W912P8-16-B-0027 Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16B0027BIDABSTRACTSIGNED.pdf | ||
| 16B0027BidAbstract.pdf | ||
| W912P8-16-B-0027_Amendment_0003.pdf | ||
| W912P8-16-B-0027_Am_02.pdf | ||
| W912P8-16-B-0027_-_Plans.pdf | ||
| W912P8-16-B-0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912P8-16-B-0027, Lake Pontchartrain and Vicinity, Hurricane and Storm Damage Risk Reduction System, LPV Mitigation, New Zydeco Ridge Flood Side BLH-Wet & Brackish Marsh Restoration, St. Tammany Parish, Louisiana, is hereby amended as follow s:
1. Include submitted questions and answ ers and associated specification changes, as per the attached.
2. Change bid opening date to 2:00PM CST Thursday, 23 June 2016.
1. CONTRACT ID CODE PAGE OF PAGES
J 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-16-B-0027
X 9B. DATED (SEE ITEM 11)
13-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Jun-2016
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 35 20 23.00 12
1. Page 14, paragraph 3.3.3.2. Delete this paragraph in its entirety and substitute the following therefore:
“3.3.3.2 Baseline Retention Dike
The BLH-wet and the marsh creation areas is divided by the baseline retention dike, southern boundary of the BLH-Wet creation area and the northern boundary of the marsh creation area. The baseline retention dike shall be constructed to a minimum elevation of +5.5' NAVD88 in accordance with the location and dimensions provided in the contract drawings. The Contractor is allowed to exceed the minimum required crown elevation. The Contractor shall place outflow weirs along the baseline dike for effluent discharge from the BLH-Wet creation area into the marsh creation area. Should excessive erosion occur along the baseline retention dike as a result of water overflow, the dike crown and slope shall be covered with a layer of Visqueen or other protective measure to minimize erosion. In lieu of, or in combination with, overflow weirs, the Contractor may place weir structures.”
2. Page 17. Add the following new paragraph as follows:
“3.4.1 Offshore Pipeline Corridor
The Contractor is allowed to adjust the offshore reach of pipeline corridor to the north/west as required to provide shallower depths for subline to cross the Rigolets waterway. Any proposed northern/western shift of the offshore pipeline corridor shall be submitted with the required Dredge Plan for Government approval. The Contractor shall ensure that the adjacent marinas and navigation way are not obstructed, provide adequate depth of submerged pipelines for navigation, and shall be in compliance with all requirements in accordance with this section.”
3. Pages 17 and 18, existing paragraphs 3.4.1, 3.4.2, 3.4.3, 3.4.4, and 3.4.5 revise these paragraph numbers accordingly.
Reponses to Contractor Inquiries
ED-14-037
1. With regards to sheet C-06 Pipeline Corridor, we request additional pipeline corridors be provided to avoid contour depths that exceed 50 feet when laying subline to cross the Rigolets waterway.
RESPONSE: See amended SECTION 35 20 23.00 12, DREDGING, new paragraph
3.4.1 Offshore Pipeline Corridor.
2. Can we build the BLH Wet Retention dike from station 0+00 to 40+84.95 to +7 in order to retain the material in the BLH Wet Creation Area? Can we place interior weir structures from BLH Wet into marsh creation area?
RESPONSE: The dike from station 0+00 to 40+84.95 is the Baseline Retention Dike. The Baseline Retention Dike is specified to have a requirement of a minimum elevation of +5.5’, therefore the Baseline Dike may be constructed higher. See amended SECTION 35 20 23.00 12, DREDGING, Paragraph 3.3.3.2, Baseline Retention Dike for additional clarification.
3. Can you please provide standard penetration tests and/or material consistency for borings ZB- 1G through ZB-4G?
RESPONSE: Borings ZB-1G through ZB-4G were all geoprobes pushed with clear tubes, standard penetration tests were not conducted. For reference, attached are the text files for borings ZB-1G through ZB-4G, pages 2 and 3, which includes material consistencies.
4. Please provide a copy of the dredging permit for this projects borrow area?
RESPONSE: The State of Louisiana, State Land Office issued a Grant of Particular Use, which grants us the right to use the State water bottoms for the purposes of borrow material to construct the project. This Grant of Particular Use and Right of Entry is solely for the purposes of entry, construction (including, but not limited to, mining of dredge material), access, and survey work of the project. This Grant of Particular Use and Right of Entry includes the right of ingress and egress on other State-owned seashore, State lands and State water bottoms not described herein, provided such ingress and egress is necessary and not otherwise conveniently available to the Grantees, and provided that the Grantees give sufficient notice to the Owner of the need for such ingress and egress.
In regards to environmental permitting documentation the Government has received, the signed Decision Record (DR) for the Individual Environmental Report is attached.
The DR is a summary of the environmental document and lists the names of all the agencies/permits the Corps has received through coordination. However, it should be noted that this document was signed in October 2015 and that the final plans and specifications (P&S) were not completed until May 2016, and that bidders should review the document only for NEPA clearances, permits, etc. Bidders must refer to the final P&S in the actual solicitation, as well as amendments, for the latest scope of work, right-of-way, and design information."
BOR. ZB-1G (14-116B)
Ground EL. -5.5
Depth
Moisture Content
Stratum Change
Soil Classification
Boring L
Color
Modification Symbols
Organic Content
Coarse Material Percentage*
0.0 2.0 21 2.0 SP F LGRGR CS 0.5 98.7
2.0 5.0 5.0 NS
5.0 6.5 22.0 SP F BR GR CS 98.7
6.5 7.5 23.0 7.5 SP F BR GR CS 0.3
7.5 10.0 10.0 NS
10.0 11.5 21.0 SP F BR CS 0.3
11.5 13.0 21.0 13.0 SP F LGR CS 99.1
13.0 15.0 15.0 NS
15.0 16.0 21.0 SP F GR CS 0.3
16.0 17.0 21.0 17.0 SP F GR BR CS 98.0
17.0 20.0 20.0 NS
20.0 21.0 22.0 SP F BR GR CS 0.3
21.0 22.0 20.0 22.0 SP F GR LGR CS 97.4
22.0 25.0 25.0 NS
*This is the percent of the material that is coarser than the No. 200 Sieve
BOR. ZB-2G (14-116B)
Ground EL. -9
Content
Stratum Change
Classificatio
Consistenc
S b l
Liquid Limit
Plastic Limit
Coarse Material P t *0.0 3.0 23 3.0 SM GR CS 0.8 88.3
3.0 5.0 5.0 NS
5.0 7.7 27.0 7.7 SM DGR CS 89.3
7.7 10.0 79.0 10.0 CH SS SO DGRLGR O OX 130.0 30.0 6.6
10.0 11.7 35.0 11.7 SM DGR CS 75.8
11.7 15.0 29.0 15.0 CH SS ST LGR OX 52.0 12.0 1.4
15.0 18.0 25.0 18.0 SM GR CS 0.4
18.0 20.0 19.0 SP F LGR CS 95.3
20.0 22.5 21.0 SP F LGR CS 95.4
22.5 25.0 21.0 25.0 SP F LGR CS 0.1
BOR.ZB-3G(14-116B)
Ground EL. -8.7
Content
Stratum Change
Classification
Log
Consistency
Symbols
Liquid Limit
0.0 3.3 31 3.3 SM DGR CS SI SIF 73.1
3.3 5.0 30.0 5.0 CL SS M GNG T OX 43.0 15.0 1.6
5.0 6.0 43.0 6.0 ML DGR CS SI SIF 1.1
6.0 7.3 33.0 CL SS SO GNG OX 40.0 14.0
7.3 10.0 31.0 10.0 CL SS SO GNG OX 42.6
10.0 10.9 30.0 10.9 ML DGR CS SIF 1.1
10.9 11.8 37.0 11.8 CL SS SO GNGGR OX
11.8 13.0 28.0 13.0 SM DGR CS SIF 69.1
13.0 15.0 30.0 15.0 CL SS M GNGLG
R
T OX 47.0 16.0
15.0 17.0 26.0 SM LGR CS 83.5
17.0 20.0 22.0 20.0 SM GR CS 0.4
20.0 22.0 36.0 22.0 SC DGR CS 27.0 16.0 0.9
22.0 25.0 23.0 25.0 SM DGR CS 73.7
BOR. ZB-4G(14-116B)
Ground EL. -16.2
Content
Stratum Change
Classificati
Consisten
Symbols
Liquid Limit
0.0 3.5 29 3.5 SM DBRGR CS SIF 1.2 81.9
3.5 5.0 5.0 NS
5.0 7.5 26.0 SM DGR CS SIF 1.1
7.5 10.0 25.0 S DGR CS SIF 84.3
10.0 12.0 33.0 S DGR CS 1.3
12.0 13.5 28.0 13.5 S DR CS 85.8
13.5 15.0 15.0 NS
15.0 17.5 29.0 17.5 SM DR CS SIFS 68.0
17.5 18.7 26.0 CL SS SO DBRGR OX SIF 2.0
18.7 20.0 21.0 20.0 CL SS ST LGRGN OX 39.0 14.0
20.0 21.0 36.0 21.0 SM GR CS SIF
21.0 23.0 32.0 23.0 CL SS SO LGRGN 60.3
23.0 25.0 39.0 25.0 CH SIS ST GNG OX 54.0 25.0 3.9
B2EDLRWB
Text Box
ENCLOSURE 2
| Am_0001.pdf |
| “3.3.3.2 Baseline Retention Dike |
| Responses to Contractor Enquiries_16-B-0027(rev1).pdf |
| Enclosure 1.pdf |
| Responses to Enquiries_16-B-0024 |
| ENCL 2 _DR LPV HSDRRS Refuge Mitigation |
| ENCL 3 Sieve Info on BSFS and Turtle Bayou_ |
| Sieves |
| Sieves Bayou Sauvage Flood Side |
| 4 |
| 158 |
| Pages from BSFS-2U Final Lab Data |
| TB-1U SIEVE DATA |
| TB-2U SIEVE DATA |
| TB-3U SIEVE DATA |
| BSFG-7G -200 WASH |
| BSFG-8G -200 WASH |
| BSFG-9G -200 WASH |
| BSFG-10G -200 WASH |
| ENCL 4 Survey files |
| 12054C-BSFR |
| 13155C-1 |
| 13155C-2 |
| 13155C-3 |
| 13155C-4 |