W912P8-16-B-0027_Amendment_0003.pdf
PDF 71 KB Posted
- Solicitation number
- W912P8-16-B-0027
About this file
W912P8-16-B-0027 - Amendment 03
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16B0027BIDABSTRACTSIGNED.pdf | ||
| 16B0027BidAbstract.pdf | ||
| W912P8-16-B-0027_Am_02.pdf | ||
| A22-W912P8-16-B-0027 Am_0001.pdf | ||
| W912P8-16-B-0027_-_Plans.pdf | ||
| W912P8-16-B-0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912P8-16-B-0027, Lake Pontchartrain and Vicinity, Hurricane and Storm Damage Risk Reduction System, LPV Mitigation, New Zydeco Ridge Flood Side BLH-Wet & Brackish Marsh Restoration, St. Tammany Parish, Louisiana, is hereby amended as follow s:
1. Change SF 1442 from 320 calendar days to 440 calendar days.
2. Section 00700: Page 3, paragraph 52.211-10, Commencement, Prosecution, and Completion of Work, change from 320 calendar days to 440 calendar days.
3. Section 01100: Page 23. Delete this page in its entirety and replace w ith pages 23, 24 and 25.
4. Bid opening date established at 2:00PM CST, Thursday, 04 August 2016.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-16-B-0027
X 9B. DATED (SEE ITEM 11)
13-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jul-2016
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
STANDARD FORM 1442
Block 11. Change “320 calendar days” to “440 calendar days”.
SECTION 00700
Page 3, paragraph 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK. Change “320 calendar days” to “440 calendar days”.
SECTION 01100
Page 23. Delete this page in its entirety and substitute the attached pages 23, 24, and 25 therefore.
W912P8-16-B-0027 01100-23 ED 14-037
(for Level 3 Communication line (north-south line parallel to Hwy. 90)) POC: Tristan Gazzea OSP Engineer Global Field Services Level 3 Communications 301 Main St., Suite 130 Baton Rouge, LA 70802
(225) 397-3811 (cell), (225)330-7912 (office)
NOTE: Level 3 Communications has provided confirmation that the cable is approximately 60-70' from the centerline of Hwy. 90 and is located between the tree line and the utility poles, between 4 and 20 feet deep. At the Hwy 433 and Hwy 90 intersection, the cable is about 6-12 feet deep. The Contractor is allowed to lay his/her dredge pipeline on the existing ground surface over the existing utility where necessary due to alignment restrictions. No excavation within the access corridor is allowed.
28. MAINTENANCE OF ACCESS CORRIDORS/STAGING AREAS
The Contractor shall mow and maintain grass and vegetation located within the limits of allowable access corridors and staging areas for the duration of the project. Grass and vegetation along fences, structures, under trailers, and in areas not accessible to mowers will be edged or trimmed neatly. Any rutting and/or destruction of grass caused by the Contractor within the access corridor or staging areas, on land, shall be repaired and seeded back to the original condition prior to damage. Any drainage or cross ditches within the access corridor, on land, shall be maintained at all times.
29. PERMIT CONDITIONS FOR DOTD
A permit has been obtained to perform required access, jack-and-bore operations, and equipment/materials offloading in the vicinity of existing State highways. The DOTD needs to be notified 72 hours prior to the commencement of work. The DOTD point of contact is Ennis Johnson at (504)-437-3103. As part of the DOTD permit, the following requirements must be adhered to during the course of work:
(1) No permanent structures are allowed within the DOTD ROW. Any equipment within the DOTD ROW will be temporary, and materials like pipeline, marsh buggies, backhoes, mats, etc., will be offloaded and immediately moved outside of the DOTD ROW and not allowed to be permanently, or for any extended period, staged within the DOTD ROW.
(2) The development of a Traffic Control Plan (TCP), as well as plans for "temporary" offloading of dredge pipeline, equipment, construction materials, etc., will be the responsibility of the Contractor and shall comply with Section 01 50 00 TRAFFIC CONTROL AND COORDINATION and the DOTD MUTC - (2009) Manual. These proposed plans will also be made a required submittal(s)
W912P8-16-B-0027 01100-24 ED 14-037
to be submitted either prior to or during the project's Pre-Construction Conference (Pre-Con). The submittal(s) will be made available for review and approval by both the Corps and DOTD with a maximum review period of 30 days allowed. No usage of the DOTD ROW for offloading shall occur prior to approval of the required plans.
(3) All offloading locations and temporary driveways (and designs/specifications) to be approved by DOTD before use.
(4) Any steel tracked equipment used within the DOTD ROW shall require matting.
(5) DOTD reserves the right to stop any work within the DOTD ROW at any time if the work violates any DOTD safety standard.
(6) Prior to performing any excavations, the Contractor shall be required to call Louisiana One Call and contact DOTD at 1-800-259-4929 at least 24 hours prior to performing any excavation.
30. GRANT OF PARTICULAR USE (GPU) CONDITIONS
A GPU has been obtained from the State of Louisiana, Division of Administration State Land Office for the purposes of entry, construction (including, but not limited to, mining of dredge material), access, and survey work for this project. As part of the GPU, the following requirements must be adhered to during the course of work:
(1) All tools, equipment, and other property (excluding project features) taken upon or placed upon State-owned seashore, State lands, and State water bottoms by the Contractor shall remain the property of the Contractor. All such tools, equipment, and other property shall be removed by the Contractor within sixty days of completion of the work.
(2) The Contractor shall act in a reasonable manner in conducting their activities on the property covered by this GPU.
(3) The Contractor is required to contact the Administrator of the State Land Office or his representative at (225) 342-4575, to notify the Office when construction will commence on the State-owned seashore, State lands and/or State water bottoms.
(4) The Contractor is allowed to post signs or notices on or near appropriate project features on the State-owned seashore, State lands and/or State water bottoms, as may be necessary for reasons of public safety or identification.
(5) The Contractor is allowed to alter or remove structures and/or appurtenances constructed on the State-owned seashore, State lands and/or State water bottoms pursuant to this construction project.
W912P8-16-B-0027 01100-25 ED 14-037
(6) The Contractor is allowed to patrol and police the State-owned seashore, State lands and/or State water bottoms for the duration of the contract.
(7) The Contractor shall be responsible for ensuring that all sub-contractors strictly comply with all aforementioned requirements.
31. SPECIAL USE PERMIT (SUP)
A SUP has been obtained from the Big Branch Marsh National Wildlife Refuge for the purposes of entry, construction, access, and survey work for this project. As part of the SUP, the following requirements must be adhered to during the course of work:
(1) Project will begin after coordination meeting between Refuge, Dept. of Army, and other associated parties.
(2) Refuge staff must be notified before beginning the project, and provided with status updates when requested.
(3) Disturbance of vegetation and wildlife should be kept to a minimum needed to complete work.
(4) All refuge regulations will be enforced, and the Contractor is responsible for the actions of employees, sub-contractors, and support personnel.
(5) The Contractor shall follow all applicable State and Federal laws.
(6) The discharge of firearms is prohibited on the refuge. Killing or harassing wildlife is prohibited. It is illegal to molest or destroy the home or dens of wildlife.
The Contractor shall keep the effects to fish, wildlife, and the environment to an absolute minimum.
(7) Littering is prohibited. The permittee and contractors must remove all refuse each day of operations.
(8) The refuge manager and/or staff can at any time inspect all sites within the plan.
(9) All other refuge regulations found within Title 50 and Subchapter C and of Code of Federal Regulations shall be followed.
(10) Any damages caused by the Contractor as a result of unauthorized work, access, or violations to the SUP requirements shall be repaired by the Contractor at no expense to the Government.
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
W912P8-16-B-0027
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
Lake Pontchartrain and Vicinity, Hurricane and Storm Damage Risk Reduction System, LPV Mitigation, New Zydeco Ridge Flood Side BLH-Wet & Brackish Marsh Restoration, St. Tammany Parish, Louisiana
Performance and Payment Bonds will be required.
DESCRIPTION OF WORK: The work consists of wetland restoration in existing shallow open water via borrow dredging from a designated borrow pit within Lake Pontchartrain. Both BLH-W and marsh platforms will be constructed. The work requires retention dike construction, board road placement, and a jack-and-bore effort to provide the dredge disposal pipeline access to the construction site.
This procurement is UNRESTRICTED.
See Item 7
Melissa Koehn 504-862-2239
5 24505/13/2016 local time 08/04/2016
2:00 PM
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
US Army Corps of Engineers, New Orleans Area Office 7400 Leake Ave.
New Orleans, LA 70118
USAED New Orleans C/O USACE FINANCE CENTER (UFC) Attn: CEFC-AO-P
5722 INTEGRITY DRIVE, MILLINGTON, TN 38054-5005
| 16-B-0026-Am_03_PD2 SF30 |
| Binder1 |
| W912P8-16-B-0027_Am_0003 |
| 01100_Am_0003.pdf |
| 28. MAINTENANCE OF ACCESS CORRIDORS/STAGING AREAS |
| 29. PERMIT CONDITIONS FOR DOTD |
| 30. GRANT OF PARTICULAR USE (GPU) CONDITIONS |
| 31. SPECIAL USE PERMIT (SUP) |
1442-16-B-0027_Am_03
File details come from the government source that posted it. Updated .