Amendment 0002 for Solicitation W912P8-17-B-0008

View the file

Other files

File Type Posted
W912P817B0008_Bid_Abstract.pdf PDF
W912P817B0008_Original_Abstract.pdf PDF
A21-W912P817B0008_Am_0004.pdf PDF
Amendment_3.pdf PDF
W912P8-17-B-0008_Am_0001.pdf PDF
Drawings_-_W912P8-17-B-0008.pdf PDF
Solicitation_W912P8-17-B-0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation is hereby amended as follow s:

1. Provide the attached responses to the contractor questions.

Bid opening date of 15 August 2018, 2:00PM local time remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-17-B-0008

X 9B. DATED (SEE ITEM 11)

22-Feb-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Aug-2018

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P8-17-B-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

The following items are applicable to this modification:

CONTINUATION PAGE

Questions and Answers

1) Section 35 20 23.00 12 Dredging;

a) Can the Government clarify if there is an order of work for the dredging event?

There is no order of work. The contractor can proceed in any order that they prefer.

2) Can the Government provide the Contractor with the necessary Federal Permits for this project?

We are not required to obtain Federal Permits for our Federally authorized maintenance dredging contracts. We do have the necessary environmental clearances. I defer to Ed Creef to add anything more to this answer if needed.

3) It is unclear when the Award will be issued;

a) Can the Government describe the award process and dates expected for Award?

The award process will follow normal procedures for a sealed bid procurement. The Government is unable to provide an exact award date at this time.

4) Page C‐03 of the Contract Drawings shows the Placement Area;

a) It is unclear what the Gulf ward limits of the placement area will be, shall the Contractor assume that the Outer Limit of Discharge point as described on the plans is the Gulf ward limit of the fill area?

As shown on the advertised plans, disposal is adjacent to existing shoreline, in a gulfward direction between the inner and outer limit of discharge locations depicted. Wind, current and wave action may move material outside of limits, which is allowable. Offset distance of 1500' from channel centerline and 100' from water's edge, adequately defines discharge area.

5) It is unclear when the Pre‐Bid Inquiries will be due;

a) Can the Government clarify this and relay that information to the Contractor?

This amendment includes responses to all questions received up to this point on this solicitation. After this point, the Government cannot guarantee a response to questions received; however, if further questions are received prior to the bid opening that warrant an amendment to the specifications, they will be addressed accordingly.

6) Will there be a site visit?

a) Due to the short time allowed for pricing the work the Contractor feels it would be beneficial to view the site prior to bid submission.

There is no site visit scheduled by the Corps. This is a typical dredging contract that we have awarded many times in the past. Prospective bidders are always welcome to perform a site visit. This is all in open water, so no need

W912P8-17-B-0008 for us to be involved in a site visit. Prospective bidders should have the marine equipment available, or have access to marine equipment, to perform their own site visit.

7) Can the Government provide the Contractor with the most recent Geotechnical data available for this project?

No Geotech data is available for submission to Contractor. Bar channel dredging requires removal of material shoaled in since 2009 as per Specifications.