LPV 9.2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The above numbered solicitation for LPV 9.2, Lake Pontchartrain, LA & Vicinity, Hurricane Protection Project, Fronting Protection and Breakwater Modification, Jefferson Lakefront, Pumping Stations No. 1 thru 4, Jefferson Parish, LA is hereby amended to incorporate contractor questions and answers.

PROPOSAL DUE DATE

The proposal due date is NOT extended.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-09-R-0065

X 9B. DATED (SEE ITEM 11)

31-Jul-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2009

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P8-09-R-0065

Question 1.

Bid Item for tension connectors (Section 00010) PS 1-4 - Please create unit item for tension connectors for pilings.

Response.

No, tension connectors are to be paid under “Furnishing Piling H, HP 14x73” and “Furnishing Piling H, HP 14x89”. See Spec section 31 62 16.00 12 paragraph 1.2.2

Question 2.

TRS Sheet Pile Tip Design (015300.0212, P.4 Paragraph 1.5.2) Although the TRS is referenced in both the plans and specifications as "Contractor Designed", both give minimum tip elevations for the TRS. Specification Section 01 53 00 .02 12 page 4, paragraph 1.5.2, states the "minimum sheet pile tip is elevation -60.0", while the plans for PS 1 (sheet G-16) and PS 2 (sheet G-15) state -48.1. PS 3 (sheet 2-25) and PS 4 (sheet C-05) state -

60.0. What elevations apply?

Response.

Pump Station 1 and 2 will be amended to show a "minimum sheet pile tip is elevation -60.0"

Question 3.

Soil (Sections 015300.01 and 015300.02) Reference Specification Sections 01 53 00.01 and 01 53 00.02 and soil boring details - The soil parameters for TRS and TFP design indicate impervious clays for a significant depth. Recent experience at some station locations indicate substantial pervious soils will/may be encountered.

Should the concept shown by the USACE of a single wall across the canal not allow for dewatering, would the USACE consider such a condition a change and result in a subsequent contract modification?

Response.

No, a contract modification will not be issued. The TRS dam shown on the plans is a suggested concept. The soil data provided is a general representation of the conditions where the TRS will be constructed, with the final TRS dam and dewatering designs being the sole responsibility of the Contractor.

Question 4.

Use of Spiral Welded Pipe (Section 33 05 00.00 12-2.11) Specification section 33 05 00.00 12 - 2.11 states in the last sentence of the first full paragraph that "Spiral welded pipe will not be allowed." This is in regards to all piping 36" - 96" in diameter as listed. I am hoping that excluding spirally welded pipe was an error and spiral welded pipe will be allowed on the subject project. Spiral welded steel pipe is the manufacturing

W912P8-09-R-0065 method of choice in large diameter pipe across the country and is much more economical than pipe from plate in the large diameters. This issue was brought to my attention late yesterday afternoon and I wanted to get clarification on the specifications. We would like to participate in the bid but as written would not be able to quote because of the clause.

Response.

The specs will be amended to allow both straight seam and spiral welded discharge pipe for both the temporary and permanent features.

Question 5 "Some of the cast iron gate sizes are non standard for cast iron. (no question on fabricated gates).

Can we quote roller gates in lieu of the cast iron sizes or can we adjust the cast iron sizes to standard sizes?"

Response:

Please bid the cast iron gates as shown on the plans. Roller gates will not be allowed.