Dorado Cycle JV, Sanford, FL 32771
LINE ITEM NO. EST QTY U/M UNIT PRICE AMOUNT
0001 Mobilization and Demobilization 1 JB 1,500,000.00 $1,500,000.00 0002 Video and Photographic Documentation 1 JB 5,000.00 $5,000.00 0003 Web Camera System 1 JB 50,000.00 $50,000.00 0004 Temporary Retaining Structures 1 JB 1,500,000.00 $1,500,000.00 0005 Traffic Control and Coordination 1 JB 40,000.00 $40,000.00 0006 Silt Fences 5700 LF 5.00 $28,500.00 0007 Truck Wash-Down Racks 1 JB 85,000.00 $85,000.00 0008 Reinforced Concrete Floodwall 1 JB 1,250,000.00 $1,250,000.00 0009 Reinforced Concrete Retaining Wall 1 JB 155,000.00 $155,000.00 0010 Reinforced Concrete Pump Station 1 JB 1,110,000.00 $1,110,000.00 0011 Reinforced Concrete Operator Room Platform 1 JB 17,000.00 $17,000.00 0012 Precast Box Culvert 72 LF 740.00 $53,280.00 0013 Pre-Engineered Operator Room 1 JB 170,000.00 $170,000.00 0014 Precast Fuel Tank Support 1 JB 85,000.00 $85,000.00 0015 Trash Rack 1 JB 60,000.00 $60,000.00 0016 Catwalk Steel 1 JB 30,000.00 $30,000.00 0017 Miscellaneous Metalwork 1 JB 12,000.00 $12,000.00 0018 Metal Stairs 1 JB 60,000.00 $60,000.00 0019 Metal Ladders 1 JB 10,000.00 $10,000.00 0020 Metal Railings 1 JB 45,000.00 $45,000.00 0021 Pump Station Metal 1 JB 450,000.00 $450,000.00 0022 Staff Gage 1 JB 5,500.00 $5,500.00 0023 Plumbing System 1 JB 55,000.00 $55,000.00 0024 Compressed Air System 1 JB 30,000.00 $30,000.00 0025 Pump Discharge Pipe 1 JB 450,000.00 $450,000.00 0026 Discharge Bells 1 JB 170,000.00 $170,000.00 0027 HVAC System 1 JB 80,000.00 $80,000.00 0028 Electrical Distribution System 1 JB 650,000.00 $650,000.00 0029 Diesel Generator and Accessories 1 JB 50,000.00 $50,000.00 0030 Lightning Protection System 1 JB 8,500.00 $8,500.00 0031 Lighting, Interior and Exterior 1 JB 58,000.00 $58,000.00 0032 CCTV System 1 JB 65,000.00 $65,000.00 0033 Separator Geotextile 5500 SY 2.50 $13,750.00 0034 Clearing and Grubbing 1 JB 700,000.00 $700,000.00 0035 Excavation, New Drainage Ditch 14950 CY 20.00 $299,000.00 0036 Excavation, New Discharge Channel 9200 CY 14.25 $131,100.00 0037 Construction Dewatering 1 JB 275,000.00 $275,000.00 0038 Embankment, Compacted Fill 8800 CY 19.50 $171,600.00 0039 New Preload 130 CY 65.00 $8,450.00 0040 Grouted Riprap 225 CY 223.00 $50,175.00 0041 Piling, Steel Sheet, Type PZ-22 14400 SF 56.00 $806,400.00 0042 Piling, Steel Sheet, Type PZ-35 12500 SF 51.00 $637,500.00 0043 16 Inch Pile, Concrete Precast, Prestressed 2260 LF 86.00 $194,360.00 0044 Compression Pile Load Test
0044AA First 3 Compression Test 3 EA 120,000.00 $360,000.00 0044AB All Over 3 Compression Tests 3 EA 60,000.00 $180,000.00
0045 Tension Pile Load Test 0045AA First 2 Tension Test 2 EA 90,000.00 $180,000.00 0045AB All Over 2 Tension Tests 2 EA 60,000.00 $120,000.00
0046 Steel H-Piling 2880 LF 86.00 $247,680.00
W912P818B0019 New Orleans To Venice, Hurricane Protection System, NOV-NF-W-06B.5, Magnolia Pump Station, Plaquemines Parish, Louisiana
Dorado Cycle JV, Sanford, FL 32771
0047 Furnish Steel Pipe Piles 25685 LF 80.00 $2,054,800.00 0048 Drive Steel Pipe Piles 25685 LF 42.00 $1,078,770.00 0049 Asphaltic Paving 550 SY 93.00 $51,150.00 0050 Surfacing 900 CY 88.00 $79,200.00 0051 Precast Concrete Access Bridge 1 JB 85,000.00 $85,000.00 0052 Turf Establishment and Maintenance 15 AC 4,300.00 $64,500.00 0053 Utility Modifications (Highpoint Gas Pipelines) 1 JB 250,000.00 $250,000.00 0054 18” Corrugated Metal Pipe 90 LF 150.00 $13,500.00 0055 Speed Reducers 1 JB 900,000.00 $900,000.00 0056 Diesel Fuel System 1 JB 165,000.00 $165,000.00 0057 Discharge Riprap 820 TON 94.00 $77,080.00 0058 Culvert Riprap 100 TON 94.00 $9,400.00 0059 Bedding 300 CY 123.00 $36,900.00 0060 Concrete Scour Protection 1440 SY 117.00 $168,480.00 0061 Vertical Pumps 1 JB 910,000.00 $910,000.00 0062 Water Level Monitoring 1 JB 20,000.00 $20,000.00 0063 Bridge Crane and Hoist 1 JB 35,000.00 $35,000.00 0064 Temporary Retaining Structures Utility Modification (Highpoint Gas Pipelines) 1 JB 375,000.00 $375,000.00
TOTAL BASE $19,086,575.00
0065 Silt Fences - OW 1500 LF 5.00 $7,500.00 0066 Truck Wash-Down Racks - OW 1 JB 25,000.00 $25,000.00 0067 Separator Geotextile – OW 240 SY 5.00 $1,200.00 0068 Clearing and Grubbing - OW 1 JB 15,000.00 $15,000.00 0069 Excavation New Drainage Ditch - OW 1650 CY 27.00 $44,550.00 0070 Embankment, Compacted Fill - OW 8650 CY 30.00 $259,500.00 0071 Asphaltic Paving – OW 275 SY 98.00 $26,950.00 0072 Surfacing - OW 65 CY 105.00 $6,825.00 0073 Turf Establishment and Maintenance - OW 4 AC 650.00 $2,600.00
TOTAL OPTONAL WORK $389,125.00
TOTAL BASE + OPTIONAL WORK $19,475,700.00
AquaTerra Contracting, LLC., Fort Worth, TX 76140
0001 Mobilization and Demobilization 1 JB 750,000.00 $750,000.00 0002 Video and Photographic Documentation 1 JB 10,000.00 $10,000.00 0003 Web Camera System 1 JB 40,000.00 $40,000.00 0004 Temporary Retaining Structures 1 JB 850,000.00 $850,000.00 0005 Traffic Control and Coordination 1 JB 20,000.00 $20,000.00 0006 Silt Fences 5700 LF 9.00 $51,300.00 0007 Truck Wash-Down Racks 1 JB 25,000.00 $25,000.00 0008 Reinforced Concrete Floodwall 1 JB 850,000.00 $850,000.00 0009 Reinforced Concrete Retaining Wall 1 JB 150,000.00 $150,000.00 0010 Reinforced Concrete Pump Station 1 JB 1,150,000.00 $1,150,000.00 0011 Reinforced Concrete Operator Room Platform 1 JB 25,000.00 $25,000.00 0012 Precast Box Culvert 72 LF 640.00 $46,080.00 0013 Pre-Engineered Operator Room 1 JB 155,000.00 $155,000.00 0014 Precast Fuel Tank Support 1 JB 100,000.00 $100,000.00 0015 Trash Rack 1 JB 50,000.00 $50,000.00 0016 Catwalk Steel 1 JB 20,000.00 $20,000.00 0017 Miscellaneous Metalwork 1 JB 5,000.00 $5,000.00 0018 Metal Stairs 1 JB 60,000.00 $60,000.00 0019 Metal Ladders 1 JB 4,000.00 $4,000.00 0020 Metal Railings 1 JB 45,000.00 $45,000.00 0021 Pump Station Metal 1 JB 275,000.00 $275,000.00 0022 Staff Gage 1 JB 2,500.00 $2,500.00 0023 Plumbing System 1 JB 45,000.00 $45,000.00 0024 Compressed Air System 1 JB 25,000.00 $25,000.00 0025 Pump Discharge Pipe 1 JB 400,000.00 $400,000.00 0026 Discharge Bells 1 JB 165,000.00 $165,000.00 0027 HVAC System 1 JB 80,000.00 $80,000.00 0028 Electrical Distribution System 1 JB 245,000.00 $245,000.00 0029 Diesel Generator and Accessories 1 JB 60,000.00 $60,000.00 0030 Lightning Protection System 1 JB 15,000.00 $15,000.00 0031 Lighting, Interior and Exterior 1 JB 35,000.00 $35,000.00 0032 CCTV System 1 JB 75,000.00 $75,000.00 0033 Separator Geotextile 5500 SY 5.00 $27,500.00 0034 Clearing and Grubbing 1 JB 365,000.00 $365,000.00 0035 Excavation, New Drainage Ditch 14950 CY 15.00 $224,250.00 0036 Excavation, New Discharge Channel 9200 CY 30.00 $276,000.00 0037 Construction Dewatering 1 JB 100,000.00 $100,000.00 0038 Embankment, Compacted Fill 8800 CY 15.00 $132,000.00 0039 New Preload 130 CY 50.00 $6,500.00 0040 Grouted Riprap 225 CY 300.00 $67,500.00 0041 Piling, Steel Sheet, Type PZ-22 14400 SF 40.00 $576,000.00 0042 Piling, Steel Sheet, Type PZ-35 12500 SF 45.00 $562,500.00 0043 16 Inch Pile, Concrete Precast, Prestressed 2260 LF 75.00 $169,500.00 0044 Compression Pile Load Test
0044AA First 3 Compression Test 3 EA 125,000.00 $375,000.00 0044AB All Over 3 Compression Tests 3 EA 25,000.00 $75,000.00
0045 Tension Pile Load Test 0045AA First 2 Tension Test 2 EA 125,000.00 $250,000.00 0045AB All Over 2 Tension Tests 2 EA 25,000.00 $50,000.00
0046 Steel H-Piling 2880 LF 105.00 $302,400.00
AquaTerra Contracting, LLC., Fort Worth, TX 76140
0047 Furnish Steel Pipe Piles 25685 LF 100.00 $2,568,500.00 0048 Drive Steel Pipe Piles 25685 LF 40.00 $1,027,400.00 0049 Asphaltic Paving 550 SY 100.00 $55,000.00 0050 Surfacing 900 CY 130.00 $117,000.00 0051 Precast Concrete Access Bridge 1 JB 105,000.00 $105,000.00 0052 Turf Establishment and Maintenance 15 AC 6,000.00 $90,000.00 0053 Utility Modifications (Highpoint Gas Pipelines) 1 JB 110,000.00 $110,000.00 0054 18” Corrugated Metal Pipe 90 LF 130.00 $11,700.00 0055 Speed Reducers 1 JB 850,000.00 $850,000.00 0056 Diesel Fuel System 1 JB 225,000.00 $225,000.00 0057 Discharge Riprap 820 TON 125.00 $102,500.00 0058 Culvert Riprap 100 TON 125.00 $12,500.00 0059 Bedding 300 CY 125.00 $37,500.00 0060 Concrete Scour Protection 1440 SY 125.00 $180,000.00 0061 Vertical Pumps 1 JB 900,000.00 $900,000.00 0062 Water Level Monitoring 1 JB 20,000.00 $20,000.00 0063 Bridge Crane and Hoist 1 JB 35,000.00 $35,000.00 0064 Temporary Retaining Structures Utility Modification (Highpoint Gas Pipelines) 1 JB 145,000.00 $145,000.00
TOTAL BASE $15,980,130.00
0065 Silt Fences - OW 1500 LF 9.00 $13,500.00 0066 Truck Wash-Down Racks - OW 1 JB 20,000.00 $20,000.00 0067 Separator Geotextile – OW 240 SY 5.00 $1,200.00 0068 Clearing and Grubbing - OW 1 JB 30,000.00 $30,000.00 0069 Excavation New Drainage Ditch - OW 1650 CY 15.00 $24,750.00 0070 Embankment, Compacted Fill - OW 8650 CY 15.00 $129,750.00 0071 Asphaltic Paving – OW 275 SY 100.00 $27,500.00 0072 Surfacing - OW 65 CY 130.00 $8,450.00 0073 Turf Establishment and Maintenance - OW 4 AC 6,000.00 $24,000.00
TOTAL OPTONAL WORK $279,150.00
TOTAL BASE + OPTIONAL WORK $16,259,280.00
Clark Construction Enterprises, LLC., St. Martinville, LA 70582
0001 Mobilization and Demobilization 1 JB 1,505,850.00 $1,505,850.00 0002 Video and Photographic Documentation 1 JB 25,875.00 $25,875.00 0003 Web Camera System 1 JB 51,750.00 $51,750.00 0004 Temporary Retaining Structures 1 JB 543,375.00 $543,375.00 0005 Traffic Control and Coordination 1 JB 51,750.00 $51,750.00 0006 Silt Fences 5700 LF 2.75 $15,675.00 0007 Truck Wash-Down Racks 1 JB 26,000.00 $26,000.00 0008 Reinforced Concrete Floodwall 1 JB 931,000.00 $931,000.00 0009 Reinforced Concrete Retaining Wall 1 JB 207,000.00 $207,000.00 0010 Reinforced Concrete Pump Station 1 JB 1,656,000.00 $1,656,000.00 0011 Reinforced Concrete Operator Room Platform 1 JB 25,785.00 $25,785.00 0012 Precast Box Culvert 72 LF 524.00 $37,728.00 0013 Pre-Engineered Operator Room 1 JB 153,904.00 $153,904.00 0014 Precast Fuel Tank Support 1 JB 77,625.00 $77,625.00 0015 Trash Rack 1 JB 72,450.00 $72,450.00 0016 Catwalk Steel 1 JB 51,750.00 $51,750.00 0017 Miscellaneous Metalwork 1 JB 232,875.00 $232,875.00 0018 Metal Stairs 1 JB 72,450.00 $72,450.00 0019 Metal Ladders 1 JB 46,575.00 $46,575.00 0020 Metal Railings 1 JB 51,750.00 $51,750.00 0021 Pump Station Metal 1 JB 191,450.00 $191,450.00 0022 Staff Gage 1 JB 5,175.00 $5,175.00 0023 Plumbing System 1 JB 122,130.00 $122,130.00 0024 Compressed Air System 1 JB 91,080.00 $91,080.00 0025 Pump Discharge Pipe 1 JB 465,750.00 $465,750.00 0026 Discharge Bells 1 JB 155,250.00 $155,250.00 0027 HVAC System 1 JB 78,660.00 $78,660.00 0028 Electrical Distribution System 1 JB 52,785.00 $52,785.00 0029 Diesel Generator and Accessories 1 JB 73,485.00 $73,485.00 0030 Lightning Protection System 1 JB 66,240.00 $66,240.00 0031 Lighting, Interior and Exterior 1 JB 98,325.00 $98,325.00 0032 CCTV System 1 JB 131,445.00 $131,445.00 0033 Separator Geotextile 5500 SY 2.10 $11,550.00 0034 Clearing and Grubbing 1 JB 268,500.00 $268,500.00 0035 Excavation, New Drainage Ditch 14950 CY 6.10 $91,195.00 0036 Excavation, New Discharge Channel 9200 CY 5.90 $54,280.00 0037 Construction Dewatering 1 JB 51,750.00 $51,750.00 0038 Embankment, Compacted Fill 8800 CY 17.00 $149,600.00 0039 New Preload 130 CY 40.00 $5,200.00 0040 Grouted Riprap 225 CY 259.00 $58,275.00 0041 Piling, Steel Sheet, Type PZ-22 14400 SF 28.00 $403,200.00 0042 Piling, Steel Sheet, Type PZ-35 12500 SF 29.00 $362,500.00 0043 16 Inch Pile, Concrete Precast, Prestressed 2260 LF 57.00 $128,820.00 0044 Compression Pile Load Test
0044AA First 3 Compression Test 3 EA 93,150.00 $279,450.00 0044AB All Over 3 Compression Tests 3 EA 7,762.00 $23,286.00
0045 Tension Pile Load Test 0045AA First 2 Tension Test 2 EA 93,150.00 $186,300.00 0045AB All Over 2 Tension Tests 2 EA 7,762.00 $15,524.00
0046 Steel H-Piling 2880 LF 62.10 $178,848.00
Clark Construction Enterprises, LLC., St. Martinville, LA 70582
0047 Furnish Steel Pipe Piles 25685 LF 85.00 $2,183,225.00 0048 Drive Steel Pipe Piles 25685 LF 23.80 $611,303.00 0049 Asphaltic Paving 550 SY 61.00 $33,550.00 0050 Surfacing 900 CY 78.00 $70,200.00 0051 Precast Concrete Access Bridge 1 JB 77,625.00 $77,625.00 0052 Turf Establishment and Maintenance 15 AC 4,000.00 $60,000.00 0053 Utility Modifications (Highpoint Gas Pipelines) 1 JB 51,750.00 $51,750.00 0054 18” Corrugated Metal Pipe 90 LF 68.00 $6,120.00 0055 Speed Reducers 1 JB 284,265.00 $284,265.00 0056 Diesel Fuel System 1 JB 300,150.00 $300,150.00 0057 Discharge Riprap 820 TON 88.00 $72,160.00 0058 Culvert Riprap 100 TON 93.00 $9,300.00 0059 Bedding 300 CY 124.20 $37,260.00 0060 Concrete Scour Protection 1440 SY 129.40 $186,336.00 0061 Vertical Pumps 1 JB 1,410,775.00 $1,410,775.00 0062 Water Level Monitoring 1 JB 53,820.00 $53,820.00 0063 Bridge Crane and Hoist 1 JB 36,225.00 $36,225.00 0064 Temporary Retaining Structures Utility Modification (Highpoint Gas Pipelines) 1 JB 207,000.00 $207,000.00
TOTAL BASE $15,328,284.00
0065 Silt Fences - OW 1500 LF 2.75 $4,125.00 0066 Truck Wash-Down Racks - OW 1 JB 7,200.00 $7,200.00 0067 Separator Geotextile – OW 240 SY 2.10 $504.00 0068 Clearing and Grubbing - OW 1 JB 17,000.00 $17,000.00 0069 Excavation New Drainage Ditch - OW 1650 CY 11.00 $18,150.00 0070 Embankment, Compacted Fill - OW 8650 CY 18.00 $155,700.00 0071 Asphaltic Paving – OW 275 SY 63.00 $17,325.00 0072 Surfacing - OW 65 CY 78.00 $5,070.00 0073 Turf Establishment and Maintenance - OW 4 AC 4,000.00 $16,000.00
TOTAL OPTONAL WORK $241,074.00
TOTAL BASE + OPTIONAL WORK $15,569,358.00
IGE
0001 Mobilization and Demobilization 1 JB 770,000.00 $770,000.00 0002 Video and Photographic Documentation 1 JB 7,730.00 $7,730.00 0003 Web Camera System 1 JB 35,210.00 $35,210.00 0004 Temporary Retaining Structures 1 JB 1,362,830.00 $1,362,830.00 0005 Traffic Control and Coordination 1 JB 88,910.00 $88,910.00 0006 Silt Fences 5700 LF 4.60 $26,220.00 0007 Truck Wash-Down Racks 1 JB 45,750.00 $45,750.00 0008 Reinforced Concrete Floodwall 1 JB 1,122,660.00 $1,122,660.00 0009 Reinforced Concrete Retaining Wall 1 JB 179,290.00 $179,290.00 0010 Reinforced Concrete Pump Station 1 JB 1,075,700.00 $1,075,700.00 0011 Reinforced Concrete Operator Room Platform 1 JB 17,090.00 $17,090.00 0012 Precast Box Culvert 72 LF 645.00 $46,440.00 0013 Pre-Engineered Operator Room 1 JB 199,020.00 $199,020.00 0014 Precast Fuel Tank Support 1 JB 93,710.00 $93,710.00 0015 Trash Rack 1 JB 98,380.00 $98,380.00 0016 Catwalk Steel 1 JB 52,960.00 $52,960.00 0017 Miscellaneous Metalwork 1 JB 134,140.00 $134,140.00 0018 Metal Stairs 1 JB 91,120.00 $91,120.00 0019 Metal Ladders 1 JB 6,660.00 $6,660.00 0020 Metal Railings 1 JB 50,800.00 $50,800.00 0021 Pump Station Metal 1 JB 214,140.00 $214,140.00 0022 Staff Gage 1 JB 5,680.00 $5,680.00 0023 Plumbing System 1 JB 24,580.00 $24,580.00 0024 Compressed Air System 1 JB 30,770.00 $30,770.00 0025 Pump Discharge Pipe 1 JB 1,435,400.00 $1,435,400.00 0026 Discharge Bells 1 JB 275,510.00 $275,510.00 0027 HVAC System 1 JB 57,310.00 $57,310.00 0028 Electrical Distribution System 1 JB 269,660.00 $269,660.00 0029 Diesel Generator and Accessories 1 JB 47,320.00 $47,320.00 0030 Lightning Protection System 1 JB 2,550.00 $2,550.00 0031 Lighting, Interior and Exterior 1 JB 46,460.00 $46,460.00 0032 CCTV System 1 JB 62,190.00 $62,190.00 0033 Separator Geotextile 5500 SY 2.60 $14,300.00 0034 Clearing and Grubbing 1 JB 33,040.00 $33,040.00 0035 Excavation, New Drainage Ditch 14950 CY 9.50 $142,025.00 0036 Excavation, New Discharge Channel 9200 CY 12.10 $111,320.00 0037 Construction Dewatering 1 JB 40,540.00 $40,540.00 0038 Embankment, Compacted Fill 8800 CY 21.81 $191,928.00 0039 New Preload 130 CY 12.10 $1,573.00 0040 Grouted Riprap 225 CY 219.00 $49,275.00 0041 Piling, Steel Sheet, Type PZ-22 14400 SF 33.56 $483,264.00 0042 Piling, Steel Sheet, Type PZ-35 12500 SF 43.95 $549,375.00 0043 16 Inch Pile, Concrete Precast, Prestressed 2260 LF 78.10 $176,506.00 0044 Compression Pile Load Test
0044AA First 3 Compression Test 3 EA 70,920.00 $212,760.00 0044AB All Over 3 Compression Tests 3 EA 26,250.00 $78,750.00
0045 Tension Pile Load Test 0045AA First 2 Tension Test 2 EA 72,880.00 $145,760.00 0045AB All Over 2 Tension Tests 2 EA 26,250.00 $52,500.00
0046 Steel H-Piling 2880 LF 72.40 $208,512.00
IGE
0047 Furnish Steel Pipe Piles 25685 LF 94.40 $2,424,664.00 0048 Drive Steel Pipe Piles 25685 LF 42.60 $1,094,181.00 0049 Asphaltic Paving 550 SY 108.40 $59,620.00 0050 Surfacing 900 CY 60.70 $54,630.00 0051 Precast Concrete Access Bridge 1 JB 61,230.00 $61,230.00 0052 Turf Establishment and Maintenance 15 AC 4,520.00 $67,800.00 0053 Utility Modifications (Highpoint Gas Pipelines) 1 JB 177,870.00 $177,870.00 0054 18” Corrugated Metal Pipe 90 LF 60.20 $5,418.00 0055 Speed Reducers 1 JB 1,900,300.00 $1,900,300.00 0056 Diesel Fuel System 1 JB 213,840.00 $213,840.00 0057 Discharge Riprap 820 TON 83.80 $68,716.00 0058 Culvert Riprap 100 TON 59.50 $5,950.00 0059 Bedding 300 CY 92.80 $27,840.00 0060 Concrete Scour Protection 1440 SY 56.20 $80,928.00 0061 Vertical Pumps 1 JB 1,881,670.00 $1,881,670.00 0062 Water Level Monitoring 1 JB 25,700.00 $25,700.00 0063 Bridge Crane and Hoist 1 JB 31,050.00 $31,050.00 0064 Temporary Retaining Structures Utility Modification (Highpoint Gas Pipelines) 1 JB 165,800.00 $165,800.00
TOTAL BASE $18,814,825.00
0065 Silt Fences - OW 1500 LF 4.60 $6,900.00 0066 Truck Wash-Down Racks - OW 1 JB 13,540.00 $13,540.00 0067 Separator Geotextile – OW 240 SY 2.60 $624.00 0068 Clearing and Grubbing - OW 1 JB 24,030.00 $24,030.00 0069 Excavation New Drainage Ditch - OW 1650 CY 9.50 $15,675.00 0070 Embankment, Compacted Fill - OW 8650 CY 41.70 $360,705.00 0071 Asphaltic Paving – OW 275 SY 108.40 $29,810.00 0072 Surfacing - OW 65 CY 60.70 $3,945.50 0073 Turf Establishment and Maintenance - OW 4 AC 4,656.00 $18,624.00
TOTAL OPTONAL WORK $473,853.50
TOTAL BASE + OPTIONAL WORK $19,288,678.50
I certify that I have opened, read and recorded on this abstract all offers received in response to the solicitation:
| 2018-02-16T09:23:51-0600 | |
| CANNADA.DUSTIN.1394393777 |