This document contains questions and responses related to solicitation number W912P722B0006 for the FY22 Suisun Bay Channel and NY Slough maintenance dredging project. The work includes annual maintenance dredging of the Suisun Bay and NY Slough Channel to depths of -35 feet MLLW plus 1 foot of overdepth, as well as Bulls Head Channel to -37 feet MLLW plus 1 foot overdepth. Dredged material will be transported to a contractor-furnished beneficial reuse upland site. The solicitation is proceeding as a small business set-aside with bids due on June 13, 2022 at 1 PM PDT and will be publicly opened via WebEx. The estimated cost range is between $5-10 million. The U.S. Army Corps of Engineers Engineering District San Francisco is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUISUN BAY CHANNEL & NY SLOUGH

FY 22 MAINTENANCE DREDGING PROJECT

AS OF: 8 June 2022

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P722B0006

The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.

Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.

Changes to any previous responses in this document will be struck-through and new, updated responses will be provided as appropriate

RFI # Spec Section RFI (Question) Revised Responses

1 See Attachments

In order to determine which upland facility we can utilize, please provide the approved Soil Suitability Determination as well as the Soil Analysis Report approved by the DMMO.

Please refer to the Soil Suitability Determination and Soil Analysis Report approved by the DMMO attached.

2 See Attachments

Please indicate if the material is considered cover or foundation material.

Please refer to the Soil Suitability Determination approved by DMMO attached. The sediment is suitable for placement as cover material at upland/beneficial re-use sites.

Section

01 57 19.01 43 Paragraph 1.8

Please provide all applicable environmental permits including but not limited to:

San Francisco Regional Water Quality Control Board (SFRWQCB) - Programmatic Water Quality Certification 2020-2024

Bay Conservation Development Commission (BCDC)

– Consistency Determination Consistency Notification Letter of Agreement 2020-2024

Please refer to the San Francisco Regional Water Quality Control Board (SFRWQCB) - Programmatic Water Quality Certification 2020- 2024 and Bay Conservation Development Commission (BCDC) – Consistency Determination Consistency Notification Letter of Agreement 2020-2024 attached.

SUISUN BAY CHANNEL & NY SLOUGH

FY 22 MAINTENANCE DREDGING PROJECT

AS OF: 8 June 2022

QUESTIONS & RESPONSES

SOLICITATION NUMBER W912P722B0006

4 Section 01 57 19.97 43

Other than supporting fish monitoring performed by the Government by installing and operating four video cameras on dredge scows, please clarify if the Contractor is responsible for any monitoring of any kind (species, water, etc.) for the project.

Please refer to Section 01 57 19.97 43. The Contractor is not responsible for any monitoring activities other than installing and operating the video cameras.

Section 00 10 00

Pricing Schedule

Please clarify why the Dredging of Reach 3E is part of CLIN 0005 when it is more contiguous with CLIN 0004. It is suggested that the Dredging of Reach 3E be included with CLIN 0004.

The bid schedule will not be revised. Please bid in accordance with the pricing schedule in Section 00 10 00.

00 21 00

Will it be acceptable for a newly formed JV company to each submit its own Financial Statement to satisfy the requirement of Line-Item D?

Yes

01 57 19.97 43

SECTION 01 57 19.97 43 FISH ENTRAINMENT

MONITORING, PART 3 EXECUTION, 3.1 Video Cameras indicates the following “Cameras and all accessories shall be returned to the COR upon completion of all required tasks.”

Can you please clarify if the intent of the section is to have the Contractor retain the cameras and accessories at the end of the contract or if they will become the property of the Government.

Please refer to Section 01 57 19.97 43.

Cameras and all accessories shall be returned to the COR upon completion of all required tasks.

As a result, the cameras and accessories will become the property of the Government.