWEEN $10,000,000.00 and $25,000,000.00
W912EE
Jason M. Carlock
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
(Title, identifying no., date):10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NEGOTIATED 22 December 2017(RFP)
(IFB) W912P818B0019
SOLICITATION, OFFER,
CALL:
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG, MS 39183-3435
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(If Other Than Item 7)
5. REQUISITION/PURCHASE REQUEST NO.
SEE SPECIAL NOTICES TO BIDDERS
AND AWARD
1. SOLICITATION NO. 2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED PAGE
4. CONTRACT NO. 6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO CODE
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within __10__ calendar days and complete it within
867 calendar days (897 calendar days with option) after award, X notice to proceed. This performance period is X mandatory, negotiable. (See _______ Section 00 700)
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed Offers in original copy to perform work required are due at the place specified in Item 8 by 1400 (hour) local time ______________ 08 Feb 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than ___60__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
x
TAX ID: See Item 14 document and return _______ copies to issuing office.)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Must be fully completed by offeror)
15. TELEPHONE NO.
16. REMITTANCE ADDRESS
20B. SIGNATURE
Contractor agrees
31A. NAME OF CONTRACTING OFFICER
30C. DATE 31B. UNITED STATES OF AMERICA
BY
(REV. 4-85) STANDARD FORM 1442 BACK
(Type or print)
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN
30B. SIGNATURE
NSN 7540-01-155-3212
to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
28. NEGOTIATED AGREEMENT (Contractor is required to sign this
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
OFFER
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CAGE CODE DUNS NUMBER:
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Include area code)
(Include only if different than Item 14)
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE
29. AWARD (Contractor is not required to sign this document.)
Your offer on this solicitation, is hereby accepted as to the items listed. This award con-summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
(Type or print)
31C. AWARD DATE
27. PAYMENT WILL BE MADE BY
US ARMY CORPS OF ENGRS FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON, TN 39054-5005
26. ADMINISTERED BY
U.S. Army Corps of Engineers New Orleans Area Office 7400 Leake Avenue, Rm 186 New Orleans, LA 70118
SECTION 00010 – BIDDING SCHEDULE
New Orleans to Venice, Hurricane Protection System, NOV-NF-W-06B.5, Magnolia Pump Station, Plaquemines Parish, Louisiana
Item Description Estimated
Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
0002 Video and Photographic Documentation 1 JOB
0003 Web Camera System 1 JOB
0004 Temporary Retaining Structures 1 JOB
0005 Traffic Control and Coordination 1 JOB
0006 Silt Fences 5,700 LF
0007 Truck Wash-Down Racks 1 JOB
0008 Reinforced Concrete Floodwall 1 JOB
0009 Reinforced Concrete Retaining Wall 1 JOB
0010 Reinforced Concrete Pump Station 1 JOB
0011 Reinforced Concrete Operator Room Platform 1 JOB
0012 Precast Box Culvert 72 LF
0013 Pre-Engineered Operator Room 1 JOB
0014 Precast Fuel Tank Support 1 JOB
0015 Trash Rack 1 JOB
0016 Catwalk Steel 1 JOB
0017 Miscellaneous Metalwork 1 JOB
0018 Metal Stairs 1 JOB
0019 Metal Ladders 1 JOB
0020 Metal Railings 1 JOB
0021 Pump Station Metal Building 1 JOB
0022 Staff Gage 1 JOB
0023 Plumbing System 1 JOB
0024 Compressed Air System 1 JOB
0025 Pump Discharge Pipe 1 JOB
W912P818B0019
0026 Discharge Bells 1 JOB
0027 HVAC System 1 JOB
0028 Electrical Distribution System 1 JOB
0029 Diesel Generator and Accessories 1 JOB
0030 Lightning Protection System 1 JOB
0031 Lighting, Interior and Exterior 1 JOB
0032 CCTV System 1 JOB
0033 Separator Geotextile 5,500 SY
0034 Clearing and Grubbing 1 JOB
0035 Excavation, New Drainage Ditch 14,250 CY
0036 Excavation, New Discharge Channel 19,550 CY
0037 Construction Dewatering 1 JOB
0038 Embankment, Compacted Fill 11,600 CY
0039 New Preload 130 CY
0040 Grouted Riprap 225 CY
0041 Piling, Steel Sheet, Type PZ-22 14,400 SF
0042 Piling, Steel Sheet, Type PZ-35 12,500 SF
0043 16 Inch Pile, Concrete Precast, Prestressed 2,115 LF
0044 Compression Pile Load Test
0044AA First 3 Compression Test 3 EA
0044AB All Over 3 Compression Tests 3 EA
0045 Tension Pile Load Test
0045AA First 2 Tension Test 2 EA
0045AB All Over 2 Tension Tests 2 EA
0046 Steel H-Piling 2,880 LF
0047 Furnish Steel Pipe Piles 25,660 LF
0048 Drive Steel Pipe Piles 25,660 LF
0049 Asphaltic Paving 550 SY
0050 Surfacing 900 CY
0051 Precast Concrete Access Bridge 1 JOB
0052 Turf Establishment and Maintenance 15 AC
0053 Utility Modifications (Highpoint Gas Pipelines) 1 JOB
0054 18” Corrugated Metal Pipe 90 LF
0055 Speed Reducers 1 JOB
0056 Diesel Fuel System 1 JOB
0057 Discharge Riprap 820 TON
0058 Culvert Riprap 100 TON
0059 Bedding 300 CY
0060 Concrete Scour Protection 475 SY
0061 Vertical Pumps 1 JOB
0062 Water Level Monitoring 1 JOB
0063 Bridge Crane and Hoist 1 JOB
TOTAL BASE: $
OPTIONAL WORK (OW)
0064 Silt Fences - OW 1,500 LF
0065 Truck Wash-Down Racks - OW 1 JOB
0066 Separator Geotextile – OW 240 SY
0067 Clearing and Grubbing - OW 1 JOB
0068 Excavation New Drainage Ditch -
OW 1,650 CY
0069 Embankment, Compacted Fill - OW 4,000 CY
0070 Asphaltic Paving – OW 275 SY
0071 Surfacing - OW 65 CY
0072 Turf Establishment and Maintenance - OW 4 AC
TOTAL OPTIONAL WORK: $
TOTAL BASE + OPTIONAL WORK: $
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A
BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT
FOR ANY ITEM, ITS BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE
INELIGIBLE FOR AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds.
Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). ** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL WORK. In the event that OPTIONAL WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 30 calendar days in addition to the original contract duration of 867 calendar days established for the BASE WORK items specified in the Contract Clause entitled
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”.
W912P818B0019 http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
EVALUATION OF SUBDIVIDED ITEMS
Item Nos. 0044 and 0045 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS.
The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. Nos. 0044 and 0045.
a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Item Nos. Nos. 0044 and 0045 are less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
c. If the quantity of work performed under Item Nos. 0044 and 0045 exceeds 115% or is less than 85% of the total estimated quantity of the subitems under that item, and/or if the quantity of work performed under the second subitem or any subsequent sub- item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(End of Clause)
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/
Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html
U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/
Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf http://benefits.va.gov/vow/ http://wtc.army.mil/modules/employers/index.html http://www.hiringourheroes.org/
Section 100 - SPECIAL NOTICES
1. INVITATION FOR BIDS (IFB) NO. W912P818B0019
FOR: New Orleans to Venice, Hurricane Protection System, NOV- NF-W-06B.5, Magnolia Pump Station, Plaquemines Parish
BID OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE AT
http://155.76.244.230/bids/bids.htm
2. SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE
RECEIVED UNTIL DATE AND TIME OF BID OPENING.
3. THIS PROCUREMENT IS TOTAL HUBZone SMALL BUSINESS SET-ASIDE.
4. YOUR ATTENTION IS DIRECTED TO SECTION 00100-BID
SCHEDULE/INSTRUCTIONS TO BIDDERS CLAUSE ENTITLED “SUBMISSION
OF BIDS”. IT IS THE BIDDER’S RESPONSIBILITY TO ENSURE THAT
BIDS SENT BY COMMERCIAL CARRIER ARE CLEARLY IDENTIFIED AS
CONTAINING A SEALED BID ON THE OUTERMOST ENVELOPE. THIS
INCLUDES, BUT IS NOT LIMITED TO, BIDS SENT VIA: FEDERAL
EXPRESS, AIRBORNE EXPRESS, EXPRESS COURIER SERVICES, INC.,
EXPRESS MAIL - U.S. POSTAL SERVICE, UNITED PARCEL SERVICE AND
PUROLATOR.
5. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL
OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
6. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT
CLAUSE ENTITLED, “AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS
FOR CONSTRUCTION”, WHICH WILL APPLY TO THE CONTRACT RESULTING
FROM THIS SOLICITATION.
7. MAIL BIDS TO THE VICKSBURG DISTRICT HEADQUARTERS
BUILDING, PLANS AND SPECIFICATIONS ROOM, ROOM 144, 4155 CLAY
STREET, VICKSBURG, MISSISSIPPI 39183-3435. BIDS SENT BY
COMMERCIAL CARRIER SHALL BE CLEARLY MARKED ON THE OUTER
ENVELOPE AS CONTAINING A “SEALED BID”. BIDS MUST BE RECEIVED
PRIOR TO THE EXACT TIME SET FOR BID OPENING.
8. HAND CARRIED BIDS MUST BE DELIVERED TO THE PLANS AND
SPECIFICATIONS ROOM, ROOM 144, IN THE VICKSBURG DISTRICT
HEADQUARTERS BUILDING, 4155 CLAY STREET, VICKSBURG,
MISSISSIPPI 39183-3435. ALL BIDS MUST BE RECEIVED PRIOR TO
THE EXACT TIME SET FOR BID OPENING. NOTE: BIDS DELIVERED
W912P818B0019 http://155.76.244.230/bids/bids.htm
LATER THAN 15 MINUTES PRIOR TO THE TIME SET FOR THE BID
OPENING SHALL BE DELIVERED DIRECTLY TO ROOM 103, BID OPENING
ROOM, RATHER THAN ROOM 144, THE PLANS AND SPECIFICATIONS ROOM.
9. BIDS WILL NOT BE ACCEPTED NOR SHALL BIDS BE WITHDRAWN
TELEGRAPHICALLY OR BY ELECTRONIC COMMERCE.
10. VENDORS CAN BE FOUND ON THE WEB SITE:
http://www.cpars.navy.mil/. IF THE CONTRACTOR WISHES TO
PARTICIPATE IN THE PERFORMANCE EVALUATION PROCESS, ACCESS TO
CCASS AND PKI CERTIFICATION IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
11. PRIOR TO BID OPENING, IN ACCORDANCE WITH FEDERAL
ACQUISITION REGULATION PART 14.303 (b) MODIFICATION OR
WITHDRAWAL OF BIDS, “A BID MAY BE WITHDRAWN IN PERSON BY A
BIDDER OR ITS AUTHORIZED REPRESENTATIVE IF, BEFORE THE EXACT
TIME SET FOR OPENING OF BIDS, THE IDENTITY OF THE PERSONS
REQUESTING WITHDRAWAL IS ESTABLISHED AND THAT PERSON SIGNS A
RECEIPT FOR THE BID."
THE FOLLOWING STEPS WILL BE REQUIRED BY THE VICKSBURG
CONTRACTING OFFICE:
1) CONTRACTOR MUST PRESENT A LETTER VERIFYING THEY ARE A
REPRESENTATIVE OF THE COMPANY.
2) CONTRACTOR MUST SHOW VALID PICTURE ID.
3) VICKSBURG DISTRICT CONTRACTING OFFICE WILL HAVE THE
REPRESENTATIVE SIGN A RECEIPT FOR BID.
http://www.cpars.navy.mil/
GENERAL NOTICES
1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA
AUTHORITY:
(a) Original Authorization: Section 203 of the Flood Control Act of 1962, Public Law 87-874 (76 Stat. 1173)
(b) Supplemental Authorization: New Orleans to Venice, LA— Under the Flood Control and Coastal Emergencies (FC&CE) heading, Chapter 3, Title I, Division B of Public Law 109 148 (119 Stat.
2762 – 2763) (3rd FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title II of Public Law 109-234 (120 Stat. 454-455) (4th FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title III of Public Law 110-252 (122 Stat. 2349-2350) (6th FC&CE Supplemental); and under the FC&CE heading, Chapter 3, Title I, Division B of Public Law 110-329 (122 Stat. 3590) (7th FC&CE Supplemental)
APPROPRIATION:
4th and 6th Supplemental appropriations for the Non-Federal Levees. 3rd, 4th, and 6th Supplemental appropriations for New Orleans to Venice, LA
FUNDING CITATION: 96x3125
2. NEGOTIATIONS AFTER SEALED BIDDING.
The Government has the option to reject all bids received in response to the sealed bid advertisement and initiate negotiation. Negotiations will include soliciting offers from each responsible bidder that submits a bid in response to the Invitation for Bids. If, after bid opening, the Contracting Officer determines that negotiations are in the best interest of the Government, the following steps will be followed:
(a) An amendment to the sealed bid advertisement will be issued to each responsible bidder changing the Invitation for Bids Number to Request for Proposals Number. The amendment will also make any necessary changes to the scope of the work.
(b) A cover letter signed by the negotiator will accompany the amendment explaining the procedures to be followed during negotiations.
3. BID, PERFORMANCE AND PAYMENT BONDS.
A bid bond is required with the bid package and is to be executed on Standard Form SF24. Performance and payment bonds with be required after award. See Section 00700, Contract Clauses 52.228-1, BID GUARANTEE and 52.228-15, PERFORMANCE AND PAYMENT BONDS -- CONSTRUCTION
4. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS.
The right is reserved, as the interest of the Government may require, to revise or amend the specifications and/or drawings prior to the date set for opening bids. Such revisions or amendments, if any, will be announced by amendment or amendments to this Invitation for Bids. Copies of such amendments as may be issued will be furnished to all prospective bidders. If the revision or amendments are of a nature which require material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the District Engineer will enable bidders to revise their bids. In such case, the amendments will include an announcement of the new date for opening bids.
5. BUSINESS INTEGRITY.
The apparent successful bidder as a condition for award of any contract resulting from this solicitation may be required to execute a certificate related to Business Integrity.
6. CONDITIONS AFFECTING THE WORK.
Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications, or related documents.
7. BIDDER'S QUALIFICATIONS.
Before a bid is considered for award, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources, and the plant available to be used in performing the work.
8. SITE OF THE WORK.
Bidders are advised that for purpose of applicability of the Davis-Bacon Act and other contract labor standard provisions, "the site of the work" under the contract to be awarded pursuant to this Invitation may not be limited to the physical place(s) where the construction called for in the contract will remain when work on it has been completed.The "site of the work" may include other adjacent or nearby property used by the Contractor or Subcontractors during such construction. For example, fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., will be considered part of the site of the work provided they are dedicated exclusively or nearly so to performance on the contract and are so located in proximity to the actual construction location that it would be reasonable to include them.
9. INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE,
AND BONDS.
a. Specifications, Invitation No. W912P818B0019, Bidding Schedule, Pre-award Information/Description of Work/Bid Evaluation, Equipment Schedule, Construction Contract Clauses, and Wage Determination Decisions No. LA170007 12/08/2017 LA7 of the Secretary of Labor, are parts of this Invitation.
b. (1) An offeror (bidder) electing to use individual sureties for either bid guarantees or performance and payment bonds must submit, concurrently with the bonds and required affidavits, a statement of both the business and personal names of the persons and/or brokerages firms through whom the bonds or the guarantees were obtained, together with the address and telephone number of the persons and/or brokerage firms.
(2) Offerors or bidders should note that some individual sureties and brokers of individual sureties have been debarred or suspended from offering themselves or others as sureties to the Government. Offerors or bidders are responsible for ascertaining the current status of their sureties and brokers.
(3) Failure to provide the required information or the submission of bid guarantees obtained from debarred or suspended sureties or brokers may cause rejection of the offer (bid).
10. DEFINITIONS
(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.
(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
(c) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of l978 is the Armed Services Board of Contract Appeals, addressed as follows: Recorder, Armed Services Board of Contract Appeals, Skyline 6, 7th Floor, 5109 Leesburg Pike, Falls Church, Virginia 22041-3208.
(d) "Small business concern" means a concern including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in 13 CFR 121.
(1) Size Standards for Construction and Special Trades.
(a) Construction. A concern is small if its average annual receipts for its preceding 3 fiscal years did not exceed $36.5 million.
(b) Dredging. A concern is small if (1) its average annual receipts for its preceding 3 fiscal years did not exceed $27.5 million, and (2) at least 40 percent of the yardage in the contract's plans and specifications is dredged with equipment owned by the concern or obtained from another small business dredging concern.
CLAUSES INCORPORATED BY REFERENCE
52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2016 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.219-2 Equal Low Bids OCT 1995 52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
CLAUSES INCORPORATED BY FULL TEXT
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management database via https://www.acquisition.gov (see 52.204-7).
(End of provision)
52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)--EFARS
Item Nos 0044 AND 0045 are subdivided into two or more estimated quantities and are to be separately priced.
The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of clause)
52.214-5000 Apparent clerical mistakes.
ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:
W912P818B0019 https://www.acquisition.gov/
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
(End of statement)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM FIXED PRICE TYPE contract resulting from this solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
SMSA Counties MS 19.2% SMSA Counties LA 31.0% Non-SMSA Counties 27.7%
6.9% 6.9%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is is (FAR Area 113, New
Orleans, LA as follows:
Standard Metropolitan Statistical Area (SMSA) Counties:
0920 Biloxi – Gulfport, MS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 19.2% MS Hancock; MS Harrison; MS Stone
5560 New Orleans, LA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 31.0% LA Jefferson; LA Orleans; LA St. Bernard; LA St. Tammany Non-Standard Metropolitan Statistical Area (Non-SMSA) Counties - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27.7% LA Assumption; LA Lafourche; LA Plaquemines; LA St. Charles; LA St. James; LA St. John the Baptist; LA Tangipahoa;
LA Terrebonne; LA Washington; MS Forrest; MS Lamar; MS Marion; MS Pearl River; MS Perry; MS Pike; MS Walthall
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S Army Corps of Engineers, Vicksburg District Attn: Ellis Screws Contracting Officer 4155 Clay Street Vicksburg, MS 39183
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Todd Jacquet Address: New Orleans Area Office Email: Todd.J.Jacquet@usace.army.mil Telephone: 504-329-5029
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any (48 CFR Chapter) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
NOTICE TO CONTRACTOR
This solicitation contains two sets of goals for minority participation in construction crafts on this contract. They are the New Orleans Hometown Plan and the New Orleans Standard Metropolitan Statistical Area (SMSA).
Contractor will determine the goals applicable to him by the following:
Hometown Plan applies only to those contractors who are signatory to the Hometown Plan and utilizing crafts signatory to the plan.
New Orleans Standard Metropolitan Statistical Area (SMSA) applies to all contractors in the New Orleans SMSA area not signatory to the Hometown Plan, or utilizing crafts not signatory to the plan.
Federal Register/Vol. 45, No. 194/Friday, October 3, 1980
NOTICE TO CONTRACTOR
This solicitation contains two sets of goals for minority participation in construction crafts on this contract. They are the New Orleans Hometown Plan and the New Orleans Standard Metropolitan Statistical Area (SMSA).
Contractor will determine the goals applicable to him by the following:
Hometown Plan applies only to those contractors who are signatory to the Hometown Plan and utilizing crafts signatory to the plan.
New Orleans Standard Metropolitan Statistical Area (SMSA) applies to all contractors in the New Orleans SMSA area not signatory to the Hometown Plan, or utilizing crafts not signatory to the plan.
Federal Register/Vol. 45, No. 194/Friday, October 3, 1980
SOLICITATION PROVISION
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION
TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY
The Bidder’s attention is called to “EQUAL OPPORTUNITY” and “LOCAL AFFIRMATIVE ACTION PLAN” clauses of the contract.
The acceptable ranges of minority manpower utilization, expressed in percentage terms, are as follows:
Goals for Minority Goals for Female
Timetables Participation for Participation in Each Trade Each Trade
Indefinitely 20% - 23 % 6.9%
The Bidder shall, within 5 days after a request therefor by the Contracting Officer of his duly authorized representative, submit the following information.
(a) A list of the construction trades he intends to use, either directly or through subcontractors at any tier, in the performance of work covered by this solicitation;
(b) A list of the labor organizations with which he has collective bargaining agreements and which are signatories to the Hometown Plan with respect to trades for which specific commitments to goals of minority manpower utilization are set forth in the Hometown Plan;
(c) A list of the labor organizations with which he has collective bargaining agreements and which are not signatories to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.