Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912P8
Southeast Louisiana Urban Flood Control Project, Louisiana Avenue Improvements (Constance Street to South Claiborne Avenue), Orleans Parish, Louisiana (ED-13-005) is hereby amended as follows: (see continuation sheet)
The original proposal due date of 01/03/2014 at 11:00 a.m. local time, is hereby changed to 01/08/2014 at 11:00 a.m. local time.
U.S. Army Corps of Engineers, New Orleans Attn: CEMVN-CT-E (Justin Dudenhefer) 7400 Leake Ave., Room 155A New Orleans, LA 70118
See Item 7
J
W912P8-14-R-0001
ED 13-005
1 1
12/19/2013
11/26/2013
SECTION 00010
Pages 3, 4, 5, 6, 7, 8, and 9. Delete these pages in their entirety and substitute the attached revised pages 3, 4, 5, 6, 7, 8, and 9 therefore:
SECTION 01100
1. Page 6, subparagraph 3(h). Beginning in the 8 th line, delete “When necessary, the owner of a facility located within the limits of work may obtain keys to the gate from the contractor for access.”
2. Page 24, subparagraph 14(a). Delete the last sentence in its entirety and substitute the following therefore: “If relocation of a privately owned facility is required, the Contractor shall notify the utility owner in accordance with paragraph “UTILITIES AND IMPROVEMENTS.”
Any delays resulting from the utility owner’s relocation activity will be paid for by an equitable adjustment under the appropriate Contract Clause in Section 00700, entitled CHANGES (FAR
52.243-4).”
3. Page 26, paragraph 16. Delete this paragraph in its entirety and substitute the following therefore:
“16. VIBRATION MONITORING
Construction operations, including installation of steel sheet pile, foundation jet grouting, demolition, excavation, and construction equipment may affect and damage existing structures. The Contractor shall perform the work in a manner which will limit vibrations at the structure nearest to the work being performed to a maximum of 0.25 inch per second.
Vibrations will be monitored by others at all structures, including buildings and pools. The
Contractor will be informed when the vibrations from his operations have exceeded the 0.25 inch per second limit and the Contractor shall take immediate action to reduce the vibrations to the acceptable limits. The Contractor shall give the Contracting Officer notice at least 15 days prior to beginning vibration-inducing construction operations, and shall coordinate the daily location of these operations with the government personnel at least 48-hours prior. The
Contractor shall also be responsible for contacting the vibration monitoring firm to schedule the necessary vibration monitoring personnel.”
Section 01 53 00.02 12
1. Page 2, paragraph 1.1. Add the following to the end of this paragraph: “The work provided by this section applies to all retaining structures. Retaining structures are required for installation of the box culvert, the Clara Street sewer siphon, and all 8” and 18” sewer siphons.”
2. Page 35, paragraph 3.4, the unnumbered subparagraph immediately after the table. Delete this subparagraph in its entirety and substitute the following therefore:
“Piezometers shall be of the vibrating wire type and shall be of such durability and pressure range appropriate for the depth installed and hydrostatic pressures to be monitored. In order to provide sufficient baseline data, piezometers should be installed before the installation of the retaining structure is within 250 feet of the piezometer location and stay in place until all backfill is in place above the top of the completed box for 250 ft. beyond the piezometer location. Standard standpipe piezometers shall also be allowed. If standard standpipe piezometers are used, they need to be installed ahead of the commencement of construction and read regularly and the readings reported to the Contracting Officer.”
Section 01 57 23.00 12
1. Page 5, paragraph 1.7.2.1. Delete the 1st sentence in its entirety and substitute the following therefore: "The Contractor shall provide straw bales or silt fence barrier as a temporary structural practice to minimize erosion and sediment runoff."
2. Page 5, paragraph 1.7.2.2. Delete the 1st sentence in its entirety and substitute the following therefore: "The Contractor shall provide silt fence barrier or straw bales as a temporary structural practice to minimize erosion and sediment runoff."
Section 02 72 10.00
Page 8, paragraph 2.1.1. Delete this paragraph in its entirety and substitute the following
“2.1.1 Polyvinyl Chloride (PVC) Drain Pipe
PVC drain pipe and fittings shall conform to the requirements specified in Section 33 11 00, paragraph "Polyvinyl Chloride (PVC) Pipe (Water Mains up to 12" Diameter)". The new PVC pipe and fittings shall be connected to the existing drain using Mission or Fernco fittings, or approved equal.”
Section 02 72 20.00
1. Page 6, paragraph 1.4.12. Delete this paragraph in its entirety and substitute the following
“1.4.12 Drop Inlets
Measurement for new drop inlets satisfactorily constructed will be made per each. Payment will be made at the applicable contract unit price per each for "Drop Inlets" and “Double Drop
Inlets”. Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment to complete the work including concrete, reinforcement, bedding, geotextile and all pipe tie-ins to the drop inlets as specified herein and as shown on the drawings.”
2. Page 12. Add the following new paragraph to the end of this section as:
“3.6 Precast Concrete Structures
In lieu of brick, catch basin manhole combos, access manholes, catch basins, drop inlets, cleanout manholes, and water meter vaults can be constructed of precast concrete. All materials shall conform to the requirements shown on S&WB Dwg. No. 6178-B-6A. Bricks for adjustment are required under the casting as shown on S&WB Dwg, No. 6178-B-6A. The bottom of the structure shall be sloped by using brick and mortar or other suitable, approved material to slope for the structure’s intended purpose. Detailed drawings of the precast structure and rebar shall be submitted to the Contracting Officer for approval.”
Section 31 43 00.30
1. Page 6, subparagraph 3.2.1.c. Delete this subparagraph in its entirety and substitute the following therefore:
“c. A measured permeability of 1x10-6cm/sec or lower in core samples."
2. Page 7, paragraph 3.2.3. Delete this paragraph in its entirety and substitute the following
“3.2.3 Soilcrete Columns
Install soilcrete columns, ensuring that continuous spoil return up the borehole annulus is achieved during jet grouting. The amount of material installed in the soilcrete columns shall be reported to the Contracting Officer daily. During jet grouting, the Contractor shall maintain a visual observation of the flow and features of the spoil return. The Contractor shall specify how continuous spoil return will be maintained. An unexpected reduction in spoil return shall be investigated and reported to the Contracting Officer immediately. If there is negligible spoil return, the Contractor shall ensure that there is no clogging of the bore hole annulus and that the jetting parameters do not have to be revised. The soilcrete columns shall overlap so that there are no voids in the finished soilcrete area."
3. Page 7, paragraph 3.2.5. Delete this paragraph in its entirety and substitute the following
“3.2.5 Grout Agitation
Upon discharge into the pump hopper or holding tank, the grout must be continuously agitated. Mixed grout may not be held in the agitator for more than 1.5 hours unless a set retarder is used, as outlined above in paragraph "Admixtures".”
4. Page 8, subparagraph 3.3.1.d. Delete this subparagraph in its entirety and substitute the following therefore:
“d. Fresh Slurry: A complete series of tests (i.e., check of viscosity by Baroid (mud balance), viscosity by Marsh funnel, bleeding by using proper graduated 500 or 1,000-cm3 capacity cylinders, and pH) shall be conducted from the mixer or tank containing fresh grout slurry ready for introduction in the trench at least twice per shift.”
Section 32 12 16.00 12
Page 4, paragraph 1.3.2. Delete this subparagraph in its entirety and substitute the following
“1.3.2 Base Course and Sub-Base Course
Measurement for crushed stone base course and sand sub-base course will be made by the cubic yard. Payment will be made at the applicable contract unit price per cubic yard for
"Base Course (Class II 9" Thick)" and "Sub-base Course (Sand, 8" Thick)". Price and payment shall constitute full compensation for furnishing all plant, labor, materials, including but not limited testing and equipment to complete the work as specified herein and as shown on the drawings.”
Section 33 11 00
1. Page 6. Add the following new paragraph as:
“1.2.9 New 6 inch Water Meter Vault
Measurement of new 6 inch water meter vault shall be per each satisfactorily installed.
Payment will be made at the contract unit price per each for “6 Inch Water Meter Vault - OW-
2” (if Optional Work 2 is exercised). Price and payment shall constitute full compensation for furnishing all plant, equipment, labor, materials, frames, covers, valves, piping, (excluding meter), including excavation, bedding, backfill and performing all operations necessary to complete the work as specified herein and as shown on the drawings.”
2. Page 13. Add the following new paragraph as:
“2.8 6 INCH WATER METER VAULT
The manhole structure shall be either brick or concrete in accordance with these specifications.
Valves and pipe shall be in accordance with Section 33 11 00. Water meter will be supplied by the Sewerage and Water Board and shall be installed by the Contractor. The meter vault shall be installed in accordance with S&WB Dwg. No. 7531-W2.”
DRAWINGS
1. On the following drawings, at the station numbers shown, change the callout for “12” RCP” to “15” RCP”.
a. SHEET IDENTIFICATION Nos. C-103. Sta. 332+01.48 and Sta. 332+02.54, Catch Basin on Northbound Side and Catch Basin on Southbound Side, respectively.
b. SHEET IDENTIFICATION No. C-108. Sta. 361+43.44, Catch Basin on Northbound Side.
c. SHEET IDENTIFICATION No. C-110. Sta. 370+70 (+/-), Catch Basin on Southbound
Side.
2. SHEET IDENTIFICATION No. C-104.
a. Change the station number of the catch basin at “Sta. 337+58.20, 88.86’ RT” to “Sta.
337+60.67, 92.74’ RT”. (The top of casting elevation of El. 23.81 is correct.)
b. For the new MH at Sta. 337+64.05, 88.86’ RT, the top of casting elevation shall be changed from “El. 20.00” to “El. 23.40” and the invert elevation shall be changed from “El.
17.90” to “El. 20.00”
3. SHEET IDENTIFICATION No. C-216, Note No. 6. Change "THE PUMP SHALL HAVE
A MINIMUM CAPACITY OF 650 GPM." to “SEE DWG. C-215 FOR PUMPING CAPACITY
REQUIREMENTS."
4. SHEET IDENTIFICATION Nos. C-121, C-218, C-122, C-123, C-127, S-106, S-111, and G-
103. Delete these drawings in their entirety and substitute the attached revised drawings SHEET
IDENTIFICATION Nos. C-121, C-218, C-122, C-123, C-127, S-106, S-111, and G-103 therefore.
5. Add the attached new drawing SHEET IDENTIFICATION No. R-174.
00010-3 Ed 13-005
SECTION 00010 – BIDDING SCHEDULE
Southeast Louisiana Urban Flood Control Project, Louisiana Avenue Improvements
(Constance Street to South Claiborne Avenue), Orleans Parish, Louisiana
Item DESCRIPTION Estimated Quantity
Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 LS
Safety Fence and Pedestrian Access
1 LS
0003 Temporary Street Car Shuttle 90 DAY $4,124.09
0004 Retaining Structures 1 LS
0005 Construction Unwatering 1 LS
0006 Piezometers 1 LS
0007 Traffic Control and Coordination 1 LS
0008 Erosion Control 1 LS
Maintenance and Diversion of Storm Water
1 LS
Temporary Dam Emergency Removal and Reconstruction
20 EA
0011 Tree Trimming and Root Pruning 1 LS
0012 Demolition 1 LS
0013 8-inch PVC Yard Drain Pipe 4,540 LF
0014 15-inch RCP 2,575 LF
0015 18-inch RCP 1,025 LF
0016 21-inch RCP 34 LF
0017 24-inch RCP 670 LF
0018 30-inch RCP 130 LF
0019 36-inch RCP 22 LF
0020 42-inch RCP 65 LF
0021 60-inch RCP 54 LF
0022 27" x 44" RCPA 42 LF
00010-4 Ed 13-005
0023 36" x 58.5" RCPA 67 LF
0024 45" x 73.5" RCPA 99 LF
0025* Drain Line Point Repair 6 EA
0026 Catch Basin No. 1 22 EA
Single Catch Basin Manhole Combination
2 EA
Double Catch Basin Manhole Combination
3 EA
Single Drop Inlet Manhole Combination
2 EA
0030 Double Vertical Catch Basin 27 EA
0031 Drain Manhole Std. No. 1 90 EA
0032 Drain Manhole Std. No. 2 2 EA
0033 Drain Manhole Std. No. 3 1 EA
0034 RCPA Drain Manhole (D-3937) 6 EA
0035 Drain Manhole (D-3340) 4 EA
0036 Access Manhole 25 EA
0037 Cleanout Manhole 4 EA
0038 Plug Existing Drain Pipe 7 EA
0039* Drop Inlets 12 EA
0040* Double Drop Inlets 6 EA
0041 Adjust Manhole 30 EA
0042 Adjust Catch Basin 26 EA
0043 Adjust Drop Inlet 4 EA
0044 Reinforced Concrete Box Culvert 1 LS
0045 Miscellaneous Metalwork 1 LS
0046 Permanent Street Lighting 1 LS
0047 Temporary Street Lighting 1 LS
0048 Separator Geotextile 72,000 SY
0049 Geogrid 64,700 SY
00010-5 Ed 13-005
Structural Excavation and Backfill
1 LS
0051 Granular Backfill 1 LS
0052 Jet Grouting 1 LS
Asphaltic Concrete Wearing Course
6,400 TON
Asphaltic Concrete Binder Course
22,200 TON
0055 Base Course (Class II 9" Thick) 16,300 CY
Sub-base Course (Sand, 8" Thick)
14,500 CY
Cold Planing Asphaltic Pavement
800 SY
Asphaltic Concrete Pavement - Temporary Detour and Access Roads
1 LS
Superpave Asphaltic Concrete Wearing Course - S. Claiborne Avenue
5 TON
Superpave Asphaltic Concrete Binder Course - S. Claiborne Avenue
10 TON
Superpave Asphaltic Concrete Base Course - S. Claiborne Avenue
15 TON
0062 Temporary Driveways 200 SY
0063 Concrete Sidewalk (4" Thick) 7,300 SY
Concrete Handicap Ramps (6" Thick)
1,000 SY
0065 Concrete Driveways (6" Thick) 1,500 SY
0066 Brick or Stone Sidewalk 139 SY
Concrete Barrier Curbs and Gutters
26,579 LF
Concrete Mountable Curbs and Gutters
985 LF
0069 Stone Curb 3,227 LF
0070 Street Name Tile 369 EA
0071 Bus Pads 13 EA
0072 Sodding 1 LS
0073 Seeding and Mulching 1 LS
0074 Topsoil 2,200 CY
00010-6 Ed 13-005
0075 Modifications to Existing Utilities 1 LS
8" PVC Water Main w/ DI Fittings
115 LF
12” PVC Water Main w/ DI Fittings
50 LF
Directionally Drilled Casing with 8" PVC Carrier Pipe
150 LF
Directionally Drilled Casing with 12" PVC Carrier Pipe
150 LF
0080 8" Water Valves 2 EA
0081 Water Manholes 2 EA
8" PVC Pipe for Sewer Siphon w/ DI Fittings
65 LF
Adjust Sewer and Water Manhole
3 EA
0084 Demolition of Existing Track 1 LS
0085 Ballasted Track Construction 100 TFT
Trolley Wire Termination (Type
TW1)
4 EA
Feeder Cable Termination (Type
FC1)
4 EA
Temporary Return Jumper Cables
1,200 LF
0089 OCS Foundations (Type 1) 2 EA
OCS Poles and Support Attachments (Type A)
2 EA
Helical Down Guy Anchors (Type DG)
2 EA
0092 Trolley Wire Splice Castings 4 EA
0093 Feeder Cable Splice 4 EA
0094 Supporting Devices 1 LS
0095 Permanent Traffic Signal System 1 LS
0096 Pavement Markings 1 LS
0097 Paved Track Construction 186 TFT
Perforated Drainage Pipe Installation
286 LF
Connect Perforated Drainage Pipe to Existing Drainage Structure
2 EA
TOTAL BASE WORK: $
00010-7 Ed 13-005
OPTIONAL WORK 1 (OW-1)
(Phases 1 and 2a)
8" PVC Water Main w/ DI Fittings - OW-1
6,240 LF
12" PVC Water Main w/ DI Fittings - OW-1
25 LF
20" PVC Water Main with DI Fittings - OW-1
100 LF
30" DI Water Main w/ DI Fittings
- OW-1
95 LF
0104 8" Water Valves - OW-1 18 EA
0105 Water Manholes - OW-1 18 EA
0106 Fire Hydrant - OW-1 10 EA
Replace 1" and Smaller Water House Connection with 1" Service - OW-1
109 EA
0108* Replace 1-1/4” and 1-1/2” Water House Connection with 1-1/2” Service - OW-1
7 EA
0109* Replace 2" Water House Connection - OW-1
3 EA
8" PVC Pipe for Sewer Siphon w/ DI Fittings - OW-1
325 LF
54" DI Pipe for Sewer Siphon w/ DI Fittings at Clara St. - OW-1
62 LF
Sewer Mains (8” Dia PVC, 9’ Depth and Deeper) - OW-1
11 LF
Sewer Mains (21” Dia PVC, 9’ Depth and Deeper) - OW-1
16 LF
Sewer Mains (24” Dia PVC, 9’ Depth and Deeper) - OW-1
20 LF
0115 Sewer Manhole - OW-1 1 EA
Adjust Sewer and Water Manhole - OW-1
20 EA
Sewer Vaults for Clara Street -
OW-1
1 LS
Temporary Sewer Bypass System - OW-1
1 LS
TOTAL OPTIONAL WORK 1 $
OPTIONAL WORK 2 (OW-2)
(Phases 2b, 2c, 2d and 3)
8" PVC Water Main w/ DI Fittings - OW-2
6,030 LF
12" PVC Water Main w/ DI Fittings - OW-2
4,475 LF
20" PVC Water Main with DI Fittings - OW-2
100 LF
00010-8 Ed 13-005
0122 8" Water Valves - OW-2 30 EA
0123 12" Water Valves - OW-2 8 EA
0124 Water Manholes - OW-2 38 EA
0125 Fire Hydrant - OW-2 18 EA
Replace 1" and Smaller Water House Connection with 1" Service - OW-2
155 EA
Replace 1-1/4” and 1-1/2” Water House Connection with 1-1/2” Service - OW-2
5 EA
Replace 2" Water House Connection - OW-2
8 EA
0129* Replace 4" Water House Connection - OW-2
7 EA
0130* Replace 6" Water House Connection - OW-2
3 EA
8" PVC Pipe for Sewer Siphon w/ DI Fittings - OW-2
325 LF
18” PVC Pipe for Sewer Siphon w/ DI Fittings - OW-2
73 LF
Adjust Sewer and Water Manhole - OW-2
31 EA
0134* 6 Inch Water Meter Vault - OW-
1 EA
TOTAL OPTIONAL WORK 2 $
TOTAL BASE WORK+OPTIONAL WORK 1 + OPTIONAL WORK 2
*Denotes a change from the previous Bidding Schedule. Item numbers have changed in some cases.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
00010-9 Ed 13-005
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. The Government will exercise Optional Work 1 no sooner than 100 calendar days and no later than 200 calendar days after Notice to Proceed of this contract. The Government will exercise Optional Work 2 no sooner than 300 calendar days and no later than 500 calendar days after notice to proceed of this contract. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
**If an option is to be exercised at the time of contract award in accordance with FAR 17.208, FAR clause 52.217-4 shall be used in place of FAR clause 52.217- 5.
NOTE 6: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that OPTION WORK items (Items 0100 through 0134) are exercised under the terms of the contract, the time required for completion of the contract will not be adjusted but shall be performed concurrent with the original contract duration of 1,500 calendar days established for the BASE WORK items specified in the Contract Clause entitled
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-
211-10 – APR 1984)”.
40’10’
HORIZ. SCALE:1"=20’
0 20’
SURVEY B/L STA. 342+00 TO STA. 347+00
C-121
342+00 343+00 344+00 345+00 347+00346+00
PROFILE - SB
10’
VERT. SCALE:1"=5’
0 5’
PVI STA 342+50.00
EL. 22.95
EXIST. 21" DRAIN
EXIST. 21" SEWER
INV. EL. 9.47’
REQ’D 24" RCP
STA. 344+02.09, 46.86’ RT.
INV. EL. 11.04’ @ BOX
SB PGL
PVI STA 343.50.00
EL. 22.60
PVI STA 344+17.00
EL. 22.83
REQ’D WMH W/
8" GATE VALVE
REQ’D 12"x12"x8" D.I. TEE
EXIST. GRADE
SB R/W
EXIST. 2" GAS
REQ’D ACCESS MH
(SEE SHEET C-223)
REQ’D 12" PVC WATER
REQ’D 18" RCP
STA. 346+66.49, 13.88’ RT.
INV. EL. 18.15’ @ DMH
REQ’D 18" RCP
STA. 346+66.49, 46.93’ RT.
INV. EL. 10.65’ @ BOX
INV. EL. 8.72’
PVI STA 345+00.00
EL. 22.41
EXIST. GRADE
C/L BOX CULVERT
REQ’D 24" RCP
STA. 344+02.09, 14.99’ RT.
INV. EL. 17.71’ @ DMH
REQ’D 8’x6’
BOX CULVERT
EXIST. GRADE
SB GUTTER LINE
CONST. JOINT (TYP)
REQ’D ACCESS M.H.
(SEE SHEET C-223)
REQ’D DROP INLET
ADJUST EXIST.
M.H.
ADJUST EXIST.
M.H.
REQ’D DROP INLET
EXIST. 12" WATER (TO BE REMOVED)
ADJUST EXIST. SMH
SURVEY B/L STA. 342+00 TO STA. 347+00
P.I. STA. 343+84.56, 50.85’ RT.
REQ’D 12"x12"x8" D.I. TEE
REQ’D 8"x8"x8" D.I. TEE
PLAN
REQ’D CONC.
BUS PAD
PLAN VIEW SHOWS NB & SB LOUISIANA AVE. SEE SHEETS
C-101 THRU C-116 FOR NB LOUISIANA AVE. PROFILE.
SURVEY B/L
C/L BOX CULVERT
LOUISIANA AVE. (NB)
LOUISIANA AVE. (SB)
REMOVE EXIST. 24" RCP
NO REPLACEMENT
REQ’D WMH W/ 8" GATE VALVE
(SEE NOTE 10)
Water Manhole
T.C. EL. 24.27’
T.O.P. EL. 21.68’
T.O.P. EL. 20.86’
Drain Inlet (Round)
T.C. EL. 22.22’
(Unable to Obtain Invert)
(Pipes per S&WB Map)
Drain Inlet (Square)
T.C. EL. 22.62’
(NW) INV. EL. 20.70’
Traffic Manhole
T.C. EL. 25.02’
BOTTOM EL. 23.70’
Traffic Manhole
T.C. EL. 24.46’
BOTTOM EL. 22.96’
Traffic Manhole
T.C. EL. 24.87’
BOTTOM EL. 23.52’
REQ’D 8"x8"x6"
D.I. TEE
REQ’D 8"x6"
D.I. REDUCER
REQ’D ACCESS M.H.
(SEE SHEET C-223)
REQ’D ACCESS M.H. (SEE SHEET C-223)
REMOVE EXIST. 24" PIPE
EXIST. R/W
SBPGL
NBPGL
SBPGL
NBPGL
REQ’D 15"
RCP
REQ’D COMBO
M.H. & C.B.
NOTES:
1. ELEVATIONS REPRESENTED BY * ON SHEETS C-101 THRU C-132 ARE FOR DATA THAT WAS NOT OBTAINABLE
DURING FIELD INVESTIGATIONS. CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS PRIOR TO
BEGINNING OF ANY PROCUREMENT OF MATERIAL AND CONSTRUCTION.
2. SEE SHEET C-204 FOR PIPING DETAILS AT PRYTANIA ST.
3. SEE SHEET G-106, NOTE 5.14 FOR FIRE HYDRANT NOTES.
4. REFER TO SHEETS C-145 THRU C-153, R-106 AND R-107 FOR HANDICAP RAMP DETAILS.
5. REFER TO SHEET R-135 FOR FIRE HYDRANT DETAILS.
6. SEE SHEETS X-101 THRU X-116 FOR POWER POLE, TELEPHONE AND TRAFFIC UTILITY
RELOCATIONS AND DISPOSITIONS.
7. PLUG ALL EXISTING MANHOLES WHERE PIPES ARE REMOVED.
8. ALL STRUCTURES, SEWERAGE, WATER AND DRAIN LINES NOT INDICATED TO BE REMOVED ARE TO REMAIN.
9. PRIOR TO INTERRUPTION OF SERVICE ON EXISTING WATER MAIN, THE CONTRACTOR SHALL
COORDINATE WITH S&WB FOR CLOSURE OF VALVES, WITNESS HYDROSTATIC TESTING AND PERFORM
PIPE CHLORINATION. THE CONTRACTOR SHALL DETERMINE THE QUANTITY OF WATER THAT NEEDS
TO BE DRAINED OR PUMPED FROM THE EXISTING WATER MAIN TO BE CUT AND ACCORDINGLY PROVIDE
REQUIRED PUMPING CAPACITY. INTERRUPTION OF SERVICE SHALL NOT EXCEED 8 HRS. FOR WATER MAIN
SIZES 4"%%c THRU 12"%%c AND 24 HRS. FOR WATER MAIN SIZES 20"%%c AND 30"%%c.
SEE SPECIFICATION SECTION 33 11 00, WATER DISTRIBUTION FOR ADDITIONAL DETAILS.
10.FOR MANHOLES AT INTERSECTIONS, SEE SHEETS C-202 THRU C-212 FOR DESCRIPTIONS, STATIONS, OFFSETS,TOP OF CASTINGS, INVERTS, AND DETAILS.
11.CONTRACTOR SHALL PROTECT EXISTING DRAIN PIPE THAT IS TO REMAIN DURING EXCAVATION FOR
ROADWAY, ROADWAY BASE AND ROADWAY SUB-BASE.
12.FOR S&WB DRAIN MANHOLES D-870:
No. 1 MH IS FOR MANHOLES WITH ALL DRAIN LINES 24" OR SMALLER.
No. 2 MH IS FOR MANHOLES WITH MAXIUM LINES OF 27" OR 30".
No. 3 MH IS FOR MANHOLES WITH 36" PIPES.
REQ’D 12"x12"x4"
D.I. TEE
REQ’D 12"x12"x4"
D.I. TEE
REQ’D 4"
PVC
REQ’D 4" PVC
REQ’D 12"x12"x4" D.I. TEE
REQ’D 12"x12"x4" D.I. TEE
G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"G2"
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B
D A
T E
S
IZ
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
P L
O T
D A
T E
F
IL
E
N U
M B
E R
A N
S I
D
U R
S
M E
T A
IR
IE
H -4
-4
C
.d g n fi
US Army Corps of Engineers
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
SHEET
IDENTIFICATION
/1
/2
UR
S
JE
G
JV
N
C a u se w a y
B lv d
S u it e
M e ta ir ie
L o u is ia n a
(5
-6
S O
L
IC
IT
A
T
IO
N
C O
N T
R A
C T
P R
O
JE
C T
N o
X X
X X
US Army Corps of Engineers
New Orleans District
S O
U T
H E
A S
T L
O U
IS
IA
N A
U R
B A
N F
L O
O D
C O
N T
R O
L P
R O
J E
C T
L O
U
IS
IA
N
A A
V E
IM
P R
O V
E M
E N
T S
(C O
N S
T A
N C
E S
T R
E E
T T
O S
O U
T H
C L
A
IR
B O
R N
E A
V E
O R
L E
A N
S P
A R
IS
H
L
A
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -4
-4 n p r o je c ts
\u r s je g j o in t v e n tu r e \1 s e la l o u is ia n a a v e i m p r o v e m e n ts to
\c a d \c u r r e n t d r a w in g s \H
C
.d g n
N O
V E
M B
E R
W12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVCW12" PVC
C-122
347+00 348+00 349+00 350+00 352+00351+00
INV. EL. 8.72’
EXIST. 21" SEWER
REQ’D 12"x12"x8" D.I. TEE
INV. EL. 8.46’
VC = 130’
REQ’D 12" PVC WATER
EXIST. 2" GAS
VPC STA 347+60.00
EL. 21.50
SB PGL
PVI STA 348+25.00
EL. 21.27
VPT STA 348+90.00
EL. 22.71
PVI STA 349+39.01
EL. 23.79
REMOVE AND REPLACE
W/ S&WB DMH
(SEE SHEET R-116)
INV. EL. 8.46’
PVI STA 349+63.01
EL. 23.79
REQ’D WMH W/ 8" GATE VALVE
VPC STA 349+90.00
EL. 23.12
PVI STA 350+50.00
EL. 21.62
REQ’D 12"x12"x6" D.I. TEE
REQ’D ACCESS MH (SEE SHEET C-223)
T.C. (MATCH EXIST. GRADE)
EXIST. GRADE
C/L BOX CULVERT
VPT STA 351+10.00
EL. 21.41
EXIST. 4" GAS
VC = 120’
PVI STA 51+71.00
EL. 21.19
REQ’D. 15" RCP
STA. 351+70.91, 46.03’ RT.
INV. EL. 12.21’ @ BOX INV. EL. 8.18’
EXIST. GRADE
SB R/W
REQ’D WMH W/
12" GATE VALVE
STA.
348+50.19
REQ’D 8" PVC SEWER
INV. EL. 3.16’
REQ’D STEEL CASING
(SEE SHEET C-205)
REQ’D 10’x8’
BOX CULVERT
STA.
348+75.23
REQ’D 12"x12"x8"
D.I. TEE
REQ’D CLEANOUT HATCH
(SEE SHEET C-225)
CONST. JOINT (TYP)
EXIST. GRADE
SB GUTTER LINE
PROFILE - SB
SURVEY B/L STA. 347+00 TO STA. 352+00
40’10’
HORIZ. SCALE:1"=20’
0 20’ 10’
VERT. SCALE:1"=5’
0 5’
REQ’D ACCESS M.H.
(SEE SHEET C-223)
REQ’D M.H.
INV. 15.20
ADJ.
EXIST. M.H.
REQ’D DROP INLET
REQ’D
C.B. & M.H.
REQ’D
C.B. & M.H.
REQ’D
DROP INLET
EXIST. 12" DRAIN
(TO BE REMOVED)
EXIST. 12" WATER (TO BE REMOVED)
REQ’D 60" RCP
STA. 349+12.95, 12.57’ RT.
INV. = EL. 15.20’ @ DMH
SURVEY B/L STA. 347+00 TO STA. 352+00
REQ’D 6" D.I. WATER LINE
REQ’D 8" PVC SEWER SIPHON
REQ’D 8" D.I. 45%%d BENDS (TYP.)
PLAN VIEW SHOWS NB & SB
LOUISIANA AVE. SEE SHEETS
C-101 THRU C-116 FOR NB
LOUISIANA AVE. PROFILE.
PLAN
REQ’D CONC. BUS PAD
REMOVE EXIST.
PIPE BETWEEN
REDUCERS
LOUISIANA AVE. (SB)
LOUISIANA AVE. (NB)
D36"
REQ’D 15" RCP
REQ’D 15" RCP
REMOVE EXIST. 12" RCP
REMOVE EXIST. 24" RCP
EXIST. 12" GAS
TO BE REMOVED
REQ’D WMH W/ 12" GATE VALVE (SEE NOTE 12)
Drain Inlet (Square)
T.C. EL. 21.39’
(SE) INV. EL. 18.70’
Drain Manhole
T.C. EL. 23.37’
(Unable to Obtain Invert)
(Pipes per S&WB Map)
Drain Inlet (Square)
T.C. EL. 21.55’
(NW) INV. EL. 19.10’
REQ’D 8"x6" D.I.
REDUCER
ADJUST DROP INLET
STA. 349+05.96, 14.31’ LT.
T.C. = EL. 22.00’
Traffic Manhole
T.C. EL. 24.21’
INVERT = 22.89’
Traffic Manhole
T.C. EL. 24.08’
INVERT = 22.65’
Traffic Box with concrete pad
Drain Manhole
NO INFORMATION
PROVIDED
REQ’D WMH W/ 8" GATE VALVE
(SEE NOTE 12)
REMOVE EXIST. SEWER PIPE BETWEEN MANHOLES
2" GAS TO BE REMOVED AND REPLACED CONCURRENT
WITH CONSTRUCTION BY OTHERS
REQ’D
8"x8"x8"
D.I. TEE
REQ’D ACCESS M.H.
(SEE SHEET C-223)
REQ’D DROP INLET
STA. 348+92.23, 2.88’ LT.
T.C. = EL. 22.75’
INV. = EL. 16.75’
REQ’D
15" RCP
REQ’D 36" RCP
Water Manhole
T.C. EL. 21.99’
BOTTOM EL. 20.15’
(2)Water Manhole
T.C. EL. 24.10’
BOTTOM EL. 19.06’
REMOVE EXIST. M.H.
STA. 351+79.11, 90.86’ RT.
REQ’D M.H. (S&WB D-870)
STA. 351+71.00. 89.57’ RT.
T.C. = EL. 21.29’
INV. = EL. 14.00’
REQ’D 12"x12"x6" D.I. TEE
C/L BOX CULVERT
SBPGL
NBPGL
SBPGL
NBPGL
REMOVE EXIST. 36"
PIPE & REPLACE W/
60" RCP
REQ’D 10’x8’
BOX CULVERT
REQ’D 15" RCP
STA. 350+33.00
INV. EL. 10.00’ @ BOX
REQ’D 15" RCP
STA. 350+33.00
INV. EL. 17.12 @ DMHREQ’D 15" RCP
STA. 349+90.48
INV. EL. 18.32
REQ’D 15" RCP
STA. 349+90.48
INV. EL. 10.50’
REQ’D 15" RCP
STA. 351+70.91
INV. EL. 16.69’ @ DMH
NOTES:
1. ELEVATIONS REPRESENTED BY * ON SHEETS C-101 THRU C-132 ARE FOR DATA THAT WAS NOT OBTAINABLE DURING
FIELD INVESTIGATIONS. CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS PRIOR TO BEGINNING OF ANY
PROCUREMENT OF MATERIAL AND CONSTRUCTION.
2. SEE SHEET C-205 FOR PIPING DETAILS AT ST. CHARLES AVE.
3. SEE SHEET G-106, NOTE 5.14 FOR FIRE HYDRANT NOTES.
4. REFER TO SHEETS C-145 THRU C-153, R-106 AND R-107 FOR HANDICAP RAMP DETAILS.
5. REFER TO SHEET R-135 FOR FIRE HYDRANT DETAILS.
6. SEE SHEETS X-101 THRU X-116 FOR POWER POLE, TELEPHONE AND TRAFFIC UTILITY RELOCATIONS AND DISPOSITIONS.
7. PLUG ALL EXISTING MANHOLES WHERE PIPES ARE REMOVED.
8. ALL STRUCTURES, SEWERAGE, WATER AND DRAIN LINES NOT INDICATED TO BE REMOVED ARE TO REMAIN.
9. REFER TO SHEETS C-501 THRU C-511 FOR STREET CAR RAIL REPLACEMENT, AND C-352 THRU C-355 FOR PHASING
AT ST. CHARLES AVENUE.
10.EXISTING FIRE HYDRANT LOCATED IN THE MEDIAN SHALL BE REMOVED, AND REPLACED AFTER CULVERT CONSTRUCTION.
CONTRACTOR SHALL KEEP ADJACENT FIRE HYDRANTS OPERABLE TO MEET THE CITY OF NEW ORLEANS HYDRANT SPACING
NO GREATER THAN 350’. SEE NEW ORLEANS ORDINANCE CHAPTER 9, "FIRE PROTECTION SYSTEMS".
11. PRIOR TO INTERRUPTION OF SERVICE ON EXISTING WATER MAIN, THE CONTRACTOR SHALL
COORDINATE WITH S&WB FOR CLOSURE OF VALVES, WITNESS HYDROSTATIC TESTING AND PERFORM
PIPE CHLORINATION. THE CONTRACTOR SHALL DETERMINE THE QUANTITY OF WATER THAT NEEDS
TO BE DRAINED OR PUMPED FROM THE EXISTING WATER MAIN TO BE CUT AND ACCORDINGLY PROVIDE
REQUIRED PUMPING CAPACITY. INTERRUPTION OF SERVICE SHALL NOT EXCEED 8 HRS. FOR WATER MAIN
SIZES 4"%%c THRU 12"%%c AND 24 HRS. FOR WATER MAIN SIZES 20"%%c AND 30"%%c.
SEE SPECIFICATION SECTION 33 11 00, WATER DISTRIBUTION FOR ADDITIONAL DETAILS.
12. FOR MANHOLES AT INTERSECTIONS, SEE SHEETS C-202 THRU C-212 FOR DESCRIPTIONS, STATIONS, OFFSETS, TOP OF CASTINGS, INVERTS, AND DETAILS.
13. CONTRACTOR SHALL PROTECT EXISTING DRAIN PIPE THAT IS TO REMAIN DURING EXCAVATION FOR
ROADWAY, ROADWAY BASE AND ROADWAY SUB-BASE.
14. FOR S&WB DRAIN MANHOLES D-870:
No. 1 MH IS FOR MANHOLES WITH ALL DRAIN LINES 24" OR SMALLER.
No. 2 MH IS FOR MANHOLES WITH MAXIUM LINES OF 27" OR 30".
No. 3 MH IS FOR MANHOLES WITH 36" PIPES.
REQ’D 60" RCP
STA. 349+12.95, 30.00’ RT.
INV. = EL. 11.50’ @ DMH
REQ’D M.H.
INV. 11.50
REQ’D 60" RCP
STA. 349+12.95, 46.00’ RT.
INV. = EL. 10.00’ @ BOX
REQ’D 60" RCP
STA. 349+12.95, 30.00’ RT.
INV. = EL. 15.00’ @ DMH
ADJ.
EXIST.
M.H.
REQ’D
60" RCP
REQ’D 12"x12"x6"
D.I. TEE
REQ’D 6" METER VAULT
REMOVE
METER
VALVES, MH
CASTING
REQ’D
12"x12"x6"
D.I. TEE
1 1
REQ’D 6" PVC
Ex
G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G2"G2"G2"G2"G2"G2"
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B
D A
T E
S
IZ
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
P L
O T
D A
T E
F
IL
E
N U
M B
E R
A N
S I
D
U R
S
M E
T A
IR
IE
H -4
-4
C
.d g n fi
US Army Corps of Engineers
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
SHEET
IDENTIFICATION
/1
/2
UR
S
JE
G
JV
N
C a u se w a y
B lv d
S u it e
M e ta ir ie
L o u is ia n a
(5
-6
S O
L
IC
IT
A
T
IO
N
C O
N T
R A
C T
P R
O
JE
C T
N o
X X
X X
US Army Corps of Engineers
New Orleans District
S O
U T
H E
A S
T L
O U
IS
IA
B A
N F
L O
O D
C O
N T
R O
L P
R O
J E
C T
L O
U
IS
IA
N
A A
V E
IM
P R
O V
E M
E N
T S
(C O
N S
T A
N C
E S
T R
E E
T T
O S
O U
T H
C L
A
IR
B O
R N
E A
V E
O R
L E
A N
S P
A R
IS
H
L
A
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -4
-4
N
P r o je c ts
\U R
S J E
G J o in t V e n tu r e \1
S
E L
A L o u is ia n a A v e I m p r o v e m e n ts
T O
\C
A D
\C u r r e n t D r a w in g s \H
C
.d g n
N O
V E
M B
E R
B2EDTLEM
Typewritten Text
15. CONTRACTOR SHALL SUBMIT A SEPARATE TRAFFIC
CONTROL PLAN TO ACCOMMODATE INSTALLATION
OF 6 INCH WATER METER VAULT.
B2EDTLEM
Polygon
B2EDTLEM
Typewritten Text
B2EDTLEM
Typewritten Text
B2EDTLEM
Polygon
40’10’
HORIZ. SCALE:1"=20’
0 20’
C-123
352+00 353+00 354+00 355+00 356+00 357+00
PROFILE - SB
10’
VERT. SCALE:1"=5’
0 5’
PVI STA 353+05.00
EL. 21.10
PVI STA 353+60.00
EL. 21.29
EXIST. 4" GAS
REQ’D 12" PVC WATER
INV. EL. 8.18’
PVI STA 352+25.00
EL. 21.38
REQ’D WMH W/
8" GATE VALVE
EXIST. 21" SEWER * CONST. JOINT (TYP)
REQ’D 12" PVC WATER
PVI STA 355+14.00
EL. 20.29
SB PGL
INV. EL. 7.67’
REQ’D 18" RCP
STA. 356+96.87, 46.03’ RT.
INV. EL. 11.72’ @ BOX
REQ’D 18" RCP
STA. 356+96.87, 15.37’ RT.
INV. EL. 16.29’ @ DMH
REQ’D 10’x8’
BOX CULVERT REQ’D 12"x12"x8"
D.I. TEE
EXIST. GRADE
SB R/W
EXIST. GRADE
C/L BOX CULVERT
EXIST. GRADE
SB GUTTER LINE
REQ’D ACCESS M.H.
(SEE SHEET C-223)
REQ’D 15" RCP
STA. 355+14.59, 20.24’ RT.
INV. EL. 15.79’ @ DMH
REQ’D 15" RCP
STA. 355+14.59, 46.03’ RT.
INV. EL. 12.00’ @ BOX
REQ’D DROP INLET
REQ’D DMH
REQ’D DMH
REQ’D DROP INLET
REQ’D MH
REQ’D DROP INLET
REQ’D DMH
REQ’D 15" RCP
STA. 356+56.30, 46.03’ RT.
INV. EL. 10.0’ @ BOX
REQ’D DMH
EXIST. 12" DRAIN
(TO BE REMOVED)
EXIST. 10" DRAIN
(TO BE REMOVED)
REQ’D 15" RCP
STA. 353+73.39, 15.49’ RT.
INV. EL. 17.00’ @ DMH
REQ’D 15" RCP
REQ’D 8" PVC WATER
REQ’D 15" RCP
REQ’D 15" RCP
SURVEY B/L STA. 352+00 TO STA. 357+00
REQ’D 8"x8"x8" D.I. TEE
REMOVE EXIST. 6" WATER PIPE
AND WMH’S BETWEEN NEW
REDUCERS
REQ’D CONC. BUS PAD
PLAN
REQ’D 12"x12"x8"
D.I. TEE
REQ’D 8"
PVC WATER
REMOVE EXIST. 12" RCP. NO REPLACEMENT
REQ’D 15" RCP
REMOVE EXIST M.H.
REMOVE EXIST. 12" RCP
NO REPLACEMENTLOUISIANA AVE. (NB)
P.I. STA. 354+43.31,
51.03’ RT.
EXIST. R/W
LOUISIANA AVE. (SB)
C/L BOX CULVERT
SURVEY B/L
ADJUST EXIST M.H.
(S&WB DRAWING 8180-SD)
(SEE NOTE 10)
Traffic Manhole
T.C. EL. 23.69’
INVERT = 21.99’
REQ’D 12"
PVC WATER
REQ’D 15" RCP
REQ’D ACCESS M.H.
(SEE SHEET C-223)
REQ’D 15" RCP
REQ’D 10’x8’
BOX CULVERT
ABANDONED 4" GAS
TO BE REMOVED
REMOVE EXIST 12" RCP
REMOVE EXIST. M.H. &
REPLACE W/ REQ’D M.H.
(S&WB D-870)
(SEE NOTE 10)
REQ’D 6" D.I. WATER
REQ’D 24" RCP
REQ’D 18" RCP
SBPGL
NBPGL
SBPGL
NBPGL
REQ’D 15" RCP
STA. 355+05.02
INV. = EL. 10.00’
REQ’D 15" RCP
STA. 355+05.02
INV. = EL. 16.60’
REQ’D 15" RCP
STA. 353+73.39, 46.03’ RT.
INV. EL. 12.02’ @ BOX
SURVEY B/L STA. 352+00 TO STA. 357+00
REQ’D 15" RCP
STA. 356+56.30, 13.91’ RT.
INV. EL. 16.79’
@ DROP INLET
REQ’D 15" RCP
NOTES:
1. ELEVATIONS REPRESENTED BY * ON SHEETS C-101 THRU C-132 ARE FOR DATA THAT WAS NOT OBTAINABLE
DURING FIELD INVESTIGATIONS. CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS PRIOR TO
BEGINNING OF ANY PROCUREMENT OF MATERIAL AND CONSTRUCTION.
2. SEE SHEET C-206 FOR PIPING DETAILS AT CARONDELET ST. AND AT BARONNE ST.
3. SEE SHEET G-106, NOTE 5.14 FOR FIRE HYDRANT NOTES.
4. REFER TO SHEETS C-145 THRU C-153, R-106 AND R-107 FOR HANDICAP RAMP DETAILS.
5. REFER TO SHEET R-135 FOR FIRE HYDRANT DETAILS.
6. SEE SHEETS X-101 THRU X-116 FOR POWER POLE, TELEPHONE AND TRAFFIC UTILITY
RELOCATIONS AND DISPOSITIONS.
7. PLUG ALL EXISTING MANHOLES WHERE PIPES ARE REMOVED.
8. ALL STRUCTURES, SEWERAGE, WATER AND DRAIN LINES NOT INDICATED TO BE REMOVED ARE TO REMAIN.
9. PRIOR TO INTERRUPTION OF SERVICE ON EXISTING WATER MAIN, THE CONTRACTOR SHALL
COORDINATE WITH S&WB FOR CLOSURE OF VALVES, WITNESS HYDROSTATIC TESTING AND PERFORM
PIPE CHLORINATION. THE CONTRACTOR SHALL DETERMINE THE QUANTITY OF WATER THAT NEEDS
TO BE DRAINED OR PUMPED FROM THE EXISTING WATER MAIN TO BE CUT AND ACCORDINGLY PROVIDE
REQUIRED PUMPING CAPACITY. INTERRUPTION OF SERVICE SHALL NOT EXCEED 8 HRS. FOR WATER MAIN
SIZES 4"%%c THRU 12"%%c AND 24 HRS. FOR WATER MAIN SIZES 20"%%c AND 30"%%c.
SEE SPECIFICATION SECTION 33 11 00, WATER DISTRIBUTION FOR ADDITIONAL DETAILS.
10.FOR MANHOLES AT INTERSECTIONS, SEE SHEETS C-202 THRU C-212 FOR DESCRIPTIONS, STATIONS, OFFSETS,TOP OF CASTINGS, INVERTS, AND DETAILS.
11.CONTRACTOR SHALL PROTECT EXISTING DRAIN PIPE THAT IS TO REMAIN DURING EXCAVATION FOR
ROADWAY, ROADWAY BASE AND ROADWAY SUB-BASE.
12.FOR S&WB DRAIN MANHOLES D-870:
No. 1 MH IS FOR MANHOLES WITH ALL DRAIN LINES 24" OR SMALLER.
No. 2 MH IS FOR MANHOLES WITH MAXIUM LINES OF 27" OR 30".
No. 3 MH IS FOR MANHOLES WITH 36" PIPES.
REQ’D 15" RCP
REQ’D
15" RCP
REMOVE EXIST. &
REPLACE W/15" RCP
REQ’D 15" RCP
REQ’D 4" PVC
REQ’D 12"x12"x4"
D.I. TEE
REQ’D 12"x12"x4"
D.I. TEE1
Ex
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B
D A
T E
S
IZ
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
P L
O T
D A
T E
F
IL
E
N U
M B
E R
A N
S I
D
U R
S
M E
T A
IR
IE
H -4
-4
C
.d g n fi
US Army Corps of Engineers
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
SHEET
IDENTIFICATION
/1
/2
UR
S
JE
G
JV
N
C a u se w a y
B lv d
S u it e
M e ta ir ie
L o u is ia n a
(5
-6
S O
L
IC
IT
A
T
IO
N
C O
N T
R A
C T
P R
O
JE
C T
N o
X X
X X
US Army Corps of Engineers
New Orleans District
S O
U T
H E
A S
T L
O U
IS
IA
B A
N F
L O
O D
C O
N T
R O
L P
R O
J E
C T
L O
U
IS
IA
N
A A
V E
IM
P R
O V
E M
E N
T S
(C O
N S
T A
N C
E S
T R
E E
T T
O S
O U
T H
C L
A
IR
B O
R N
E A
V E
O R
L E
A N
S P
A R
IS
H
L
A
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -4
-4 n p r o je c ts
\u r s je g j o in t v e n tu r e \1 s e la l o u is ia n a a v e i m p r o v e m e n ts to
\c a d \c u r r e n t d r a w in g s \H
C
.d g n
N O
V E
M B
E R
REQ’D 8" PVC WATER
EXIST. 24" SEWER
REQ’D 8"x8"x6" D.I. TEE
REQ’D 8" PVC WATER
EXIST. 2" GAS
EXIST. 18" DRAIN
REQ’D CLEANOUT HATCH
(SEE SHEET C-225)
EXIST. GRADE
C/L BOX CULVERT
CONST. JOINT (TYP)
REQ’D 8"x8"x8"
D.I. TEE
REQ’D WMH W/
8" GATE VALVE
REQ’D 15" RCP
STA. 372+97.98, 15.78’ RT.
INV. = EL. 13.96’ @ DMH
REQ’D 15" RCP
STA. 372+97.98, 46.03’ RT.
INV. = EL. 8.00’ @ BOX
REQ’D COMBO
C.B. & M.H.
REQ’D 45"x73" RCPA
STA. 374+51.71, 11.01’ RT.
INV. EL. 12.75’ @ DMH
REQ’D M.H.
EXIST. 6" WATER
(TO BE REMOVED)
REQ’D 8" D.I. 45%%d BENDS (TYP.)
REQ’D 8" D.I. 45%%d BENDS (TYP.)
REMOVE EXIST. 6" WATER PIPE AND WMH’S BETWEEN NEW REDUCERS
REQ’D 6" D.I. WATER
REQ’D 8" PVC SEWER SIPHON
REQ’D 8" D.I. 45%%d
BENDS (TYP.)
Water Manhole
T.C. EL. 19.18’
(SW) INV. EL. 16.90’
(NE) INV. EL. 16.90’
REQ’D 8"x6" D.I. REDUCER
REQ’D WMH W/ 8" GATE VALVE
REQ’D FIRE HYDRANT
(SEE NOTE 3)
REMOVE EXIST. FIRE
HYDRANT AND PIPE
REMOVE 24" AND
REPLACE W/
45"x73" RCPA
REQ’D ACCESS M.H.
(SEE SHEET C-223)
REMOVE 24" AND REPLACE
W/ 45"x73" RCPA
SBPGL
NBPGL
SBPGL
NBPGL
ADJUST EXIST. M.H.
NOTES:
1. ELEVATIONS REPRESENTED BY * ON SHEETS C-101 THRU C-132 ARE FOR DATA THAT WAS NOT OBTAINABLE
DURING FIELD INVESTIGATIONS. CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS PRIOR TO
BEGINNING OF ANY PROCUREMENT OF MATERIAL AND CONSTRUCTION.
2. SEE SHEET C-209 FOR PIPING DETAILS AT S. LIBERTY ST.
3. SEE SHEET G-106, NOTE 5.14 FOR FIRE HYDRANT NOTES.
4. REFER TO SHEETS C-145 THRU C-153, R-106 AND R-107 FOR HANDICAP RAMP DETAILS.
5. REFER TO SHEET R-135 FOR FIRE HYDRANT DETAILS.
6. SEE SHEETS X-101 THRU X-116 FOR POWER POLE, TELEPHONE AND TRAFFIC UTILITY
RELOCATIONS AND DISPOSITIONS.
7. PLUG ALL EXISTING MANHOLES WHERE PIPES ARE REMOVED.
8. ALL STRUCTURES, SEWERAGE, WATER AND DRAIN LINES NOT INDICATED TO BE REMOVED ARE TO REMAIN.
9. PRIOR TO INTERRUPTION OF SERVICE ON EXISTING WATER MAIN, THE CONTRACTOR SHALL
COORDINATE WITH S&WB FOR CLOSURE OF VALVES, WITNESS HYDROSTATIC TESTING AND PERFORM
PIPE CHLORINATION. THE CONTRACTOR SHALL DETERMINE THE QUANTITY OF WATER THAT NEEDS
TO BE DRAINED OR PUMPED FROM THE EXISTING WATER MAIN TO BE CUT AND ACCORDINGLY PROVIDE
REQUIRED PUMPING CAPACITY. INTERRUPTION OF SERVICE SHALL NOT EXCEED 8 HRS. FOR WATER MAIN
SIZES 4"%%c THRU 12"%%c AND 24 HRS. FOR WATER MAIN SIZES 20"%%c AND 30"%%c.
SEE SPECIFICATION SECTION 33 11 00, WATER DISTRIBUTION FOR ADDITIONAL DETAILS.
10.FOR MANHOLES AT INTERSECTIONS, SEE SHEETS C-202 THRU C-212 FOR DESCRIPTIONS, STATIONS, OFFSETS,TOP OF CASTINGS, INVERTS, AND DETAILS.
11.CONTRACTOR SHALL PROTECT EXISTING DRAIN PIPE THAT IS TO REMAIN DURING EXCAVATION FOR
ROADWAY, ROADWAY BASE AND ROADWAY SUB-BASE.
12.FOR S&WB DRAIN MANHOLES D-870:
No. 1 MH IS FOR MANHOLES WITH ALL DRAIN LINES 24" OR SMALLER.
No. 2 MH IS FOR MANHOLES WITH MAXIUM LINES OF 27" OR 30".
No. 3 MH IS FOR MANHOLES WITH 36" PIPES.
REQ’D 15" RCP
STA. 376+30.27, 15.78’ RT.
INV. = EL. 13.95’ @ DMH
REQ’D 15" RCP
STA. 376+30.27, 46.03’ RT.
INV. = EL. 11.00’ @ BOX
REQ’D COMBO
C.B. & M.H.
372+00 373+00 374+00 375+00 376+00 377+00
G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"G4"
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B
D A
T E
S
IZ
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
P L
O T
D A
T E
F
IL
E
N U
M B
E R
A N
S I
D
U R
S
M E
T A
IR
IE
H -4
-4 C
.d g n fi
US Army Corps of Engineers
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
SHEET
IDENTIFICATION
/1
/2
UR
S
JE
G
JV
N
C a u se w a y
B lv d
S u it e
M e ta ir ie
L o u is ia n a
(5
-6
S O
L
IC
IT
A
T
IO
N
C O
N T
R A
C T
P R
O
JE
C T
N o
X X
X X
US Army Corps of Engineers
New Orleans District
S O
U T
H E
A S
T L
O U
IS
IA
B A
N F
L O
O D
C O
N T
R O
L P
R O
J E
C T
L O
U
IS
IA
N
A A
V E
IM
P R
O V
E M
E N
T S
(C O
N S
T A
N C
E S
T R
E E
T T
O S
O U
T H
C L
A
IR
B O
R N
E A
V E
O R
L E
A N
S P
A R
IS
H
L
A
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -4
-4 n p r o je c ts
\u r s je g j o in t v e n tu r e \1 s e la l o u is ia n a a v e i m p r o v e m e n ts to
\c a d \c u r r e n t d r a w in g s \H
C
.d g n
N O
V E
M B
E R
EXISTING SEWER
LINE TO BE REMOVED
ST. CHARLES
S. SARATOGA
COLISEUM
BARONNE
DRYADES
DANNEEL
LOYOLA
MAGNOLIA
385+09.26
339+19.75
348+97.72
357+08.96
360+65.47
364+09.59
367+58.76
371+08.12
388+92.09
A B C
13.11
12.98
12.32
11.02
11.46
11.71
10.69
9.61
9.13
9.91
8.46
7.49
7.30
6.83
6.49
6.24
4.81
4.44
13.78
13.15
11.44
12.47
12.30
10.93
9.89
9.08
ELEVATIONS
18"
C-218
S E
W E
R S
IP
H
O N
D E
T A
IL
S
E
MIN.
LASALLE
MAGAZINE 18.80
10.03
18.63 8"328+66.55 11.46
5.48378+17.44
8"
8"
8"
8"
8"
8"
8"
8"
8"
NOTES:
SCALE: N.T.S.
SEWER SIPHON DETAIL
PIPE SIZE, %%c
8’ X 6’
8’ X 6’
10’ X 8’
10’ X 8’
10’ X 8’
10’ X 8’
10’ X 8’
10’ X 8’
B M
M R
L W
N C
N T
S
GRANULAR
BACKFILL
EXIST. SEWER LINE
TO REMAINEXIST. SEWER LINE
TO REMAIN
EXISTING
MANHOLE
TO REMAIN
SIZE OF BOX VARIES. SEE SHEETS
S-117 THRU S-120 FOR DETAILS
NEW PVC SEWER,
INV. EL. "D"
C/L
NEW BOX CULVERT
EXISTING
MANHOLE
TO REMAIN
EXIST. SEWER
PIPE DIA. "E"3’
MIN.
3’
* INVERT IS UNKNOWN TO BE FIELD VERIFIED.
STREET
INTERSECTION
B/L STATION
BOX CULVERT
SIZE D
1.64
S. ROBERTSON
8.29
5.91
5.29
4.32
3.98
3.66
2.32
2.99
2.31
ASECTION
SCALE: 1/2" = 1’-0"
A S-117
S-121
45%%d D.I. BEND
SEE NOTE 5 (TYP.)
16’ X 7.5’
16’ X 7.5’
16’ X 7.5’
INV.
EL. "B"
M
IN
1. CONTRACTOR TO FIELD VERIFY INVERTS.
2. THIS DETAIL APPLIES TO ALL SIZES OF BOX
CULVERT SECTIONS AND TRANSITIONS.
3. THE SEWER SIPHON PIPE SHALL HAVE THE SAME
SLOPE AT THE EXISTING SEWER MH’S AS THE
PIPE BEING REPLACED.
4. CONTRACTOR SHALL MINIMIZE INTERRUPTION
TO EXISTING SERVICE.
5. ALL BENDS SHALL BE RESTRAINED DUCTILE
IRON WITH STAINLESS STEEL BOLTS, NUTS
AND WASHERS.
NEW DMH
REQ’D 8" WATER LINE
EXIST. 36" RCP DRAIN
NEW DMH
REQ’D 45"x73" RCPA
REQ’D 45"x73" RCPA
EL. 15.83’EL. 13.62’
GRANULAR BACKFILL
INV. EL. 5.88’
16’x7.5’ BOX CULVERT
C/L BOX CULVERTSURVEY B/L
SCALE: 1" = 60’
REQ’D JET GROUT
EXIST. 24"
DRAIN LINE
REQ’D 8" WATER
LINE
INV. EL. "A"
INV. EL. "C"
EXIST. 8" SEWER LINE TO REMAIN
EL. 7.38’
EXIST. 24" SEWER LINE
TO BE REMAIN
EL. 12.75’
S. LIBERTY ST. DRAINAGE DETAIL
(STA. 374+61.00)
A N
D S
O U
T H
L
IB
E R
T Y
S T
D R
A
IN
A G
E D
E T
A
IL
374+60.92 10.29 5.83 10.93 2.66 8"S. LIBERTY 16’ X 7.5’
1.23
EXIST. 18" RCP
INV. 13.85
EXIST. 18" RCP
INV. 13.63’
INV. EL. 7.08
INV. EL. 8.12’
NEW PVC
SEWER
NEW PVC
SEWER
INSTALL JET GROUT FOR ALL SIPHONS
SIMILAR TO TO DWGS. C-214 AND S-125
LOUISIANA AVE.
(SOUTHBOUND)
LOUISIANA AVE.
(NORTHBOUND)
LOUISIANA AVE.
(NORTHBOUND)
LOUISIANA AVE.
(SOUTHBOUND)
-1
-1
A D
D E
D J
E T
G R
O U
T F
IL
E
N A
M E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D
2 3
C
4 5
A
B
D A
T E
S
IZ
E
S U
B M
IT
T
E D
B Y
P L
O T
S C
A L
E
P L
O T
D A
T E
F
IL
E
N U
M B
E R
A N
S I
D
U R
S
M E
T A
IR
IE
F
IL
E
A fi
US Army Corps of Engineers
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
A P
P R
D
A T
E D
E S
C R
IP
T
IO
N
M A
R K
SHEET
IDENTIFICATION
D
A T
E
UR
S
JE
G
JV
N
C a u se w a y
B lv d
S u it e
M e ta ir ie
L o u is ia n a
(5
-6
S O
L
IC
IT
A
T
IO
N
C O
N T
R A
C T
P R
O
JE
C T
N o
X X
X X
US Army Corps of Engineers
New Orleans District
S O
U T
H E
A S
T L
O U
IS
IA
B A
N F
L O
O D
C O
N T
R O
L P
R O
J E
C T
L O
U
IS
IA
N
A A
V E
IM
P R
O V
E M
E N
T S
(C O
N S
T A
N C
E S
T R
E E
T T
O S
O U
T H
C L
A
IR
B O
R N
E A
V E
O R
L E
A N
S P
A R
IS
H
L
A
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N E
W O
R L
E A
N S
D
IS
T R
IC
T
N E
W O
R L
E A
N S
L
O U
IS
IA
N A
H -4
-4
F
IL
E
N O
V E
M B
E R
INDEX OF SHEETS
TITLE TITLE TITLE
CROSS SECTIONS
SHEETS SHEETS SHEETS
STRUCTURAL REFERENCE
STRUCTURAL NOTESS-101
S-102
S-103
S-104
S-105
S-106
S-107
S-108
S-109
S-110
S-111
S-112
S-113
S-114
S-115
S-116
S-117
S-118
S-119
S-120
S-121
S-123
S-124
S-125
V-101
V-102
V-103
V-104
V-105
V-106
V-107
V-108
V-109
V-110
V-111
V-112
V-113
V-114
V-115
V-116
V-117
V-118
V-119
V-120
V-121
V-122
V-123
V-124
V-125
V-126
CLARA ST. TRS
S&WB, DWG. NO. D-3937 - DETAIL OF STANDARD MANHOLES FOR LARGE
CONCRETE ARCH PIPE
S&WB, DWG. NO. D-3934 - TYPICAL SECTIONS OF REINFORCED CONCRETE
ARCH PIPE BEDDING (FROM 73" X 45" TO 122" X 78")
S&WB, DWG. NO. D-3933 - TYPICAL SECTIONS OF REINFORCED CONCRETE
ARCH PIPE BEDDING FROM 22" X 13 1/2" TO 65" X 40"
S&WB, DWG. NO. D-3810 - TYPICAL SECTIONS OF CONCRETE PIPE BEDDING
FROM 48" TO 72" PIPE
S&WB, DWG. NO. D-3809 - TYPICAL SECTIONS OF CONCRETE PIPE BEDDING
FROM 12" TO 42" PIPE
S&WB, DWG. NO. D-3340 - DETAIL OF STANDARD MANHOLE FOR CIRCULAR
PIPE GREATER THAN 36"
S&WB, DWG. NO. D-3431-B - DETAIL OF STANDARD DOUBLE MOUNTABLE
CATCH BASIN
S&WB, DWG. NO. D-3431-A - DETAIL OF STANDARD SINGLE MOUNTABLE
CATCH BASIN
UTILITY DISPOSITION
X-101
X-102
X-103
X-104
X-105
X-106
X-107
X-108
X-109
X-110
X-111
X-112
X-113
X-114
X-115
X-116
TRANSITION TO EXISTING CULVERT PLAN AND ELEVATION
REFERENCE
R-101
R-102
R-103
R-104
CNO, STD 2 - MISCELLANEOUS DETAILS FOR STREET CONSTRUCTION
CNO, STD 3 - MISCELLANEOUS DETAILS FOR STREET CONSTRUCTION
CNO, STD 4 - GUTTERBOTTOM AND CURB FOR STREET CONSTRUCTION
CNO, STD 8 - STANDARD DRIVEWAYS FOR STREET CONSTRUCTION
CNO, STD 9 - MISCELLANEOUS DETAILS FOR CATCH BASIN, MANHOLE AND
UTILITIES INSTALLATION
CNO, STD 14 - TYPICAL APPLICATION OF PAVEMENT MARKINGS
CNO, STD 15 - TYPICAL TRAFFIC SIGNAL-LOOP INSTALLATION, STREET NAME
SIGN LEGEND & BORDER
CNO, STD 13 - TYPICAL CONSTRUCTION ZONE FOR MINIMUM TRAFFIC
CONTROL LAYOUT
CNO, STD 12 - TYPICAL CONSTRUCTION ZONE FOR MINIMUM TRAFFIC
CONTROL LAYOUT
CNO, STD 11 - TYPICAL CONSTRUCTION ZONE FOR MINIMUM TRAFFIC
CONTROL LAYOUT
S&WB, DWG. NO. D-871 - GENERAL PLAN OF DRAIN MANHOLE FRAME & COVER
S&WB, DWG. NO. D-873A - DETAIL OF STD. DOUBLE VERTICAL CATCH BASIN
S&WB, DWG. NO. D-1359 - DETAIL OF STEPS FOR CONCRETE & BRICK
MANHOLES
S&WB, DWG. NO. D-870 - GENERAL SECTION OF STANDARD DRAIN BRICK
MANHOLE
R-169
R-170
N.O.D.P.W., DWG AM 00-106 UNDERGROUND CONSTRUCTION STANDARDS
STREET LIGHTING TYPICAL CONCRETE BUTT BASE POLE SETTING &
CABLE TERMINATION DETAILS SHEET (3 OF 3)
R-171
R-172
N.O.D.P.W., DWG AM 00-106 UNDERGROUND CONSTRUCTION STANDARDS
STREET LIGHTING TYPICAL CONCRETE BUTT BASE POLE SETTING & CABLE
TERMINATION DETAILS SHEET (1 OF 3) & (2 OF 3)
TYPICAL 8’ X 6’ BOX PLAN AND SECTION
TYPICAL 10’ X 8’ BOX PLAN AND SECTION
CROSS SECTIONS STA. 327+00 TO STA. 329+00
CROSS SECTIONS STA. 324+81 TO STA. 326+00
CROSS SECTIONS STA. 330+00 TO STA. 332+00
CROSS SECTIONS STA. 333+00 TO STA. 335+00
CROSS SECTIONS STA. 336+00 TO STA. 338+00
CROSS SECTIONS STA. 339+00 TO STA. 341+00
CROSS SECTIONS STA. 342+00 TO STA. 344+00
CROSS SECTIONS STA. 345+00 TO STA. 347+00
CROSS SECTIONS STA. 348+00 TO STA. 350+00
CROSS SECTIONS STA. 351+00 TO STA. 353+00
CROSS SECTIONS STA. 354+00 TO STA. 356+00
CROSS SECTIONS STA. 357+00 TO STA. 359+00
CROSS SECTIONS STA. 360+00 TO STA. 362+00
CROSS SECTIONS STA. 363+00 TO STA. 365+00
CROSS SECTIONS STA. 366+00 TO STA. 368+00
CROSS SECTIONS STA. 369+00 TO STA. 371+00
CROSS SECTIONS STA. 372+00 TO STA. 374+00
CROSS SECTIONS STA. 375+00 TO STA. 377+00
CROSS SECTIONS STA. 378+00 TO STA. 380+00
CROSS SECTIONS STA. 381+00 TO STA. 383+00
CROSS SECTIONS STA. 384+00 TO STA. 386+00
CROSS SECTIONS STA. 387+00 TO STA. 389+00
CROSS SECTIONS STA. 390+00 TO STA. 392+00
CROSS SECTIONS STA. 393+00 TO STA. 395+00
CROSS SECTIONS STA. 396+00 TO STA. 398+00
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .